J-2-1_BiddingC.xls

XLS spreadsheet 92 KB Posted

Attached to
To construct tower (1) & kennels (8) in Tulua and (1) Tower in Facatativa, Colombia
Solicitation number
SAQMMA16R0509
Issued by

About this file

J-2-1 Bidding Chart

View the file

Other files

File Type Posted
QandAs-16R0509_Tulua-Faca(06OCT16).pdf PDF
Amend_001_Sched_B-M(30SEP16).pdf PDF
SF30-A001_Approved_(30SEP16).pdf PDF
Soil-Geo_StudyFacatativa.pdf PDF
Soil-Geo_StudyTulua.pdf PDF
VAT-IVATax_ExemptionTemplate.pdf PDF
J-2-4_Electrical.pdf PDF
J-1-1_Mat_Prod_Substitution_Form.pdf PDF
J-1-3FirmT.pdf PDF
J-1-5_IncidentsF.pdf PDF
J-1-2_PastP.pdf PDF
FinalSched_B-M(01SEP16).pdf PDF
SF1442_(01SEP16).pdf PDF
J-2-2_Archit.pdf PDF
J-2-3_Structural.pdf PDF
J-1-4_Insurance.pdf PDF
SOW(01SEP16)Rev3.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown Price by division

UNITED STATES DEPARTMENT OF STATE
BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS
1234567
DIVISION/DESCRIPTIONLABORMATERIALSOVERHEADPROFITTOTAL (Colombian Pesos)TOTAL (US Dollars)
1. General Requirements/Mobilization
2. Site Work
3. Concrete
4. Masonry
5. Metals
6. Wood and Plastic
7. Thermal and Moisture
8. Doors and Windows
9. Finishes
10. Specialties
11. Equipment
12. Furnishings
13. Special Construction
14. Conveying Systems
15. Mechanical
16. Electrical
TOTAL
Colombian PesosUS Dollars
Allowance Items:Allowance Items:
PROPOSAL PRICE TOTAL:PROPOSAL PRICE TOTAL:
Alternates (list separately do not total)
Offeror: Date

