J-1-4_Insurance.pdf
PDF 63 KB Posted
- Solicitation number
- SAQMMA16R0509
About this file
J-1-4 Insurance Policies
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandAs-16R0509_Tulua-Faca(06OCT16).pdf | ||
| Amend_001_Sched_B-M(30SEP16).pdf | ||
| SF30-A001_Approved_(30SEP16).pdf | ||
| Soil-Geo_StudyFacatativa.pdf | ||
| Soil-Geo_StudyTulua.pdf | ||
| VAT-IVATax_ExemptionTemplate.pdf | ||
| J-2-4_Electrical.pdf | ||
| J-1-1_Mat_Prod_Substitution_Form.pdf | ||
| J-1-3FirmT.pdf | ||
| J-1-5_IncidentsF.pdf | ||
| J-1-2_PastP.pdf | ||
| FinalSched_B-M(01SEP16).pdf | ||
| SF1442_(01SEP16).pdf | ||
| J-2-2_Archit.pdf | ||
| J-2-3_Structural.pdf | ||
| J-2-1_BiddingC.xls | XLS spreadsheet | |
| SOW(01SEP16)Rev3.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1-1 INSURANCE POLICIES
SOLICITATION No. SAQMMA16R0509
ONE (1) TOWER AND KENNELS (8) IN TULUA, VALLE DEL CAUCA, COLOMBIA
OPTION ONE. 1: ONE (1) TOWER IN FACATATIVA, COLOMBIA
Performance Policy (Póliza de Cumplimiento): Submitted after the contractor is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract and valid for the duration of the contract and a further two months, Payment Policy (Póliza de Pago de Salarios y Prestaciones Sociales): Submitted after the contract is signed and prior to the notice to proceed in a sum equal to 20% of the value of the contract, and valid for the duration of the contract and a further three years for the salaries and social benefits of the workers.
Liability Policy ( Póliza de Responsabilidad Civil Contractual): submitted after the contract is signed and prior to the notice to proceed in a sum equal to 30% of the value of the contract, and valid for the duration of the contract and a further two months covering contractual and Third Party Civil Liability, Stability Policy (Póliza de Estabilidad): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for three years from the date of the handover of the work/ substantial completion.
Elements Quality Policy ( Póliza de Calidad de Elementos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion.
Correct Equipment Functioning Policy (Póliza de correcto funcionamiento de los equipos): Submitted when the acceptance of work is signed in a sum equal to 30% of the value of the contract, and valid for one year from the date of the handover of the work/ substantial completion
File details come from the government source that posted it. Updated .