SAQMMA16R0171_Section_B_Pricing.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- Elevator Maintenance Services
- Solicitation number
- SAQMMA16R0171
About this file
SAQMMA16R0171 Attachment 1 Section B Pricing
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT A | |
| B.3 | BASE YEAR - PERIOD OF PERFORMANCE: TBD |
CLIN Description
0001 Harry S. Truman and Potomac Annex Locations
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
| (a) Adjuster | 2000 | $0.00 | $0.00 | 500.00 | $0.00 | $0.00 |
| (b) Foreman | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (c) Mechanic | 2000 | $0.00 | $0.00 | 288.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (e) Apprentice | 4000 | $0.00 | $0.00 | 192.00 | $0.00 | $0.00 |
| (h)) repair parts (see C.9.1) | $_____________ |
| (i) Semiannual (routine) inspection (see C.19) | $_____________ |
| (j) Annual (periodic) inspection (see C.19) | $_____________ |
| (k) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
| (l) E-16 annual escalator maintenance (see C.5.10.1) | $_____________ |
Firm Fixed Price CLIN 0001 TOTAL $_____________
0002 Columbia Plaza Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $0.00 $0.00
| (e) repair parts (see C.9.1) | $_____________ |
| (f) Semiannual (routine) inspection (see C.19) | $_____________ |
| (g) Annual (periodic) inspection (see C.19) | $_____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
Firm Fixed Price CLIN 0002 TOTAL $_______________
0003 National Foreign Affairs Training Center Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $_____________ $0.00
| (e) repair parts (see C.9.1) | $ ____________ |
| (f) Semiannual (routine) inspection (see C.19) | $ ____________ |
| (g) Annual (periodic) inspection (see C.19) | $ ____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $ ____________ |
Firm Fixed Price CLIN 0003 TOTAL $_____________
0004 Blair House
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $ __________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 0004 TOTAL $_____________
0005 Beltsville Information Management Center
| (a) Repairs, Preventive Maintenance as stated in section C. | $ __________ |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 0005 TOTAL $______________
0006 International Chancery Center
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
| (d) 5 year safety inspection (see C.19 & section J attachment 11) | $ __________ |
Firm Fixed Price CLIN 0006 TOTAL $_______________
| 0007 Reimbursable Services - estimated | 1 | lot | $200,000 | |
| cost of repairs, preventive maintenance, | ||||
| inspections and\or alterations as well as | ||||
| actual labor cost (whether in-house or by | ||||
| subcontractor) cost of the actual | ||||
| replacement/repair parts and materials | ||||
| for all those services specified, which | ||||
| DoS has responsibility under Section C. | ||||
| at Harry S. Truman, Columbia Plaza, Potomac Annex | ||||
| Complex, National Foreign Affairs Training Center, | ||||
| Blair House and Beltsville Information | ||||
| Management Center. This may include work | ||||
| during regular, overtime, Sundays or | ||||
| holidays, emergency calls. See B.3.1 below, | ||||
| which shall reflect hourly rates proposed | ||||
| and accepted by DoS. | ||||
| CLIN 0007 TOTAL $200,000 |
| 0008 Reimbursable Services - estimated | 1 | lot | $40,000 |
| cost of repairs, preventive maintenance, | |||
| inspections and\or alterations as well as | |||
| actual labor cost (whether in-house or by sub- | |||
| contractor) cost of the actual replacement/ | |||
| repair parts and materials for all those | |||
| services specified, which DoS has | |||
| responsibility under Section C. at | |||
| International Chancery Center. This may | |||
| include work during regular, overtime, | |||
| Sundays or holidays, emergency calls. | |||
| See B.3.1 below, which shall reflect | |||
| hourly rates proposed and accepted by DoS. |
CLIN 0008 TOTAL $40,000
TOTAL BASIC SERVICES COST, BASE YEAR, CLIN's 0001 through 0006 $______________
TOTAL REIMBURSABLE SERVICES COST, BASE YEAR, CLIN 0007 THROUGH 0008 $______________
TOTAL ALL SERVICES, CLIN's 0001 thru 0008 $______________
B.3.1 Notes:
1. The Contractor shall fill in fixed labor rates for normal work hours (6:00am to 6:00pm Mon thru Fri), after hours work (6:00pm to 6:00am Mon thru Fri, all day Saturday) and Sunday\holiday rates- for the personnel designated below for reimbursable work. The Government is not obligated to purchase any reimbursable hours. The fixed hourly rates provided below shall be fully loaded hourly rates that include profit, overhead, general and administrative expenses, etc. In addition, the contractor may propose additional trades (with associated hourly labor rates) they deem necessary to perform under this contract, though are not listed below, that form a part of their technical/cost proposals.
