J-2-2_Bidding_chart.pdf

PDF 114 KB Posted

Attached to
CNP Warehouse in Guaymaral, Bogota, Colombia
Solicitation number
SAQMMA16R0583
Issued by

About this file

J-2-2 Bidding Charts

View the file

Other files

File Type Posted
Final_Amend_001_(07DEC16).pdf PDF
Amend_001_S-120_Drawings.pdf PDF
Soil_Study_Amen_001_(06DEC16)Guaymaral.pdf PDF
Final-QAs_(07DEC16)Guaymaral.pdf PDF
Specifications.pdf PDF
J-1-4_Insurance.pdf PDF
J-2-1_Drawings.pdf PDF
Final-Sched_B-M_Guaymaral(09NOV16).pdf PDF
J-1-2_PastP.pdf PDF
J-1-1_Mat_Prod_Substitution_Form.pdf PDF
J-1-6_VAT-IVA_Template.pdf PDF
SF1442-CNP_Warehouse_Guaymaral(09NOV16).pdf PDF
J-1-5_IncidentReports.docx DOCX document
J-1-3FirmT.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: CNP WAREHOUSE

Place: CNP Hangar II, Guaymaral airport, Colombia

Date: 10/31/2016

BASE BID

ITEM DESCRIPTION

MATERIAL

UNIT

MATERIAL

QUANTITY

MATERIAL

UNIT COST

LABOR UNIT

LABOR

QUANTITY

LABOR UNIT

COST

EQUIPMENT

UNIT

EQUIPMENT

QUANTITY

EQUIPMENT

UNIT COST

TOTAL COST TOTAL COST BY CHAPTER

A. GENERAL REQUIREMENTS $ 0.00

1 GENERAL REQUIREMENTS $ 0.00

01 32 16 00 20 Construction Progress Documentation $ 0.00

$ 0.00

01 33 00 Submittal Procedures $ 0.00

$ 0.00

01 50 00 Temporary Construction Facilities and Controls $ 0.00

$ 0.00

01 78 00 Execution and Closeout Submittals $ 0.00

$ 0.00

B. WAREHOUSE BUILDING $ 0.00

2 EXISTING CODITIONS $ 0.00

02 41 00 Demolition $ 0.00

$ 0.00

3 CONCRETE $ 0.00

03 15 00.00 10 Concrete accessories $ 0.00

$ 0.00

03 20 00.00 10 Concrete Reinforcing $ 0.00

$ 0.00

03 30 00 Cast-in-Place Concrete $ 0.00

$ 0.00

4 MASONRY $ 0.00

04 20 00 Masonry $ 0.00

$ 0.00

5 METALS $ 0.00

05 05 23.16 Welding, Structural $ 0.00

$ 0.00

05 12 00 Structural Steel $ 0.00

$ 0.00

05 40 00 Cold-Formed Metal Framing $ 0.00

$ 0.00

05 50 13 Metal: Miscellaneous and Fabrications $ 0.00

$ 0.00

6 WOODS, PLASTICS AND COMPOSITES $ 0.00

06 10 00 Rough Carpentry $ 0.00

$ 0.00

06 20 00 Finish Carpentry $ 0.00

$ 0.00

7 THERMAL AND MOISTURE PROTECTION $ 0.00

07 61 14.00 20 Steel Standing Seam Roofing $ 0.00

$ 0.00

07 92 00 Roof Joint Sealants $ 0.00

$ 0.00

8 OPENINGS $ 0.00

08 11 13 Steel Doors and Frames $ 0.00

$ 0.00

OFFICIAL BIDDING CHART

CEFOP BUILDING Page 1 of 3 CUCUTA

08 13 73 Sliding Metal Doors $ 0.00

$ 0.00

08 51 13 Aluminum Windows $ 0.00

$ 0.00

08 71 00 Door Hardware $ 0.00

$ 0.00

08 81 00 Glazing $ 0.00

$ 0.00

9 FINISHES $ 0.00

09 06 90 Color Schedule $ 0.00

$ 0.00

09 30 13 Ceramic Tiling $ 0.00

$ 0.00

09 51 00 Acoustical Ceilings $ 0.00

$ 0.00

09 90 00 Paints and Coatings $ 0.00

$ 0.00

10 SPECIALTIES $ 0.00

10 14 00.20 Interior Signage $ 0.00

$ 0.00

10 28 13 Toilet Accessories $ 0.00

$ 0.00

10 44 16 Fire Extinguishers $ 0.00

$ 0.00

22 PLUMBING $ 0.00

22 00 00 Plumbing, General Purpose $ 0.00

$ 0.00

23 HEATING, VENTILATING, AND AIR CONDITIONING $ 0.00

23 00 00 Air Supply, Distribution, Ventilation and Exhaust Systems $ 0.00

$ 0.00

23 34 23.00 40 HVAC Power Ventilators $ 0.00

$ 0.00

26 Electrical $ 0.00

26 00 00.00 20 Basic Electrical Materials and Methods $ 0.00

$ 0.00

26 05 00.00 40 Common Work Results for Electrical $ 0.00

$ 0.00

26 09 13 Power Monitoring System $ 0.00

$ 0.00

26 20 00 Interior Distribution System $ 0.00

$ 0.00

26 24 16.00 40 Pannelboards $ 0.00

$ 0.00

26 33 53.00 20 Uninterruptible Power Supply (UPS) System $ 0.00

$ 0.00

26 41 01.00 40 Lightning Protection System $ 0.00

$ 0.00

26 51 00 Interior Lighting $ 0.00

$ 0.00

26 56 00 Exterior Lighting $ 0.00

$ 0.00

27 Communications $ 0.00

CEFOP BUILDING Page 2 of 3 CUCUTA

27 10 00 Building Telecommunications Cabling System $ 0.00

$ 0.00

28 Electronic Safety and Security $ 0.00

28 31 76 Interior Fire Alarm and Mass Notifications System $ 0.00

$ 0.00

C. EXTERIOR WORKS $ 0.00

31 Earthwork $ 0.00

31 00 00 Earthwork $ 0.00

$ 0.00

31 10 00 Clearing for Civil Works $ 0.00

$ 0.00

31 11 00 Clearing and Grubbing $ 0.00

$ 0.00

31 23 00.00 20 Excavation and Fill $ 0.00

$ 0.00

32 Exterior Improvements $ 0.00

32 16 13 Concrete Sidewalks and Curbs and Gutters $ 0.00

$ 0.00

32 92 23 Sodding $ 0.00

$ 0.00

33 Utilities $ 0.00

33 11 00 Water Distribution $ 0.00

$ 0.00

33 30 00 Sanitary Sewer $ 0.00

$ 0.00

33 40 00 Storm Drainage Utilities $ 0.00

$ 0.00

33 71 02 Underground Electrical and Telecomunications Distribution $ 0.00

$ 0.00

D. MARKUPS $ 0.00

D TOTAL DIRECT COST PHYSICAL ADECUATION WORKS $ 0.00

D Administration % $ 0.00 D Unforenseens % $ 0.00 D Profit % $ 0.00 D TAX(Over the profit value) % $ 0.00

T TOTAL COSTS (Base bid) $ $ 0.00

CEFOP BUILDING Page 3 of 3 CUCUTA

File details come from the government source that posted it. Updated .