SOW_Att_1_-_202_Drawings.pdf
PDF 15 MB Posted
- Attached to
- Heating, Ventilation, and Air Conditioning Construction Federal contract opportunity
- Solicitation number
- SB134118RP0004
About this file
SOW Att 1 - 202 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A3_RFI_9_-_30_and_Responses.pdf | ||
| A2_SF_1442.pdf | ||
| Re_A2_-_RFI_No._8_-_Site_Visit_Attendance_Sheet.pdf | ||
| Re_A2_-_RFI_No._6_-_Rev_SOW_Att_3_-_301_Drawings.pdf | ||
| A2_RFI_1_-_8_&_Responses.pdf | ||
| Re_A2_-_RFI_No._1_-_Rev_SOW_Att_9_-_Humidifier_Specifications.pdf | ||
| SOW_Att_7_-_218_Humidifier_Bar_Drawings.pdf | ||
| SOW_Att_9_-_Humidifier_Specifications.pdf | ||
| FormSF1442_Released_13APR2018.pdf | ||
| SOW_Att_10_-_Division_1_-_Entire_Procurement.pdf | ||
| SOW_Att_8_-_219_Humidifier_Bar_Drawings.pdf | ||
| SOW_Att_5_-_215_Humidifier_Bar_Drawings.pdf | ||
| SOW_Att_4_-_301_Specifications.pdf | ||
| SOW_Att_6_-_217_Humidifier_Bar_Drawings.pdf | ||
| SOW_Att_2_-_202_Specifications.pdf | ||
| SOW_Att_3_-_301_Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
XXXXX
WX
A101
1 SIM
A101
SIM
A.F.F.
XXX
1' - 0"
ROOM NAME
PXXXX
CX
XX
XXA7XX
A101
1 SIM
DOOR NUMBER
RX
DX
XX
XX
FX
CL
WINDOW NUMBER
DETAIL NUMBER
DRAWING SHOWN ON
SECTION NUMBER
DRAWING SHOWN ON
CEILING TYPE
CEILING HEIGHT ABOVE FINISHED FLOOR
ROOM NAME & NUMBER
WORK POINT, CONTROL POINT, OR
DATUM POINT
REVISION NUMBER
PARTITION TYPE DESIGNATION
CONSTRUCTION NOTE - SEE DWG. AXXX
REFLECTED CEILING PLAN NOTE
DEMOLITION PLAN NOTE
NORTH ARROW
FINISH PLAN NOTE
EXTERIOR ELEVATION TAG
SECTION DETAIL
CENTERLINE
COLUMN LINE REFERENCE
BREAK LINE
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
NEW SWING DOOR PER SCHEDULE
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE REMOVED
NEW PARTITION AS SCHEDULED
2-HOUR FIRE SEPARATION
1-HOUR FIRE SEPARATION
1-HOUR SMOKE BARRIER
CORRIDOR SEPARATION - SEE DETAIL
DRAWING XX/A6XX FOR MORE
INFORMATION
LIMIT LINE - SCOPE OF WORK
EARTH
DRAINAGE FILL
SAND, MORTAR, PLASTER, GWB
CONCRETE
BRICK
CONCRETE MASONRY UNIT(S)
STRUCTURAL STEEL, METAL
FINISHED WOOD
CONTINUOUS WOOD BLOCKING
INTERRUPTED WOOD BLOCKING
PLYWOOD
BATT INSULATION
SB SB
XX
X
A7XX INTERIOR ELEVATION TAG
REVISION CLOUD
LSX LIFE SAFETY PLAN NOTE
X DETAIL NOTE
ABBREVIATIONS SYMBOLS LEGEND EXISTING CONDITIONS
BUILDING CODES
CONSTRUCTION LIFE SAFETY
GENERAL CONSTRUCTION NOTESNORTH
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
cr goodman associates 912 commerce road annapolis, md 21401 p: 410-841-2570 F: 410-841-2575 www.crgoodmanassociates.com
ARCHITECTURAL CONSULTANT:
PIPE ENCLOSURE
INTAKE AIR PLENUM
D4 202-049
B4 202-050
B5 202-050
A1
202-049
202-050
MECHANICAL
EQUIPMENT ROOM #3
ROOM 303
35' - 1 5 16"
32' - 4 1/2"
2ND FLOOR
LOWER ROOF
BELOW
23' - 6 1/2"
AREA OF
ARCHITECTURAL
WORK
B3
2ND FLOOR
UPPER ROOF
BELOW
A. DEMOLITION PLANS ARE PROVIDED TO INDICATE A GENERAL
DEMOLITION SCOPE ONLY.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION AND
RELATED CONDITIONS PRIOR TO START-UP OF DEMOLITION AND NEW
CONSTRUCTION. ALL DISCREPANCIES SHALL BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE ARCHITECT.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
DEMOLITION WITH THE REQUIREMENTS OF ALL PORTIONS OF THE
CONSTRUCTION DOCUMENTS AND SHALL PERFORM ALL DEMOLITION AS
SHOWN AND/OR NECESSARY TO COMPLETE ALL REQUIRED RENOVATION
AND NEW CONSTRUCTION.
D. AT POINTS OF CONSTRUCTION ACCESS, CONTRACTOR TO PROVIDE
LABOR AND MATERIALS TO REPAIR ALL DISTURBED ELEMENTS.
E. PROVIDE NEAT, CLOSE FITTING OPENINGS FOR ALL MECHANICAL,
PLUMBING, AND ELECTRICAL PENETRATIONS.
F. REMOVE ALL DIRT, DEBRIS, AND FOREIGN MATTER FROM EXISTING
SURFACES TO RECEIVE NEW DIRECT APPLIED FINISHES. CLEAN TO EXTENT
RECOMMENDED BY FINISH MANUFACTURER.
G. SEE STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS
FOR ADDITIONAL DEMOLITION REQUIREMENTS WHICH TAKE PLACE WITHIN
AND/OR OUTSIDE OF THE ARCHITECTURAL PROJECT SCOPE.
DEMOLITION SPECIFIC NOTES
D1
D2
D3
D4
PRIOR TO DEMOLITION CLEAN ALL MATCHING BRICK ON 3RD FLOOR EAST
ELEVATION PER SOI APPROVED METHODS USING THE GENTLEST MEANS
POSSIBLE SUCH AS LOW PRESSURE WATER AND DETERGENTS,
SCRUBBING WITH NATURAL BRISTLE BRUSHES. PRIOR TO CLEANING, TEST
POSSIBLE CLEANING METHODS IN INCONSPICUOUS AREA TO DETERMINE
THE GENTLEST EFFECTIVE METHOD.
REMOVE FACE BRICK FROM EXISTING WALL USING HAND TOOLS TO
MINIMIZE DAMAGE FROM ELECTRIC TOOLS. REMOVE IN A STAGGERED
PATTERN IN ORDER FOR NEW BRICK TO BE TOOTHED IN. PREP SURFACE
OF OPENING BY REMOVING EXCESS MORTAR FOR INSTALLATION OF NEW
MATCHING BRICK INFILL.
REMOVE EXISTING CONCRETE MASONRY UNIT WALL CONSTRUCTION
TAKING CARE NOT TO DAMAGE MATERIAL TO BE RETAINED. PREP
OPENING FOR STRUCTURAL BRACING.
REMOVE EXISTING LOUVERS AND FRAMES TAKING CARE NOT TO DAMAGE
ALLOWING FOR REUSE / REINSTALLATION
REMOVE EXISTING INTAKE AIR PLENUM TO CREATE CLEARANCE FOR
REMOVAL OF AIR HANDLER UNITS
REMOVE EXISTING PIPE ENCLOSURE CONCRETE MASONRY UNIT WALL
REMOVE EXISTING
" CHECKER PLATE PIPE ENCLOSURE COVER
REMOVE EXISTING WOOD PLATFORM WALKWAY AND STAIRS
D5
DEMOLITION GENERAL NOTES
D6
D7
D8
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
EXISTING DEMOLITION
cr goodman associates 912 commerce road annapolis, md 21401 p: 410-841-2570 F: 410-841-2575
LIMIT OF EXTERIOR
ARCHITECTURAL
RENOVATION
2ND FLOOR LOWER ROOF
23' - 6 1/2"
2ND FLOOR UPPER ROOF
32' - 4 1/2"
3RD FLOOR ROOF
53' - 11 1/8"
4TH LEVEL ROOF
62' - 4 1/2"
5TH LEVEL ROOF
79'' - 0 1/2"
HIGH BAY ROOF
97' - 5 3/4"
3RD FLOOR
35' - 1 5/16"
'-9
1'-91 2" 2'-9" 1'-91
2"
6'-4"
LIMIT OF EXTERIOR
ARCHITECTURAL
RENOVATION
1'-4" 1'-4"
1' -6
'-9
MIN.MIN.
DEMOLITION SPECIFIC NOTES
D1
D2
D3
D4
PRIOR TO DEMOLITION CLEAN ALL MATCHING BRICK ON 3RD FLOOR EAST
ELEVATION PER SOI APPROVED METHODS USING THE GENTLEST MEANS
POSSIBLE SUCH AS LOW PRESSURE WATER AND DETERGENTS,
SCRUBBING WITH NATURAL BRISTLE BRUSHES. PRIOR TO CLEANING, TEST
POSSIBLE CLEANING METHODS IN INCONSPICUOUS AREA TO DETERMINE
THE GENTLEST EFFECTIVE METHOD.
REMOVE FACE BRICK FROM EXISTING WALL USING HAND TOOLS TO
MINIMIZE DAMAGE FROM ELECTRIC TOOLS. REMOVE IN A STAGGERED
PATTERN IN ORDER FOR NEW BRICK TO BE TOOTHED IN. PREP SURFACE
OF OPENING BY REMOVING EXCESS MORTAR FOR INSTALLATION OF NEW
MATCHING BRICK INFILL.