2. Under the fixed price portion of the contract, if the required hours as set forth in Section C.5 herein, are not furnished by the Contractor, a monetary deduction will be made by the COR at the applicable loaded hourly rate times the number of un furnished hours as set forth in Section B.3.
3. The prices for line items 0001 through 0006 are fully loaded and include, as may be appropriate, charges for supplies, equipment, tools, labor fringe benefits, parts handling, overhead, general and administrative expenses and profit.
4. Reimbursable Work Rates
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (a) Adjuster | $0.00 | $0.00 | $0.00 |
| (b) Foreman | $0.00 | $0.00 | $0.00 |
| (c) Mechanic | $0.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | $0.00 | $0.00 | $0.00 |
| (e) Apprentice | $0.00 | $0.00 | $0.00 |
| (f) Truck Driver | $0.00 | $0.00 | $0.00 |
| (g) Supervisor | $0.00 | $0.00 | $0.00 |
Cable and Alterations Work
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (h) Adjuster | $0.00 | $0.00 | $0.00 |
| (i) Foreman | $0.00 | $0.00 | $0.00 |
| (j) Mechanic | $0.00 | $0.00 | $0.00 |
| (k) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 |
Emergency Calls
| Labor Category | Normal work hours | After Hours Work | Sunday\Holiday Hours |
| (n) Adjuster | |||
| (o) Foreman | $0.00 | $0.00 | $0.00 |
| (p) Mechanic | $0.00 | $0.00 | $0.00 |
| (q) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 |
B.4 OPTION YEAR 1 - PERIOD OF PERFORMANCE: TBD
CLIN Description
1001 Harry S. Truman and Potomac Annex Locations
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
| (a) Adjuster | 2000 | $0.00 | $0.00 | 500.00 | $0.00 | $0.00 |
| (b) Foreman | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (c) Mechanic | 2000 | $0.00 | $0.00 | 288.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic 2000 | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (e) Apprentice | 4000 | $0.00 | $0.00 | 192.00 | $0.00 | $0.00 |
| (h)) repair parts (see C.9.1) | $_____________ |
| (i) Semiannual (routine) inspection (see C.19) | $_____________ |
| (j) Annual (periodic) inspection (see C.19) | $_____________ |
| (k) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
| (l) E-16 annual escalator maintenance (see C.5.10.1) | $_____________ |
Firm Fixed Price CLIN 1001 TOTAL $_____________
1002 Columbia Plaza Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $0.00 $0.00
| (e) repair parts (see C.9.1) | $_____________ |
| (f) Semiannual (routine) inspection (see C.19) | $_____________ |
| (g) Annual (periodic) inspection (see C.19) | $_____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
Firm Fixed Price CLIN 1002 TOTAL $_______________
1003 National Foreign Affairs Training Center Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $_____________ $0.00
| (e) repair parts (see C.9.1) | $ ____________ |
| (f) Semiannual (routine) inspection (see C.19) | $ ____________ |
| (g) Annual (periodic) inspection (see C.19) | $ ____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $ ____________ |
| CLIN 1003 TOTAL $_____________ | ||
| 1004 | Blair House |
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $ __________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 1004 TOTAL $_____________
1005 Beltsville Information Management Center
