SOW_Att_4_-_301_Specifications.pdf
PDF 3 MB Posted
- Attached to
- Heating, Ventilation, and Air Conditioning Construction Federal contract opportunity
- Solicitation number
- SB134118RP0004
About this file
SOW Att 4 - 301 Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A3_RFI_9_-_30_and_Responses.pdf | ||
| A2_SF_1442.pdf | ||
| Re_A2_-_RFI_No._8_-_Site_Visit_Attendance_Sheet.pdf | ||
| A2_RFI_1_-_8_&_Responses.pdf | ||
| Re_A2_-_RFI_No._1_-_Rev_SOW_Att_9_-_Humidifier_Specifications.pdf | ||
| Re_A2_-_RFI_No._6_-_Rev_SOW_Att_3_-_301_Drawings.pdf | ||
| SOW_Att_1_-_202_Drawings.pdf | ||
| SOW_Att_7_-_218_Humidifier_Bar_Drawings.pdf | ||
| SOW_Att_9_-_Humidifier_Specifications.pdf | ||
| FormSF1442_Released_13APR2018.pdf | ||
| SOW_Att_10_-_Division_1_-_Entire_Procurement.pdf | ||
| SOW_Att_5_-_215_Humidifier_Bar_Drawings.pdf | ||
| SOW_Att_6_-_217_Humidifier_Bar_Drawings.pdf | ||
| SOW_Att_2_-_202_Specifications.pdf | ||
| SOW_Att_3_-_301_Drawings.pdf | ||
| SOW_Att_8_-_219_Humidifier_Bar_Drawings.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 301
NIST, GAITHERSBURG, MD REFURBISH OR REPLACE AIR HANDLING UNITS
FOR OFFICIAL USE ONLY
CLIN 0003 TOC - 1
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
See separate document consolidated for CLIN’s 0001 through 0007
DIVISION 02 – EXISTING CONDITIONS
024119 Selective Demolition
024119.1 Cutting and Patching
DIVISION 04 – MASONRY
040110 Masonry Cleaning 042000 Unit Masonry
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
078413 Penetration Firestopping 079200 Joint Sealants
DIVISION 08 – OPENINGS
089119 Fixed Louvers
DIVISION 09 – FINISHES
099100 Painting Specifications
DIVISION 22 – PLUMBING
220719 Plumbing Piping Insulation 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties 223200 Domestic Water Filtration Equipment
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230519 Meters and Gages for HVAC Piping 230523 General-Duty Valves for HVAC Piping 230529 Hangers and Supports for HVAC Piping and Equipment 230553 Identification for HVAC Piping and Equipment 230593 Testing, Adjusting, and Balancing for HVAC 230713 Duct Insulation 230719 HVAC Piping Insulation 230923 Direct Digital Control Systems Specification 232113 Hydronic Piping 232116 Hydronic Piping Specialties 232213 Steam and Condensate Heating Piping 232216 Steam and Condensate Piping Specialties
BUILDING 301
CLIN 0003 TOC - 2
233113 Metal Ducts 237313 Modular Central Station Air – Handling Units 237314 Central Station Rooftop/ Cooling Units
238216.11 Hydronic Air Coils
238216.12 Steam Air Coils
DIVISION 26 – ELECTRICAL
260519 Low Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding For Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260553 Identification for Electrical Systems 262416 Panelboards 262419 Motor-Control Centers
262913.03 Manual and Magnetic Motor Controllers
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
283111 Digital, Addressable Fire-Alarm System
BUILDING 301 SB1341‐14‐CQ‐0023
SUMMER CONSULTANTS, INC. 024119 - 1 MCLEAN, VIRGINIA
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
3. Historic materials for reinstallation
B. Related Requirements:
1. Section 011000 "Summary" for restrictions on use of the premises, Owner-occupancy requirements, and phasing requirements.
2. Section 017300 "Execution" for cutting and patching procedures.
3. Section 013516 "Alteration Project Procedures" for general protection and work procedures for alteration projects.
4. Section 013510 “Special Procedures for Historic Treatment” for selective demolition associated with historic building materials.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and store on site prior to delivery to owner.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
SUMMER CONSULTANTS, INC. 024119 - 2 MCLEAN, VIRGINIA
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
1.5 PREINSTALLATION MEETINGS
A. Predemolition Conference: Conduct conference at the Project site.
1. Inspect and discuss condition of construction to be selectively demolished.
2. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.