REMOVE EXISTING CONCRETE MASONRY UNIT WALL CONSTRUCTION
TAKING CARE NOT TO DAMAGE MATERIAL TO BE RETAINED. PREP
OPENING FOR STRUCTURAL BRACING.
REMOVE EXISTING LOUVERS AND FRAMES TAKING CARE NOT TO DAMAGE,
ALLOWING FOR REUSE / REINSTALLATION.
REMOVE EXISTING INTAKE AIR PLENUM TO CREATE CLEARANCE FOR
REMOVAL OF AIR HANDLER UNITS.
D5
A. DEMOLITION PLANS ARE PROVIDED TO INDICATE A GENERAL
DEMOLITION SCOPE ONLY.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION AND
RELATED CONDITIONS PRIOR TO START-UP OF DEMOLITION AND NEW
CONSTRUCTION. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE ARCHITECT.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
DEMOLITION WITH THE REQUIREMENTS OF ALL PORTIONS OF THE
CONSTRUCTION DOCUMENTS AND SHALL PERFORM ALL DEMOLITION AS
SHOWN AND/OR NECESSARY TO COMPLETE ALL REQUIRED RENOVATION
AND NEW CONSTRUCTION.
D. AT POINTS OF CONSTRUCTION ACCESS, CONTRACTOR TO PROVIDE
LABOR AND MATERIALS TO REPAIR ALL DISTURBED ELEMENTS.
E. PROVIDE NEAT, CLOSE FITTING OPENINGS FOR ALL MECHANICAL,
PLUMBING, AND ELECTRICAL PENETRATIONS.
F. REMOVE ALL DIRT, DEBRIS, AND FOREIGN MATTER FROM EXISTING
SURFACES TO RECEIVE NEW DIRECT APPLIED FINISHES. CLEAN TO EXTENT
RECOMMENDED BY FINISH MANUFACTURER.
G. SEE STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION REQUIREMENTS WHICH TAKE PLACE WITHIN
AND/OR OUTSIDE OF THE ARCHITECTURAL PROJECT SCOPE.
DEMOLITION GENERAL NOTES
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
cr goodman associates 912 commerce road annapolis, md 21401 p: 410-841-2570 F: 410-841-2575
2' -1
D1
D2
D3
D4
PRIOR TO DEMOLITION CLEAN ALL MATCHING BRICK ON 3RD FLOOR EAST
ELEVATION PER SOI APPROVED METHODS USING THE GENTLEST MEANS
POSSIBLE SUCH AS LOW PRESSURE WATER AND DETERGENTS,
SCRUBBING WITH NATURAL BRISTLE BRUSHES. PRIOR TO CLEANING, TEST
POSSIBLE CLEANING METHODS IN INCONSPICUOUS AREA TO DETERMINE
THE GENTLEST EFFECTIVE METHOD.
REMOVE FACE BRICK FROM EXISTING WALL USING HAND TOOLS TO
MINIMIZE DAMAGE FROM ELECTRIC TOOLS. REMOVE IN A STAGGERED
PATTERN IN ORDER FOR NEW BRICK TO BE TOOTHED IN. PREP SURFACE
OF OPENING BY REMOVING EXCESS MORTAR FOR INSTALLATION OF NEW
MATCHING BRICK INFILL.
REMOVE EXISTING CONCRETE MASONRY UNIT WALL CONSTRUCTION
TAKING CARE NOT TO DAMAGE MATERIAL TO BE RETAINED. PREP
OPENING FOR STRUCTURAL BRACING.
REMOVE EXISTING LOUVERS AND FRAMES TAKING CARE NOT TO DAMAGE
ALLOWING FOR REUSE / REINSTALLATION
REMOVE EXISTING INTAKE AIR PLENUM TO CREATE CLEARANCE FOR
REMOVAL OF AIR HANDLER UNITS
REMOVE EXISTING PIPE ENCLOSURE CONCRETE MASONRY UNIT WALL
REMOVE EXISTING 6WF 15.5 STEEL BEAMS AT PIPE ENCLOSURE
REMOVE EXISTING
" CHECKER PLATE PIPE ENCLOSURE COVER
D5
A. DEMOLITION PLANS ARE PROVIDED TO INDICATE A GENERAL
DEMOLITION SCOPE ONLY.
B. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION AND
RELATED CONDITIONS PRIOR TO START-UP OF DEMOLITION AND NEW
CONSTRUCTION. ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE
ATTENTION OF THE ARCHITECT.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING
DEMOLITION WITH THE REQUIREMENTS OF ALL PORTIONS OF THE
CONSTRUCTION DOCUMENTS AND SHALL PERFORM ALL DEMOLITION AS
SHOWN AND/OR NECESSARY TO COMPLETE ALL REQUIRED RENOVATION
AND NEW CONSTRUCTION.
D. AT POINTS OF CONSTRUCTION ACCESS, CONTRACTOR TO PROVIDE
LABOR AND MATERIALS TO REPAIR ALL DISTURBED ELEMENTS.
E. PROVIDE NEAT, CLOSE FITTING OPENINGS FOR ALL MECHANICAL,
PLUMBING, AND ELECTRICAL PENETRATIONS.
F. REMOVE ALL DIRT, DEBRIS, AND FOREIGN MATTER FROM EXISTING
SURFACES TO RECEIVE NEW DIRECT APPLIED FINISHES. CLEAN TO EXTENT
RECOMMENDED BY FINISH MANUFACTURER.
G. SEE STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR
ADDITIONAL DEMOLITION REQUIREMENTS WHICH TAKE PLACE WITHIN
AND/OR OUTSIDE OF THE ARCHITECTURAL PROJECT SCOPE.
DEMOLITION GENERAL NOTES
D6
D7
D8
EXISTING DEMOLITION
DEMOLITION SPECIFIC NOTES
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
cr goodman associates 912 commerce road annapolis, md 21401 p: 410-841-2570 F: 410-841-2575
INTAKE AIR PLENUM
A1
202-049
B3 202-052
MECHANICAL
EQUIPMENT ROOM #3
ROOM 303
35' - 1 5 16"
2ND FLOOR
LOWER ROOF
BELOW
23' - 6 1/2"
AREA OF
ARCHITECTURAL
NEW WORK
32' - 4 1/2"
2ND FLOOR
UPPER ROOF
BELOW
EXISTING NEW WORK
NEW WORK SPECIFIC NOTES
C1
C2
C3
C4
INSTALL NEW BRICK INFILL TO BE TOOTHED IN, FULL EXTENT OF EXPOSED
WALL TO MATCH EXISTING BRICK SIZE, COLOR, FINISH, AND BOND
PATTERN. BRICK TO BE USED IS GLEN-GERY ROME GREY WITH SMOOTH
FINISH, AS APPROVED BY THE NIST PROJECT COR. MATCH EXISTING
MORTAR JOINT WIDTH, PROFILE, MORTAR COLOR, AND COMPRESSIVE
STRENGTH.
INSTALL NEW CONCRETE MASONRY UNIT WALL CONSTRUCTION TO MATCH
EXISTING, FULL EXTENT OF EXPOSED WALL. MATCH EXISTING MORTAR
JOINT WIDTH, PROFILE, COLOR, AND COMPRESSIVE STRENGTH.
REINSTALL EXISTING LOUVERS AND FRAMES SALVAGED DURING
DEMOLITION.
INSTALL INTAKE AIR PLENUM SUPPLY FOR AIR HANDLER UNITS
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING OR CURRENTCONSTRUCTION
RELATED CONDITIONS PRIOR TO THE START OF NEW CONSTRUCTION. ANY AND
ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT.
B. MECHANICAL, ELECTRICAL, AND PLUMBING (M.E.P.) ITEMS AND EQUIPMENT
APPEARING ON ARCHITECTURAL DRAWINGS ARE SHOWN FOR CLARITY, AND
ARE NOT MEANT TO BE ALL INCLUSIVE; SEE APPROPRIATE M.E.P. SHEETS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL PATCH, AND REPAIR ALL EXISTING WALLS DAMAGED OR
DISTURBED AS A RESULT OF DEMOLITION / CONSTRUCTION; TO MATCH
ADJACENT.
D. PATCH AND REPAIR ALL PENETRATIONS IN WALLS RESULTING FROM THE
REMOVAL OF MECHANICAL/ELECTRICAL FIXTURES TO MATCH ADJACENT
CONSTRUCTION. PREPARE THE AREA FOR NEW FINISHES.
E. EVERY EFFORT HAS BEEN MADE TO IDENTIFY THOSE DIMENSIONS WHICH MAY
VARY WITH +/-. DIMENSIONS NOT SO NOTED ARE INTENDED TO BE HELD.
ALL DIMENSIONS, HOWEVER, SHALL BE FIELD VERIFIED BY THE CONTRACTOR
PRIOR TO FABRICATION OR INSTALLATION OF BUILDING COMPONENTS.
F. ALL WORK SHALL CONFORM TO LOCAL BUILDING CODES AND REGULATIONS
AND SHALL BE INSTALLED ACCORDING TO THE REQUIREMENTS AND DECISIONS
OF ALL LOCAL AUTHORITIES. IF ANY CONTRACTOR OR SUBCONTRACTOR
PERFORMS ANY WORK CONTRARY TO THE LOCAL BUILDING CODES,
ORDINANCES, RULES OR REGULATIONS WITHOUT PRIOR WRITTEN NOTICE TO THE
OWNER, THE CONTRACTOR SHALL BEAR ALL COSTS ARISING THERE FROM.
G. COORDINATE WITH MECHANICAL & ELECTRICAL REQUIREMENTS FOR
CONDITIONS THAT WILL DISTURB EXISTING CONDITIONS AND WHICH WILL
REQUIRE SELECTIVE DEMOLITION, PATCHING, AND FINISHING OUTSIDE OF
THAT SHOWN ON THE ARCHITECTURAL DRAWINGS.