| (a) Repairs, Preventive Maintenance as stated in section C. | $ __________ |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 1005 TOTAL $______________
1006 International Chancery Center
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
| (d) 5 year safety inspection (see C.19 & section J attachment 11) | $ __________ |
Firm Fixed Price CLIN 1006 TOTAL $_______________
| 1007 Reimbursable Services - estimated | 1 | lot | $200,000 | |
| cost of repairs, preventive maintenance, | ||||
| inspections and\or alterations as well as | ||||
| actual labor cost (whether in-house or by | ||||
| subcontractor) cost of the actual | ||||
| replacement/repair parts and materials | ||||
| for all those services specified, which | ||||
| DoS has responsibility under Section C. | ||||
| at Harry S. Truman, Columbia Plaza, Potomac Annex | ||||
| Complex, National Foreign Affairs Training Center, | ||||
| Blair House and Beltsville Information | ||||
| Management Center. This may include work | ||||
| during regular, overtime, Sundays or | ||||
| holidays, emergency calls. See B.3.1 below, | ||||
| which shall reflect hourly rates proposed | ||||
| and accepted by DoS. | ||||
| CLIN 1007 TOTAL $200,000 |
| 1008 Reimbursable Services - estimated | 1 | lot | $40,000 |
| cost of repairs, preventive maintenance, | |||
| inspections and\or alterations as well as | |||
| actual labor cost (whether in-house or by sub- | |||
| contractor) cost of the actual replacement/ | |||
| repair parts and materials for all those | |||
| services specified, which DoS has | |||
| responsibility under Section C. at | |||
| International Chancery Center. This may | |||
| include work during regular, overtime, | |||
| Sundays or holidays, emergency calls. | |||
| See B.3.1 below, which shall reflect | |||
| hourly rates proposed and accepted by DoS. |
CLIN 1008 TOTAL $40,000
TOTAL BASIC SERVICES COST, BASE YEAR, CLIN's 1001 through 1006 $______________
TOTAL REIMBURSABLE SERVICES COST, BASE YEAR, CLIN 1007 THROUGH 1008 $______________
TOTAL ALL SERVICES, CLIN's 1001 thru 1008 $______________
B.3.1 Notes:
1. The Contractor shall fill in fixed labor rates for normal work hours (6:00am to 6:00pm Mon thru Fri), after hours work (6:00pm to 6:00am Mon thru Fri, all day Saturday) and Sunday\holiday rates- for the personnel designated below for reimbursable work. The Government is not obligated to purchase any reimbursable hours. The fixed hourly rates provided below shall be fully loaded hourly rates that include profit, overhead, general and administrative expenses, etc. In addition, the contractor may propose additional trades (with associated hourly labor rates) they deem necessary to perform under this contract, though are not listed below, that form a part of their technical/cost proposals.
| 2. Under the fixed price portion of the contract, if the required hours as set forth in Section C.5 herein, are not furnished by the Contractor, a monetary |
| deduction will be made by the COR at the applicable loaded hourly rate times the number of un furnished hours as set forth in Section B.3. |
3. The prices for line items 1001 through 1006 are fully loaded and include, as may be appropriate, charges for supplies, equipment, tools, labor fringe benefits, parts handling, overhead, general and administrative expenses and profit.