Summary of Activities

OFICIAL BREAKDOWN CHART
PROJECT:RAPPEL TOWERS AND KENNELS CONSTRUCTION
Place:CNP COUNTERNARCOTIC BASE AT TULUA, VALLE DEL CAUCA. OPTION NO.1: CNP TRAINING FACILITIES AT FACATATIVA, CUNDINAMARCA
Date:Jul-16
BASE CONTRACT
ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTAL COSTSUB TOTALTOTAL COST BY CHAPTER (Colombian Pesos)TOTAL COST BY CHAPTER (US Dollars)
1RAPPEL TOWER AND KENNELS AT TULUA$ 0.00
1.01RAPPEL TOWER$ 0.00
1.01.01GENERAL REQUIREMENTS$ 0.00
1.01.01.01Soil StudyGBL1.00
1.01.01.02Location and LayoutGBL1.00
1.01.01.03Temporary Facilities (Including enclousure)GBL1.00
1.01.01.04Removal of surface layerGBL1.00
1.01.02FOUNDATION AND CONCRETE STRUCTURES$ 0.00
1.01.02.01ExcavationGBL1.00
1.01.02.02Compacting of the foundation levelGBL1.00
1.01.02.03Filling in compacted granular materialGBL1.00
1.01.02.04Cyclopean concrete SupportGBL1.00
1.01.02.05Concrete FootingGBL1.00
1.01.02.06Concrete Tie beamsGBL1.00
1.01.02.07Columns - structural wallsGBL1.00
1.01.02.08Concrete sub-floor slabGBL1.00
1.01.02.09Concrete Floor slab - Level 2GBL1.00
1.01.02.10Concrete Floor slab - Level 3GBL1.00
1.01.02.11Concrete Floor slab - Level 4GBL1.00
1.01.02.12Concrete Floor slab - Level 5GBL1.00
1.01.02.13Concrete Floor slab - Level 6GBL1.00
1.01.02.14Concrete Floor slab - Level 7GBL1.00
1.01.02.15Concrete DitchGBL1.00
1.01.02.16Structural masonry, including waterproofing.GBL1.00
1.01.02.17Concrete walls for cushioning system, including drainage systemGBL1.00
1.01.02.18Cushioning system in shredded rubberGBL1.00
1.01.02.19Re-Configurable Climbing System Wall SystemGBL1.00
1.01.03METALLIC ELEMENTS$ 0.00
1.01.03.01Metallic StairsGBL1.00
1.01.03.02Metallic HandrailsGBL1.00
1.01.03.03Metallic Support structuresGBL1.00
1.01.03.04Roof Metallic StructureGBL1.00
1.01.03.05Roof TilesGBL1.00
1.01.03.06Chain Link fence and access doorsGBL1.00
1.01.03.07Skids for two (2) concrete platformsGBL1.00
1.01.03.08Metallic side rope protectors for concrete platformsGBL1.00
1.01.04ELECTRICAL WORKS$ 0.00
1.01.04.01Obstruction lightsGBL1.00
1.01.04.02Supply and Installation of Lighting protection and Grounding system- TowerGBL1.00
1.01.04.03Supply and Installation of Three-Pahse Panelboard 12 circuits with space for totalizer and 40-amp breaker for towerGBL1.00
1.01.04.04Supply and Installation of LED lamps 2x18W hermetica rim panicGBL1.00
1.01.04.05Supply and Installation of 3x8 + 1x8 Cable THHN / THWN 90 ° C 600V CT for electrical connection towerGBL1.00
1.01.04.06Luminaire output ceiling and walls 3/4 PVC conduit pipe towerGBL1.00
1.01.04.07Output switch includes control systemGBL1.00
1.02KENNELS$ 0.00
1.02.01FOUNDATION AND CONCRETE STRUCTURES$ 0.00
1.02.01.01ExcavationGBL1.00
1.02.01.02Compacting of the foundation levelGBL1.00
1.02.01.03Filling in compacted granular materialGBL1.00
1.02.01.04Cyclopean concrete SupportGBL1.00
1.02.01.05Concrete Slab 3000 psi E=0,10 m.GBL1.00
1.02.01.06Concrete tie beam 3000 psi 0.30x0.40 m.GBL1.00
1.02.01.07Concrete upper beam 3000 psiGBL1.00
1.02.01.08ReinforcementGBL1.00
1.02.01.09Vapor BarrierGBL1.00
1.02.01.10Concrete counter with granite polished finish, shelves and stainless steel water tankGBL1.00
1.02.02METALLIC STRUCTURE$ 0.00
1.02.02.01Metallic StructureGBL1.00
1.02.03ROOF$ 0.00
1.02.03.01Metallic roof sandwich typeGBL1.00
1.02.03.02Metallic RidgeGBL1.00
1.02.03.03Gutters and accessoriesGBL1.00
1.02.03.04Downspouts and accessoriesGBL1.00
1.02.04MASONRY$ 0.00
1.02.04.01Structural masonryGBL1.00
1.02.04.02GroutingGBL1.00
1.02.04.03ReinforcingGBL1.00
1.02.05WALL AND FLOOR FINISHINGS$ 0.00
