J-1-1_Mat_Prod_Substitution_Form.pdf

PDF 30 KB Posted

Attached to
To construct tower (1) & kennels (8) in Tulua and (1) Tower in Facatativa, Colombia
Solicitation number
SAQMMA16R0509
Issued by

About this file

J-1-1 Mat Substitution

View the file

Other files

File Type Posted
QandAs-16R0509_Tulua-Faca(06OCT16).pdf PDF
Amend_001_Sched_B-M(30SEP16).pdf PDF
SF30-A001_Approved_(30SEP16).pdf PDF
Soil-Geo_StudyFacatativa.pdf PDF
Soil-Geo_StudyTulua.pdf PDF
VAT-IVATax_ExemptionTemplate.pdf PDF
J-2-4_Electrical.pdf PDF
J-1-3FirmT.pdf PDF
J-1-5_IncidentsF.pdf PDF
J-1-2_PastP.pdf PDF
FinalSched_B-M(01SEP16).pdf PDF
SF1442_(01SEP16).pdf PDF
J-2-2_Archit.pdf PDF
J-2-3_Structural.pdf PDF
J-1-4_Insurance.pdf PDF
J-2-1_BiddingC.xls XLS spreadsheet
SOW(01SEP16)Rev3.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL/PRODUCT SUBSTITUTION REQUEST

FORM (Ref: H.44.1.6 Substitutions.)

Date: __________________________

Project:_____________________________________________________________________________________

D/B –A/E ___________________________________________________________________________________

Contractor: __________________________________________________________________________________

After the construction NTP, this form shall be used to request consideration of materials for substitution of products specified as a minimum standard.

Specified Material/Product___________________________________________________________________________

Specification Division – Section________________________________________________________________

Specified Manufacturer/Origin ________________________________________________________________

Proposed Substitution ________________________________________________________________________

Proposed Manufacturer/Origin _________________________________________________________________

Proposed Supplier/Source_____________________________________________________________________

Attached hereto are the specification, data, performance documents and standard laboratory test results supporting the product substitution

The following criteria has been taken into consideration

The use of this material/product is applicable to this product in the prescribed location and will be warranted in the same manner as the specified product for a period of ___ years, when applied and used as per the manufacturers’ guidelines.

The substitution of this product will not affect the dimensions shown on the drawing in any way.

This product substitution will not affect the work of other trades working on this product The advantages of incorporating the proposed substitution into this Project are as follows:_____________

Submitted By: ________________________________________of_______________________________________

This completed form is to be sent to INL COR with the required submittal.

See contract Section/Paragraph H.44.1.6 Substitutions.

File details come from the government source that posted it. Updated .