4. Reimbursable Work Rates
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (a) Adjuster | $0.00 | $0.00 | $0.00 |
| (b) Foreman | $0.00 | $0.00 | $0.00 |
| (c) Mechanic | $0.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | $0.00 | $0.00 | $0.00 |
| (e) Apprentice | $0.00 | $0.00 | $0.00 |
| (f) Truck Driver | $0.00 | $0.00 | $0.00 |
| (g) Supervisor | $0.00 | $0.00 | $0.00 |
Cable and Alterations Work
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (h) Adjuster | $0.00 | $0.00 | $0.00 |
| (i) Foreman | $0.00 | $0.00 | $0.00 |
| (j) Mechanic | $0.00 | $0.00 | $0.00 |
| (k) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 |
Emergency Calls
| Labor Category | Normal work hours | After Hours Work | Sunday\Holiday Hours |
| (n) Adjuster | |||
| (o) Foreman | $0.00 | $0.00 | $0.00 |
| (p) Mechanic | $0.00 | $0.00 | $0.00 |
| (q) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 |
B.5 OPTION YEAR 2 - PERIOD OF PERFORMANCE: TBD
CLIN Description
2001 Harry S. Truman and Potomac Annex Locations
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
| (a) Adjuster | 2000 | $0.00 | $0.00 | 500.00 | $0.00 | $0.00 |
| (b) Foreman | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (c) Mechanic | 2000 | $0.00 | $0.00 | 288.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (e) Apprentice | 4000 | $0.00 | $0.00 | 192.00 | $0.00 | $0.00 |
| (h)) repair parts (see C.9.1) | $_____________ |
| (i) Semiannual (routine) inspection (see C.19) | $_____________ |
| (j) Annual (periodic) inspection (see C.19) | $_____________ |
| (k) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
| (l) E-16 annual escalator maintenance (see C.5.10.1) | $_____________ |
Firm Fixed Price CLIN 2001 TOTAL $_____________
2002 Columbia Plaza Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $0.00 $0.00
| (e) repair parts (see C.9.1) | $_____________ |
| (f) Semiannual (routine) inspection (see C.19) | $_____________ |
| (g) Annual (periodic) inspection (see C.19) | $_____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
Firm Fixed Price CLIN 2002 TOTAL $_______________
2003 National Foreign Affairs Training Center Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $_____________ $0.00
| (e) repair parts (see C.9.1) | $ ____________ |
| (f) Semiannual (routine) inspection (see C.19) | $ ____________ |
| (g) Annual (periodic) inspection (see C.19) | $ ____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $ ____________ |
Firm Fixed Price CLIN 2003 TOTAL $_____________
2004 Blair House
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $ __________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 2004 TOTAL $_____________
2005 Beltsville Information Management Center
| (a) Repairs, Preventive Maintenance as stated in section C. | $ __________ |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 2005 TOTAL $______________
2006 International Chancery Center
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
| (d) 5 year safety inspection (see C.19 & section J attachment 11) | $ __________ |
Firm Fixed Price CLIN 2006 TOTAL $_______________
| 2007 Reimbursable Services - estimated | 1 | lot | $200,000 | |
| cost of repairs, preventive maintenance, | ||||
| inspections and\or alterations as well as | ||||
| actual labor cost (whether in-house or by | ||||
| subcontractor) cost of the actual | ||||
| replacement/repair parts and materials | ||||
| for all those services specified, which | ||||
| DoS has responsibility under Section C. | ||||
| at Harry S. Truman, Columbia Plaza, Potomac Annex | ||||
| Complex, National Foreign Affairs Training Center, | ||||
| Blair House and Beltsville Information | ||||
| Management Center. This may include work | ||||
| during regular, overtime, Sundays or | ||||
| holidays, emergency calls. See B.3.1 below, | ||||
| which shall reflect hourly rates proposed | ||||
| and accepted by DoS. | ||||
| CLIN 2007 TOTAL $200,000 |
| 2008 Reimbursable Services - estimated | 1 | lot | $40,000 |
| cost of repairs, preventive maintenance, | |||
| inspections and\or alterations as well as | |||
| actual labor cost (whether in-house or by sub- | |||
| contractor) cost of the actual replacement/ | |||
| repair parts and materials for all those | |||
| services specified, which DoS has | |||
| responsibility under Section C. at | |||
| International Chancery Center. This may | |||
| include work during regular, overtime, | |||
| Sundays or holidays, emergency calls. | |||
| See B.3.1 below, which shall reflect | |||
| hourly rates proposed and accepted by DoS. |
CLIN 2008 TOTAL $40,000
TOTAL BASIC SERVICES COST, BASE YEAR, CLIN's 2001 through 2006 $______________
TOTAL REIMBURSABLE SERVICES COST, BASE YEAR, CLIN 2007 THROUGH 2008 $______________
TOTAL ALL SERVICES, CLIN's 2001 thru 2008 $______________
B.3.1 Notes:
1. The Contractor shall fill in fixed labor rates for normal work hours (6:00am to 6:00pm Mon thru Fri), after hours work (6:00pm to 6:00am Mon thru Fri, all day Saturday) and Sunday\holiday rates- for the personnel designated below for reimbursable work. The Government is not obligated to purchase any reimbursable hours. The fixed hourly rates provided below shall be fully loaded hourly rates that include profit, overhead, general and administrative expenses, etc. In addition, the contractor may propose additional trades (with associated hourly labor rates) they deem necessary to perform under this contract, though are not listed below, that form a part of their technical/cost proposals.
