J-2-2_Bidding_chart.pdf
PDF 114 KB Posted
- Attached to
- CNP Warehouse in Guaymaral, Bogota, Colombia
- Solicitation number
- SAQMMA16R0583
About this file
J-2-2 Bidding Charts
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_Amend_001_(07DEC16).pdf | ||
| Amend_001_S-120_Drawings.pdf | ||
| Soil_Study_Amen_001_(06DEC16)Guaymaral.pdf | ||
| Final-QAs_(07DEC16)Guaymaral.pdf | ||
| Specifications.pdf | ||
| J-1-4_Insurance.pdf | ||
| J-2-1_Drawings.pdf | ||
| Final-Sched_B-M_Guaymaral(09NOV16).pdf | ||
| J-1-2_PastP.pdf | ||
| J-1-1_Mat_Prod_Substitution_Form.pdf | ||
| J-1-6_VAT-IVA_Template.pdf | ||
| SF1442-CNP_Warehouse_Guaymaral(09NOV16).pdf | ||
| J-1-5_IncidentReports.docx | DOCX document | |
| J-1-3FirmT.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: CNP WAREHOUSE
Place: CNP Hangar II, Guaymaral airport, Colombia
Date: 10/31/2016
BASE BID
ITEM DESCRIPTION
MATERIAL
UNIT
MATERIAL
QUANTITY
MATERIAL
UNIT COST
LABOR UNIT
LABOR
QUANTITY
LABOR UNIT
COST
EQUIPMENT
UNIT
EQUIPMENT
QUANTITY
EQUIPMENT
UNIT COST
TOTAL COST TOTAL COST BY CHAPTER
A. GENERAL REQUIREMENTS $ 0.00
1 GENERAL REQUIREMENTS $ 0.00
01 32 16 00 20 Construction Progress Documentation $ 0.00
$ 0.00
01 33 00 Submittal Procedures $ 0.00
$ 0.00
01 50 00 Temporary Construction Facilities and Controls $ 0.00
$ 0.00
01 78 00 Execution and Closeout Submittals $ 0.00
$ 0.00
B. WAREHOUSE BUILDING $ 0.00
2 EXISTING CODITIONS $ 0.00
02 41 00 Demolition $ 0.00
$ 0.00
3 CONCRETE $ 0.00
03 15 00.00 10 Concrete accessories $ 0.00
$ 0.00
03 20 00.00 10 Concrete Reinforcing $ 0.00
$ 0.00
03 30 00 Cast-in-Place Concrete $ 0.00
$ 0.00
4 MASONRY $ 0.00
04 20 00 Masonry $ 0.00
$ 0.00
5 METALS $ 0.00
05 05 23.16 Welding, Structural $ 0.00
$ 0.00
05 12 00 Structural Steel $ 0.00
$ 0.00
05 40 00 Cold-Formed Metal Framing $ 0.00
$ 0.00
05 50 13 Metal: Miscellaneous and Fabrications $ 0.00
$ 0.00
6 WOODS, PLASTICS AND COMPOSITES $ 0.00
06 10 00 Rough Carpentry $ 0.00
$ 0.00
06 20 00 Finish Carpentry $ 0.00
$ 0.00
7 THERMAL AND MOISTURE PROTECTION $ 0.00
07 61 14.00 20 Steel Standing Seam Roofing $ 0.00
$ 0.00
07 92 00 Roof Joint Sealants $ 0.00
$ 0.00
8 OPENINGS $ 0.00
08 11 13 Steel Doors and Frames $ 0.00
$ 0.00
OFFICIAL BIDDING CHART
CEFOP BUILDING Page 1 of 3 CUCUTA
08 13 73 Sliding Metal Doors $ 0.00
$ 0.00
08 51 13 Aluminum Windows $ 0.00
$ 0.00
08 71 00 Door Hardware $ 0.00
$ 0.00
08 81 00 Glazing $ 0.00
$ 0.00
9 FINISHES $ 0.00
09 06 90 Color Schedule $ 0.00
$ 0.00
09 30 13 Ceramic Tiling $ 0.00
$ 0.00
09 51 00 Acoustical Ceilings $ 0.00
$ 0.00
09 90 00 Paints and Coatings $ 0.00
$ 0.00
10 SPECIALTIES $ 0.00
10 14 00.20 Interior Signage $ 0.00
$ 0.00
10 28 13 Toilet Accessories $ 0.00
$ 0.00
10 44 16 Fire Extinguishers $ 0.00
$ 0.00
22 PLUMBING $ 0.00
22 00 00 Plumbing, General Purpose $ 0.00
$ 0.00
23 HEATING, VENTILATING, AND AIR CONDITIONING $ 0.00
23 00 00 Air Supply, Distribution, Ventilation and Exhaust Systems $ 0.00
$ 0.00
23 34 23.00 40 HVAC Power Ventilators $ 0.00
$ 0.00
26 Electrical $ 0.00
26 00 00.00 20 Basic Electrical Materials and Methods $ 0.00
$ 0.00
26 05 00.00 40 Common Work Results for Electrical $ 0.00
$ 0.00
26 09 13 Power Monitoring System $ 0.00
$ 0.00
26 20 00 Interior Distribution System $ 0.00
$ 0.00
26 24 16.00 40 Pannelboards $ 0.00
$ 0.00
26 33 53.00 20 Uninterruptible Power Supply (UPS) System $ 0.00
$ 0.00
26 41 01.00 40 Lightning Protection System $ 0.00
$ 0.00
26 51 00 Interior Lighting $ 0.00
$ 0.00
26 56 00 Exterior Lighting $ 0.00
$ 0.00
27 Communications $ 0.00
CEFOP BUILDING Page 2 of 3 CUCUTA
27 10 00 Building Telecommunications Cabling System $ 0.00
$ 0.00
28 Electronic Safety and Security $ 0.00
28 31 76 Interior Fire Alarm and Mass Notifications System $ 0.00
$ 0.00
C. EXTERIOR WORKS $ 0.00
31 Earthwork $ 0.00
31 00 00 Earthwork $ 0.00
$ 0.00
31 10 00 Clearing for Civil Works $ 0.00
$ 0.00
31 11 00 Clearing and Grubbing $ 0.00
$ 0.00
31 23 00.00 20 Excavation and Fill $ 0.00
$ 0.00
32 Exterior Improvements $ 0.00
32 16 13 Concrete Sidewalks and Curbs and Gutters $ 0.00
$ 0.00
32 92 23 Sodding $ 0.00
$ 0.00
33 Utilities $ 0.00
33 11 00 Water Distribution $ 0.00
$ 0.00
33 30 00 Sanitary Sewer $ 0.00
$ 0.00
33 40 00 Storm Drainage Utilities $ 0.00
$ 0.00
33 71 02 Underground Electrical and Telecomunications Distribution $ 0.00
$ 0.00
D. MARKUPS $ 0.00
D TOTAL DIRECT COST PHYSICAL ADECUATION WORKS $ 0.00
D Administration % $ 0.00 D Unforenseens % $ 0.00 D Profit % $ 0.00 D TAX(Over the profit value) % $ 0.00
T TOTAL COSTS (Base bid) $ $ 0.00
CEFOP BUILDING Page 3 of 3 CUCUTA