H. BUILDING 202 IS A CONTRIBUTORY RESOURCE WITHIN THE NIST NATIONAL
REGISTER HISTORIC DISTRICT. ALL WORK MUST COMPLY WITH THE REHABILITATION
GUIDELINES OF THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE
TREATMENT OF HISTORIC STRUCTURES. THE DESIGN, AS SHOWN HAS BEEN
APPROVED BY THE MARYLAND HISTORICAL TRUST. THEREFORE, SHOULD FIELD
CONDITIONS DICTATE ANY CHANGES TO THE DESIGN AS SHOWN, ADVANCE
APPROVAL SHALL BE REQUIRED.
NEW WORK GENERAL NOTES
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
cr goodman associates 912 commerce road annapolis, md 21401 p: 410-841-2570 F: 410-841-2575
NEW WORK SPECIFIC NOTES
C1
C2
C3
C4
INSTALL W 6 X 9 STEEL BEAM
INSTALL
" STEEL HUNG PLATE TO MATCH WALL WIDTH - 1"
INSTALL SOLID BRICK INFILL AROUND STEEL BEAM
INSTALL NEW CONCRETE MASONRY UNIT WALL CONSTRUCTION BETWEEN
LOUVER OPENINGS. MATCH EXISTING MORTAR JOINT WIDTH, PROFILE,
COLOR, AND COMPRESSIVE STRENGTH.
INSTALL NEW BRICK INFILL TO BE TOOTHED IN, FULL EXTENT OF EXPOSED
WALL TO MATCH EXISTING BRICK SIZE, COLOR, FINISH, AND BOND
PATTERN. BRICK TO BE USED IS GLEN-GERY ROME GREY WITH SMOOTH
FINISH, AS APPROVED BY THE NIST PROJECT COR. MATCH EXISTING
MORTAR JOINT WIDTH, PROFILE, MORTAR COLOR, AND COMPRESSIVE
STRENGTH.
REINSTALL EXISTING LOUVERS AND FRAMES SALVAGED DURING
DEMOLITION.
INSTALL INTAKE AIR PLENUM SUPPLY FOR AIR HANDLER UNITS
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING OR CURRENTCONSTRUCTION
RELATED CONDITIONS PRIOR TO THE START OF NEW CONSTRUCTION. ANY AND
ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT.
B. MECHANICAL, ELECTRICAL, AND PLUMBING (M.E.P.) ITEMS AND EQUIPMENT
APPEARING ON ARCHITECTURAL DRAWINGS ARE SHOWN FOR CLARITY, AND
ARE NOT MEANT TO BE ALL INCLUSIVE; SEE APPROPRIATE M.E.P. SHEETS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL PATCH, AND REPAIR ALL EXISTING WALLS DAMAGED OR
DISTURBED AS A RESULT OF DEMOLITION / CONSTRUCTION; TO MATCH
ADJACENT.
D. PATCH AND REPAIR ALL PENETRATIONS IN WALLS RESULTING FROM THE
REMOVAL OF MECHANICAL/ELECTRICAL FIXTURES TO MATCH ADJACENT
CONSTRUCTION. PREPARE THE AREA FOR NEW FINISHES.
E. EVERY EFFORT HAS BEEN MADE TO IDENTIFY THOSE DIMENSIONS WHICH MAY
VARY WITH +/-. DIMENSIONS NOT SO NOTED ARE INTENDED TO BE HELD.
ALL DIMENSIONS, HOWEVER, SHALL BE FIELD VERIFIED BY THE CONTRACTOR
PRIOR TO FABRICATION OR INSTALLATION OF BUILDING COMPONENTS.
F. ALL WORK SHALL CONFORM TO LOCAL BUILDING CODES AND REGULATIONS
AND SHALL BE INSTALLED ACCORDING TO THE REQUIREMENTS AND DECISIONS
OF ALL LOCAL AUTHORITIES. IF ANY CONTRACTOR OR SUBCONTRACTOR
PERFORMS ANY WORK CONTRARY TO THE LOCAL BUILDING CODES,
ORDINANCES, RULES OR REGULATIONS WITHOUT PRIOR WRITTEN NOTICE TO THE
OWNER, THE CONTRACTOR SHALL BEAR ALL COSTS ARISING THERE FROM.
G. COORDINATE WITH MECHANICAL & ELECTRICAL REQUIREMENTS FOR
CONDITIONS THAT WILL DISTURB EXISTING CONDITIONS AND WHICH WILL
REQUIRE SELECTIVE DEMOLITION, PATCHING, AND FINISHING OUTSIDE OF
THAT SHOWN ON THE ARCHITECTURAL DRAWINGS.
H. BUILDING 202 IS A CONTRIBUTORY RESOURCE WITHIN THE NIST NATIONAL
REGISTER HISTORIC DISTRICT. ALL WORK MUST COMPLY WITH THE REHABILITATION
GUIDELINES OF THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE
TREATMENT OF HISTORIC STRUCTURES. THE DESIGN, AS SHOWN HAS BEEN
APPROVED BY THE MARYLAND HISTORICAL TRUST. THEREFORE, SHOULD FIELD
CONDITIONS DICTATE ANY CHANGES TO THE DESIGN AS SHOWN, ADVANCE
APPROVAL SHALL BE REQUIRED.
NEW WORK GENERAL NOTES
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
cr goodman associates 912 commerce road annapolis, md 21401 p: 410-841-2570 F: 410-841-2575 www.crgoodmanassociates.com
ARCHITECTURAL CONSULTANT:
EXISTING NEW WORK
C5
C6
C7
REINFORCED
FABRIC FLASHING
TURN UP & DAM ENDS
WEEP HOLES
CAULK
ALUMINUM
LOUVER
BRICK VENEER
CONCRETE
MASONRY UNIT
2" STEEL HUNG PLATE
TO MATCH WALL
WIDTH -1"
SOLID MASONRY
INFILL AROUND
BEAM
W 6 X 9
STEEL BEAM
S.S. DRIP EDGE
DRYPACK NON-SHRINK
GROUT AS REQUIRED
'-9
1'-91 2" 2'-9" 1'-91
2"
6'-4"
LIMIT OF EXTERIOR
ARCHITECTURAL
RENOVATION
ALUMINUM SILL
CAULK
ALUMINUM
LOUVER
BRICK VENEER
WATERPROOFING
MEMBRANE
CONCRETE FILL
GROUT
CONCRETE
MASONRY UNIT
ALUMINUM
LOUVER
BRICK
VENEER
CONCRETE
MASONRY UNIT
ALUMINUM SILL
BEYOND
GROUT OPEN CELLS OF CMU
16" W X FULL HEIGHT OF OPENING
TO UNDERSIDE OF LINTEL BEARING
NEW WORK SPECIFIC NOTES
C1
C2
C3
INSTALL NEW BRICK INFILL TO BE TOOTHED IN, FULL EXTENT OF EXPOSED
WALL TO MATCH EXISTING BRICK SIZE, COLOR, FINISH, AND BOND
PATTERN. BRICK TO BE USED IS GLEN-GERY ROME GREY WITH SMOOTH
FINISH, AS APPROVED BY THE NIST PROJECT COR. MATCH EXISTING
MORTAR JOINT WIDTH, PROFILE, MORTAR COLOR, AND COMPRESSIVE
STRENGTH.
INSTALL NEW CONCRETE MASONRY UNIT WALL CONSTRUCTION BETWEEN
LOUVER OPENINGS & FULL EXTENT OF EXPOSED WALL TO MATCH
EXISTING MORTAR JOINT WIDTH, PROFILE, COLOR, AND COMPRESSIVE
STRENGTH.
REINSTALL EXISTING LOUVERS AND FRAMES SALVAGED DURING
DEMOLITION.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING OR CURRENTCONSTRUCTION
RELATED CONDITIONS PRIOR TO THE START OF NEW CONSTRUCTION. ANY AND
ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT.
B. MECHANICAL, ELECTRICAL, AND PLUMBING (M.E.P.) ITEMS AND EQUIPMENT
APPEARING ON ARCHITECTURAL DRAWINGS ARE SHOWN FOR CLARITY, AND
ARE NOT MEANT TO BE ALL INCLUSIVE; SEE APPROPRIATE M.E.P. SHEETS FOR
ADDITIONAL INFORMATION.
C. CONTRACTOR SHALL PATCH, AND REPAIR ALL EXISTING WALLS DAMAGED OR
DISTURBED AS A RESULT OF DEMOLITION / CONSTRUCTION; TO MATCH
ADJACENT.
D. PATCH AND REPAIR ALL PENETRATIONS IN WALLS RESULTING FROM THE
REMOVAL OF MECHANICAL/ELECTRICAL FIXTURES TO MATCH ADJACENT
CONSTRUCTION. PREPARE THE AREA FOR NEW FINISHES.
E. EVERY EFFORT HAS BEEN MADE TO IDENTIFY THOSE DIMENSIONS WHICH MAY
VARY WITH +/-. DIMENSIONS NOT SO NOTED ARE INTENDED TO BE HELD.
ALL DIMENSIONS, HOWEVER, SHALL BE FIELD VERIFIED BY THE CONTRACTOR
PRIOR TO FABRICATION OR INSTALLATION OF BUILDING COMPONENTS.
F. ALL WORK SHALL CONFORM TO LOCAL BUILDING CODES AND REGULATIONS
AND SHALL BE INSTALLED ACCORDING TO THE REQUIREMENTS AND DECISIONS
OF ALL LOCAL AUTHORITIES. IF ANY CONTRACTOR OR SUBCONTRACTOR
PERFORMS ANY WORK CONTRARY TO THE LOCAL BUILDING CODES,
ORDINANCES, RULES OR REGULATIONS WITHOUT PRIOR WRITTEN NOTICE TO THE
OWNER, THE CONTRACTOR SHALL BEAR ALL COSTS ARISING THERE FROM.
