J-2-07A Bidding Charts
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GPM_Inventory.pdf | ||
| J-2-02_A004_INL_SOW-Specifics_per_Project.pdf | ||
| A004_Signed_SF30.pdf | ||
| Revised_Sections_B-M_D B_A004.pdf | ||
| J-2-01_A004-SOW-General_for_all_sites-Final.pdf | ||
| QAs_Haiti_Modular_Units-A004.pdf | ||
| Solicitation_extension_Mar_7-2016.pdf | ||
| SAQMMA16R0075-A002_Signed.pdf | ||
| A001.pdf | ||
| J-1_Admin_Docs.zip | ZIP file | |
| SAQMMA16R0075.pdf | ||
| Haiti_Modular_2015_Sections_B-M_D B_Construction.pdf | ||
| J-2_Technical_attachment.zip | ZIP file |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Breakdown CLIN-001
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN 001 - Canadian Embassy | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization/schedule submission | $0.00 | ||||
| 2. Security Clearance | $0.00 | ||||
| 3. Laydown area preparation | $0.00 | ||||
| 4. Fence removal & Fence re-installaton | $0.00 | ||||
| 5. Laundry Unit removal & Laundrey Unit re-installation | $0.00 | ||||
| 6. Stairway removal & transportation and off load to PAP site | $0.00 | ||||
| 7. Disconnect/removal of uitlities from Canadian Units | $0.00 | ||||
| 8. Disconnect Units - Load - Remove to staging area | $0.00 | ||||
| 9. Equipment - Crane Rental | $0.00 | ||||
| 10. Removed pilings to 1.5' below grade | $0.00 | ||||
| 11. Prepare Units for transport | $0.00 | ||||
| 12. Transport Units to designated locations | $0.00 | ||||
| 13. Off load units at designated locations | $0.00 | ||||
| 14. Site Landscape - Site Restoration | $0.00 | ||||
| 15. Demobilization - Cleanup | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-002
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN 002 Les Cayes Coast Guard Station | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization/schedule submission | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction US/Canadian Modulars | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction US/Canadian Modulars | $0.00 | ||||
| 8. Special Construction - Canadian Modular ( 9 Units ( 8 Dorm + 1 Ablution)) - See note 2 | $0.00 | ||||
| 9. Transport Shipping container (US Modular parts) (1 Unit) US Embassy to Les Cayes - Off load | $0.00 | ||||
| 10. Special Construction - US Modular - See note 1 | $0.00 | ||||
| 11. Generator - Purchase and install with concrete pad | $0.00 | ||||
| 12. Fuel Tank (double walled) w/enclosure | $0.00 | ||||
| 13. Water System - Water Tank w/booster pump, pressure tank, and connection to exisiting water supply with shutoff valve. See Note 3 | $0.00 | ||||
| 14. Water Purification System - See note 3 | $0.00 | ||||
| 15. Sewer Line - connect to existing system | $0.00 | ||||
| 16. Electrical - System to include covered panel board w/breaker box (weather proof), and ATS w/line to existing facility electric. | $0.00 | ||||
| 17. Canine Exercise yard (20' X 60') - with Chain Link Fence w/6' gate & clean fill | $0.00 | ||||
| Install one (1) 40' Shipping container (GFE) - Provide & Install wooden shelves along sides of container. See note 4. | $0.00 | ||||
| 15. Demobilization - Cleanup | $0.00 | ||||
| Total | $0.00 | ||||
| Note 1: US Modular (GFE) requires complete assembly including electric, doors, and windows. | |||||
| Note 2: Canadian Modular requires utility connections and removing shipping restraints. | |||||
| Note 3: System to use dual RFC Radial Flow Carbon filters or equal. Water Tank shall be 500 gallon PVC "Tuff Tank" or equal. | |||||
