Breakdown Price by division
| UNITED STATES DEPARTMENT OF STATE | ||||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | ||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL (Colombian Pesos) | TOTAL (US Dollars) |
| 1. General Requirements/Mobilization | ||||||
| 2. Site Work | ||||||
| 3. Concrete | ||||||
| 4. Masonry | ||||||
| 5. Metals | ||||||
| 6. Wood and Plastic | ||||||
| 7. Thermal and Moisture | ||||||
| 8. Doors and Windows | ||||||
| 9. Finishes | ||||||
| 10. Specialties | ||||||
| 11. Equipment | ||||||
| 12. Furnishings | ||||||
| 13. Special Construction | ||||||
| 14. Conveying Systems | ||||||
| 15. Mechanical | ||||||
| 16. Electrical | ||||||
| TOTAL | ||||||
| Colombian Pesos | US Dollars | |||||
| Allowance Items: | Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | ||||||
| Offeror: Date |
Summary of Activities
| OFICIAL BREAKDOWN CHART | ||||||||
| PROJECT: | RAPPEL TOWERS AND KENNELS CONSTRUCTION | |||||||
| Place: | CNP COUNTERNARCOTIC BASE AT TULUA, VALLE DEL CAUCA. OPTION NO.1: CNP TRAINING FACILITIES AT FACATATIVA, CUNDINAMARCA | |||||||
| Date: | Jul-16 | |||||||
| BASE CONTRACT | ||||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST | SUB TOTAL | TOTAL COST BY CHAPTER (Colombian Pesos) | TOTAL COST BY CHAPTER (US Dollars) |
| 1 | RAPPEL TOWER AND KENNELS AT TULUA | $ 0.00 | ||||||
| 1.01 | RAPPEL TOWER | $ 0.00 | ||||||
| 1.01.01 | GENERAL REQUIREMENTS | $ 0.00 | ||||||
| 1.01.01.01 | Soil Study | GBL | 1.00 | |||||
| 1.01.01.02 | Location and Layout | GBL | 1.00 | |||||
| 1.01.01.03 | Temporary Facilities (Including enclousure) | GBL | 1.00 | |||||
| 1.01.01.04 | Removal of surface layer | GBL | 1.00 | |||||
| 1.01.02 | FOUNDATION AND CONCRETE STRUCTURES | $ 0.00 | ||||||
| 1.01.02.01 | Excavation | GBL | 1.00 | |||||
| 1.01.02.02 | Compacting of the foundation level | GBL | 1.00 | |||||
| 1.01.02.03 | Filling in compacted granular material | GBL | 1.00 | |||||
| 1.01.02.04 | Cyclopean concrete Support | GBL | 1.00 | |||||
| 1.01.02.05 | Concrete Footing | GBL | 1.00 | |||||
| 1.01.02.06 | Concrete Tie beams | GBL | 1.00 | |||||
| 1.01.02.07 | Columns - structural walls | GBL | 1.00 | |||||
| 1.01.02.08 | Concrete sub-floor slab | GBL | 1.00 | |||||
| 1.01.02.09 | Concrete Floor slab - Level 2 | GBL | 1.00 | |||||
| 1.01.02.10 | Concrete Floor slab - Level 3 | GBL | 1.00 | |||||
| 1.01.02.11 | Concrete Floor slab - Level 4 | GBL | 1.00 | |||||
| 1.01.02.12 | Concrete Floor slab - Level 5 | GBL | 1.00 | |||||
| 1.01.02.13 | Concrete Floor slab - Level 6 | GBL | 1.00 | |||||
| 1.01.02.14 | Concrete Floor slab - Level 7 | GBL | 1.00 | |||||
| 1.01.02.15 | Concrete Ditch | GBL | 1.00 | |||||
| 1.01.02.16 | Structural masonry, including waterproofing. | GBL | 1.00 | |||||
| 1.01.02.17 | Concrete walls for cushioning system, including drainage system | GBL | 1.00 | |||||
| 1.01.02.18 | Cushioning system in shredded rubber | GBL | 1.00 | |||||
| 1.01.02.19 | Re-Configurable Climbing System Wall System | GBL | 1.00 | |||||
| 1.01.03 | METALLIC ELEMENTS | $ 0.00 | ||||||
| 1.01.03.01 | Metallic Stairs | GBL | 1.00 | |||||