G. COORDINATE WITH MECHANICAL & ELECTRICAL REQUIREMENTS FOR
CONDITIONS THAT WILL DISTURB EXISTING CONDITIONS AND WHICH WILL
REQUIRE SELECTIVE DEMOLITION, PATCHING, AND FINISHING OUTSIDE OF
THAT SHOWN ON THE ARCHITECTURAL DRAWINGS.
H. BUILDING 202 IS A CONTRIBUTORY RESOURCE WITHIN THE NIST NATIONAL
REGISTER HISTORIC DISTRICT. ALL WORK MUST COMPLY WITH THE REHABILITATION
GUIDELINES OF THE SECRETARY OF THE INTERIOR'S STANDARDS FOR THE
TREATMENT OF HISTORIC STRUCTURES. THE DESIGN, AS SHOWN HAS BEEN
APPROVED BY THE MARYLAND HISTORICAL TRUST. THEREFORE, SHOULD FIELD
CONDITIONS DICTATE ANY CHANGES TO THE DESIGN AS SHOWN, ADVANCE
APPROVAL SHALL BE REQUIRED.
NEW WORK GENERAL NOTES
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
cr goodman associates 912 commerce road annapolis, md 21401 p: 410-841-2570 F: 410-841-2575
FIRE DAMPER WITH ACCESS DOOR
TEMPERATURE SENSOR
DUCTWORK TURNED DOWN OR AWAY
DUCTWORK TURNED UP OR TOWARDS
FD
EXHAUST AIR DUCTWORK
RETURN AIR DUCTWORK
SUPPLY AIR DUCTWORK
DUCTWORK
AIR FLOW DIRECTION
MECHANICAL EQUIPMENT IDENTIFICATION
NEW WORK PLAN NOTE IDENTIFICATION
FLEXIBLE DUCT CONNECTION
DETAIL IDENTIFICATION
DETAIL NUMBER AND DRAWING NUMBER AS INDICATED
MECHANICAL SYMBOLS
END OF DEMOLITION
POINT OF CONNECTION TO EXISTING
EXISTING TO BE REMOVED
NEW WORK
EXISTING TO REMAIN
COLD WATER PIPE
CONDENSATE DRAIN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE TURNED DOWN
PIPE TURNED UP
CHECK VALVE
BALANCING VALVE
ATC CONTROL VALVE
SHUT-OFF VALVE
STRAINER WITH 3/4" DRAIN VALVE AND CAP
HEATING WATER SUPPLY PIPING
HEAT WATER RETURN PIPING
LOW PRESSURE STEAM SUPPLY PIPING
CONDENSATE RETURN PIPING
SD
BDD
U DOOR UNDERCUT
SMOKE DAMPER
BACKDRAFT DAMPER
M-6
SD
LOW PRESSURE STEAM CONDENSATE PIPING
MEDIUM PRESSURE STEAM CONDENSATE PIPING
MEDIUM PRESSURE STEAM SUPPLY PIPING
HIGH PRESSURE STEAM CONDENSATE PIPING
HIGH PRESSURE STEAM SUPPLY PIPING
MECHANICAL ABBREVIATIONS
ABV
ACU
A/D
AFF
AHU
AI
AO
ATC
BAS
BHP
BOD
BDD
BR/S
CA
CC
CLG
CP
CHWR
CHWS
CSR
CW
CV
CD
DI
ABOVE
AIR CONDITIONING UNIT
ACCESS DOOR
ABOVE FINISHED FLOOR
AIR HANDLING UNIT
ANALOG INPUT
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROL
BUILDING AUTOMATION SYSTEM
BRAKE HORSEPOWER
BOTTOM OF DUCT
BACK DRAFT DAMPER
BRINE SUPPLY/RETURN
COMPRESSED AIR
COOLING COIL
CEILING
CONDENSATE PUMP
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CURRENT SENSING RELAY
DOMESTIC COLD WATER
CONTROL VALVE
CONDENSATE PIPING
DIGITAL INPUT
DN
(E)
EA
EF
ER
ES
FC
FDR
FE
FL
FO
GE
H
HC
HWR
HWS
LMC
MOD
MHP
MVD
NC
NO
DOWN
EXISTING
EXHAUST AIR
EXHAUST FAN
BRINE SPRAY DRAIN
BRINE SPRAY SUPPLY
FAIL CLOSED
FLOOR DRAIN
FLOW MEASUREMENT ELEMENT
FAIL IN LAST POSITION
FAIL OPEN
GENERAL EXHAUST
HUMIDIFIER
HEATING COIL
HEATING WATER RETURN
HEATING WATER SUPPLY
LAB MODULE CONTROLLER
MOTORIZED DAMPER
MOTOR HORSEPOWER
MANUAL VOLUME DAMPER
NORMALLY CLOSED
NORMALLY OPEN
OA
OAT
OED
PA
PC
PRV
RA
RAT
RHC
RHT
(R)
(X)
SA
SAT
SF
S/L
SP
SS
ST
T/A
TEC
TOD
UH
VFD
OUTSIDE AIR
OUTSIDE AIR TEMPERATURE
OPEN ENDED DUCT WITH 1/2"x1/2" FRAMED WIRE MESH.
PNEUMATIC CONTROL COMPRESSED AIR
PRE-HEAT COIL
PRESSURE REDUCING VALVE
RETURN AIR
RETURN AIR TEMPERATURE
REHEAT COIL
REHEAT TEMPERATURE
RELOCATE / RELOCATED
REMOVE EXISTING
SUPPLY AIR
SUPPLY AIR TEMPERATURE
SUPPLY FAN
SOUND LINING
STATIC PRESSURE SENSOR
STAINLESS STEEL
STEAM TRAP
TRANSFER AIR ABV CEILING
TERMINAL EQUIPMENT CONTROLLER
TOP OF DUCT
UNIT HEATER
VARIABLE FREQUENCY DRIVE
THERMOMETER IN THERMOWELL
F
ATC FLOW METER
ATC PRESSURE SENSOR
ATC IMMERSION TEMPERATURE SENSOR
P
T
T
FLEXIBLE PIPE CONNECTION
PRESSURE / TEMPERATURE RELIEF VALVE
PRESSURE GAUGE W/ ISOLATION VALVE
PIPE UNION
DRAIN VALVE W/ HOSE CONNECTION
AIR VENT
CHWS
CHWR
CD
STORM WATER PIPE
HWS
HWR
CR
HPS
HPC
LPC
LPS
MPC
MPS
SMOKE DETECTOR
MANUAL VOLUME DAMPER
FSD FIRE/SMOKE DAMPER WITH ACCESS DOOR
FROM SHOWN
SECTION IDENTIFICATION
XXX-X
DEMOLITION PLAN NOTE IDENTIFICATION
SOUND-LINED DUCTWORK
MOTORIZED DAMPER
DASHED INDICATES BELOW
PRESSURE / TEMPERATURE TEST PORT
STEAM TRAP
SPS
STATIC PRESSURE SENSOR
GENERAL SPECIFICATIONS MECHANICAL NOTES
DIVISION 1 - GENERAL CONDITIONS
1. SCOPE: PROVIDE AND INSTALL ALL WORK, EQUIPMENT, AND MATERIALS AS INDICATED ON THE PROJECT DRAWINGS AND IN THE
SPECIFICATIONS TO PROVIDE A COMPLETELY OPERATIONAL SYSTEM. THE DRAWINGS DO NOT INDICATE EVERY FITTING, ELBOW, OFFSET, VALVE, PULL BOX OR SIMILAR COMPONENTS WHICH ARE REQUIRED TO COMPLETE THE PROJECT WORK. PREPARE FIELD CONSTRUCTION
DRAWINGS IF NECESSARY FOR, OR AS REQUIRED TO, INSURE PROPER INSTALLATION. PROVIDE ALL NECESSARY OFFSETS, FITTINGS, AND
AUXILIARY ITEMS SUCH AS RELAYS, CONTROL MODULES, CABINETS, ETC. TO INSTALL THE SYSTEMS AS DIAGRAMMED AT NO ADDITIONAL COST.
2. APPLICABLE CODES AND REGULATIONS: ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING CODES, REFERENCES AND
REGULATIONS. THE CONTRACTOR SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES, AND REGULATIONS OF ALL GOVERNMENTAL
AUTHORITIES HAVING JURISDICTION AND OF THE PUBLIC UTILITIES HAVING JURISDICTION OVER ANY OF THE SYSTEMS HEREIN SPECIFIED.
a. INTERNATIONAL BUILDING CODE 2015
b. INTERNATIONAL MECHANICAL CODE 2015
c. INTERNATIONAL PLUMBING CODE 2015
d. NATIONAL FIRE PROTECTION ASSOCIATION
e. NATIONAL ELECTRIC CODE 2014
f. APPLICABLE REGULATIONS WSSC AND/OR WASA 2008
3. SITE VISITS AND COORDINATION: THE CONTRACTOR SHALL VISIT THE SITE AND SHALL CONFIRM AND EVALUATE EXISTING CONDITIONS AND
INSTALLED EQUIPMENT, DUCTWORK, PIPING, FINISHES, ETC. PRIOR TO START OF WORK. THE CONTRACTOR IS FULLY RESPONSIBLE FOR
COORDINATING HIS/HER WORK WITH THE OTHER TRADES AND EXISTING CONDITIONS. IF ANY DISCREPANCY OR CONFLICT IS DETECTED AT THE
JOB SITE, IT SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER AND ARCHITECT IMMEDIATELY, PRIOR TO DOING ANY WORK, WITH
RECOMMENDATIONS FOR PROPER CORRECTION FOR THE ENGINEER'S APPROVAL.
