Solicitation Air Handlers 5-3-10.doc

DOC document 615 KB Posted

Attached to
BASE NOTICE: RECOVERY- REPAIR, REPLACEMENT OF HEATING VENTILLATION AND AIR CONDITIONING UNITS AT NIST GAITHERSBURG, MD
Solicitation number
SB1341-10-RP-0047
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Q R 6-15-10.doc DOC document
AHUQA18June2010pm.doc DOC document
Amendment 7 to SB1341-10-RP-0047.doc DOC document
Questions and ResponsesAHU 6-23-10.doc DOC document
Attachment A- NIST Bldg 245 ACU 1A Hot Water Coil Schedule.pdf PDF
AHU questions and answers 6-17-10.doc DOC document
Amendment 0005 6-11-10.doc DOC document
AHU q a 6-10-10.doc DOC document
EHXBIT ACU Casing Sizes Per building —
Amendment 0004 6-9-10.doc DOC document
Amendment 0003 6-1-10.doc DOC document
Questions and Responses to SB1341.doc DOC document
Amendment 0002 SB1341-10-RP-0047.doc DOC document
visitor's log.pdf PDF
revised Section K.doc DOC document
2-Table of Contents.doc DOC document
15725 Modular Indoor Central-Station Air-Handling Units.doc DOC document
Bldg 225.zip ZIP file
Bldg 231.zip ZIP file
Fraud Prevention Presentation.pptx PPTX presentation
Bldg 220 Part 2.zip ZIP file
Bldg 245 Part 2.zip ZIP file
Bldg 221 Part 1.zip ZIP file
Bldg 236.zip ZIP file
Bldg 220 Part 1.zip ZIP file
Specs HVAC 4-26-10.zip ZIP file
Bldg 230.zip ZIP file
Bldg 221 Part 2.zip ZIP file
Bldg 202.zip ZIP file
Bldg 245 Part 1.zip ZIP file
Bldg 224.zip ZIP file
Bldg 223.zip ZIP file
Bldg 235.zip ZIP file
Bldg 226.zip ZIP file
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER, AND AWARD

1. Solicitation No.
2. Type of Solicitation
3. Date Issued
Page of Pages
SB1341-10-RP-0047
Sealed Bid (IFB)
May 5, 2010
1
Of
80

(Construction, Alteration, or Repair)

X
Negotiated (RFP)

IMPORTANT – The “offer” section on the reverse must be fully completed by offeror.

4. Contract No.
5. Requisition/Purchase Request No.
6. Project No.
NB190000-A-04601
7. Issued By
Code 000SB
8. Address Offer to
Code 000SB
NATIONAL INST OF STDS AND TECHNOLOGY
NATIONAL INST OF STDS AND TECHNOLOGY
100 BUREAU DRIVE STOP 1640
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B125
BUILDING 301 ROOM B125
GAITHERSBURG, MD 20899-1640
GAITHERSBURG, MD 20899-1640
9. For Information Call:
A. Name
B. Telephone No. (Include area code) (No Collect Calls)
ALBERT PETTO (ID BAW)
301-975-6338

ALBERT.PETTO@NIST.GOV

SOLICITATION

NOTE: In sealed bid solicitation “offer” and “offeror” mean “bid” and “bidder”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: (Title, Identifying No., Date)

SBA REQUIREMENT NUMBER: 0353/10/003719/01

THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR, EQUIPMENT, AND MATERIAL TO REFURBISH AIR HANDLING UNITS (AHU), AT THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLGY, GAITHERSBURG, MARYLAND CAMPUS.

THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $5,000,000 - $10,000,000

THIS REQUIREMENT IS 100% FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009.

THE REQUIREMENT IS A 100% SET-ASIDE FOR AN 8(a) SMALL BUSINESS WITH A NAICS CODE OF 238220 AND INCLUDES A SMALL BUSINESS STANDARD OF $14.0M

11. The Contractor shall begin performance within 30 calendar days and complete it within 545 calendar days after receiving the

award,
X
notice to proceed. This performance period is
X
mandatory
negotiable. ( See .)
12A. The Contractor must furnish any required performance and payment bonds?
12B. Calendar Days
(If “YES”, indicate within how many calendar days after award in item 12B.)
10
X
Yes
No

13. Additional Solicitation Requirements:

A. Sealed offers in original and 5 copies to perform the work required are due at the place specified in Item 8 by 12:00 PM (hour) local time

June 14, 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee
X
is
Is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101
Standard Form 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1 (e)

OFFER (Must be fully completed by offeror)

14. Name and Address of Offeror (Include ZIP Code)

15. Telephone No. (Include are code)

15. Remittance Address (Include on it different than Item 14)

Code Facility Code

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this is accepted by the Government in writing within ________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendment to the solicitation - give number and data of each)

AMENDMENT

No.