| 2. Under the fixed price portion of the contract, if the required hours as set forth in Section C.5 herein, are not furnished by the Contractor, a monetary |
| deduction will be made by the COR at the applicable loaded hourly rate times the number of un furnished hours as set forth in Section B.3. |
3. The prices for line items 2001 through 2006 are fully loaded and include, as may be appropriate, charges for supplies, equipment, tools, labor fringe benefits, parts handling, overhead, general and administrative expenses and profit.
4. Reimbursable Work Rates
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (a) Adjuster | $0.00 | $0.00 | $0.00 |
| (b) Foreman | $0.00 | $0.00 | $0.00 |
| (c) Mechanic | $0.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | $0.00 | $0.00 | $0.00 |
| (e) Apprentice | $0.00 | $0.00 | $0.00 |
| (f) Truck Driver | $0.00 | $0.00 | $0.00 |
| (g) Supervisor | $0.00 | $0.00 | $0.00 |
Cable and Alterations Work
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (h) Adjuster | $0.00 | $0.00 | $0.00 |
| (i) Foreman | $0.00 | $0.00 | $0.00 |
| (j) Mechanic | $0.00 | $0.00 | $0.00 |
| (k) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 |
Emergency Calls
| Labor Category | Normal work hours | After Hours Work | Sunday\Holiday Hours |
| (n) Adjuster | |||
| (o) Foreman | $0.00 | $0.00 | $0.00 |
| (p) Mechanic | $0.00 | $0.00 | $0.00 |
| (q) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 |
B.6 OPTION YEAR 3 - PERIOD OF PERFORMANCE: TBD
CLIN Description
3001 Harry S. Truman and Potomac Annex Locations
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
| (a) Adjuster | 2000 | $0.00 | $0.00 | 500.00 | $0.00 | $0.00 |
| (b) Foreman | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (c) Mechanic | 2000 | $0.00 | $0.00 | 288.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (e) Apprentice | 4000 | $0.00 | $0.00 | 192.00 | $0.00 | $0.00 |
| (h)) repair parts (see C.9.1) | $_____________ |
| (i) Semiannual (routine) inspection (see C.19) | $_____________ |
| (j) Annual (periodic) inspection (see C.19) | $_____________ |
| (k) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
| (l) E-16 annual escalator maintenance (see C.5.10.1) | $_____________ |
Firm Fixed Price CLIN 3001 TOTAL $_____________
3002 Columbia Plaza Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $0.00 $0.00
| (e) repair parts (see C.9.1) | $_____________ |
| (f) Semiannual (routine) inspection (see C.19) | $_____________ |
| (g) Annual (periodic) inspection (see C.19) | $_____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
Firm Fixed Price CLIN 3002 TOTAL $_______________
3003 National Foreign Affairs Training Center Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $_____________ $0.00
| (e) repair parts (see C.9.1) | $ ____________ |
| (f) Semiannual (routine) inspection (see C.19) | $ ____________ |
| (g) Annual (periodic) inspection (see C.19) | $ ____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $ ____________ |
Firm Fixed Price CLIN 3003 TOTAL $_____________
3004 Blair House
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $ __________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 3004 TOTAL $_____________
3005 Beltsville Information Management Center
