About this file

Amendment 0004 to Solicitation SB1341-10-RP-0047

View the file

Other files

File Type Posted
Q R 6-15-10.doc DOC document
AHUQA18June2010pm.doc DOC document
Amendment 7 to SB1341-10-RP-0047.doc DOC document
Questions and ResponsesAHU 6-23-10.doc DOC document
Attachment A- NIST Bldg 245 ACU 1A Hot Water Coil Schedule.pdf PDF
AHU questions and answers 6-17-10.doc DOC document
Amendment 0005 6-11-10.doc DOC document
AHU q a 6-10-10.doc DOC document
EHXBIT ACU Casing Sizes Per building —
Amendment 0003 6-1-10.doc DOC document
Questions and Responses to SB1341.doc DOC document
Amendment 0002 SB1341-10-RP-0047.doc DOC document
visitor's log.pdf PDF
revised Section K.doc DOC document
2-Table of Contents.doc DOC document
15725 Modular Indoor Central-Station Air-Handling Units.doc DOC document
Bldg 225.zip ZIP file
Bldg 231.zip ZIP file
Fraud Prevention Presentation.pptx PPTX presentation
Bldg 220 Part 2.zip ZIP file
Bldg 245 Part 2.zip ZIP file
Bldg 221 Part 1.zip ZIP file
Bldg 236.zip ZIP file
Bldg 220 Part 1.zip ZIP file
Solicitation Air Handlers 5-3-10.doc DOC document
Specs HVAC 4-26-10.zip ZIP file
Bldg 230.zip ZIP file
Bldg 221 Part 2.zip ZIP file
Bldg 202.zip ZIP file
Bldg 245 Part 1.zip ZIP file
Bldg 224.zip ZIP file
Bldg 223.zip ZIP file
Bldg 235.zip ZIP file
Bldg 226.zip ZIP file
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SF30 Continuation of Block Narrative

Page
2
of
4
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code
Page of Pages
1
4
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
0004
Jun 9, 2010
NB190000-A-04601
6. Issued By
Code 000SB
7. Administered By (If other than Item 6)
Code SEE BLOCK 6
NATIONAL INST OF STDS AND TECHNOLOGY
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B125
GAITHERSBURG, MD 20899-1640
8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
SB1341-10-RP-0047

9B. Date (See Item 11)

May 5, 2010

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
X
is extended
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor
is not,
is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment number 0004 to Solicitation SB1341-10-RP-0047 is to extend the due date for proposals. the proposals are now due June 21, 2010 at noon eastern daylight savings time.

All Other Terms and Conditions Remain the Same

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) HVAC UPGRADE/OVERHAUL CONSTRUCTION SOLICITATION

0001
BASE CONTRACT - Within seven (7) days of contract award, the Contractor shall provide a Safety Plan in accordance with the Attachment 2 entitled "Construction Safety Instructions" located in Section J, of this Solicitation.

NOTE: The Contractor shall not be allowed to begin work until the site specific safety plan is approved

1
JB
______________
______________

FOB: Destination

0002
BASE CONTRACT - The Contractor shall provide all supervision, labor, equipment, and material to perform refurbishment to the AHUs along with the respective DDC system in nine buildings (9) buildings located acrosss the National Institute of Standards and Technology's (NIST) Gaithersburg campus. The Buildings are listed at CLIN0002 through CLIN0010.

The Contractor shall provide all supervision, labor, equipment, and material for the HVAC refurbishment work associated with Building 202. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.

1
EA
______________
______________

FOB: Destination

0003
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 220. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0004
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 221.All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0005
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 223.All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0006
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 224. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0007
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 225. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0008
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 226. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0009
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 235. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0010
The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 231. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.

TOTAL OF CONTRACT LINE ITEM NUMBERS 0001 THROUGH 0010.

1
JB
______________
______________

FOB: Destination

OPTIONS/ALTERNATES ARE IDENTIFIED AS "ADDITIVE/ALTERNATES" IN THE SPECIFICATIONS AND DRAWINGS.

0011
Alternate #1 - The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 245. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0012
Alternate #2 - The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 230. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

0013
Alternate #3 - The Contractor shall provide all supervision, labor, equipment, and material for the HVAC work associated with Building 236. All work shall be performed in accordance with Section C, Description/ Specifications/Work Statement and Section J of this solicitation.
1
JB
______________
______________

FOB: Destination

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

File details come from the government source that posted it. Updated .