4. Review areas where existing construction is to remain and requires protection.
5. Review portions of selective demolition work that include historic building materials.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For refrigerant recovery technician.
B. Proposed Protection Measures: Submit report that indicates the measures proposed for protecting individuals and property, for environmental protection, for dust control and, for noise control. Indicate proposed locations and construction of barriers.
C. Schedule of Selective Demolition Activities: Indicate the following:
1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's on-site operations are uninterrupted. Confirm and coordinate the
2. Interruption of utility services. Indicate how long utility services will be interrupted.
3. Coordination for shutoff, capping, and continuation of utility services.
4. Use of elevator and stairs.
5. Coordination of Owner's continuing occupancy of portions of existing building and of
Owner's partial occupancy of completed Work.
D. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.
SUMMER CONSULTANTS, INC. 024119 - 3 MCLEAN, VIRGINIA
E. Warranties: Documentation indicating that existing warranties are still in effect after completion of selective demolition.
1.7 CLOSEOUT SUBMITTALS
A. Inventory: Submit a list of items that have been removed and salvaged.
1.8 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.9 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
C. Notify COTR of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
E. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified elsewhere in the Contract Documents.
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.
3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.
F. Storage or sale of removed items or materials on-site is not permitted.
G. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
SUMMER CONSULTANTS, INC. 024119 - 4 MCLEAN, VIRGINIA
1. Maintain fire-protection facilities in service during selective demolition operations.
1.10 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:
1. Existing roof warranty
B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.
1.11 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
SUMMER CONSULTANTS, INC. 024119 - 5 MCLEAN, VIRGINIA
D. Survey of Existing Conditions: Record existing conditions by use of measured drawings and preconstruction photographs or video.
1. Inventory and record the condition of items to be removed and salvaged. Provide photographs or video of conditions that might be misconstrued as damage caused by salvage operations.
2. Before selective demolition or removal of existing building elements that will be reproduced or duplicated in final Work, make permanent record of measurements, materials, and construction details required to make exact reproduction.
3.2 PREPARATION
A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Owner will arrange to shut off indicated services/systems when requested by Contractor.
2. Arrange to shut off utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.
SUMMER CONSULTANTS, INC. 024119 - 6 MCLEAN, VIRGINIA
3.4 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."
B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.
1. Strengthen or add new supports when required during progress of selective demolition.
C. Remove temporary barricades and protections where hazards no longer exist.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 2 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
SUMMER CONSULTANTS, INC. 024119 - 7 MCLEAN, VIRGINIA
8. Remove structural framing members, if required, and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
11. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
B. Work in Historic Areas: Selective demolition may be performed only in areas of Project that are not designated as historic. In historic spaces, areas, and rooms, or on historic surfaces, the terms "demolish" or "remove" shall mean historic "removal" or "dismantling" as specified in Section 013510 "Special Procedures for Historic Treatment."
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by the COTR, items may be removed to a suitable, protected storage location during selective demolition, cleaned and reinstalled in their original locations after selective demolition operations are complete.
3.6 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS
A. Concrete: Demolish in small sections. Using power-driven saw, cut concrete to a depth of at least 3/4 inch at junctures with construction to remain. Dislodge concrete from reinforcement at perimeter of areas being demolished, cut reinforcement, and then remove remainder of concrete.
Neatly trim openings to dimensions indicated.
B. Concrete: Demolish in sections. Cut concrete full depth at junctures with construction to remain and at regular intervals using power-driven saw, and then remove concrete between saw cuts.
C. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts. Refer to drawings and
SUMMER CONSULTANTS, INC. 024119 - 8 MCLEAN, VIRGINIA
Section 013510 "Special Procedures for Historic Treatment" for additional information regarding the existing terra cotta masonry screenwall.
D. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, and then break up and remove.
E. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing and so that building interior remains watertight and weathertight. See Section 024119.1 “Cutting and Patching” for new roofing requirements.
1. Remove existing roof membrane, flashings, copings, and roof accessories.
2. Remove existing roofing system down to substrate.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Burning: Do not burn demolished materials.