DATE

20A NAME,TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print)
20B. SIGNATURE
20c. OFFER DATE

AWARD (to be completed by Government)

21. ITEM(S) ACCEPTED

22. Amount

23. Accounting and Appropriation Data

24. Submit Invoices to Address shown above

(4 copies unless otherwise specified)

Item

25. Other Than full and open competition pursuant to

10 U.S.C. 2304(c) ( )
41 U.S.C 253 (c) ( )
26. Administered by
Payment will be made by

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work, requisition stated in this contract. The rights and obligation s of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and(c) the clauses, representations certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. Name and Title of Contractor or Person authorized

31A. Name of Contracting Officer (Type or Print)

30b. Signature
30C. Date
31B. United States of America
31C. Award Date
By

STANDARD FORM 1442 BACK (REV. 4-85)

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) HVAC REFURBISHMENT CONSTRUCTION SOLICITATION

0001
BASE CONTRACT - Within seven (7) days of contract award, the Contractor shall provide a Safety Plan in accordance with the Attachment 2 entitled "Construction Safety Instructions" located in Section J, of this Solicitation.

NOTE: The Contractor shall not be allowed to begin work until the site specific safety plan is approved

1
JB
______________
______________

FOB: Destination

0002
BASE CONTRACT - The Contractor shall provide all supervision, labor, equipment, and material to perform refurbishment to the AHUs along with the respective DDC system in nine buildings (9) buildings located acrosss the National Institute of Standards and Technology's (NIST) Gaithersburg campus. The Buildings are listed at CLIN0002 through CLIN0010.

The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 202. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.

1
JB
______________
______________

FOB: Destination

0003
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 220.All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0004
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 221.All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0005
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 223. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0006
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 224. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0007
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 225. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0008
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 226. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0009
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 235. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0010
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishement work associated with Building 231. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.

TOTAL OF CONTRACT LINE ITEM NUMBERS 0001 THROUGH 0010.

1
JB
______________
______________

FOB: Destination

OPTIONS/ ALTERNATES ARE IDENTIFIED AS "ADDITIVE/ALTERNATES" IN THE SPECIFICATIONS AND DRAWINGS.

0011
Option/Alternate #1 - The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 245. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0012
Option/Alternate #2 - The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 230. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0013
Option/Alternate #3 - The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 236. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

10SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 Statement of Work

SECTION D - PACKAGING AND MARKING

D.1 Marking of Deliverables

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

E.2 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)

SECTION F - DELIVERIES OR PERFORMANCE

F.1 52.242-14 SUSPENSION OF WORK (APR 1984)

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

F.3 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 1352.201-70 CONTRACTING OFFICER'S AUTHORITY (APR 2010)

G.2 1352.201-72 CONTRACTING OFFICER'S REPRESENTATIVE (C0R) (APR 2010)

G.3 1352.237-74 PROGRESS REPORTS (APR 2010)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)

H.2 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)

H.3 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

H.4 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

H.5 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

H.6 1352.219-72 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(a) CONCERNS, ALTERNATE III (DEVIATION) (APR 2010)

H.7 1352.228-70 INSURANCE COVERAGE (APR 2010)

H.8 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

H.9 1352.237-75 KEY PERSONNEL (APR 2010)

SECTION I - CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.2 52.202-1 DEFINITIONS (JUL 2004)

I.3 52.203-3 GRATUITIES (APR 1984)

I.4 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)

I.5 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

I.6 52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)

I.7 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997) I.8 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997) I.9 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2007)

I.10 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

I.11 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)

I.12 52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAR 2009)

I.13 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (AUG 2000)

I.14 52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)

I.15 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT REPORTING REQUIREMENTS (MAR 2009) I.16 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (SEP 2006)

I.17 RESERVED

I.18 52.215-2 I AUDIT AND RECORDS--NEGOTIATION (MAR 2009)--ALTERNATE I

I.19 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

I.20 52.215-11 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--MODIFICATIONS (OCT 1997)

I.21 52.215-13 SUBCONTRACTOR COST OR PRICING DATA--MODIFICATIONS (OCT 1997)

I.22 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

I.23 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JUN 2003)

I.24 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2004)

I.25 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)

I.26 52.219-18 RESERVED

I.27 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (APR 2009)