| (a) Repairs, Preventive Maintenance as stated in section C. | $ __________ |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 3005 TOTAL $______________
3006 International Chancery Center
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
| (d) 5 year safety inspection (see C.19 & section J attachment 11) | $ __________ |
Firm Fixed Price CLIN 3006 TOTAL $_______________
| 3007 Reimbursable Services - estimated | 1 | lot | $200,000 | |
| cost of repairs, preventive maintenance, | ||||
| inspections and\or alterations as well as | ||||
| actual labor cost (whether in-house or by | ||||
| subcontractor) cost of the actual | ||||
| replacement/repair parts and materials | ||||
| for all those services specified, which | ||||
| DoS has responsibility under Section C. | ||||
| at Harry S. Truman, Columbia Plaza, Potomac Annex | ||||
| Complex, National Foreign Affairs Training Center, | ||||
| Blair House and Beltsville Information | ||||
| Management Center. This may include work | ||||
| during regular, overtime, Sundays or | ||||
| holidays, emergency calls. See B.3.1 below, | ||||
| which shall reflect hourly rates proposed | ||||
| and accepted by DoS. | ||||
| CLIN 3007 TOTAL $200,000 |
| 3008 Reimbursable Services - estimated | 1 | lot | $40,000 |
| cost of repairs, preventive maintenance, | |||
| inspections and\or alterations as well as | |||
| actual labor cost (whether in-house or by sub- | |||
| contractor) cost of the actual replacement/ | |||
| repair parts and materials for all those | |||
| services specified, which DoS has | |||
| responsibility under Section C. at | |||
| International Chancery Center. This may | |||
| include work during regular, overtime, | |||
| Sundays or holidays, emergency calls. | |||
| See B.3.1 below, which shall reflect | |||
| hourly rates proposed and accepted by DoS. |
CLIN 3008 TOTAL $40,000
TOTAL BASIC SERVICES COST, BASE YEAR, CLIN's 3001 through 3006 $______________
TOTAL REIMBURSABLE SERVICES COST, BASE YEAR, CLIN 3007 THROUGH 3008 $______________
TOTAL ALL SERVICES, CLIN's 3001 thru 3008 $______________
B.3.1 Notes:
1. The Contractor shall fill in fixed labor rates for normal work hours (6:00am to 6:00pm Mon thru Fri), after hours work (6:00pm to 6:00am Mon thru Fri, all day Saturday) and Sunday\holiday rates- for the personnel designated below for reimbursable work. The Government is not obligated to purchase any reimbursable hours. The fixed hourly rates provided below shall be fully loaded hourly rates that include profit, overhead, general and administrative expenses, etc. In addition, the contractor may propose additional trades (with associated hourly labor rates) they deem necessary to perform under this contract, though are not listed below, that form a part of their technical/cost proposals.
| 2. Under the fixed price portion of the contract, if the required hours as set forth in Section C.5 herein, are not furnished by the Contractor, a monetary |
| deduction will be made by the COR at the applicable loaded hourly rate times the number of un furnished hours as set forth in Section B.3. |
3. The prices for line items 3001 through 3006 are fully loaded and include, as may be appropriate, charges for supplies, equipment, tools, labor fringe benefits, parts handling, overhead, general and administrative expenses and profit.