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 024119
SUMMER CONSULTANTS, INC. 024119.1 - 1 MCLEAN, VIRGINIA
SECTION 024119.1 - CUTTING AND PATCHING
PART 1 - GENERAL
1.1 SUMMARY
A. This section includes procedural requirements for cutting and patching.
B. Definition: Cutting and patching includes cutting into existing construction to provide for the installation or performance of other work and subsequent fitting and repair required to restore surfaces to their original condition.
C. Refer to other sections for other requirements and limitations applicable to cutting and patching individual parts of the Work.
D. Coordinate cutting and patching with demolition requirements specified in Division 1 Section "Selective Demolition".
1.2 SUBMITTALS
A. Cutting and Patching Plan: Submit a proposal to the Contracting Officer's representative, describing procedures at least 14 calendar days in advance of the time cutting and patching will initially be performed.
1. Include the following information, as applicable:
a. Description of the extent of cutting and patching required. Show how it will be performed and indicate why it cannot be avoided.
b. Description of the anticipated results in terms of changes to existing construction.
Include changes to structural elements and operating components as well as changes in appearance and other significant visual elements.
c. List of products to be used and entities that will perform work.
d. Dates and hours of operation when cutting and patching will be performed.
e. Compatibility and cohesion characteristics of patching compounds with adjacent materials.
f. Details and engineering calculations showing integration of reinforcement with the original structure, where cutting and patching involves adding reinforcement to structural elements.
2. Approval by the Contracting Officer or Contracting Officer's Technical Representative to proceed with cutting and patching does not waive the right to later require complete removal and replacement of unsatisfactory work.
1.3 QUALITY ASSURANCE
A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would change their load-carrying capacity or load-deflection ratio.
SUMMER CONSULTANTS, INC. 024119.1 - 2 MCLEAN, VIRGINIA
1. The cutting and patching plan shall include but not be necessarily limited to work required at the following structural elements:
a. Structural/roof decking.
b. Roof systems, including finished membrane, insulation and vapor barriers
c. Miscellaneous structural metals.
d. Equipment supports.
e. Piping, ductwork, vessels, and equipment.
f. Structural systems of other construction.
g. Core drilling for pipe penetrations.
B. Operational Limitations: Do not cut and patch operating elements, safety related systems, or related components in a manner that would result in reducing their capacity to perform as intended. Do not cut and patch operating elements, safety related systems or related components in a manner that would result in increased maintenance or decreased operational life or safety.
1. The cutting and patching plan shall include but not be necessarily limited to work required at the following operating elements or safety related systems:
a. Primary operational systems and equipment.
b. Water, moisture, or vapor barriers.
c. Membranes and flashings.
d. Fire protection systems.
e. Electrical wiring systems.
f. Operating systems of other construction.
1.4 EXISTING WARRANTIES
A. Replace, patch, and repair material and surfaces cut or damaged by methods and with materials in such a manner as not to avoid any existing warranties.
B. Roof Warranty: The contractor shall coordinate all work with the existing roof to maintain existing warranties. Generally, any work on existing roofs must be performed by or in accordance to the existing roofing manufacturer's guidelines and standards. This item must be coordinated through the COTR and factored into the Contractor's overall project schedule for performing this work
PART 2 - PRODUCTS
2.1 MATERIALS
A. Use materials identical to existing materials to the maximum extent available.
B. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
C. Use materials whose installed performance will equal or surpass that of existing materials.
SUMMER CONSULTANTS, INC. 024119.1 - 3 MCLEAN, VIRGINIA
PART 3 - EXECUTION
3.1 INSPECTION
A. Before cutting, examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. If unsafe or unsatisfactory conditions are encountered, take corrective action before proceeding.
B. Before proceeding with cutting and patching involving two or more trades, meet at the Project site with the entities providing or affected by the cutting and patching. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.
3.2 PREPARATION
A. Provide temporary support of work to be cut.
B. Protect existing conditions during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations.
C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
D. Bypass in-service existing pipe, conduit, or ductwork scheduled to be removed or relocated before cutting.
3.3 PERFORMANCE
A. Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.
B. Cutting: Cut existing construction using methods least likely to damage elements retained and adjoining construction. Where possible, review proposed procedures with the original installer and comply with the original installer's recommendations.
1. In general, use hand or small power tools designed for sawing or grinding, not for hammering and chopping.
2. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
3. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.