I.28 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

I.29 52.222-3 CONVICT LABOR (JUN 2003)

I.30 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--OVERTIME COMPENSATION (JUL 2005)

I.31 52.222-6 DAVIS-BACON ACT (JUL 2005)

I.32 52.222-7 WITHHOLDING OF FUNDS (FEB 1988)

I.33 52.222-8 PAYROLLS AND BASIC RECORDS (FEB 1988)

I.34 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

I.35 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

I.36 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (JUL 2005)

I.37 52.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)

I.38 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (FEB 1988)

I.39 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

I.40 52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)

I.41 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)

I.42 52.222-26 EQUAL OPPORTUNITY (MAR 2007)

I.43 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999) I.44 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS. [SEP 2006]

I.45 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)

I.46 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)

I.47 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)

I.48 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)

I.49 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (DEC 2007) I.50 52.223-3 I HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)-- ALTERNATE I (JUL 1995)

I.51 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)

I.52 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (AUG 2003)

I.53 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I.54 52.223-14 TOXIC CHEMICAL RELEASE REPORTING (AUG 2003)

I.55 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)

I.56 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)

I.57 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

I.58 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

I.59 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)

I.60 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)

I.61 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

I.62 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

I.63 52.228-11 PLEDGES OF ASSETS (SEP 2009)

I.64 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (OCT 1995)

I.65 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (NOV 2006)

I.66 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (APR 2003)

I.67 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (SEP 2002)

I.68 52.232-16 I PROGRESS PAYMENTS (APR 2003)--ALTERNATE I (MAR 2000)

I.69 52.232-17 INTEREST (OCT 2008)

I.70 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)

I.71 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (OCT 2008)

I.72 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR REGISTRATION (OCT 2003)

I.73 52.233-1 DISPUTES (JUL 2002)

I.74 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I.75 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I.76 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

I.77 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

I.78 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

I.79 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

I.80 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

I.81 52.236-8 OTHER CONTRACTS (APR 1984)

I.82 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

I.83 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

I.84 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

I.85 52.236-12 CLEANING UP (APR 1984)

I.86 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

I.87 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

I.88 52.236-17 LAYOUT OF WORK (APR 1984)

I.89 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

I.90 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

I.91 52.242-13 BANKRUPTCY (JUL 1995)

I.92 52.242-14 SUSPENSION OF WORK (APR 1984)

I.93 52.243-4 CHANGES (JUN 2007)

I.94 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2010)

I.95 52.245-1 GOVERNMENT PROPERTY (JUN 2007)

I.96 52.245-9 USE AND CHARGES (JUN 2007)

I.97 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

I.98 52.248-3 VALUE ENGINEERING--CONSTRUCTION (SEP 2006)

I.99 52.249-2 I TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (MAY 2004)-- ALTERNATE I (SEP 1996)

I.100 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

I.101 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I.102 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (SEP 2007)

I.103 52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989) I.104 52.219-18 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(a) CONCERNS. (DEVIATION)(JULY 2008) I.105 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) I.106 52.225-23 REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER MANUFACTURED GOODS--BUY AMERICAN ACT--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (AUG 2009) I.107 52.225-24 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER MANUFACTURED GOODS--BUY AMERICAN ACT--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAR 2009)

I.108 52.228-1 BID GUARANTEE (SEP 1996)

I.109 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

I.110 52.236-13 I ACCIDENT PREVENTION (NOV 1991)--ALTERNATE I (NOV 1991)

I.111 NIST LOCAL_04 BILLING INSTRUCTIONS

SECTION J.1 - LIST OF ATTACHMENTS

J.2 Attachment 1: General Decision J.3 Attachment 2: Safety Procedure J.4 Attachment 3: Guidelines

SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K.1 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2007) K.2 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2007) K.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) K.4 52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS (DEC 2001)

K.5 52.223-1 BIOBASED PRODUCT CERTIFICATION (DEC 2007)

K.6 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)

K.7 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

K.8 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)

K.9 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)

K.10 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (MAY 2004)

K.11 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)

K.12 52.223-13 CERTIFICATION OF TOXIC CHEMICAL RELEASE REPORTING (AUG 2003)

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L.2 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

L.3 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

L.4 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

L.5 52.232-13 NOTICE OF PROGRESS PAYMENTS (APR 1984)

L.6 1352.215-70 PROPOSAL PREPARATION (APR 2010)

L.7 1352.215-72 INQUIRIES (APR 2010)

L.8 52.216-1 TYPE OF CONTRACT (APR 1984)