4. PROJECT BIDDING: AS THE SITE, LOCATION, SIZE AND ROUTING OF EXISTING SYSTEMS INDICATED TO HAVE NEW CONNECTIONS MADE TO THEM
ARE SHOWN AS ACCURATELY AS FIELD CONDITIONS WOULD PERMIT, IT IS SUGGESTED THAT THE BIDDING CONTRACTORS SHALL VISIT THE
SITE AND THOROUGHLY EXAMINE THE CONTRACT DRAWINGS PRIOR TO BID. THE CONTRACTORS SHALL REPORT TO THE COR, BEFORE
SUBMITTING A BID, ANY CONDITIONS WHICH MIGHT MAKE THE INSTALLATION OF THE REQUIRED EQUIPMENT NOT FEASIBLE. THE
CONTRACTOR'S BIDS SHALL INCLUDE ALL NECESSARY PERMIT FEES REQUIRED TO COMPLETE THE SCOPE OF WORK, UNLESS OTHERWISE
DIRECTED BY THE COR. COPIES OF ALL PERMITS SHALL BE SUPPLIED TO THE COR PRIOR TO STARTING CONSTRUCTION.
a. UNLESS OTHERWISE SPECIFIED, THE TERM “PROVIDE” SHALL MEAN THAT THE CONTRACTOR IS REQUIRED TO FURNISH AND INSTALL
SAID EQUIPMENT.
5. EXISTING CONDITIONS: THE ENGINEERING DESIGN DRAWINGS ARE DIAGRAMMATIC IN NATURE, AND ARE NOT CONSIDERED CONSTRUCTION
SHOP DRAWINGS. ALL CRITICAL DIMENSIONS SHALL BE CONFIRMED BY THE CONTRACTOR IN THE FIELD. THE LOCATION AND SIZES OF
EXISTING EQUIPMENT, PIPING, DUCTWORK, FIXTURES, ETC. ARE APPROXIMATE AND SHALL BE VERIFIED AT THE JOB SITE, BY THE
CONTRACTOR. CONNECTION TO, REMOVAL OR RELOCATION OF EXISTING EQUIPMENT, PIPING AND DUCTWORK SHALL BE DONE IN SUCH A
MANNER AS NOT TO DAMAGE THE EXISTING FIXTURES OR EQUIPMENT. ANY EQUIPMENT, DUCTWORK, PIPING ETC. DAMAGED DUE TO THE
WORK PERFORMED UNDER THIS CONTRACT SHALL BE REPAIRED OR REPLACED BY THIS CONTRACTOR TO THE SATISFACTION OF NIST COR, AND AT NO ADDITIONAL COST TO NIST.
b. THE CONTRACTOR SHALL PROTECT ALL EXISTING FIRE SUPPRESSION AND FIRE ALARM SYSTEMS AS NECESSARY TO AVOID FALSE
ALARMS AND NUISANCE TRIPS. ALL SUCH SYSTEMS SHALL REMAIN OPERATIONAL DURING CONSTRUCTION AS REQUIRED BY THE LOCAL
FIRE MARSHAL.
6. SERVICE INTERRUPTIONS AND WORKING HOURS: PRIOR TO THE START OF WORK, CONTRACTOR SHALL OBTAIN THE PERMISSION OF THE COR
FOR INTERRUPTION OF EXISTING SERVICES AND FOR CONNECTION TO THE SAME. CONTRACTOR SHALL COORDINATE THE TIME OF WORK AND
INTERRUPTION OF SERVICES IN ACCORDANCE WITH THE INSTRUCTIONS OF THE COR. ALL WORK SHALL BE PERFORMED DURING NORMAL
WORKING HOURS AS DEFINED BY THE COR. WORK PERFORMED OUTSIDE OF NORMAL WORKING HOURS SHALL BE NEGOTIATED WITH OWNER
PRIOR TO THE CONSTRUCTION PHASE. REQUIRED EXISTING SYSTEM SHUTDOWNS SHALL BE COORDINATED IN WRITING WITH THE COR'S
REPRESENTATIVE A MINIMUM OF 15 DAYS IN ADVANCE.
7. SCAFFOLDING, RIGGING AND HOISTING: CONTRACTOR SHALL PROVIDE ALL SERVICES REQUIRED FOR INSTALLATION, ERECTION AND DELIVERY
OF ALL MATERIALS AND EQUIPMENT TO THE SITE AND FOR REMOVAL OF TRASH, CONSTRUCTION DEBRIS, WASTE, AND DEMOLISHED ITEMS
FROM THE PREMISES.
8. INSTALLATION: INSTALLATION OF EQUIPMENT, PIPING, FIXTURES, WIRING, ETC. SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER, AND
SHALL CONFORM TO THE LATEST TRADE PRACTICES. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, UNLESS INDICATED OTHERWISE, AND
THE CURRENT MODEL, FOR WHICH REPLACEMENT PARTS IS AVAILABLE. SUBSTITUTIONS SHALL ONLY BE ACCEPTED AT THE DISCRETION OF
THE COR OR THE ENGINEER. THE CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS AND
RECOMMENDATIONS, UNLESS INDICATED OTHERWISE. ALL EQUIPMENT SHALL BE MOUNTED VIBRATION FREE.
a. THE CONTRACTOR SHALL REPAIR ALL OPENINGS IN WALLS, CEILINGS, FLOORS, ETC., WHICH ARE CREATED BY DEMOLITION AND/OR NEW
PROJECT WORK. THE REPAIRS SHALL BE WITH MATERIALS AND FINISHED TO MATCH EXISTING. OPENINGS AND PENETRATIONS IN FIRE
RATED PARTITIONS OR DUCTWORK SHALL BE SEALED WITH U.L. APPROVED FIRE STOPPING MATERIAL TO MAINTAIN FIRE RESISTANT
INTEGRITY. DUCTWORK AND PIPING SHALL BE CAPPED, SEALED AIR AND WATERTIGHT AND INSULATED TO MATCH EXISTING.
b. ALL EQUIPMENT AND DEVICES SHALL BE INSTALLED TO PROVIDE THE MANUFACTURER'S REQUIRED SERVICE CLEARANCES, AND ANY AIR
AND WATER BALANCING DEVICES SHALL BE ACCESSIBLE FOR ADJUSTMENT. PROVIDE ACCESS DOORS IN DRYWALL CEILINGS AND
PARTITIONS AS REQUIRED TO SERVICE EQUIPMENT, BALANCE DIFFUSERS, AND EXPOSED JUNCTION BOXES. COORDINATE THE EXACT
LOCATIONS AND STYLE OF FLANGELESS ACCESS DOORS WITH THE ENGINEER.
c. THE CONTRACTOR SHALL INSTALL ALL DUCTWORK, PIPING, RACEWAYS, CIRCUITRY, CONDUIT, ETC., AS HIGH AS POSSIBLE TO MAXIMIZE
HEADROOM.
9. PROJECT CLEANING: ALL MATERIAL NOT TO BE USED SHALL BE REMOVED FROM THE SITE AND ALL DEBRIS SHALL BE CLEARED. THE AREA OF
WORK SHALL BE LEFT IN CLEAN CONDITION PRIOR TO TURNOVER TO OWNER. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL
THOROUGHLY CLEAN THE CONTRACT AREA AND ALL OTHER AREAS USED FOR STORAGE, STAGING, ETC. THIS SHALL INCLUDE, BUT NOT BE
LIMITED TO WASHING AND/OR REPAIRING GLASS, REMOVING SPOTS AND STAINS, CLEANING ALL FIXTURES AND WASHING ALL FLOORS, WALLS
AND CEILINGS IF APPROPRIATE.
10. PROJECT CLOSEOUT, COMMISSIONING, AND PUNCH LISTS: UPON COMPLETING APPROXIMATELY 75% OF THE REQUIRED WORK, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER AND ARCHITECT IN ORDER TO SCHEDULE A PRE-FINAL REVIEW OF CONSTRUCTION. NO WORK
SHALL BE CONCEALED BY CEILINGS, WALLS, ETC. FINAL REVIEW SHALL BE SCHEDULED AT 100% COMPLETION OF CONSTRUCTION. ALL PUNCH
LIST ITEMS MUST BE ACCOMPLISHED PRIOR TO FINAL ACCEPTANCE.
a. ALL EQUIPMENT WARRANTIES AND OPERATIONS AND MAINTENANCE MANUALS SHALL BE FULLY TRANSFERRED TO THE COR PRIOR TO
FINAL ACCEPTANCE. ALL EQUIPMENT, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED IN FULL FROM DEFECT FOR ONE YEAR
FROM THE DATE OF FINAL ACCEPTANCE OF THIS WORK BY COTR.
b. UNLESS OTHERWISE SPECIFIED IN THE COMMISSIONING SPECIFICATIONS, THE CONTRACTOR SHALL TEST ALL EQUIPMENT INSTALLED
UNDER THIS CONTRACT AND DEMONSTRATE TO THE COR ITS PROPER OPERATION(S).
c. PROVIDE OPERATION AND MAINTENANCE MANUALS IN 3-RING BINDER. LIST ALL DESIGN FIRMS, CONTRACTORS AND PRIMARY
SUPPLIERS; PROVIDE A POINT OF CONTACT WITH PHONE NUMBER AND E-MAIL ADDRESS FOR EACH FIRM. INCLUDE WARRANTY
STATEMENTS, COPY OF APPROVED SUBMITTAL AND OPERATION AND MAINTENANCE PROCEDURES FOR EACH PIECE OF EQUIPMENT.
INCLUDE A COPY OF THE FINAL, APPROVED WATER AND AIR BALANCE REPORT.
d. PROVIDE PREVENTATIVE MAINTENANCE MANUALS SEPARATE FROM OPERATION AND MAINTENANCE MANUALS. PREVENTATIVE
MAINTENANCE MANUALS SHALL BE TURNED OVER TO THE NIST COR.