4. Cut through concrete using a cutting machine, such as a Carborundum saw or a diamond-core drill.
5. After utility services are bypassed, cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting.
C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances.
SUMMER CONSULTANTS, INC. 024119.1 - 4 MCLEAN, VIRGINIA
1. Where feasible, inspect and test patched areas to demonstrate integrity of the installation.
2. Restore exposed finishes of patched areas and extend finish restoration into adjoining construction in a manner that will eliminate evidence of patching and refinishing.
3.4 CLEANING
A. Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar items.
B. Thoroughly clean piping, conduit, and similar features before applying paint, restored pipe coverings, or other finishing materials.
END OF SECTION 024119.1
SUMMER CONSULTANTS, INC. 040110 - 1 MCLEAN, VIRGINIA
SECTION 040110 - MASONRY CLEANING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes cleaning the following:
1. Unit masonry surfaces.
2. Terra cotta masonry units
1.3 DEFINITIONS
A. Very Low-Pressure Spray: Under 100 psi
1.4 SEQUENCING AND SCHEDULING
A. Work Sequence: Perform masonry-cleaning work in the following sequence:
1. Remove plant growth.
2. Inspect for open mortar joints. Where repairs are required, delay further cleaning work until after repairs are completed, cured, and dried to prevent the intrusion of water and other cleaning materials into the wall.
3. Clean masonry surfaces.
4. Where water repellents are to be used on or near masonry, delay application of these chemicals until after cleaning.
5. Selectively remove all terra cotta masonry units by hand before each is cleaned individually.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include material descriptions and application instructions.
2. Include test data substantiating that products comply with requirements.
SUMMER CONSULTANTS, INC. 040110 - 2 MCLEAN, VIRGINIA
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For paint-remover manufacturer and chemical-cleaner manufacturer.
B. Preconstruction Test Reports: For cleaning materials and methods.
C. Cleaning program.
1.7 QUALITY ASSURANCE
A. Chemical-Cleaner Manufacturer Qualifications: A firm regularly engaged in producing masonry cleaners that have been used for similar applications with successful results.
B. Cleaning Program: Prepare a written cleaning program that describes cleaning process in detail, including materials, methods, and equipment to be used; protection of surrounding materials;
and control of runoff during operations. Include provisions for supervising worker performance and preventing damage.
1. If materials and methods other than those indicated are proposed for any phase of cleaning work, add a written description of such materials and methods, including evidence of successful use on comparable projects and demonstrations to show their effectiveness for this Project.
1.8 FIELD CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit masonry-cleaning work to be performed according to product manufacturers' written instructions and specified requirements.
B. Clean masonry surfaces only when air temperature is 40 deg F and above and is predicted to remain so for at least seven days after completion of cleaning.
PART 2 - PRODUCTS
2.1 CLEANING MATERIALS
A. Water: Potable.
B. Hot Water: Water heated to a temperature of 140 to 160 deg F.
C. Detergent Solution, Job Mixed: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 1/2 cup of laundry detergent, and 20 quarts of hot water for every 5 gal.
of solution required.
D. Mold, Mildew, and Algae Remover, Job Mixed: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 5 quarts of 5 percent sodium hypochlorite (bleach), and 15 quarts of hot water for every 5 gal. of solution required.
SUMMER CONSULTANTS, INC. 040110 - 3 MCLEAN, VIRGINIA
E. Nonacidic Liquid Cleaner: Manufacturer's standard mildly alkaline liquid cleaner formulated for removing mold, mildew, and other organic soiling from ordinary building materials, including polished stone, brick, aluminum, plastics, and wood.
2.2 CHEMICAL CLEANING SOLUTIONS
A. Dilute chemical cleaners with water to produce solutions not exceeding concentration recommended in writing by chemical-cleaner manufacturer.
PART 3 - EXECUTION
3.1 PROTECTION
A. Comply with each manufacturer's written instructions for protecting building and other surfaces against damage from exposure to its products. Prevent paint removers and chemical cleaning solutions from coming into contact with people, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact.
1. Do not apply chemical solutions during winds of enough force to spread them to unprotected surfaces.
2. Neutralize alkaline and acid wastes before disposal.
3. Dispose of runoff from operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.
3.2 CLEANING MASONRY, GENERAL
A. Cleaning Appearance Standard: Cleaned surfaces are to have a uniform appearance as viewed from 20 feet away by NIST Historic Preservation Officer and COTR.