L.9 1352.233-70 AGENCY PROTESTS (APR 2010)

L.10 1352.233-71 GAO AND COURT OF FEDERAL CLAIMS PROTESTS (APR 2010)

L.11 1352.242-70 POSTAWARD CONFERENCE (APR 2010)

L.12 1352.270-71 PRE-BID / PRE-PROPOSAL CONFERENCE AND SITE VISIT (APR 2010)

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 52.217-4 EVALUATION OF OPTIONS EXERCISED AT TIME OF CONTRACT AWARD (JUN 1988)

M.2 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

M.3 1352.215-74 BEST VALUE EVALUATION (APR 2010)

M.4 1352.215-75 EVALUATION CRITERIA (APR 2010)

TC "SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT" \f C \l "1"

TC "C.1 Statement of Work " \f C \l "2" C.1 Statement of Work

Statement of Work/Specifications and Drawings.

This project, as detailed in the drawings and specifications in Section J as an at attachment to the solicitation, consists of upgrades to AHU along with DDC system in twelve (12) buildings located throughout the NIST Gaithersburg campus. The work consists of refurbishment of NIST AHUs and upgrades to the direct digital control system.

The additional information is provided to assist the offeror in preparation of proposals by providing conditions to be considered in preparation of proposals and scheduling work. The information does not replace any information contained in the specifications and/or drawings in Section J.

The Government will occupy the site and existing buildings during the entire occupancy period as such the contractor will be limited to working on no more than six (6) air handling units at a time and no more than two (2) air handling units per building. To minimize the operational disruptions to the end user the contractor will be required to give a minimum of two (2) weeks’ notice prior to work commencing in a lab. Twenty Four (24) hours prior to work beginning in a lab the contractor will have all necessary parts and equipment onsite.

The schedule of repair of each AHU in the building shall be based on research activities in the building. NIST COTR will coordinate the schedule of repair of AHU with contractor.

The Contractor shall repair one AHU in wing “A” and one AHU in wing “B”, but no two AHUs in the same wing in a building at the same time.

TC "SECTION D - PACKAGING AND MARKING" \f C \l "1"

TC "D.1 Marking of Deliverables " \f C \l "2" D.1 Marking of Deliverables

Deliverables

The contract number shall be placed on or adjacent to all exterior mailing or shipping labels of deliverable items called for by the contract, except for reports.

Mark deliverables, except for reports, for:

To be determined (TBD) at time of award.

(End of clause) TC "SECTION E - INSPECTION AND ACCEPTANCE" \f C \l "1"

TC "E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)" \f C \l "2"

E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

(Reference 46.312)

TC "E.2 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)" \f C \l "2"

E.2 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)

(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract. (b) The place of acceptance will be:

The National Institute of Standards and Technology

100 Bureau Drive

Gaithersburg, MD 20899

(End of clause)

TC "SECTION F - DELIVERIES OR PERFORMANCE" \f C \l "1"

TC "F.1 52.242-14 SUSPENSION OF WORK (APR 1984)" \f C \l "2"

F.1 52.242-14 SUSPENSION OF WORK (APR 1984)

(Reference 42.1305)

TC "F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)" \f C \l "2"

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to

(a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 545 calendar days from the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

TC "F.3 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)" \f C \l "2"

F.3 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)

(a) The base period of performance of this contract is from the receipt of the notice to proceed for a total of 545 calendar days to include any options exercised.

(b)The notice requirements for unilateral exercise of option periods are set out in FAR 52.217-9.

(End of clause)

TC "SECTION G - CONTRACT ADMINISTRATION DATA" \f C \l "1"

TC "G.1 1352.201-70 CONTRACTING OFFICER'S AUTHORITY (APR 2010)" \f C \l "2"

G.1 1352.201-70 CONTRACTING OFFICER'S AUTHORITY (APR 2010)

(Reference 1301.602-170)

TC "G.2 1352.201-72 CONTRACTING OFFICER'S REPRESENTATIVE (C0R) (APR 2010)" \f C \l "2"

G.2 1352.201-72 CONTRACTING OFFICER'S REPRESENTATIVE (C0R) (APR 2010)

(a) To Be Determined at Award is hereby designated as the Contracting Officer's Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:

100 Bureau Drive

Gaithersburg, MD 20899

Phone Number: 301-975- XXXX

Email: __________

(b) The responsibilities and limitations of the COR are as follows:

(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.

(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.