| Note 4: Contractor shall use the 40 ft shipping container that contains the US Modular unit. Therefore contractor is not responsible to ship the container back to PAP. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-003
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN - 003 Port au Prince Seaport | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization/schedule submission | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction US/Canadian Modulars | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction US/Canadian Modulars | $0.00 | ||||
| 8. Special Construction - Canadian Modular ( 1 Units) - See note 2 | $0.00 | ||||
| 9. Transport Shipping container (US Modular parts) (2 Units/doublewide) US Embassy to Seaport - Off load | $0.00 | ||||
| 10. Special Construction - US Modular - See note 1 | $0.00 | ||||
| 11. Generator - Purchase and install with concrete pad | $0.00 | ||||
| 12. Fuel Tank (double walled) w/enclosure | $0.00 | ||||
| 13. Electrical - System to include covered panel board w/breaker box (weather proof), and ATS w/line to existing facility electric. | $0.00 | ||||
| 14. Provide and install two (2) solar lights. | $0.00 | ||||
| 15. Load, ship, off load empty 40 ft shipping container from Seaport to US Embassy storage yard. | $0.00 | ||||
| 16. Demobilization - Cleanup | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Note 1: US Modular (GFE) requires complete assembly including electric, doors, and windows. | |||||
| Note 2: Canadian Modular requires utility connections and removing shipping restraints. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-004
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN 004 - Mallpasse Border Post | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization/schedule submission | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction US Units | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction US Units | $0.00 | ||||
| 8. Transport Shipping container (US Modular parts) (2 Units/doublewide) US Embassy to Mallpasse - Off load | $0.00 | ||||
| 9. Special Construction - US Modular (double wide) - See note 1 | $0.00 | ||||
| 10. Generator - Purchase and install with concrete pad | $0.00 | ||||
| 11. Fuel Tank (double walled) w/enclosure | $0.00 | ||||
| 12. Electrical - System to include covered panel board w/breaker box (weather proof), and ATS w/line to existing facility electric. | $0.00 | ||||
| 13. Provide and install four (4) solar lights. | $0.00 | ||||
| 14. Provide and install 200 L.F. chain link fence with triple strand barbed wire | $0.00 | ||||
| 15. Proive and install Twenty (20) foot double hung chain link fence gate with tripple strand barbed wire. | $0.00 | ||||
| 15. Load, ship, off load empty 40 ft shipping container from Mallpasse to US Embassy storage yard. | $0.00 | ||||
| 16. Demobilization - Cleanup | $0.00 | ||||
| TOTAL | |||||
| Note 1: US Modular (GFE) requires complete assembly including electric, doors, and windows. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-005
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN 005 - Terrier Rouge Customs | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization/schedule submission | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction Canadian Units | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction Canadian Units | $0.00 | ||||
| 8. Special Construction - Canadian Modular ( 4 Units ( 3 Dorm + 1 Ablution)) - See note 1 | $0.00 | ||||
| 9. Generator - Purchase and install with concrete pad | $0.00 | ||||
