Amend 001 Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_Amend_001_(07DEC16).pdf | ||
| Amend_001_S-120_Drawings.pdf | ||
| Soil_Study_Amen_001_(06DEC16)Guaymaral.pdf | ||
| Specifications.pdf | ||
| J-1-4_Insurance.pdf | ||
| J-2-1_Drawings.pdf | ||
| J-2-2_Bidding_chart.pdf | ||
| Final-Sched_B-M_Guaymaral(09NOV16).pdf | ||
| J-1-2_PastP.pdf | ||
| J-1-1_Mat_Prod_Substitution_Form.pdf | ||
| J-1-6_VAT-IVA_Template.pdf | ||
| SF1442-CNP_Warehouse_Guaymaral(09NOV16).pdf | ||
| J-1-5_IncidentReports.docx | DOCX document | |
| J-1-3FirmT.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Warehouse in Guaymaral SAQMMA-16-R-0583 Q&As
SAQMMA-16-R-0583
Warehouse in Guaymaral
Bogota, Colombia
Q&As No.
Drawing/Spec Reference Subject Description Responses
1 SOW Key Staff Resident Engineer's Office: The SOW requests a 19 m2 office. Must this office be provided according to the specifications?
Yes.
2 General SOW Most of the construction materials in Colombia do not have a code certification like ASTM, COE, AWS, SSPC, UL and others.
Normally doors, lamps and other elements are manufactured according to the Colombian standards, but are not certified or have the RETIE certification. Can we use Colombian materials that are for common use in this type of construction?
The contractor shall supply materials that meet the technical standards in accordance to specifications.
3 General SOW Do we have to demonstrate that the Colombian materials meet the requested codes?
See answer, Question #2.
4 General SOW Materials and / or equipment on site. What percentage of the materials and / or equipment on site will be paid before its installation?
Upon contract award, the contractor needs to negotiate with the CO based on justifiable technical needs the volume to be acceptable for this construction project. It will be based on the offerors business strategy proposed in relation to their performance schedule.
5 General Ground Rods The requested ground rods are 20 mm diameter and 3050 mm length. The commercial copper rods are 5/8” and 2,4 mt length. Please confirm the required ground rods.
The offeror shall install the ground rods indicated on drawing E-112.
6 General Buried warning & identification
Shall the buried tape be detectable?
Yes.
tape.
7 General Soil Study Provide soil studies See Amendment 001 8 Drawing A-
Doors This drawing calls for metal doors with the following characteristics: 1) Material: Metal,
2) Finish: Stainless Steel.
Please clarify if doors must be manufactured of cold rolled metal sheets with stainless steel finish color or if they must be manufactured of stainless steel.
Door shall be manufactured of cold rolled metal sheets gauge 18, with stainless steel protector. See details in drawing A-108.
9 Specs C101 Hazmat Area Please confirm that the bid option for the Hazmat area is an Option. If so, please provide instructions on how to submit the price since this item is not included in the bidding charts.
The Hazmat area is not an option. The offeror shall bid the hazmat area according to general specifications of the warehouse.
10 Drawing S108
Beams Bean B-1, section indicates .75 x .50 x .60.
Please confirm if this is a typo and if the actual section is .30 x .60 as indicated in drawing S107.
The section of beam B-1 is as follow:
Between axes A and C apply section 4B-4B indicated in drawing S-108.
Between axes C and E apply section 4C-4C indicated in drawing S-108.
11 General Specifications Detail RJ-1 is missing The question is not clear. Normally in the specifications there are not details or drawings.
12 Drawings S112 Drawing S112 is missing Yes, the drawing S-112 does not exist. It is a numbering issue.
13 General Beams Please provide B-8 and B-9 beams details See new drawing S-120.
14 General Specifications There is not structural details for mezzanine, please provide them.
This project does not have mezzanine. It is only one concrete slab to cover hot rooms and bathroom. See new drawing S-120.
15 General Specifications Please provide structural details of access ramp (Hazmat Area)
The offeror shall use the same details for the main ramp indicated in drawing S-111.
16 Drawings S102 It shows in “Piles Notes” that the quantity is 41 piles, Type 1 but Foundations Plan view shows 32 piles. Please confirm the number.
The project has 32 piles.
17 General Specifications Please confirm if the length of FBS is 20m as shown on drawings S105 and not as shown in
FB-S length is 20 m.
Reinforcement details are in A-112 drawing.
drawing A112. Also, please confirm the reinforcement details.
18 General Specifications The details and specifications for the submersible pump depicted on drawing C103 are missing.
Drawing C-102 shows an existing submersible pump.