(End of clause)

TC "G.3 1352.237-74 PROGRESS REPORTS (APR 2010)" \f C \l "2"

G.3 1352.237-74 PROGRESS REPORTS (APR 2010)

The contractor shall submit, to the Government, a progress report every single month(s) after the effective date of the contract, and every month thereafter during the period of performance. The contractor shall deliver progress reports that summarize the work completed during the performance period, the work forecast for the following period, and state the names, titles and number of hours expended for each of the contractor's professional personnel assigned to the contract, including officials of the contractor. The report shall also include any additional information--including findings and recommendations -- that may assist the Government in evaluating progress under this contract. The first report shall include a detailed work outline of the project and the contractor's planned phasing of work by reporting period.

(End of Clause)

TC "SECTION H - SPECIAL CONTRACT REQUIREMENTS" \f C \l "1"

TC "H.1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)" \f C \l "2"

H.1 1352.208-70 RESTRICTIONS ON PRINTING AND DUPLICATING (APR 2010)

(Reference 1308.802-70)

TC "H.2 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)" \f C \l "2"

H.2 1352.209-72 RESTRICTIONS AGAINST DISCLOSURE (APR 2010)

(Reference 1309.507-2)

TC "H.3 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)" \f C \l "2"

H.3 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)

(Reference 1309.507-2)

TC "H.4 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)" \f C \l "2"

H.4 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)

(Reference 1309.507-2)

TC "H.5 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)" \f C \l "2"

H.5 1352.237-71 SECURITY PROCESSING REQUIREMENTS - LOW RISK CONTRACTS (APR 2010)

(Reference 1337.110-70)

TC "H.6 1352.219-72 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(a) CONCERNS, ALTERNATE III (DEVIATION) (APR 2010)" \f C \l "2" H.6 1352.219-72 NOTIFICATION OF COMPETITION LIMITED TO ELIGIBLE 8(a) CONCERNS, ALTERNATE III (DEVIATION) (APR 2010)

(a) Offers are solicited only from small business concerns expressly certified by the Small Business Administration (SBA) for participation in the SBA's 8(a) Program and which meet the following criteria at the time of submission of offers--

(1) The Offeror is in conformance with the 8(a) support limitation set forth in its approved business plan; and

(2) The Offeror is in conformance with the Business Activity Targets set forth in its approved business plan or any remedial action directed by the SBA.

(b) By submission of its offer, the Offeror represents that it meets all of the criteria set forth in paragraph (a) of this clause.

(c) Any award resulting from this solicitation shall be made directly by the Contracting Officer to the successful 8(a) offeror selected through the evaluation criteria set forth in this solicitation.

(d)

(1) Agreement. A small business concern submitting an offer in its own name shall furnish, in performing the contract, only end items manufactured or produced by small business concerns in the United States or its outlying areas. If this procurement is processed under simplified acquisition procedures and the total amount of this contract does not exceed $25,000, a small business concern may furnish the product of any domestic firm. This paragraph does not apply to construction or service contracts.

(2) To Be Determined after Award will notify the National Institute of Standards and Technology Contracting Officer in writing immediately upon entering an agreement (either oral or written) to transfer all or part of its stock or other ownership interest to any other party.

(End of clause)

TC "H.7 1352.228-70 INSURANCE COVERAGE (APR 2010)" \f C \l "2"

H.7 1352.228-70 INSURANCE COVERAGE (APR 2010)

(a) Workers Compensation and Employer's Liability. The contractor is required to comply with applicable federal and state workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

(b) General liability.

(1) The contractor shall have bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.

(2) When special circumstances apply in accordance with FAR 28.307-2(b), Property Damage Liability Insurance shall be required in the amount of $1,000,000.

(c) Automobile liability. The contractor shall have automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

(d) Aircraft public and passenger liability. When aircraft are used in connection with performing the contract, the contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

(e) Vessel liability. When contract performance involves use of vessels, the Contractor shall provide, vessel collision liability and protection and indemnity liability insurance as determined by the Government.

(End of clause)

TC "H.8 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)" \f C \l "2" H.8 1352.228-72 DEDUCTIBLES UNDER REQUIRED INSURANCE COVERAGE- FIXED PRICE (APR 2010)

When the Government is injured, wholly or partially as a result of the contractor's actions and such actions are covered by the insurance required by 1352.228-70, Insurance Coverage, the Government is entitled to recover from the contractor the full amount of any such injury attributable to the contractor regardless of a deductible. The Contracting Officer may offset the amount of recovery against any payment due to the contractor.