1.02.05.01Ceramic Floor Tile. Reference Corona Duropiso aprox 0.34x.34 or equivalentGBL1.00
1.02.05.02CeramicWall Tile. Reference Corona Ejeo aprox 0.30x0.30 or equivalentGBL1.00
1.02.05.03Plaster 1:4 E=1.5 cm.GBL1.00
1.02.05.04Floors Sloped water proof 1:3 mortarGBL1.00
1.02.05.05Sikaguard 62’ CO Paint or equivalentGBL1.00
1.02.05.06Painting interior and exteriorGBL1.00
1.02.05.07Anti-Humidity Paint for Exterior facadesGBL1.00
1.02.06ELECTRICAL INSTALLATIONS$ 0.00
1.02.06.01Supply and Installation of electrical circuit in 3x6 + 1x8 cable THHN/THWN 90 ºC 600 V CT for KennelsGBL1.00
1.02.06.02Supply and Installation of three-phase Panelboard 12 circuits with space for totalizer and 40-amp breaker for kennelsGBL1.00
1.02.06.03Supply and Installation of three-phase Panelboard 12 circuits with space for totalizer and 40-amp breaker for kennelsGBL1.00
1.02.06.04Supply and Installation of electrical outlets PVC pipe wall 3/4-inches Grade 20A includes electrical outlets GFCI Duplex for kennelsGBL1.00
1.02.06.05Supply and Installation of LED lighting lamps turtle type 13.5WGBL1.00
1.02.06.06Supply and Installation of lightning and grounding for tower and KennelsGBL1.00
1.02.06.07Supply and Installation of electrical outlets in PVC pipe wall 3/4-inches includes electrical outlets NEMA 5-15R, 2P kennelsGBL1.00
1.02.06.08Supply and Installation of single switch output conduit 3/4-inches for kennelsGBL1.00
1.02.06.09Supply and Installation of switch dual output conduit 3/4-inches for kennelsGBL1.00
1.02.07INSTALACIONES HIDROSANITARIAS$ 0.00
1.02.07.01Sanitary outlet Pipe PVC 3-inchesGBL1.00
1.02.07.02Sanitary outlet Pipe PVC 4-inchesGBL1.00
1.02.07.03Hydraulic outlet PVC 1/2-inchesGBL1.00
1.02.07.04Hydraulic outlet PVC 3/4-inchesGBL1.00
1.02.07.053/4-inches ValvesGBL1.00
1.02.07.06Valve box 20x20GBL1.00
1.02.08SANITARY APARATUS AND ACCESSORIES$ 0.00
1.02.08.01Wall washbasinGBL1.00
1.02.08.02Institutional sanitaryGBL1.00
1.02.08.03AccessoriesGBL1.00
1.02.08.04Showers including aluminum divisionGBL1.00
1.02.08.05FaucetsGBL1.00
1.02.08.06Rejilla con sosco 3X2"GBL1.00
1.02.09METALLIC CARPENTRY$ 0.00
1.02.09.01Aluminum Doors and Frames (P1-P2)GBL1.00
1.02.09.02Aluminum Doors and Frames (P5)GBL1.00
1.02.09.03Chain mesh and mosquito mesh kennel door/windows (P3). Including accessoriesGBL1.00
1.02.09.04Chain Mesh door (on perimeter fence) P4GBL1.00
1.02.09.05Sliding aluminum door and transom louver (V1)GBL1.00
1.02.09.06Aluminum louvers including frame (R1-R2-R5)GBL1.00
1.02.09.07Chain mesh ventilation grids 2.00 x 0.60 (R3-R4)GBL1.00
1.02.09.08Perimeter Chain Link Fence, including accessories and barbed wireGBL1.00
1.02.09.09Floor Metal GrillGBL1.00
1.02.10GLASSES AND MIRRORS$ 0.00
1.02.10.01Mirror -6mmGBL1.00
1.02.11OTHERS$ 0.00
1.02.11.01Aluminum Eating BowlsGBL1.00
1.02.11.02Kitchen FurnitureGBL1.00
1.02.11.03Additional furnitureGBL1.00
1.02.11.04House KeepingGBL1.00
1.02.12UTILITIES$ 0.00
1.02.12.01Water Supply including Potable water treatment systemGBL1.00
1.02.12.02Sewage main connection and Sewage Treatment System (PTAR)GBL1.00
1.02.12.03Storm Drainage Water systemGBL1.00
1.03ELECTRICAL SUBSTATION$ 0.00
1.03.01ELECTRICAL SUBSTATION$ 0.00
1.03.01.01Supply and installation three-phase transformer 150 KVA including concrete slab and perimeter chain link Fence with roof coverGBL1.00
1.03.01.02Substation grounding systemGBL1.00
1.03.01.03Channels and installation of 4-inch PipeGBL1.00
1.03.01.04Construction of inspection HandHole CS 276GBL1.00
1.03.01.05Construction of inspection HandHole CS 275GBL1.00
1.03.01.06Channels and installation of 2-inch PipeGBL1.00