| 1.01.03.02 | Metallic Handrails | GBL | 1.00 | |||||
| 1.01.03.03 | Metallic Support structures | GBL | 1.00 | |||||
| 1.01.03.04 | Roof Metallic Structure | GBL | 1.00 | |||||
| 1.01.03.05 | Roof Tiles | GBL | 1.00 | |||||
| 1.01.03.06 | Chain Link fence and access doors | GBL | 1.00 | |||||
| 1.01.03.07 | Skids for two (2) concrete platforms | GBL | 1.00 | |||||
| 1.01.03.08 | Metallic side rope protectors for concrete platforms | GBL | 1.00 | |||||
| 1.01.04 | ELECTRICAL WORKS | $ 0.00 | ||||||
| 1.01.04.01 | Obstruction lights | GBL | 1.00 | |||||
| 1.01.04.02 | Supply and Installation of Lighting protection and Grounding system- Tower | GBL | 1.00 | |||||
| 1.01.04.03 | Supply and Installation of Three-Pahse Panelboard 12 circuits with space for totalizer and 40-amp breaker for tower | GBL | 1.00 | |||||
| 1.01.04.04 | Supply and Installation of LED lamps 2x18W hermetica rim panic | GBL | 1.00 | |||||
| 1.01.04.05 | Supply and Installation of 3x8 + 1x8 Cable THHN / THWN 90 ° C 600V CT for electrical connection tower | GBL | 1.00 | |||||
| 1.01.04.06 | Luminaire output ceiling and walls 3/4 PVC conduit pipe tower | GBL | 1.00 | |||||
| 1.01.04.07 | Output switch includes control system | GBL | 1.00 | |||||
| 1.02 | KENNELS | $ 0.00 | ||||||
| 1.02.01 | FOUNDATION AND CONCRETE STRUCTURES | $ 0.00 | ||||||
| 1.02.01.01 | Excavation | GBL | 1.00 | |||||
| 1.02.01.02 | Compacting of the foundation level | GBL | 1.00 | |||||
| 1.02.01.03 | Filling in compacted granular material | GBL | 1.00 | |||||
| 1.02.01.04 | Cyclopean concrete Support | GBL | 1.00 | |||||
| 1.02.01.05 | Concrete Slab 3000 psi E=0,10 m. | GBL | 1.00 | |||||
| 1.02.01.06 | Concrete tie beam 3000 psi 0.30x0.40 m. | GBL | 1.00 | |||||
| 1.02.01.07 | Concrete upper beam 3000 psi | GBL | 1.00 | |||||
| 1.02.01.08 | Reinforcement | GBL | 1.00 | |||||
| 1.02.01.09 | Vapor Barrier | GBL | 1.00 | |||||
| 1.02.01.10 | Concrete counter with granite polished finish, shelves and stainless steel water tank | GBL | 1.00 | |||||
| 1.02.02 | METALLIC STRUCTURE | $ 0.00 | ||||||
| 1.02.02.01 | Metallic Structure | GBL | 1.00 | |||||
| 1.02.03 | ROOF | $ 0.00 | ||||||
| 1.02.03.01 | Metallic roof sandwich type | GBL | 1.00 | |||||
| 1.02.03.02 | Metallic Ridge | GBL | 1.00 | |||||
| 1.02.03.03 | Gutters and accessories | GBL | 1.00 | |||||
| 1.02.03.04 | Downspouts and accessories | GBL | 1.00 | |||||
| 1.02.04 | MASONRY | $ 0.00 | ||||||
| 1.02.04.01 | Structural masonry | GBL | 1.00 | |||||
| 1.02.04.02 | Grouting | GBL | 1.00 | |||||
| 1.02.04.03 | Reinforcing | GBL | 1.00 | |||||
| 1.02.05 | WALL AND FLOOR FINISHINGS | $ 0.00 | ||||||
| 1.02.05.01 | Ceramic Floor Tile. Reference Corona Duropiso aprox 0.34x.34 or equivalent | GBL | 1.00 | |||||
| 1.02.05.02 | CeramicWall Tile. Reference Corona Ejeo aprox 0.30x0.30 or equivalent | GBL | 1.00 | |||||
| 1.02.05.03 | Plaster 1:4 E=1.5 cm. | GBL | 1.00 | |||||
| 1.02.05.04 | Floors Sloped water proof 1:3 mortar | GBL | 1.00 | |||||
| 1.02.05.05 | Sikaguard 62’ CO Paint or equivalent | GBL | 1.00 | |||||