(End of clause)

TC "H.9 1352.237-75 KEY PERSONNEL (APR 2010)" \f C \l "2"

H.9 1352.237-75 KEY PERSONNEL (APR 2010)

(a) The contractor shall assign to this contract the following key personnel:

To be Determined at Award Project Manager

To be Determined at Award Site Superintendent

To be Determined at Award Mechanical Superintendent

(b) The contractor shall obtain the consent of the Contracting Officer prior to making key personnel substitutions. Replacements for key personnel must possess qualifications equal to or exceeding the qualifications of the personnel being replaced, unless an exception is approved by the Contracting Officer.

(c) Requests for changes in key personnel shall be submitted to the Contracting Officer at least 15 working days prior to making any permanent substitutions. The request should contain a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. The Contracting Officer will notify the contractor within 10 working days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes.

(End of Clause)

TC "SECTION I - CONTRACT CLAUSES" \f C \l "1"

TC "I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)" \f C \l "2"

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://acquisition.gov/comp/far/index.html

(End of Clause)

TC "I.2 52.202-1 DEFINITIONS (JUL 2004)" \f C \l "2"

I.2 52.202-1 DEFINITIONS (JUL 2004)

(Reference 2.201)

TC "I.3 52.203-3 GRATUITIES (APR 1984)" \f C \l "2"

I.3 52.203-3 GRATUITIES (APR 1984)

(Reference 3.202)

TC "I.4 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)" \f C \l "2"

I.4 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984)

(Reference 3.404)

TC "I.5 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)" \f C \l "2"

I.5 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(Reference 3.503-2)

TC "I.6 52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)" \f C \l "2"

I.6 52.203-7 ANTI-KICKBACK PROCEDURES (JUL 1995)

(Reference 3.502-3)

TC "I.7 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)" \f C \l "2" I.7 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)

(Reference 3.104-9)

TC "I.8 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)" \f C \l "2" I.8 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)

(Reference 3.104-9)

TC "I.9 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2007)" \f C \l "2" I.9 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (SEP 2007)

(Reference 3.808)

TC "I.10 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)" \f C \l "2"

I.10 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

(Reference 3.1004)

TC "I.11 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)" \f C \l "2"

I.11 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007)

(Reference 3.1004)

TC "I.12 52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAR 2009)" \f C \l "2" I.12 52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAR 2009)

(Reference 3.907-7)

TC "I.13 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (AUG 2000)" \f C \l "2"

I.13 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (AUG 2000)

(Reference 4.303)

TC "I.14 52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)" \f C \l "2"

I.14 52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)

(Reference 4.1105)

TC "I.15 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT REPORTING REQUIREMENTS (MAR 2009)" \f C \l "2" I.15 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT REPORTING REQUIREMENTS (MAR 2009)

(Reference 4.1502)

TC "I.16 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (SEP 2006)" \f C \l "2" I.16 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (SEP 2006)

(Reference 9.409)

TC "I.17 RESERVED" \f C \l "2"

I.17 RESERVED

TC "I.18 52.215-2 I AUDIT AND RECORDS--NEGOTIATION (MAR 2009)--ALTERNATE I" \f C \l "2"

I.18 52.215-2 I AUDIT AND RECORDS--NEGOTIATION (MAR 2009)--ALTERNATE I

(Reference 15.209)

TC "I.19 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)" \f C \l "2"

I.19 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(Reference 15.209)

TC "I.20 52.215-11 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--MODIFICATIONS (OCT 1997)" \f C \l "2" I.20 52.215-11 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA--MODIFICATIONS (OCT 1997)

(Reference 15.408)

TC "I.21 52.215-13 SUBCONTRACTOR COST OR PRICING DATA--MODIFICATIONS (OCT 1997)" \f C \l "2"

I.21 52.215-13 SUBCONTRACTOR COST OR PRICING DATA--MODIFICATIONS (OCT 1997)

(Reference 15.408)

TC "I.22 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)" \f C \l "2"

I.22 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(Reference 15.408)

TC "I.23 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JUN 2003)" \f C \l "2"

I.23 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (JUN 2003)

(Reference 19.508)

TC "I.24 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2004)" \f C \l "2"

I.24 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2004)

(Reference 19.708)

TC "I.25 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)" \f C \l "2"

I.25 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEC 1996)

(Reference 19.811-3)

TC "I.26 52.219-18 RESERVED" \f C \l "2"

I.26 RESERVED

TC "I.27 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (APR 2009)" \f C \l "2"

I.27 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (APR 2009)

(Reference 19.308)

TC "I.28 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)" \f C \l "2"

I.28 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

(Reference 22.103-5)

TC "I.29 52.222-3 CONVICT LABOR (JUN 2003)" \f C \l "2"