B. Proceed with cleaning in an orderly manner.
C. Use only those cleaning methods indicated for each masonry material and location.
1. Brushes: Do not use wire brushes or brushes that are not resistant to chemical cleaner being used.
2. Spray Equipment: Use spray equipment that provides controlled application at volume and pressure indicated, measured at nozzle. Adjust pressure and volume to ensure that cleaning methods do not damage surfaces, including joints.
a. Equip units with pressure gages.
b. For chemical-cleaner spray application, use low-pressure tank or chemical pump suitable for chemical cleaner indicated, equipped with nozzle having a cone-shaped spray.
c. For water-spray application, use fan-shaped spray that disperses water at an angle of 25 to 50 degrees.
d. For high-pressure water-spray application, use fan-shaped spray that disperses water at an angle of at least 40 degrees.
SUMMER CONSULTANTS, INC. 040110 - 4 MCLEAN, VIRGINIA
e. For heated water-spray application, use equipment capable of maintaining temperature between 140 and 160 deg F at flow rates indicated.
f. For steam application, use steam generator capable of delivering live steam at nozzle.
D. Perform each cleaning method indicated in a manner that results in uniform coverage of all surfaces, including corners, moldings, and interstices, and that produces an even effect without streaking or damaging masonry surfaces. Keep wall wet below area being cleaned to prevent streaking from runoff.
E. Perform additional general cleaning, paint and stain removal, and spot cleaning of small areas that are noticeably different when viewed according to the "Cleaning Appearance Standard" Paragraph, so that cleaned surfaces blend smoothly into surrounding areas.
F. Water Application Methods:
1. Water-Soak Application: Soak masonry surfaces by applying water continuously and uniformly to limited area for time indicated. Apply water at low pressures and low volumes in multiple fine sprays using perforated hoses or multiple spray nozzles. Erect a protective enclosure constructed of polyethylene sheeting to cover area being sprayed.
2. Water-Spray Applications: Unless otherwise indicated, hold spray nozzle at least 6 inches (150 mm) from masonry surface and apply water in horizontal back-and-forth sweeping motion, overlapping previous strokes to produce uniform coverage.
G. Steam Cleaning: Apply steam to masonry surfaces at the very low pressures indicated for each type of masonry. Hold nozzle at least 6 inches from masonry surface and apply steam in horizontal back-and-forth sweeping motion, overlapping previous strokes to produce uniform coverage.
H. Chemical-Cleaner Application Methods: Apply chemical cleaners to masonry surfaces according to chemical-cleaner manufacturer's written instructions; use brush application. Do not allow chemicals to remain on surface for periods longer than those indicated or recommended in writing by manufacturer.
I. Rinse off chemical residue and soil by working upward from bottom to top of each treated area at each stage or scaffold setting. Periodically during each rinse, test pH of rinse water running off of cleaned area to determine that chemical cleaner is completely removed.
1. Apply neutralizing agent and repeat rinse if necessary to produce tested pH of between
6.7 and 7.5.
J. After cleaning is complete, remove protection no longer required. Remove tape and adhesive marks.
3.3 PRELIMINARY CLEANING
A. Removing Plant Growth: Completely remove visible plant, moss, and shrub growth from masonry surfaces. Carefully remove plants, creepers, and vegetation by cutting at roots and allowing remaining growth to dry as long as possible before removal. Remove loose soil and plant debris from open joints to whatever depth they occur.
SUMMER CONSULTANTS, INC. 040110 - 5 MCLEAN, VIRGINIA
B. Preliminary Cleaning: Before beginning general cleaning, remove extraneous substances that are resistant to planned cleaning methods. Extraneous substances include paint, calking, asphalt, and tar.
1. Carefully remove heavy accumulations of rigid materials from masonry surface with sharp chisel. Do not scratch or chip masonry surface.
3.4 CLEANING MASONRY
A. Cold-Water Wash: Use cold water applied by hand.
B. Hot-Water Wash: Use hot water applied by hand.
C. Steam Cleaning: Apply steam at very low pressures not exceeding 30 psi. Remove dirt softened by steam with wood scrapers, stiff-nylon or -fiber brushes, or cold-water wash, as indicated by cleaning tests.