4. Reimbursable Work Rates
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (a) Adjuster | $0.00 | $0.00 | $0.00 |
| (b) Foreman | $0.00 | $0.00 | $0.00 |
| (c) Mechanic | $0.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | $0.00 | $0.00 | $0.00 |
| (e) Apprentice | $0.00 | $0.00 | $0.00 |
| (f) Truck Driver | $0.00 | $0.00 | $0.00 |
| (g) Supervisor | $0.00 | $0.00 | $0.00 |
Cable and Alterations Work
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (h) Adjuster | $0.00 | $0.00 | $0.00 |
| (i) Foreman | $0.00 | $0.00 | $0.00 |
| (j) Mechanic | $0.00 | $0.00 | $0.00 |
| (k) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 |
Emergency Calls
| Labor Category | Normal work hours | After Hours Work | Sunday\Holiday Hours |
| (n) Adjuster | |||
| (o) Foreman | $0.00 | $0.00 | $0.00 |
| (p) Mechanic | $0.00 | $0.00 | $0.00 |
| (q) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 |
B.7 OPTION YEAR 4 - PERIOD OF PERFORMANCE: TBD
CLIN Description
4001 Harry S. Truman and Potomac Annex Locations
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
| (a) Adjuster | 2000 | $0.00 | $0.00 | 500.00 | $0.00 | $0.00 |
| (b) Foreman | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (c) Mechanic | 2000 | $0.00 | $0.00 | 288.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | 2000 | $0.00 | $0.00 | $0.00 | $0.00 | |
| (e) Apprentice | 4000 | $0.00 | $0.00 | 192.00 | $0.00 | $0.00 |
| (h)) repair parts (see C.9.1) | $_____________ |
| (i) Semiannual (routine) inspection (see C.19) | $_____________ |
| (j) Annual (periodic) inspection (see C.19) | $_____________ |
| (k) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
| (l) E-16 annual escalator maintenance (see C.5.10.1) | $_____________ |
Firm Fixed Price CLIN 4001 TOTAL $_____________
4002 Columbia Plaza Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $0.00 $0.00
| (e) repair parts (see C.9.1) | $_____________ |
| (f) Semiannual (routine) inspection (see C.19) | $_____________ |
| (g) Annual (periodic) inspection (see C.19) | $_____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $_____________ |
Firm Fixed Price CLIN 4002 TOTAL $_______________
4003 National Foreign Affairs Training Center Location
| Rate Normal | Overtime | Overtime Rate/ | ||||
| Labor Category | hours | work hour's Total | Total | Hours | After Work Hours | Total |
(a) Mechanic 2000 $0.00 $0.00 72 $_____________ $0.00
| (e) repair parts (see C.9.1) | $ ____________ |
| (f) Semiannual (routine) inspection (see C.19) | $ ____________ |
| (g) Annual (periodic) inspection (see C.19) | $ ____________ |
| (h) 5 year safety inspection (see C.19 & section J attachment 11) | $ ____________ |
Firm Fixed Price CLIN 4003 TOTAL $_____________
4004 Blair House
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $ __________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 4004 TOTAL $_____________
4005 Beltsville Information Management Center
| (a) Repairs, Preventive Maintenance as stated in section C. | $ __________ |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
Firm Fixed Price CLIN 4005 TOTAL $______________
4006 International Chancery Center
| (a) Repairs, Preventive Maintenance as stated in section C. | |
| and repair parts (see C.9.1) | $_____________ |
| (b) Semiannual (routine) inspection (see C.19) | $ __________ |
| (c) Annual (periodic) inspection (see C.19) | $ __________ |
| (d) 5 year safety inspection (see C.19 & section J attachment 11) | $ __________ |
Firm Fixed Price CLIN 4006 TOTAL $_______________
| 4007 Reimbursable Services - estimated | 1 | lot | $200,000 | |
| cost of repairs, preventive maintenance, | ||||
| inspections and\or alterations as well as | ||||
| actual labor cost (whether in-house or by | ||||
| subcontractor) cost of the actual | ||||
| replacement/repair parts and materials | ||||
| for all those services specified, which | ||||
| DoS has responsibility under Section C. | ||||