I.29 52.222-3 CONVICT LABOR (JUN 2003)

(Reference 22.202)

TC "I.30 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--OVERTIME COMPENSATION (JUL 2005)" \f C \l "2" I.30 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT--OVERTIME COMPENSATION (JUL 2005)

(Reference 22.305)

TC "I.31 52.222-6 DAVIS-BACON ACT (JUL 2005)" \f C \l "2"

I.31 52.222-6 DAVIS-BACON ACT (JUL 2005)

(Reference 22.407)

TC "I.32 52.222-7 WITHHOLDING OF FUNDS (FEB 1988)" \f C \l "2"

I.32 52.222-7 WITHHOLDING OF FUNDS (FEB 1988)

(Reference 22.407)

TC "I.33 52.222-8 PAYROLLS AND BASIC RECORDS (FEB 1988)" \f C \l "2"

I.33 52.222-8 PAYROLLS AND BASIC RECORDS (FEB 1988)

(Reference 22.407)

TC "I.34 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)" \f C \l "2"

I.34 52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

(Reference 22.407)

TC "I.35 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)" \f C \l "2"

I.35 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

(Reference 22.407)

TC "I.36 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (JUL 2005)" \f C \l "2"

I.36 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (JUL 2005)

(Reference 22.407)

TC "I.37 52.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)" \f C \l "2"

I.37 52.222-12 CONTRACT TERMINATION--DEBARMENT (FEB 1988)

(Reference 22.407)

TC "I.38 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (FEB 1988)" \f C \l "2" I.38 52.222-13 COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS (FEB 1988)

(Reference 22.407)

TC "I.39 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)" \f C \l "2"

I.39 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

(Reference 22.407)

TC "I.40 52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)" \f C \l "2"

I.40 52.222-15 CERTIFICATION OF ELIGIBILITY (FEB 1988)

(Reference 22.407)

TC "I.41 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)" \f C \l "2"

I.41 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)

(Reference 22.810)

TC "I.42 52.222-26 EQUAL OPPORTUNITY (MAR 2007)" \f C \l "2"

I.42 52.222-26 EQUAL OPPORTUNITY (MAR 2007)

(Reference 22.810)

TC "I.43 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)" \f C \l "2" I.43 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB 1999)

(Reference 22.810)

TC "I.44 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS. [SEP 2006]" \f C \l "2" I.44 52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS. [SEP 2006]

(Reference 22.1310)

TC "I.45 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)" \f C \l "2"

I.45 52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (JUN 1998)

(Reference 22.1408)

TC "I.46 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)" \f C \l "2" I.46 52.222-37 EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS (SEP 2006)

(Reference 22.1310)

TC "I.47 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)" \f C \l "2"

I.47 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)

(Reference 22.1705)

TC "I.48 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)" \f C \l "2"

I.48 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2009)

(Reference 22.1803)

TC "I.49 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (DEC 2007)" \f C \l "2" I.49 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (DEC 2007)

(Reference 23.406)

TC "I.50 52.223-3 I HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)-- ALTERNATE I (JUL 1995)" \f C \l "2" I.50 52.223-3 I HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)-- ALTERNATE I (JUL 1995)

(Reference 23.303)

TC "I.51 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)" \f C \l "2"

I.51 52.223-4 RECOVERED MATERIAL CERTIFICATION (MAY 2008)

(Reference 23.406)

TC "I.52 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (AUG 2003)" \f C \l "2"

I.52 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (AUG 2003)

(Reference 23.1005)

TC "I.53 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)" \f C \l "2"

I.53 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

(Reference 23.505)

TC "I.54 52.223-14 TOXIC CHEMICAL RELEASE REPORTING (AUG 2003)" \f C \l "2"

I.54 52.223-14 TOXIC CHEMICAL RELEASE REPORTING (AUG 2003)

(Reference 23.906)

TC "I.55 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)" \f C \l "2"

I.55 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS (DEC 2007)

(Reference 23.206)

TC "I.56 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)" \f C \l "2" I.56 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)

(Reference 23.406)

TC "I.57 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)" \f C \l "2"

I.57 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

(Reference 25.1103)

TC "I.58 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)" \f C \l "2"

I.58 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

(Reference 27.201-2)

TC "I.59 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)" \f C \l "2" I.59 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT (DEC 2007)

(Reference 27.201-2)

TC "I.60 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)" \f C \l "2"

I.60 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)

(Reference 27.201-2)

TC "I.61 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)" \f C \l "2"