D. Detergent Cleaning:
1. Wet surface with hot water applied by hand.
2. Scrub surface with detergent solution using medium-soft brushes until soil is thoroughly dislodged and can be removed by rinsing. Use small brushes to remove soil from mortar joints and crevices. Dip brush in solution often to ensure that adequate fresh detergent is used and that surface remains wet.
3. Rinse with cold water applied by hand to remove detergent solution and soil.
4. Repeat cleaning procedure above where required to produce cleaning effect established by mockup.
E. Mold, Mildew, and Algae Removal:
1. Wet surface with hot water applied by low-pressure spray.
2. Apply mold, mildew, and algae remover by brush.
3. Scrub surface with medium-soft brushes until mold, mildew, and algae are thoroughly dislodged and can be removed by rinsing. Use small brushes for mortar joints and crevices. Dip brush in mold, mildew, and algae remover often to ensure that adequate fresh cleaner is used and that surface remains wet.
4. Rinse with cold water applied by hand to remove mold, mildew, and algae remover and soil.
5. Repeat cleaning procedure above where required to produce cleaning effect established by mockup.
F. Nonacidic Liquid Chemical Cleaning:
1. Wet surface with cold water applied by hand.
2. Apply cleaner to surface in two applications by brush.
3. Let cleaner remain on surface for period recommended in writing by chemical-cleaner manufacturer.
4. Rinse with cold water applied by hand to remove chemicals and soil.
SUMMER CONSULTANTS, INC. 040110 - 6 MCLEAN, VIRGINIA
5. Repeat cleaning procedure above where required to produce cleaning effect established by mockup. Do not repeat more than once. If additional cleaning is required, use steam cleaning.
3.5 FINAL CLEANING
A. Clean adjacent nonmasonry surfaces of spillage and debris. Use detergent and soft brushes or cloths.
B. Remove debris from gutters and downspouts. Rinse off roof and flush gutters and downspouts.
C. Remove masking materials, leaving no residues that could trap dirt.
END OF SECTION 040110
SUMMER CONSULTANTS, INC. 042000 - 1 MCLEAN, VIRGINIA
SECTION 042000 - UNIT MASONRY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Concrete masonry units.
2. Face brick.
3. Terra cotta masonry units
4. Mortar and grout.
5. Masonry-joint reinforcement.
6. Ties and anchors.
7. Embedded flashing.
8. Miscellaneous masonry accessories.
B. Related Requirements:
1. Section 013510 “Special Procedures for Historic Treatment”
2. Section 040110 " Masonry Cleaning".
1.3 DEFINITIONS
A. CMU(s): Concrete masonry unit(s).
B. Reinforced Masonry: Masonry containing reinforcing steel in grouted cells.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Samples for Initial Selection:
1. Building (common) brick: Provide range of three color samples intended to match existing. Provide no fewer than ten (10) bricks in each color sample to indicate representative range of variation within the sample.
SUMMER CONSULTANTS, INC. 042000 - 2 MCLEAN, VIRGINIA
2. Terra cotta masonry unit: The design intent is to reuse only existing selectively removed terra cotta masonry units. In the event that sufficient exiting units cannot be removed and retained for reuse, subject to approval by the NIST Historic Preservation Officer and by the COTR, the contractor may use new terra cotta masonry units to match existing.
Provide a sample of no fewer than four units intended to match existing, representative of the range of color variation anticipated for the material.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For testing agency.
B. Material Certificates: For each type and size of the following:
1. Masonry units.
a. For brick, include size-variation data verifying that actual range of sizes falls within specified tolerances.
b. For exposed brick, include test report for efflorescence according to ASTM C 67.
2. Cementitious materials. Include name of manufacturer, brand name, and type.
3. Mortar admixtures.
4. Preblended, dry mortar mixes. Include description of type and proportions of ingredients.
5. Grout mixes. Include description of type and proportions of ingredients.
6. Reinforcing bars.
7. Joint reinforcement.
8. Anchors, ties, and metal accessories.
C. Mix Designs: For each type of mortar. Include description of type and proportions of ingredients.
1. Include test reports for mortar mixes required to comply with property specification. Test according to ASTM C 109/C 109M for compressive strength, ASTM C 1506 for water retention, and ASTM C 91/C 91M for air content.