| 10. Fuel Tank (double walled) w/enclosure | $0.00 | ||||
| 11. Electrical - System to include covered panel board w/breaker box (weather proof), and line to existing facility electric. | $0.00 | ||||
| 12. Water System - Water Tank w/booster pump, pressure tank. See note 2. | $0.00 | ||||
| 13. Water Purification System - See note 2 | $0.00 | ||||
| 14. Setpic System- Sewer Line, Septic tank, and Soak pit | $0.00 | ||||
| 15. Provide and install four (4) solar lights. | $0.00 | ||||
| 16. Provide and install 320 L.F. six (6) Ft. chain link fence with triple strand barbed wire | $0.00 | ||||
| 17. Provie and install Twenty (20) foot double hung chain link fence gate with tripple strand barbed wire. | $0.00 | ||||
| 18. Load,Transport from Port au Prince, off load, and install one (1) Incinerator (GFE) | $0.00 | ||||
| 19. Demobilization - Cleanup | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Note 1: Canadian Modular requires utility connections and removing shipping restraints. | |||||
| Note 2: System to use dual RFC Radial Flow Carbon filters or equal . Water tank shall be PVC "Tuff Tank" or equal. | |||||
| Note 3: Area where modulars, water tank, fuel tank, generator, and incinerator are to be placed is a concrete parking area. Design shall include the concrete as the base, i.e. it it not required to excavate the concrete in the placement of these items. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-006
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN - 006 DCPJ | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization/schedule submission | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction Canadian Units | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction Canadian Units | $0.00 | ||||
| 8. Special Construction - Canadian Modular (4 Office Units) - See note 1 | $0.00 | ||||
| 9. Electrical System - to include covered panel board w/breaker box (weather proof) and in ground conduit connection from units to DCPJ Building. See note 2. | $0.00 | ||||
| 10. IT system - install in ground conduit connection from units to DCPJ Building. See note3. | $0.00 | ||||
| 11. Inverter Battery Rack | $0.00 | ||||
| 12. Provide and install Twelve (12) Deep cell batteries | $0.00 | ||||
| 13 Provide and install one (1) solar light. | $0.00 | ||||
| 14. Demobilization - Cleanup | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Note 1: Canadian Modular requires utility connections and removing shipping restraints. | |||||
| Note 2: Approximate distance is 150 ft. Contractor shall saw cut concrete, install conduit, compact fill, and replace concrete. | |||||
| Note 3: Approximate distance is 150 ft. Contractor shall saw cut concrete, install conduit, compact fill, and replace concrete. | |||||
| TOTAL | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-007
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN - 007 PAP City Haul | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| This is a zero cost CLIN, Cost for transporation, loading, and off loading of one (1) Canadian unit shall be covered in CLIN - 001 | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-008
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN - 008Cap Haitien Coast Guard Station | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General requirements/mobilization and schedule submission. | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction US Units | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction US Units | $0.00 | ||||