| 1.02.05.06 | Painting interior and exterior | GBL | 1.00 | |||||
| 1.02.05.07 | Anti-Humidity Paint for Exterior facades | GBL | 1.00 | |||||
| 1.02.06 | ELECTRICAL INSTALLATIONS | $ 0.00 | ||||||
| 1.02.06.01 | Supply and Installation of electrical circuit in 3x6 + 1x8 cable THHN/THWN 90 ºC 600 V CT for Kennels | GBL | 1.00 | |||||
| 1.02.06.02 | Supply and Installation of three-phase Panelboard 12 circuits with space for totalizer and 40-amp breaker for kennels | GBL | 1.00 | |||||
| 1.02.06.03 | Supply and Installation of three-phase Panelboard 12 circuits with space for totalizer and 40-amp breaker for kennels | GBL | 1.00 | |||||
| 1.02.06.04 | Supply and Installation of electrical outlets PVC pipe wall 3/4-inches Grade 20A includes electrical outlets GFCI Duplex for kennels | GBL | 1.00 | |||||
| 1.02.06.05 | Supply and Installation of LED lighting lamps turtle type 13.5W | GBL | 1.00 | |||||
| 1.02.06.06 | Supply and Installation of lightning and grounding for tower and Kennels | GBL | 1.00 | |||||
| 1.02.06.07 | Supply and Installation of electrical outlets in PVC pipe wall 3/4-inches includes electrical outlets NEMA 5-15R, 2P kennels | GBL | 1.00 | |||||
| 1.02.06.08 | Supply and Installation of single switch output conduit 3/4-inches for kennels | GBL | 1.00 | |||||
| 1.02.06.09 | Supply and Installation of switch dual output conduit 3/4-inches for kennels | GBL | 1.00 | |||||
| 1.02.07 | INSTALACIONES HIDROSANITARIAS | $ 0.00 | ||||||
| 1.02.07.01 | Sanitary outlet Pipe PVC 3-inches | GBL | 1.00 | |||||
| 1.02.07.02 | Sanitary outlet Pipe PVC 4-inches | GBL | 1.00 | |||||
| 1.02.07.03 | Hydraulic outlet PVC 1/2-inches | GBL | 1.00 | |||||
| 1.02.07.04 | Hydraulic outlet PVC 3/4-inches | GBL | 1.00 | |||||
| 1.02.07.05 | 3/4-inches Valves | GBL | 1.00 | |||||
| 1.02.07.06 | Valve box 20x20 | GBL | 1.00 | |||||
| 1.02.08 | SANITARY APARATUS AND ACCESSORIES | $ 0.00 | ||||||
| 1.02.08.01 | Wall washbasin | GBL | 1.00 | |||||
| 1.02.08.02 | Institutional sanitary | GBL | 1.00 | |||||
| 1.02.08.03 | Accessories | GBL | 1.00 | |||||
| 1.02.08.04 | Showers including aluminum division | GBL | 1.00 | |||||
| 1.02.08.05 | Faucets | GBL | 1.00 | |||||
| 1.02.08.06 | Rejilla con sosco 3X2" | GBL | 1.00 | |||||
| 1.02.09 | METALLIC CARPENTRY | $ 0.00 | ||||||
| 1.02.09.01 | Aluminum Doors and Frames (P1-P2) | GBL | 1.00 | |||||
| 1.02.09.02 | Aluminum Doors and Frames (P5) | GBL | 1.00 | |||||
| 1.02.09.03 | Chain mesh and mosquito mesh kennel door/windows (P3). Including accessories | GBL | 1.00 | |||||
| 1.02.09.04 | Chain Mesh door (on perimeter fence) P4 | GBL | 1.00 | |||||
| 1.02.09.05 | Sliding aluminum door and transom louver (V1) | GBL | 1.00 | |||||
| 1.02.09.06 | Aluminum louvers including frame (R1-R2-R5) | GBL | 1.00 | |||||
| 1.02.09.07 | Chain mesh ventilation grids 2.00 x 0.60 (R3-R4) | GBL | 1.00 | |||||
| 1.02.09.08 | Perimeter Chain Link Fence, including accessories and barbed wire | GBL | 1.00 | |||||
| 1.02.09.09 | Floor Metal Grill | GBL | 1.00 | |||||
| 1.02.10 | GLASSES AND MIRRORS | $ 0.00 | ||||||
| 1.02.10.01 | Mirror -6mm | GBL | 1.00 | |||||