2. Include test reports, according to ASTM C 1019, for grout mixes required to comply with compressive strength requirement.
1.7 QUALITY ASSURANCE
A. Testing Agency Qualifications: Qualified according to ASTM C 1093 for testing indicated.
B. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for materials and execution.
1. Build mockup to include base course of face brick as indicated on drawings and no fewer than eleven (11) terra cotta masonry units. Construct mockup in final installed location.
Following acceptance by NIST Historic Preservation Officer and COTR, mock up may be incorporated into the finished work.
2. Where masonry is to match existing, erect mockups adjacent and parallel to existing surface.
SUMMER CONSULTANTS, INC. 042000 - 3 MCLEAN, VIRGINIA
3. Acceptance of mockups is for color, texture, and blending of masonry units; relationship of mortar and sealant colors to masonry unit colors; tooling of joints; and aesthetic qualities of workmanship.
a. Acceptance of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.
4. Subject to compliance with requirements, accepted mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Store masonry units on elevated platforms in a dry location. If units are not stored in an enclosed location, cover tops and sides of stacks with waterproof sheeting, securely tied. If units become wet, do not install until they are dry.
B. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.
C. Store aggregates where grading and other required characteristics can be maintained and contamination avoided.
D. Deliver preblended, dry mortar mix in moisture-resistant containers. Store preblended, dry mortar mix in delivery containers on elevated platforms in a dry location or in covered weatherproof dispensing silos.
E. Store masonry accessories, including metal items, to prevent corrosion and accumulation of dirt and oil.
1.9 FIELD CONDITIONS
A. Protection of Masonry: During construction, cover tops of walls, projections, and sills with waterproof sheeting at end of each day's work. Cover partially completed masonry when construction is not in progress.
1. Extend cover a minimum of 24 inches down both sides of walls, and hold cover securely in place.
2. Where one wythe of multiwythe masonry walls is completed in advance of other wythes, secure cover a minimum of 24 inches down face next to unconstructed wythe, and hold cover in place.
B. Do not apply uniform floor or roof loads for at least 12 hours and concentrated loads for at least three days after building masonry walls or columns.
C. Stain Prevention: Prevent grout, mortar, and soil from staining the face of masonry to be left exposed or painted. Immediately remove grout, mortar, and soil that come in contact with such masonry.
SUMMER CONSULTANTS, INC. 042000 - 4 MCLEAN, VIRGINIA
1. Protect base of walls from rain-splashed mud and from mortar splatter by spreading coverings on ground and over wall surface.
2. Protect sills, ledges, and projections from mortar droppings.
3. Protect surfaces of window and door frames, as well as similar products with painted and integral finishes, from mortar droppings.
4. Turn scaffold boards near the wall on edge at the end of each day to prevent rain from splashing mortar and dirt onto completed masonry.
D. Cold-Weather Requirements: Do not use frozen materials or materials mixed or coated with ice or frost. Do not build on frozen substrates. Remove and replace unit masonry damaged by frost or by freezing conditions. Comply with cold-weather construction requirements contained in
TMS 602/ACI 530.1/ASCE 6.
1. Cold-Weather Cleaning: Use liquid cleaning methods only when air temperature is 40 deg F and higher and will remain so until masonry has dried, but not less than seven days after completing cleaning.
E. Hot-Weather Requirements: Comply with hot-weather construction requirements contained in
TMS 602/ACI 530.1/ASCE 6.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations for Masonry Units: Obtain exposed masonry units of a uniform texture and color, or a uniform blend within the ranges accepted for these characteristics, from single source from single manufacturer for each product required.
B. Source Limitations for Mortar Materials: Obtain mortar ingredients of a uniform quality, including color for exposed masonry, from single manufacturer for each cementitious component and from single source or producer for each aggregate.
2.2 UNIT MASONRY, GENERAL
A. Masonry Standard: Comply with TMS 602/ACI 530.1/ASCE 6, except as modified by requirements in the Contract Documents.
B. Defective Units: Referenced masonry unit standards may allow a certain percentage of units to contain chips, cracks, or other defects exceeding limits stated.
2.3 CONCRETE MASONRY UNITS
A. Shapes: Provide shapes indicated and as follows, with exposed surfaces matching exposed faces of adjacent units unless otherwise indicated.