| 8. Transport Shipping container (US Modular parts) (2 Units/doublewide) US Embassy to Cap Haitien Coast Guard Station - Off load - See note 2. | $0.00 | ||||
| 9. Special Construction - US Modular (double wide) - See note 1 | $0.00 | ||||
| 10. Pump out existing Septic Tank | $0.00 | ||||
| 11. Electrical System to include covered panel board w/breaker box (weather proof), and line to existing facility electric. | $0.00 | ||||
| 12. Provide and install new water pump at exisiting water tank. | $0.00 | ||||
| 13. Septic System - Provide and install septic line from doublewide to exisitng septic tank. | $0.00 | ||||
| 14. Conduct evaluation of current Coast Guard Station eletrical , water, and plumbing systems. Provide a line item cost estimate. | $0.00 | ||||
| 15. Demobilation - Cleanup | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Note 1: US Modular (GFE) requires complete assembly including bathroom unit, electric, doors, and windows. | |||||
| Note 2: Empty 40 ft shipping container shall remain on site. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-009
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN 009 - US Embassy | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General requirements/mobilization and schedule submission. | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction - See note 2 | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction US Units | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction US Units | $0.00 | ||||
| 8. Transport Shipping container (US Modular parts) (2 Units/doublewide) US Embassy Storage Yard to US Embassy - Off load | $0.00 | ||||
| 9. Special Construction - US Modular (double wide) - See note 1 | $0.00 | ||||
| 10. Provide and install electrical conduit/connection from double wide unit to power source - not to exceed 150 ft. | $0.00 | ||||
| 15. Load, ship, off load empty 40 ft shipping container from US Embassy to US Embassy storage yard. | $0.00 | ||||
| 11. Demobilation - Cleanup | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Note 1: US Modular (GFE) requires complete assembly including, electric, doors, and windows. | |||||
| Note 2: Contractor to provide cost option to construct a 26' X 40' reinforced concrete pad 10" thick. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-010
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN - 010 BLTS PAP IAP K9 | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General requirements/mobilization and schedule submission. | $0.00 | ||||
| 2. Design - Site layout - | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - 60' X 12' reinforced concrete pad six (6) inches thick with graded swale. | $0.00 | ||||
| 5. Provide and install 120' X 12' metal framed,corrugate metal roof over existing and new concrete pad. | $0.00 | ||||
| 6. Demobilation - Cleanup see note 1 | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Note 1. Any grass areas disturbed my the construction sall be restored to original condition. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Price Breakdown CLIN-011
| UNITED STATES DEPARTMENT OF STATE | |||||
| BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS | |||||
| CLIN 011 - BLTS Jacmel Seaport | |||||
| 1 | 2 | 3 | 4 | 5 | 6 |
| DIVISION/DESCRIPTION | LABOR | MATERIALS | OVERHEAD | PROFIT | TOTAL |
| 1. General Requirements/Mobilization/schedule submission | $0.00 | ||||
| 2. Design - Site layout - Utilities - Footings | $0.00 | ||||
| 3. Site Work + Demolition | $0.00 | ||||