11. PROJECT WARRANTY: ALL WORK SHALL BE FULLY WARRANTED FOR A PERIOD OF ONE YEAR UNLESS SPECIFICALLY NOTED OTHERWISE.
DURING THE CORRECTION PERIOD, THE CONTRACTOR SHALL CORRECT ANY WORK FOUND NOT TO BE IN ACCORDANCE WITH THE CONTRACT
DOCUMENTS BY REPAIRING OR REPLACING THE DEFECTIVE WORK AT NO ADDITION TO THE CONTRACT SUM. ALL MANUFACTURE EQUIPMENT
WARRANTIES SHALL BE TRANSFERRED TO THE COR UPON SUBSTANTIAL COMPLETION. THE WARRANTY SHALL BEGIN AT SUBSTANTIAL
PROJECT COMPLETION.
A. PROVIDE FIRE STOPPING FOR ALL PIPE AND DUCT PENETRATIONS THROUGH WALLS AND FIRE-RATED WALLS AND FLOOR SLABS. ALL
PENETRATIONS SEALED/CAULKED BY FM CERTIFIED INSTALLER.
B. INSULATION FLAME/SMOKE RATING: PROVIDE COMPOSITE MECHANICAL INSULATION JACKETS, COVERINGS, SEALERS, MASTIC, AND
ADHESIVES WITH FLAME-SPREAD INDEX OF 25 OR LESS AND SMOKE DEVELOPED INDEX OF 50 OR LESS AS TESTED BY ASTM E4 AND THE
APPROVED METHOD OF NFPA 255. INSULATION MUST BE U.L. LISTED AND LABELED.
C. DUCTWORK AND PIPING PASSING THROUGH AREAS OF RENOVATION AND SERVING ADJACENT SPACES SHALL BE PROTECTED IN PLACE.
WHERE IT IS DETERMINED THAT THESE DUCTWORK AND PIPING MUST BE RELOCATED, CONTRACTOR SHALL REROUTE AND RESTORE
SERVICES WITH MINIMAL DISRUPTION. COORDINATE WORK WITH THE NIST AND APPROPRIATE USERS.
D. BALANCING: SYSTEM SHALL BE BALANCED TO DELIVER AIR AND WATER QUANTITIES INDICATED ON DRAWINGS. WORK SHALL BE
PERFORMED BY FIRM(S) CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) OR THE ASSOCIATED AIR BALANCE
COUNCIL (AABC). MECHANICAL CONTRACTOR SHALL PROVIDE ALL NECESSARY MANUAL VOLUME DAMPERS TO ACHIEVE AIR QUANTITIES
INDICATED ON DRAWINGS. AIR BALANCE SHALL BE PERFORMED PRIOR TO OCCUPANCY. THE CONTRACTOR SHALL FURNISH ALL LABOR, INSTRUMENTS, TOOLS AND MATERIALS AS REQUIRED FOR THE TESTS.
E. THE CONTRACTOR SHALL SUBMIT FOUR (4) COPIES OF SHOP DRAWINGS FOR THE FOLLOWING EQUIPMENT AND MATERIALS TO THE
ENGINEER FOR REVIEW.
1. FINAL BALANCING REPORTS
2. ALL SCHEDULED EQUIPMENT
3. DUCTWORK, PIPING, VALVES, AND INSULATION
F. SUPPORT ALL RIGID AND FLEXIBLE DUCTWORK AND PIPING FROM STRUCTURE ABOVE, AS REQUIRED TO PREVENT SAGGING. AND LEAKAGE.
MAXIMUM DISTANCE BETWEEN SUPPORTS SHALL BE 6'-0".
G. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS PUBLISHED INSTALLATION LITERATURE.
H. PROVIDE ALL WORK, EQUIPMENT, AND MATERIALS INDICATED. PROVIDE ALL INTERLOCKS, RELAYS, CONTROLS, ETC., FOR A FULLY
FUNCTIONAL SYSTEM.
I. SUPPORT EQUIPMENT WITH VIBRATION ISOLATORS.
J. PROVIDE DIELECTRIC COUPLINGS AT ALL FERROUS TO NON-FERROUS PIPE CONNECTIONS AND FLANGE UNION ISOLATING JOINTS TO
PREVENT ANY ELECTROLYTIC ACTION BETWEEN DISSIMILAR METAL. DIELECTRIC FITTINGS SHALL BE EQUAL TO EPCO SALES, INC. ALL
CONNECTIONS TO STEEL PIPES SHALL BE MADE WITH WELDING FITTINGS.
K. INSULATE ALL SUPPLY AND OUTSIDE AIR DUCTWORK.
L. PROVIDE ONE SPARE SET OF ALL AIR FILTERS TO NIST.
M. PIPES PENETRATING RATED WALLS, PARTITIONS, CEILINGS, AND FLOOR SLABS SHALL BE STOPPED AT RATED OUTER SURFACES.
INSULATION ENDS SHALL BE SEALED VAPORTIGHT.
N. ALL DUCTWORK SHALL BE IDENTIFIED AS TO SERVICE (SUPPLY/RETURN/EXHAUST) AND DIRECTION OF AIRFLOW. SELF ADHESIVE TYPE
IDENTIFICATION SHALL BE APPLIED TO DUCT INSULATION AT REGULAR INTERVALS, MAXIMUM 10 FEET BETWEEN MARKERS.
O. PROVIDE UNIONS AT PIPE CONNECTIONS TO EQUIPMENT TO FACILITATE REMOVAL OF EQUIPMENT.
P. ALL NEW PIPING SHALL BE PAINTED, STRIPED, AND LABELED TO BE CONSISTENT WITH EXISTING CONDITIONS. PIPE IDENTIFICATION LABELS
SHALL HAVE 2" HIGH LETTERS WITH BACKGROUND COLOR THAT CONTRASTS BOTH THE COLOR OF PAINT AND LETTERING. FLOW
DIRECTIONAL ARROWS SHALL MATCH PIPE IDENTIFICATION. PAINT SHALL BE DURON EPOXY MODIFIED ENAMEL WITH COLORS DEFINED BY
THE PIPING SPECIFICATIONS OR TO MATCH BUILDING STANDARD.
Q. INSULATE ALL HVAC WATER, DRAIN, AND COLD WATER PIPING PER SPECIFICATIONS. ALL INSULATED EXTERIOR PIPING SHALL BE FITTED
WITH ALUMINUM JACKETING.
R. COORDINATE HOURS OF ALL WELDING AND HOT WORK WITH NIST. TEMPORARY POWER REQUIREMENTS MUST BE COORDINATED WITH
ELECTRICAL CONTRACTOR. PRIOR TO WELDING/GRINDING ANY HOT WORK CONTRACTOR MUST PROVIDE COR WITH COPIES OF HOT WORK
PERMITS. HOT WORK PERMIT MUST BE POSTED AT JOB SITE FOR DURATION OF HOT WORK. TYPICAL HOT WORK PERMITS ARE ISSUED FOR
NO LONGER THAN A CALENDAR WEEK.
S. ALL FIELD FABRICATED PIPING JOINTS SHALL BE LEAK TESTED PRIOR TO BEING PUT IN SERVICE. ALL FIELD FABRICATED PIPING SYSTEMS
SHALL BE PRESSURE TESTED, TO TWICE THE MAXIMUM SYSTEM OPERATING PRESSURE, AND FLUSHED PRIOR TO SYSTEM STARTUP.
T. PROVIDE 1-1/2" ROUND BRASS VALVE IDENTIFICATION TAGS FOR ALL NEW VALVES.
U. SUPPORT ALL NEW PIPING FROM EXISTING BUILDING STRUCTURE AT A MAXIMUM OF 10'-0" INTERVALS OR AS REQUIRED TO PREVENT
SAGGING.
V. TEST WATER PIPING UNDER ACTUAL OPERATING CONDITIONS. REPAIR LEAKS AND RETURN TO SERVICE. TEST WATER PIPING AT 125 PSI
FOR 2 HOURS. MAKE REPAIRS WITH NEW MATERIALS. REPLACE LEAKING MATERIALS, DO NOT REPAIR BY PATCHING.
W. ALL NEW CONSTRUCTION SHALL MATCH BUILDING STANDARD (MATERIALS, INSTALLATION METHODS AND QUALITY). ANY MAJOR
DEVIATIONS SHALL REQUIRE APPROVAL OF THE ENGINEER AND/OR BUILDING NIST PRIOR TO PROCEEDING.
X. ALL NEW CONSTRUCTION SHALL ADHERE TO THE LATEST EDITION OF THE NIST DESIGN REQUIREMENTS MANUAL. ANY DEVIATIONS FOR
THESE STANDARDS WILL REQUIRE APPROVAL FROM NIST BEFORE PROCEEDING.
Y. ALL NEW AND EXISTING WALL AND FLOOR PENETRATIONS THRU FIRE RATED WALL / FLOOR SHALL BE COMPLETELY SEALED WITH AN
APPROVED U.L. LISTED FIRESTOPPING MATERIAL. ALL OTHERS SHALL BE SEALED WITH CAULK
Z. ALL WORK AND MATERIAL SHALL BE PROVIDED TO ACCOMPLISH THE INTENT OF THE PLANS. WORK INDICATED HAVING MINOR DETAILS NOT
SHOWN SHALL BE PROVIDED COMPLETELY TO PERFORM THE FUNCTIONS INTENDED.
AA. ALL SPRINKLER HEADS AND PIPING SHALL BE RELOCATED AS NECESSARY TO PROVIDE THE REQUIRED SCOPE OF WORK. APPROVAL FROM
THE DIVISION OF FIRE MARSHALL SHALL BE OBTAIN PRIOR TO ANY WORK.