1. Provide special shapes for lintels, corners, jambs, sashes, movement joints, headers, bonding, and other special conditions.
2. Provide square-edged units for outside corners unless otherwise indicated.
SUMMER CONSULTANTS, INC. 042000 - 5 MCLEAN, VIRGINIA
B. Integral Water Repellent: Provide units made with integral water repellent.
1. Integral Water Repellent: Liquid polymeric, integral water-repellent admixture that does not reduce flexural bond strength. Units made with integral water repellent, when tested according to ASTM E 514/E 514M as a wall assembly made with mortar containing integral water-repellent manufacturer's mortar additive, with test period extended to 24 hours, shall show no visible water or leaks on the back of test specimen.
C. CMUs: ASTM C 90.
1. Unit Compressive Strength: Provide units with minimum average net-area compressive strength of 3050 psi.
2. Density Classification: Normal weight.
3. Size (Width): Manufactured to dimensions 3/8 inch less than nominal dimensions.
2.4 BRICK
A. General: Provide shapes indicated and as follows, with exposed surfaces matching finish and color of exposed faces of adjacent units:
1. For ends of sills and caps and for similar applications that would otherwise expose unfinished brick surfaces, provide units without cores or frogs and with exposed surfaces finished.
B. Face Brick: Facing brick complying with ASTM C 216.
1.
2. Grade: SW.
3. Type: FBX or HBX.
4. Unit Compressive Strength: Provide units with minimum average net-area compressive strength of 4950 psi.
5. Initial Rate of Absorption: Less than 30 g/30 sq. in. per minute when tested according to
ASTM C 67.
6. Efflorescence: Provide brick that has been tested according to ASTM C 67 and is rated
"not effloresced."
7. Size (Actual Dimensions): To match existing.
2.5 TERRA COTTA MASONRY UNITS
A. It is the design intent to use terra cotta masonry units exclusively salvaged from the original existing construction. As permitted by the COTR, if a sufficient quantity of existing units cannot be salvaged, new terra cotta masonry units to match existing may be used to the extent that there is a shortfall of original materials. The new units shall be made from terra cotta chimney lining units cut to width to match the existing terra cotta masonry units.
B. Size: As indicated on the drawings and to match existing
C. Terra cotta masonry units: ASTM C 315.
SUMMER CONSULTANTS, INC. 042000 - 6 MCLEAN, VIRGINIA
2.6 MORTAR AND GROUT MATERIALS
A. Portland Cement: ASTM C 150/C 150M, Type I or II, except Type III may be used for cold-weather construction. Provide natural color or white cement as required to produce mortar color indicated.
1. Alkali content shall not be more than 0.1 percent when tested according to ASTM C 114.
B. Hydrated Lime: ASTM C 207, Type S.
C. Portland Cement-Lime Mix: Packaged blend of portland cement and hydrated lime containing no other ingredients.
D. Masonry Cement: ASTM C 91/C 91M.
E. Mortar Pigments: Natural and synthetic iron oxides and chromium oxides, compounded for use in mortar mixes and complying with ASTM C 979/C 979M. Use only pigments with a record of satisfactory performance in masonry mortar.
F. Aggregate for Mortar: ASTM C 144.
1. For mortar that is exposed to view, use washed aggregate consisting of natural sand or crushed stone.
2. For joints less than 1/4 inch thick, use aggregate graded with 100 percent passing the No. 16 (1.18-mm) sieve.
3. White-Mortar Aggregates: Natural white sand or crushed white stone.
4. Colored-Mortar Aggregates: Natural sand or crushed stone of color necessary to produce required mortar color.
G. Cold-Weather Admixture: Nonchloride, noncorrosive, accelerating admixture complying with ASTM C 494/C 494M, Type C, and recommended by manufacturer for use in masonry mortar of composition indicated.
H. Water-Repellent Admixture: Liquid water-repellent mortar admixture intended for use with CMUs containing integral water repellent from same manufacturer.
I. Water: Potable.
2.7 REINFORCEMENT
A. Uncoated-Steel Reinforcing Bars: ASTM A 615/A 615M or ASTM A 996/A 996M, Grade 60 (Grade 420).
B. Reinforcing Bar Positioners: Wire units designed to…