| 4. Concrete - Modular Building Footing Construction | $0.00 | ||||
| 5. Doors and Windows - GFE Included in Special Construction US Units | $0.00 | ||||
| 6. Equipment - Crane Rental | $0.00 | ||||
| 7. Furnishings - GFE Included in Special Construction US Units | $0.00 | ||||
| 8. Transport Shipping container (US Modular parts) (2 Units/doublewide) US Embassy to Jacmel- Off load - See note 2 | $0.00 | ||||
| 9. Special Construction - US Modular ( 3 modular units (One double wide and one single)) - See note 1 | $0.00 | ||||
| 10. Generator - Purchase and install with concrete pad | $0.00 | ||||
| 11. Fuel Tank (double walled) w/enclosure | $0.00 | ||||
| 12. Electrical - System to include covered panel board w/breaker box (weather proof). | $0.00 | ||||
| 13. Provide and install four (4) solar lights. | $0.00 | ||||
| 14. Provide and install 150 L.F. six (6) Ft. chain link fence with triple strand barbed wire | $0.00 | ||||
| 15. Provie and install Twenty (20) foot double hung chain link fence gate with tripple strand barbed wire. | $0.00 | ||||
| 16. Demobilization - Cleanup | $0.00 | ||||
| TOTAL | $0.00 | ||||
| Note 1: US Modular (GFE) requires complete assembly including bathroom unit, electric, doors, and windows. | |||||
| Note 2: Empty 40 ft shipping container shall remain on site. | |||||
| Allowance Items: | |||||
| PROPOSAL PRICE TOTAL: | |||||
| Alternates (list separately do not total) | |||||
| Offeror: Date |
Summary of Activities
| OFICIAL BREAKDOWN CHART | |||||||
| PROJECT: | HAITIAN MODULAR PROJECT | ||||||
| Place: | HAITI | ||||||
| Date: | |||||||
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT COST | TOTAL COST | SUB TOTAL | TOTAL COST BY CHAPTER |
| 1 | PRELIMINARY | $ 0.00 | |||||
| 1.01 | PRELIMINARY WORKS | $ 0.00 | |||||
| 1.01.01E | Camp site and bathrooms for workers and management staff, area = 30m2 | GBL | 1.00 | ||||
| 1.01.02E | Temporary closure polypropylene fabric h = 2.20 m | GBL | 1.00 | ||||
| 1.01.03E | Location and layout | GBL | 1.00 | ||||
| 1.02 | PROVISIONALS | $ 0.00 | |||||
| 1.02.01E | Provisionals for Water and Sewer | GBL | 1.00 | ||||
| 1.02.02E | Provisional Energy Installation | GBL | 1.00 | ||||
| 2 | FOUNDATION | $ 0.00 | |||||
| 2.01 | EXCAVATIONS, REPLACEMENTS AND STUFFED SCHOOL | $ 0.00 | |||||
| 2.01.01E | Manual excavation for foundations, including load, withdrawal, racking, disposal and timbering. | GBL | 1.00 | ||||
| 2.01.02E | Mechanical excavation in common material includes load, racking, retirement and paying fees for disposal. | GBL | 1.00 | ||||
| 2.01.03E | Excavation piles (d = 40 cm incl. Excavation, loading and removal of leftovers, mobilization, installation and removal equipment). | GBL | 1.00 | ||||
| 2.01.04E | Supply, spreding and compacting of granular filling material. | GBL | 1.00 | ||||
| 2.02 | CONCRETE FOUNDATION | $ 0.00 | |||||
| 2.02.01E | Poor cleaning Concrete (f'c = 1,500 psi), thickness of 5 cm. | GBL | 1.00 | ||||
| 2.02.02E | Dice in 4000 psi concrete. | GBL | 1.00 | ||||
| 2.02.03E | Foundation beams in 4000 psi reinforced concrete | GBL | 1.00 | ||||
| 2.02.04E | Subfloor joists in 4000 psi reinforced concrete | GBL | 1.00 | ||||
| 2.02.05E | Concrete subfloor in 4000 psi concrete e = 0.05 m | GBL | 1.00 | ||||
| 2.02.06E | 4,000 psi waterproofed reinforced concrete for machine room | GBL | 1.00 | ||||
| 2.02.07E | Piles D = 0.40 m. ,24.5 Mpa. (d = 40 cm incl. Mobilization and dismantling equipment, concrete). | GBL | 1.00 | ||||
| 2.03 | FOUNDATION REINFORCEMENT STEEL | $ 0.00 | |||||