| 1.02.11 | OTHERS | $ 0.00 | ||||||
| 1.02.11.01 | Aluminum Eating Bowls | GBL | 1.00 | |||||
| 1.02.11.02 | Kitchen Furniture | GBL | 1.00 | |||||
| 1.02.11.03 | Additional furniture | GBL | 1.00 | |||||
| 1.02.11.04 | House Keeping | GBL | 1.00 | |||||
| 1.02.12 | UTILITIES | $ 0.00 | ||||||
| 1.02.12.01 | Water Supply including Potable water treatment system | GBL | 1.00 | |||||
| 1.02.12.02 | Sewage main connection and Sewage Treatment System (PTAR) | GBL | 1.00 | |||||
| 1.02.12.03 | Storm Drainage Water system | GBL | 1.00 | |||||
| 1.03 | ELECTRICAL SUBSTATION | $ 0.00 | ||||||
| 1.03.01 | ELECTRICAL SUBSTATION | $ 0.00 | ||||||
| 1.03.01.01 | Supply and installation three-phase transformer 150 KVA including concrete slab and perimeter chain link Fence with roof cover | GBL | 1.00 | |||||
| 1.03.01.02 | Substation grounding system | GBL | 1.00 | |||||
| 1.03.01.03 | Channels and installation of 4-inch Pipe | GBL | 1.00 | |||||
| 1.03.01.04 | Construction of inspection HandHole CS 276 | GBL | 1.00 | |||||
| 1.03.01.05 | Construction of inspection HandHole CS 275 | GBL | 1.00 | |||||
| 1.03.01.06 | Channels and installation of 2-inch Pipe | GBL | 1.00 | |||||
| 1.03.01.07 | Channels and installation of 1 1/2-inch Pipe | GBL | 1.00 | |||||
| 1.03.01.08 | Supply and Installation of main connection in Cu XLPE 15 KV No. 2/0 Cable for Substation | GBL | 1.00 | |||||
| 1.03.01.09 | Supply and Installation of industrial electrical board interperie proof, including 3x400amp Industrial breaker, 3x40 amp and tvss system | GBL | 1.00 | |||||
| VALUE DIRECT COSTS | $ 0.00 | |||||||
| A.I.U. - VAT | $ 0.00 | |||||||
| $ 0.00 | ||||||||
| A . I . U | $ 0.00 | |||||||
| Administration | % | |||||||
| Unforenseens | % | |||||||
| Profit | % | |||||||
| VAT(Over the profit total value) | % | |||||||
| A.TOTAL PROJECT(COLOMBIAN PESOS) | $ 0.00 | |||||||
| B.TOTAL PROJECT(US DOLLARS) | $ 0.00 | |||||||
| PERFORMANCE TIME (in calendar days) | ||||||||
| BID OPTION #1: RAPPEL TOWER AT FACATATIVA | ||||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST | SUB TOTAL | TOTAL COST BY CHAPTER (Colombian Pesos) | TOTAL COST BY CHAPTER (US Dollars) |
| BID OPTION #1 | RAPPEL TOWER AT FACATATIVA | $ 0.00 | $ 0.00 | |||||
| BO-1 | FOUNDATION AND CONCRETE STRUCTURES | $ 0.00 | ||||||
| BO-1.1 | Excavation | GBL | 1.00 | |||||
| BO-1.2 | Compacting of the foundation level | GBL | 1.00 | |||||
| BO-1.3 | Filling in compacted granular material | GBL | 1.00 | |||||
| BO-1.4 | Cyclopean concrete Support | GBL | 1.00 | |||||
| BO-1.5 | Concrete Footing | GBL | 1.00 | |||||
| BO-1.6 | Concrete Tie beams | GBL | 1.00 | |||||
| BO-1.7 | Columns - structural walls | GBL | 1.00 | |||||
| BO-1.8 | Concrete sub-floor slab | GBL | 1.00 | |||||
| BO-1.9 | Concrete Floor slab - Level 2 | GBL | 1.00 | |||||
| BO-1.10 | Concrete Floor slab - Level 3 | GBL | 1.00 | |||||
| BO-1.11 | Concrete Floor slab - Level 4 | GBL | 1.00 | |||||
| BO-1.12 | Concrete Floor slab - Level 5 | GBL | 1.00 | |||||
| BO-1.13 | Concrete Floor slab - Level 6 | GBL | 1.00 | |||||