FIRESTATF
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
AutoCAD SHX Text
U.S. DEPARTMENT OF COMMERCE
AutoCAD SHX Text Office of Facilities & Property Management
AutoCAD SHX Text
SH.NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
DWG.
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
SPONSOR
AutoCAD SHX Text
FACILITIES IMPROVEMENT GROUP OFF.
AutoCAD SHX Text
PROJECT LEADER
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT/W.O.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - SAFETY OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
FACILITIES OPERATION GROUP OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - NIST FIRE MARSHAL/AHJ
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - ENVIRONMENTAL OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text 202-060
AutoCAD SHX Text
BUILDING 202
AutoCAD SHX Text
ENGINEERING MECHANICS
AutoCAD SHX Text
AHU REPLACEMENT DESIGN
AutoCAD SHX Text
LEGEND - MECHANICAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PW/MM
AutoCAD SHX Text 06/06/17
AutoCAD SHX Text 16-392
AutoCAD SHX Text
%%UGENERAL NOTES:
AutoCAD SHX Text
REPORT. REMOVAL OF EXHAUST DUCTWORK
AutoCAD SHX Text
3. THE SHOP FOREMAN (SHOPS WORK) AND/0R
AutoCAD SHX Text
THE PROJECT COTR (CONTRACTED WORK)
AutoCAD SHX Text
SHALL NOT AUTHORIZE WORK TO BEGIN ON
AutoCAD SHX Text
EXHAUST DUCTWORK, AND/OR FIRE STOP
AutoCAD SHX Text
DEMOLITION PRIOR TO HAVING A COMPLETED
AutoCAD SHX Text
FORM 899 (SAFETY INVESTIGATION REPORT,
AutoCAD SHX Text
EXHAUST DUCTWORK) AND/OR ACM SURVEY
AutoCAD SHX Text
(INSULATED PIPE, EXHAUST DUCTWORK AND
AutoCAD SHX Text
FIRE STOPS). REFER TO PLANT DIVISION
AutoCAD SHX Text
INSTRUCTION 3.16 FOR DUCTWORK PROJECTS.
AutoCAD SHX Text
SHALL BE IN ACCORDANCE WITH THE
AutoCAD SHX Text
REQUIREMENTS OF THE FORM 899 AS
AutoCAD SHX Text
DESIGNATED BY THE PLANT DIVISION
AutoCAD SHX Text SAFETY COORDINATOR, x6999.
AutoCAD SHX Text
PROJECTS INVOLVING INSULATED PIPE,
AutoCAD SHX Text
1. NO INSULATED PIPE, EXHAUST DUCTWORK,
AutoCAD SHX Text
DEMOLITION SHALL BE PERFORMED PRIOR
AutoCAD SHX Text
TO THE RECEIPT OF A COMPLETED ACM
AutoCAD SHX Text
MATERIAL) SURVEY INDICATING WORK CAN
AutoCAD SHX Text
CONTINUE. THE ACM SURVEY WILL BE
AutoCAD SHX Text
PERFORMED BY THE PLANT DIVISION SAFETY
AutoCAD SHX Text
DISTURBED PRIOR TO THE COMPLETION OF
AutoCAD SHX Text
A NIST FORM 899, SAFETY INVESTIGATION
AutoCAD SHX Text
2. EXHAUST DUCTWORK SHALL NOT BE
AutoCAD SHX Text
OR FIRE STOP DISTURBANCE AND/OR
AutoCAD SHX Text
(POSSIBLE ASBESTOS CONTAINING
AutoCAD SHX Text COORDINATOR, x6999.
AutoCAD SHX Text
AutoCAD SHX Text
65%%% SUBMISSION
AutoCAD SHX Text
PW
AutoCAD SHX Text 3/10/17
AutoCAD SHX Text
AutoCAD SHX Text
95%%% SUBMISSION
AutoCAD SHX Text
PW
AutoCAD SHX Text 4/28/17
AutoCAD SHX Text
AutoCAD SHX Text
100%%% SUBMISSION
AutoCAD SHX Text
PW
AutoCAD SHX Text 6/6/17
ACU-5(E)
ACU-11(X)
60"x24" OA(E)
INTAKE DUCT(E)
18"x14" SA(E)
HC-11-3(X)
22"x12" SA(E)
40"x12" SA(E)
32"x18"
SA UP(X)
30"x18" RA(E)
96"x42" OA(E)
INTAKE DUCT(E)
60"x16" RA(E)
FAN(X)
FILTER(X)
A/D(E)
(E)
(X)
42"x14" RELIEF
AIR UP(E)
(E)
(X)
HC-11-2(X)
A/D(X)
(X)
(X)
MECH RM
(X) x
R
A X
56"x24" SA(E)
30"x18" RA(E)
RETURN FAN
E-5(E)
60"x16"
RELIEF(E)
42"x14"
RELIEF(E)
RETURN FAN
E-1(E)
RETURN FAN
E-11(E)
F
F
F (X)
(X)
(X)
HC-5-3(X)
HC-5-2(X)
PRV(E)
14"x10" SA(E)
32"x12"
SA(E)
34"x24" SA(E)
PRV(E)
AREA OF WORK
MCC-1 (E)
ACU-12(X)
34"x12" SA(E) x
O
A E
18"x12" OA
GRILLE(E)
24"x24" RA
GRILLE(E)
MIXING BOX (X)
(X) x
S
A
E x
S
A
E
FD(E)
LOADING DOCK
(E) x
O
A X
AREA OF WORK
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD
DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL
EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE CONTRACTOR IS STRONGLY ENCOURAGED
TO VISIT THE SITE AND VERIFY EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR
ORDER OF EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE
ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT
THE EXECUTION OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION
IS PROVIDED.
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE OWNER. IF THE OWNER DEEMS THE
EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT OFF-SITE IN THE PROPER
MANNER. MECHANICAL, PLUMBING AND RELATED ELECTRICAL COMPONENTS SHALL NOT BE
ABANDONED IN PLACE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING REMOVED THROUGH
EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER, THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL REMOVALS, AS SOME
DIFFERENCES MAY EXIST.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO
COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK TO MATCH
EXISTING CONDITIONS.
6. CONTRACTOR SHALL REMOVE PNEUMATIC CONTROLS IN THEIR ENTIRETY INCLUDING PNEUMATIC
TUBING, ACTUATORS, SENSORS, GAUGES AND CONTROL BOARDS. PNEUMATIC TUBING SHALL BE
REMOVED BACK TO SOURCE OR WALL PENETRATION. CAP AND SEAL TUBING TO PROPER SEAL
CLASS. CONTRACTOR IS TO NOT REMOVE ANY PNEUMATIC CONTROL DEVICES OUTSIDE OF THIS
PROJECTS AREA OF WORK OR SCOPE OF WORK. CONTRACTOR SHALL NOT REMOVE MAIN/BRANCH
PNEUMATIC TUBING SERVING ANY EXISTING TO REMAIN PNEUMATIC DEVICES.
DEMOLITION GENERAL NOTES
REMOVE SUPPLY AIR DUCTWORK INCLUDING ANY VOLUME DAMPERS AND PNEUMATIC
DEVICES FROM LOCATION SHOWN TO UNIT.
DISCONNECT ACU-11 FROM OUTDOOR/RETURN AIR DUCTWORK. 60"x24" INTAKE DUCT UP
SHALL REMAIN. SEE NEW WORK FOR NEW OUTDOOR CONNECTION TO ACU-11.
REMOVE RETURN AIR DUCTWORK AT LOCATION SHOWN.
REMOVE ACU-11 IN ITS ENTIRETY, INCLUDING ALL FAN, FILTERS, ENCLOSURE,
CONTROLS, SUPPORTS, ECT.
REMOVE OUTDOOR AIR DAMPER AND PNEUMATIC ACTUATOR. DAMPER CONDITION AND
LOCATION WERE NOT ACCESSIBLE DURING SURVEY. LOCATION SHALL BE CONFIRMED BY
CONTRACTOR.
REMOVE SUPPLY FAN. FLEXIBLE DUCT CONNECTION TO OUTLET SHALL BE REMOVED. SEE
NEW WORK EQUIPMENT SCHEDULES.
REMOVE RETURN AIR DAMPER AND PNEUMATIC ACTUATOR INCLUDING ALL ASSOCIATED
PNEUMATIC TUBING.
RELIEF AIR MOTORIZED DAMPER BLADES SHALL REMAIN. REMOVE PNEUMATIC
ACTUATOR INCLUDING ALL ASSOCIATED PNEUMATIC TUBING. RELIEF AIR MOTORIZED
DAMPER BLADES SHALL REMAIN AND BE USED WITH NEW ACTUATOR.
REMOVE RETURN AIR MOTORIZED DAMPER INCLUDING ALL DDC CONTROLS. SALVAGE
ACTUATOR AND CONTROL WIRING TO BE USED IN NEW WORK INSTALLATION. SEE NEW
WORK FOR NEW MOTORIZED DAMPER LOCATION.
REMOVE ALL RETURN FAN PNEUMATIC CONTROLS BACK TO SOURCE INCLUDING DUCT
FIRESTAT. RETURN FAN SHALL REMAIN EXISTING.
REMOVE FILTER ASSEMBLY INCLUDING PRE FILTER, MAIN FILTER AND FILTER SUPPORT
BRACKETING.
REMOVE DUCTWORK AT PENETRATION AS SHOWN. FIRE DAMPER SHALL REMAIN AND
PROTECTED DURING CONSTRUCTION. SEE NEW WORK FOR NEW DUCT CONNECTION.
REMOVE HEATING COIL INCLUDING NECESSARY TRANSITION DUCTWORK AND
CONNECTION DUCTWORK. REMOVE PNEUMATIC CONTROLS BACK TO SOURCE.