| 2.03.01E | Reinforcement steel f'y = 4200 kg/cm2 (420Mpa) includes shaping, cut and installation (foundation beams, machine room, dice and piles) | GBL | 1.00 | ||||
| 2.03.02E | Welded mesh f'y = 4.200 kg / cm 2 (500 MPa) for concrete slabs, slabs subfloor and machine room | GBL | 1.00 | ||||
| 2.03.03E | Foundation slabs rebars (Grafiles 3,5 mm, 4 mm, 6 mm y 7,5 mm) | GBL | 1.00 | ||||
| 3 | STRUCTURE | $ 0.00 | |||||
| 3.01 | BEAMS AND COLUMNS SCHOOL | $ 0.00 | |||||
| 3.01.01E | Concrete square columns in 4000 psi; (finish in sight) | GBL | 1.00 | ||||
| 3.01.02E | Circular concrete columns 4000 psi; (finish in sight) | GBL | 1.00 | ||||
| 3.01.03E | Beams second floor in 4000 psi concrete | GBL | 1.00 | ||||
| 3.01.04E | Joists and struts second floor in 4000 psi concrete | GBL | 1.00 | ||||
| 3.01.05E | Beams and joists for roof covering in 4000 psi concrete | GBL | 1.00 | ||||
| 3.01.06E | Concrete channel beam of 4000 psi. | GBL | 1.00 | ||||
| 3.02 | CONCRETE SLABS | $ 0.00 | |||||
| 3.02.02E | Llightened concrete slab h = 0.35m,(without lower slab) in 4000 psi concrete, not including beams, joists and beams bracing. | GBL | 1.00 | ||||
| 3.02.03E | Solid flat plate of 0.10 m of 4000 psi | GBL | 1.00 | ||||
| 3.03 | VARIOUS ELEMENTS IN CONCRETE | $ 0.00 | |||||
| 3.03.01E | Solid aerial stairs in reinforced concrete of 4000 psi concrete finish in sight | GBL | 1.00 | ||||
| 3.04 | REINFORCEMENT STEEL | $ 0.00 | |||||
| 3.04.01E | Reinforcement steel f'y = 4200 kg/cm2 (420Mpa) includes shaping, cut and installation (square columns) | GBL | 1.00 | ||||
| 3.04.02E | Reinforcement steel f'y = 4200 kg/cm2 (420Mpa) includes shaping, cut and installation (Circular Columns) | GBL | 1.00 | ||||
| 3.04.03E | Reinforcement steel f'y = 4200 kg/cm2 (420Mpa) (beams, joists and bracing beams, aerial beams and plates) | GBL | 1.00 | ||||
| 3.04.04E | Reinforcement steel f'y = 4200 kg/cm2 (420Mpa) includes shaping, cut and installation (Stairs) | GBL | 1.00 | ||||
| 3.04.05E | Welded mesh f'y = 4.200 kg / cm2 | GBL | 1.00 | ||||
| 3.05 | METALLIC STRUCTURES | $ 0.00 | |||||
| 3.09.01E | Supply, manufacturing, transportation, assembly, primer and finish paint for marine environment for roof metallic structure | GBL | 1.00 | ||||
| 4 | MASONRY | $ 0.00 | |||||
| 4.01 | MASONRY WALLS | $ 0.00 | |||||
| 4.01.01E | Brick Wall in N. 5 20x 30x 12cm | GBL | 1.00 | ||||
| 4.01.03E | Block walls type split (40x20x12cm), mortar with same block color, type M.1: 4 and striated board | GBL | 1.00 | ||||
| 4.02 | MASONRY REINFORCEMENT | $ 0.00 | |||||
| 4.02.01E | Concrete small columns(Columneta) 10x20 w / confinement in concrete block masonry | GBL | 1.00 | ||||
| 4.03 | REINFORCEMENT STEEL | $ 0.00 | |||||
| 4.03.01E | Reinforcement steel PDR-60 f'y = 4200 kg/cm2 (420mpa) (columnetas) | GBL | 1.00 | ||||
| 5 | PREFABRICATED AND NON STRUCTURAL ELEMENTS IN ARCHITECTURAL CONCRETE | $ 0.00 | |||||
| 5.01 | NON STRUCTURAL ARCHITECTURAL CONCRETE, FINISH IN SIGHT | $ 0.00 | |||||
| 5.01.01E | Cover walls in concrete, slope of 1% | GBL | 1.00 | ||||
| 5.01.02E | Frame 3500 psi reinforced concrete (finish in sight) | GBL | 1.00 | ||||
| 5.01.03E | Lintel plate E = 0.12 m | GBL | 1.00 | ||||
| 5.01.04A | Reinforced concrete lintel in 4000 psi | GBL | 1.00 | ||||
| 5.02 | REINFORCING STEEL PDR-60 f'y = 4200 kg/cm2 (420 MPa) FOR SCHOOL | $ 0.00 | |||||
| 5,02,01E | Reinforcement Steel PDR-60 f'y = 4200 kg/cm2 (420 MPa) includes, shaping, cutting, installation | GBL | 1.00 | ||||