I.61 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

(Reference 28.106-4)

TC "I.62 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)" \f C \l "2"

I.62 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

(Reference 28.310)

TC "I.63 52.228-11 PLEDGES OF ASSETS (SEP 2009)" \f C \l "2"

I.63 52.228-11 PLEDGES OF ASSETS (SEP 2009)

(Reference 28.203-6)

TC "I.64 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (OCT 1995)" \f C \l "2"

I.64 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (OCT 1995)

(Reference 28.106-4)

TC "I.65 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (NOV 2006)" \f C \l "2"

I.65 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (NOV 2006)

(Reference 28.102-3)

TC "I.66 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (APR 2003)" \f C \l "2"

I.66 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (APR 2003)

(Reference 29.401-3)

TC "I.67 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (SEP 2002)" \f C \l "2"

I.67 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (SEP 2002)

(Reference 32.111)

TC "I.68 52.232-16 I PROGRESS PAYMENTS (APR 2003)--ALTERNATE I (MAR 2000)" \f C \l "2"

I.68 52.232-16 I PROGRESS PAYMENTS (APR 2003)--ALTERNATE I (MAR 2000)

(Reference 32.502-4)

TC "I.69 52.232-17 INTEREST (OCT 2008)" \f C \l "2"

I.69 52.232-17 INTEREST (OCT 2008)

(Reference 32.611)

TC "I.70 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)" \f C \l "2"

I.70 52.232-23 ASSIGNMENT OF CLAIMS (JAN 1986)

(Reference 32.806)

TC "I.71 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (OCT 2008)" \f C \l "2"

I.71 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (OCT 2008)

(Reference 32.908)

TC "I.72 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR REGISTRATION (OCT 2003)" \f C \l "2" I.72 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--CENTRAL CONTRACTOR REGISTRATION (OCT 2003)

(Reference 32.1110)

TC "I.73 52.233-1 DISPUTES (JUL 2002)" \f C \l "2"

I.73 52.233-1 DISPUTES (JUL 2002)

(Reference 33.215)

TC "I.74 52.233-3 PROTEST AFTER AWARD (AUG 1996)" \f C \l "2"

I.74 52.233-3 PROTEST AFTER AWARD (AUG 1996)

(Reference 33.106)

TC "I.75 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)" \f C \l "2"

I.75 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(Reference 33.215)

TC "I.76 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)" \f C \l "2"

I.76 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

(Reference 36.502)

TC "I.77 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)" \f C \l "2"

I.77 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

(Reference 36.503)

TC "I.78 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)" \f C \l "2"

I.78 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

(Reference 36.505)

TC "I.79 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)" \f C \l "2"

I.79 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

(Reference 36.506)

TC "I.80 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)" \f C \l "2"

I.80 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

(Reference 36.507)

TC "I.81 52.236-8 OTHER CONTRACTS (APR 1984)" \f C \l "2"

I.81 52.236-8 OTHER CONTRACTS (APR 1984)

(Reference 36.508)

TC "I.82 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)" \f C \l "2" I.82 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

(Reference 36.509)

TC "I.83 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)" \f C \l "2"

I.83 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

(Reference 36.510)

TC "I.84 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)" \f C \l "2"

I.84 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

(Reference 36.511)

TC "I.85 52.236-12 CLEANING UP (APR 1984)" \f C \l "2"

I.85 52.236-12 CLEANING UP (APR 1984)

(Reference 36.512)

TC "I.86 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)" \f C \l "2"

I.86 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

(Reference 36.514)

TC "I.87 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)" \f C \l "2"

I.87 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

(Reference 36.515)

TC "I.88 52.236-17 LAYOUT OF WORK (APR 1984)" \f C \l "2"

I.88 52.236-17 LAYOUT OF WORK (APR 1984)

(Reference 36.517)

TC "I.89 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)" \f C \l "2"

I.89 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)

(Reference 36.521)

TC "I.90 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)" \f C \l "2"

I.90 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

(Reference 36.522)

TC "I.91 52.242-13 BANKRUPTCY (JUL 1995)" \f C \l "2"

I.91 52.242-13 BANKRUPTCY (JUL 1995)

(Reference 42.903)

TC "I.92 52.242-14 SUSPENSION OF WORK (APR 1984)" \f C \l "2"

I.92 52.242-14 SUSPENSION OF WORK (APR 1984)

(Reference 42.1305)

TC "I.93 52.243-4 CHANGES (JUN 2007)" \f C \l "2"

I.93 52.243-4 CHANGES (JUN 2007)

(Reference 43.205)

TC…