1.03.01.07Channels and installation of 1 1/2-inch PipeGBL1.00
1.03.01.08Supply and Installation of main connection in Cu XLPE 15 KV No. 2/0 Cable for SubstationGBL1.00
1.03.01.09Supply and Installation of industrial electrical board interperie proof, including 3x400amp Industrial breaker, 3x40 amp and tvss systemGBL1.00
VALUE DIRECT COSTS$ 0.00
A.I.U. - VAT$ 0.00
$ 0.00
A . I . U$ 0.00
Administration%
Unforenseens%
Profit%
VAT(Over the profit total value)%
A.TOTAL PROJECT(COLOMBIAN PESOS)$ 0.00
B.TOTAL PROJECT(US DOLLARS)$ 0.00
PERFORMANCE TIME (in calendar days)
BID OPTION #1: RAPPEL TOWER AT FACATATIVA
ITEMDESCRIPTIONUNITQUANTITYUNIT COSTTOTAL COSTSUB TOTALTOTAL COST BY CHAPTER (Colombian Pesos)TOTAL COST BY CHAPTER (US Dollars)
BID OPTION #1RAPPEL TOWER AT FACATATIVA$ 0.00$ 0.00
BO-1FOUNDATION AND CONCRETE STRUCTURES$ 0.00
BO-1.1ExcavationGBL1.00
BO-1.2Compacting of the foundation levelGBL1.00
BO-1.3Filling in compacted granular materialGBL1.00
BO-1.4Cyclopean concrete SupportGBL1.00
BO-1.5Concrete FootingGBL1.00
BO-1.6Concrete Tie beamsGBL1.00
BO-1.7Columns - structural wallsGBL1.00
BO-1.8Concrete sub-floor slabGBL1.00
BO-1.9Concrete Floor slab - Level 2GBL1.00
BO-1.10Concrete Floor slab - Level 3GBL1.00
BO-1.11Concrete Floor slab - Level 4GBL1.00
BO-1.12Concrete Floor slab - Level 5GBL1.00
BO-1.13Concrete Floor slab - Level 6GBL1.00
BO-1.14Concrete Floor slab - Level 7GBL1.00
BO-1.15Concrete DitchGBL1.00
BO-1.16Structural masonry, including waterproofing.GBL1.00
BO-1.17Sand bags walls for cushioning system, including drainage systemGBL1.00
BO-1.18Cushioning systemGBL1.00
BO-1.19Re-Configurable Climbing System Wall SystemGBL1.00
BO-2METALLIC ELEMENTS$ 0.00
BO-2.1Metallic StairsGBL1.00
BO-2.2Metallic HandrailsGBL1.00
BO-2.3Metallic Support structuresGBL1.00
BO-2.4Roof Metallic StructureGBL1.00
BO-2.5Roof TilesGBL1.00
BO-2.6Chain Link fence and access doorsGBL1.00
BO-2.7Skids for two (2) concrete platformsGBL1.00
BO-2.8Metallic side rope protectors for concrete platformsGBL1.00
BO-3ELECTRICAL WORKS$ 0.00
BO-3.1Obstruction lightsGBL1.00
BO-3.2Supply and Installation of Lighting protection and Grounding system- TowerGBL1.00
BO-3.3Supply and Installation of Three-Pahse Panelboard 12 circuits with space for totalizer and 40-amp breaker for towerGBL1.00
BO-3.4Supply and Installation of LED lamps 2x18W hermetica rim panicGBL1.00
BO-3.5Supply and Installation of 3x8 + 1x8 Cable THHN / THWN 90 ° C 600V CT for electrical connection towerGBL1.00
BO-3.6Luminaire output ceiling and walls 3/4 PVC conduit pipe towerGBL1.00
BO-3.7Output switch includes control systemGBL1.00
VALUE DIRECT COSTS$ 0.00
A.I.U. - VAT$ 0.00
$ 0.00
A . I . U$ 0.00
Administration%
Unforenseens%
Profit%
VAT(Over the profit total value)%
A.TOTAL PROJECT(COLOMBIAN PESOS)$ 0.00
B. TOTAL PROJECT(US DOLLARS$ 0.00
PERFORMANCE TIME (in calendar days)

Detailed Bidding Chart

DETAILED BIDDING CHART - Guide-
ItemDescriptionUnitQuantityUnit PriceTotal Price (Colombian Pesos)Total Price (US Dollars)
These are examples of how to present this chart. Note this is a guide and just some few examples were included and are not referenced to this specific project.
Civil works
Excavations for pipingm335
Excavations for foundationsm3150
Back fill for slabm3100
Plaster for wallsM250
Electrical and Cabling works
110 OutletsUn20
Voice and data outletsUn14
Electrical channelingMl80
Furniture
Interlocutor ChairsUn18
Work stations 1.50Un18
Floor to ceiling panelsMl60
DIRECT COST
Admin costs%
Unforeseen
Profit%
SUBTOTAL
Taxes IVA
A. TOTAL (Colombian Pesos)
B. TOTAL (US Dollars)