DEMOLITION PLAN NOTES
0'4' 2' 4' 8'
1/4"=1'-0"
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
MECH RM 100 - DEMOLITION - DUCTWORK
SCALE: 1/4" = 1'-0"
LOADING DOCK - DEMOLITION - DUCTWORK
SCALE: 1/4" = 1'-0"
AOW
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text K
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
U.S. DEPARTMENT OF COMMERCE
AutoCAD SHX Text Office of Facilities & Property Management
AutoCAD SHX Text
SH.NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
DWG.
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
SPONSOR
AutoCAD SHX Text
FACILITIES IMPROVEMENT GROUP OFF.
AutoCAD SHX Text
PROJECT LEADER
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT/W.O.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - SAFETY OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
FACILITIES OPERATION GROUP OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - NIST FIRE MARSHAL/AHJ
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - ENVIRONMENTAL OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text 202-061
AutoCAD SHX Text
BUILDING 202
AutoCAD SHX Text
ENGINEERING MECHANICS
AutoCAD SHX Text
AHU REPLACEMENT DESIGN
AutoCAD SHX Text
MECH RM100/LOADING DOCK - DEMO - DUCTWORK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PW/MM
AutoCAD SHX Text 06/06/17
AutoCAD SHX Text 16-392
AutoCAD SHX Text
AutoCAD SHX Text
65%%% SUBMISSION
AutoCAD SHX Text
PW
AutoCAD SHX Text 3/10/17
AutoCAD SHX Text
AutoCAD SHX Text
95%%% SUBMISSION
AutoCAD SHX Text
PW
AutoCAD SHX Text 4/28/17
AutoCAD SHX Text
AutoCAD SHX Text
100%%% SUBMISSION
AutoCAD SHX Text
PW
ACU-4(E)
ACU-1(E)
ACU-2(E)
64"x30" SA UP(E)
64"x30" SA UP(E)
74"x42" FRESH
AIR UP(E)
42"x24" SA(E)
FAN(X)
FAN(X)
FAN(X)
FILTER(X) FILTER(X)
F I L T
E R
X
36"x30" RA(E) x
R
A E
(E)
(X) x
R
E L I E
F E
2 6
(E) x
R
E L I E
F E
(X)
(X) (X)
(X)
(X)
(E)
72"x30" FRESH
AIR UP(E)
72"x30" FRESH
AIR UP(E)
60"x26" RA FROM
FLOOR BELOW(E)
78"x24"
RA(E)
x
R
E L I E
F E
MECH RM
RETURN FAN
E-2(E)
RETURN FAN
E-2(E)
RETURN FAN
E-12(E)
HC-1-2(X)
HC-1-3(X)
HC-4-3(X)
HC-4-2(X)
32"x22" SA(E)
HOTDECK(E)
20"x20" SA(E)
HOTDECK(E)
30"x24" SA(E)
HOTDECK(E)
30"x24" SA(E)
HOTDECK(E)
24"x17" SA(E)
HOTDECK(E)
20"x20" SA(E)
HOTDECK(E)
78"x24"
RA(E)
F
F
F
(X)
(X)
(X)
BRINE CONCENTRATOR
PUMP(X)
MCC-2 (E)
AREA OF WORK
1. EXISTING CONDITIONS SHOWN ON THIS DRAWING HAVE BEEN OBTAINED FROM RECORD
DRAWINGS WHEN AVAILABLE AND GENERAL FIELD SURVEY AND MAY NOT INDICATE ACTUAL
EXISTING CONDITIONS IN DETAIL AND DIMENSION. THE CONTRACTOR IS STRONGLY ENCOURAGED
TO VISIT THE SITE AND VERIFY EXACT EXISTING CONDITIONS PRIOR TO THE FABRICATION OR
ORDER OF EQUIPMENT OR PERFORMANCE OF ANY WORK. THE CONTRACTOR SHALL NOTIFY THE
ARCHITECT OR ENGINEER IN WRITING IF EXISTING CONDITIONS ARE DISCOVERED THAT PREVENT
THE EXECUTION OF WORK. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL DIRECTION
IS PROVIDED.
2. ALL EQUIPMENT REMOVED IS THE PROPERTY OF THE OWNER. IF THE OWNER DEEMS THE
EQUIPMENT "UNSALVAGEABLE", THE CONTRACTOR IS TO DISPOSE OF IT OFF-SITE IN THE PROPER
MANNER. MECHANICAL, PLUMBING AND RELATED ELECTRICAL COMPONENTS SHALL NOT BE
ABANDONED IN PLACE UNLESS OTHERWISE NOTED ON THE DRAWINGS.
3. EVERY EFFORT HAS BEEN MADE TO INDICATE ALL DEVICES THAT ARE BEING REMOVED THROUGH
EXISTING DRAWINGS AND FIELD OBSERVATIONS. HOWEVER, THE CONTRACTOR IS STRONGLY
ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING TO VERIFY ALL REMOVALS, AS SOME
DIFFERENCES MAY EXIST.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO
COMPLETE DEMOLITION WORK.
5. CONTRACTOR SHALL PATCH AND SEAL ALL OPENINGS GENERATED BY DEMO WORK TO MATCH
EXISTING CONDITIONS.
6. CONTRACTOR SHALL REMOVE PNEUMATIC CONTROLS IN THEIR ENTIRETY INCLUDING PNEUMATIC
TUBING, ACTUATORS, SENSORS, GAUGES AND CONTROL BOARDS. PNEUMATIC TUBING SHALL BE
REMOVED BACK TO SOURCE OR WALL PENETRATION. CAP AND SEAL TUBING TO PROPER SEAL
CLASS. CONTRACTOR IS TO NOT REMOVE ANY PNEUMATIC CONTROL DEVICES OUTSIDE OF THIS
PROJECTS AREA OF WORK OR SCOPE OF WORK. CONTRACTOR SHALL NOT REMOVE MAIN/BRANCH
PNEUMATIC TUBING SERVING ANY EXISTING TO REMAIN PNEUMATIC DEVICES.
DEMOLITION GENERAL NOTES
REMOVE OUTDOOR AIR DAMPER BLADES AND PNEUMATIC ACTUATOR INCLUDING ALL
ASSOCIATED PNEUMATIC TUBING BACK TO SOURCE.
REMOVE SUPPLY FAN. FLEXIBLE DUCT CONNECTION TO OUTLET SHALL BE REMOVED.
REMOVE RETURN AIR DAMPER AND PNEUMATIC ACTUATOR INCLUDING ALL ASSOCIATED
PNEUMATIC TUBING BACK TO SOURCE.
RETURN AIR DAMPER AND PNEUMATIC ACTUATOR SHALL BE REMOVED INCLUDING ALL
ASSOCIATED PNEUMATIC TUBING BACK TO SOURCE.
REMOVE PNEUMATIC ACTUATOR INCLUDING ALL ASSOCIATED PNEUMATIC TUBING BACK
TO SOURCE. RELIEF AIR MOTORIZED DAMPER BLADES SHALL REMAIN AND BE USED WITH
NEW DDC ACTUATOR. SEE NEW WORK PLAN.
REMOVE FILTER ASSEMBLY INCLUDING PRE FILTER, MAIN FILTER AND FILTER SUPPORT
BRACKETING.
RELIEF DUCTWORK IS BELOW THE SECOND FLOOR SLAB WITHIN MECHANICAL ROOM 100.
SHOWN HERE FOR CLARITY FOR LOCATION OF RELIEF MOTORIZED DAMPER.
REMOVE ALL RETURN FAN PNEUMATIC CONTROLS BACK TO SOURCE INCLUDING DUCT
FIRESTAT. RETURN FAN SHALL REMAIN EXISTING. SEE NEW WORK FOR NEW CONTROLS.
RETURN AIR DUCT ROUTED HIGH ALONG CEILING.
REMOVE HEATING COIL INCLUDING NECESSARY TRANSITION DUCTWORK AND
CONNECTION DUCTWORK. REMOVE PNEUMATIC CONTROLS BACK TO SOURCE.
REMOVE BRINE SYSTEM CONCENTRATOR PUMP ASSEMBLY IN ITS ENTIRETY. CAP AND
SEAL ALL ASSOCIATED DUCTWORK TO PROPER SEAL CLASS WITHIN MECHANICAL ROOM.
DEMOLITION PLAN NOTES
0'4' 2' 4' 8'
1/4"=1'-0"
KEY PLAN
mep consultants 20251 century blvd. suite 120
:: germantown, md 20874 p: 877-871-4229 F: 301-560-6336 info@cfrengineering.com
PROJECT #16096
MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANT:
MECHANICAL RM 200 - DEMOLITION - DUCTWORK
SCALE: 1/4" = 1'-0"
AOW
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text K
AutoCAD SHX Text M
AutoCAD SHX Text 5a
AutoCAD SHX Text
AutoCAD SHX Text
U.S. DEPARTMENT OF COMMERCE
AutoCAD SHX Text Office of Facilities & Property Management
AutoCAD SHX Text
SH.NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
DWG.
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
SPONSOR
AutoCAD SHX Text
FACILITIES IMPROVEMENT GROUP OFF.
AutoCAD SHX Text
PROJECT LEADER
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PROJECT/W.O.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - SAFETY OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
FACILITIES OPERATION GROUP OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - NIST FIRE MARSHAL/AHJ
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SHED - ENVIRONMENTAL OFF.
AutoCAD SHX Text
DATE
AutoCAD SHX Text 202-062
AutoCAD SHX Text
BUILDING 202
AutoCAD SHX Text
ENGINEERING MECHANICS
AutoCAD SHX Text
AHU REPLACEMENT DESIGN
AutoCAD SHX Text
MECHANICAL RM 200 - DEMOLITION - DUCTWORK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PW/MM
AutoCAD SHX Text 06/06/17
Au…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.