| at Harry S. Truman, Columbia Plaza, Potomac Annex | ||||
| Complex, National Foreign Affairs Training Center, | ||||
| Blair House and Beltsville Information | ||||
| Management Center. This may include work | ||||
| during regular, overtime, Sundays or | ||||
| holidays, emergency calls. See B.3.1 below, | ||||
| which shall reflect hourly rates proposed | ||||
| and accepted by DoS. | ||||
| CLIN 4007 TOTAL $200,000 |
| 4008 Reimbursable Services - estimated | 1 | lot | $40,000 |
| cost of repairs, preventive maintenance, | |||
| inspections and\or alterations as well as | |||
| actual labor cost (whether in-house or by sub- | |||
| contractor) cost of the actual replacement/ | |||
| repair parts and materials for all those | |||
| services specified, which DoS has | |||
| responsibility under Section C. at | |||
| International Chancery Center. This may | |||
| include work during regular, overtime, | |||
| Sundays or holidays, emergency calls. | |||
| See B.3.1 below, which shall reflect | |||
| hourly rates proposed and accepted by DoS. |
CLIN 4008 TOTAL $40,000
TOTAL BASIC SERVICES COST, BASE YEAR, CLIN's 4001 through 4006 $______________
TOTAL REIMBURSABLE SERVICES COST, BASE YEAR, CLIN 4007 THROUGH 4008 $______________
TOTAL ALL SERVICES, CLIN's 4001 thru 4008 $______________
B.3.1 Notes:
1. The Contractor shall fill in fixed labor rates for normal work hours (6:00am to 6:00pm Mon thru Fri), after hours work (6:00pm to 6:00am Mon thru Fri, all day Saturday) and Sunday\holiday rates- for the personnel designated below for reimbursable work. The Government is not obligated to purchase any reimbursable hours. The fixed hourly rates provided below shall be fully loaded hourly rates that include profit, overhead, general and administrative expenses, etc. In addition, the contractor may propose additional trades (with associated hourly labor rates) they deem necessary to perform under this contract, though are not listed below, that form a part of their technical/cost proposals.
| 2. Under the fixed price portion of the contract, if the required hours as set forth in Section C.5 herein, are not furnished by the Contractor, a monetary |
| deduction will be made by the COR at the applicable loaded hourly rate times the number of un furnished hours as set forth in Section B.3. |
3. The prices for line items 4001 through 4006 are fully loaded and include, as may be appropriate, charges for supplies, equipment, tools, labor fringe benefits, parts handling, overhead, general and administrative expenses and profit.
4. Reimbursable Work Rates
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (a) Adjuster | $0.00 | $0.00 | $0.00 |
| (b) Foreman | $0.00 | $0.00 | $0.00 |
| (c) Mechanic | $0.00 | $0.00 | $0.00 |
| (d) Mechanic/Pneumatic | $0.00 | $0.00 | $0.00 |
| (e) Apprentice | $0.00 | $0.00 | $0.00 |
| (f) Truck Driver | $0.00 | $0.00 | $0.00 |
| (g) Supervisor | $0.00 | $0.00 | $0.00 |
Cable and Alterations Work
Labor Category Normal work hours After Hours Work Sunday\Holiday Hours
| (h) Adjuster | $0.00 | $0.00 | $0.00 |
| (i) Foreman | $0.00 | $0.00 | $0.00 |
| (j) Mechanic | $0.00 | $0.00 | $0.00 |
| (k) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 |
Emergency Calls
| Labor Category | Normal work hours | After Hours Work | Sunday\Holiday Hours |
| (n) Adjuster | |||
| (o) Foreman | $0.00 | $0.00 | $0.00 |
| (p) Mechanic | $0.00 | $0.00 | $0.00 |
| (q) Apprentice | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 |
B.8 GRAND SUMMARY - PRICING - BASE YEAR AND 4 OPTION YEARS
Total amount for base year per B.3 total $
Total amount for option year 1 per B.4 total $
Total amount for option year 2 per B.5 total $
Total amount for option year 3 per B.6 total $
Total amount for option year 4 per B.7 total $
B.9 TOTAL PRICING - BASE YEAR AND 4 OPTION YEARS $
SAQMMA16R0171
&N
Sheet 2
File details come from the government source that posted it. Updated .