| BO-1.14 | Concrete Floor slab - Level 7 | GBL | 1.00 | |||||
| BO-1.15 | Concrete Ditch | GBL | 1.00 | |||||
| BO-1.16 | Structural masonry, including waterproofing. | GBL | 1.00 | |||||
| BO-1.17 | Sand bags walls for cushioning system, including drainage system | GBL | 1.00 | |||||
| BO-1.18 | Cushioning system | GBL | 1.00 | |||||
| BO-1.19 | Re-Configurable Climbing System Wall System | GBL | 1.00 | |||||
| BO-2 | METALLIC ELEMENTS | $ 0.00 | ||||||
| BO-2.1 | Metallic Stairs | GBL | 1.00 | |||||
| BO-2.2 | Metallic Handrails | GBL | 1.00 | |||||
| BO-2.3 | Metallic Support structures | GBL | 1.00 | |||||
| BO-2.4 | Roof Metallic Structure | GBL | 1.00 | |||||
| BO-2.5 | Roof Tiles | GBL | 1.00 | |||||
| BO-2.6 | Chain Link fence and access doors | GBL | 1.00 | |||||
| BO-2.7 | Skids for two (2) concrete platforms | GBL | 1.00 | |||||
| BO-2.8 | Metallic side rope protectors for concrete platforms | GBL | 1.00 | |||||
| BO-3 | ELECTRICAL WORKS | $ 0.00 | ||||||
| BO-3.1 | Obstruction lights | GBL | 1.00 | |||||
| BO-3.2 | Supply and Installation of Lighting protection and Grounding system- Tower | GBL | 1.00 | |||||
| BO-3.3 | Supply and Installation of Three-Pahse Panelboard 12 circuits with space for totalizer and 40-amp breaker for tower | GBL | 1.00 | |||||
| BO-3.4 | Supply and Installation of LED lamps 2x18W hermetica rim panic | GBL | 1.00 | |||||
| BO-3.5 | Supply and Installation of 3x8 + 1x8 Cable THHN / THWN 90 ° C 600V CT for electrical connection tower | GBL | 1.00 | |||||
| BO-3.6 | Luminaire output ceiling and walls 3/4 PVC conduit pipe tower | GBL | 1.00 | |||||
| BO-3.7 | Output switch includes control system | GBL | 1.00 | |||||
| VALUE DIRECT COSTS | $ 0.00 | |||||||
| A.I.U. - VAT | $ 0.00 | |||||||
| $ 0.00 | ||||||||
| A . I . U | $ 0.00 | |||||||
| Administration | % | |||||||
| Unforenseens | % | |||||||
| Profit | % | |||||||
| VAT(Over the profit total value) | % | |||||||
| A.TOTAL PROJECT(COLOMBIAN PESOS) | $ 0.00 | |||||||
| B. TOTAL PROJECT(US DOLLARS | $ 0.00 | |||||||
| PERFORMANCE TIME (in calendar days) |
Detailed Bidding Chart
| DETAILED BIDDING CHART - Guide- | ||||||
| Item | Description | Unit | Quantity | Unit Price | Total Price (Colombian Pesos) | Total Price (US Dollars) |
| These are examples of how to present this chart. Note this is a guide and just some few examples were included and are not referenced to this specific project. | ||||||
| Civil works | ||||||
| Excavations for piping | m3 | 35 | ||||
| Excavations for foundations | m3 | 150 | ||||
| Back fill for slab | m3 | 100 | ||||
| Plaster for walls | M2 | 50 | ||||
| Electrical and Cabling works | ||||||
| 110 Outlets | Un | 20 | ||||
| Voice and data outlets | Un | 14 | ||||
| Electrical channeling | Ml | 80 | ||||
| Furniture | ||||||
| Interlocutor Chairs | Un | 18 | ||||
| Work stations 1.50 | Un | 18 | ||||
| Floor to ceiling panels | Ml | 60 | ||||
| DIRECT COST | ||||||
| Admin costs | % | |||||
| Unforeseen | ||||||
| Profit | % | |||||
| SUBTOTAL | ||||||
| Taxes IVA | ||||||
| A. TOTAL (Colombian Pesos) | ||||||
| B. TOTAL (US Dollars) |