| 6 | PLUMBING | $ 0.00 | |||||
| 6.01 | COLD WATER INTERIOR NETWORK | $ 0.00 | |||||
| 6.01.01E | Piping PVCP1 1/4" | GBL | 1.00 | ||||
| 6.01.02E | Accessories PVCP 1-1/4" | GBL | 1.00 | ||||
| 6.01.03E | Piping PVCP1" | GBL | 1.00 | ||||
| 6.01.04E | Accessories PVCP1" | GBL | 1.00 | ||||
| 6.01.05E | Piping PVCP3/4" | GBL | 1.00 | ||||
| 6.01.06E | Accessories PVCP3/4" | GBL | 1.00 | ||||
| 6.01.07E | Piping PVCP1/2" | GBL | 1.00 | ||||
| 6.01.08E | Accessories PVCP1/2" | GBL | 1.00 | ||||
| 6.02 | HOT WATER INTERIOR NETWORK | $ 0.00 | |||||
| 6.02.01E | Piping CPVC3/4" | GBL | 1.00 | ||||
| 6.02.02E | Accessories CPVC3/4" | GBL | 1.00 | ||||
| 6.02.03E | Piping CPVC1/2" | GBL | 1.00 | ||||
| 6.02.04E | Accessories CPVC1/2" | GBL | 1.00 | ||||
| 6.02.05E | Cut-off valve | GBL | 1.00 | ||||
| 6.02.06E | Box to cut-off valve | GBL | 1.00 | ||||
| 6.03 | COLD WATER POINT | $ 0.00 | |||||
| 6.03.01E | Sink 1/2" | GBL | 1.00 | ||||
| 6.03.02E | Tank toilets 1/2" | GBL | 1.00 | ||||
| 6.03.03E | Urinals | GBL | 1.00 | ||||
| 6.03.04E | Cleaning sink 1/2" | GBL | 1.00 | ||||
| 6.03.05E | Dishwasher 1/2" | GBL | 1.00 | ||||
| 6.05 | SANITARY OUTLETS | $ 0.00 | |||||
| 6.05.01E | Sink 2" | GBL | 1.00 | ||||
| 6.05.02E | Tank toilets 4" | GBL | 1.00 | ||||
| 6.05.03E | Urinals | GBL | 1.00 | ||||
| 6.05.04E | Cleaning sink 2" | GBL | 1.00 | ||||
| 6,05,05E | Dishwasher 2" | GBL | 1.00 | ||||
| 6.05.06E | Floor trap 2 "(includes aluminum grille with sosco 2x3) | GBL | 1.00 | ||||
| 6.05.07E | 4" sanitary flange for toilet installation | GBL | 1.00 | ||||
| 6.06 | SEWAGE DRAINAGE SYSTEM | $ 0.00 | |||||
| 6.06.01E | Piping pvcs 4" | GBL | 1.00 | ||||
| 6.06.02E | Accessories pvcs 4" | GBL | 1.00 | ||||
| 6.06.03E | Piping pvcs 2" | GBL | 1.00 | ||||
| 6.06.04E | Accessories pvcs 2" | GBL | 1.00 | ||||
| 6.07 | SEWAGE DOWNSPOUTS | $ 0.00 | |||||
| 6.07.01E | Piping pvcs 4" | GBL | 1.00 | ||||
| 6.07.02E | Accessories pvcs 4" | GBL | 1.00 | ||||
| 6.07.03E | Piping pvcs 2" | GBL | 1.00 | ||||
| 6.07.04E | Accessories pvcs 2" | GBL | 1.00 | ||||
| 6.07.05E | Fixings 4" | GBL | 1.00 | ||||
| 6.07.06E | Fixings 2" | GBL | 1.00 | ||||
| 6.08 | RAIN WATER DOWNSPOUTS | $ 0.00 | |||||
| 6.08.01E | Piping pvcs 4" | GBL | 1.00 | ||||
| 6.08.02E | Accessories pvcs 4" | GBL | 1.00 | ||||
| 6.08.03E | Fixings 4" | GBL | 1.00 | ||||
| 6.09 | SEWAGE DRAINAGE NETWORK | $ 0.00 | |||||
| 6.09.01E | Novafort pvc Pipe 6 " | GBL | 1.00 | ||||
| 6.09.02E | Accessories pvc Novafort 6 " | GBL | 1.00 | ||||
| 6.09.03E | Novafort pvc Pipe 8" | GBL | 1.00 | ||||
| 6.09.04E | Accessories pvc Novafort 8" | GBL | 1.00 | ||||
| 6.09.05E | Grass Trap | GBL | 1.00 | ||||
| 6.09.06E | Concrete ditch with steel grille in 1/2" | GBL | 1.00 | ||||
| 6.09.07E | Inspection Boxes 80x80 | GBL | 1.00 | ||||
| 6.10 | TREATMENT SYSTEM OF SEPTIC TANK | $ 0.00 | |||||
| 6.10.01E | 5 cms Sand bed | GBL | 1.00 | ||||
| 6.10.02E | Coarse gravel Filter 2 1/2 " | GBL | 1.00 | ||||
| 6.10.03E | Brick manhole (includes cap sheet type alfajor) | GBL | 1.00 | ||||
| 6.10.04E | Supply and installation of complete septic tanks in reinforced polyester, includes one 10000 liters tank with false bottom and lids. (septic tank, anaerobic tank and grease trap) | GBL | 1.00 | ||||
| 6.10.05E | Supply and installation accessories 2 "and 4" (13 units per system) | GBL | 1.00 | ||||
| 6.10.06E | Supply and installation sanitary pvc pipe 2 " | GBL | 1.00 | ||||
| 6.10.07E | Supply and installation sanitary pvc pipe 4 "rabbeted | GBL | 1.00 | ||||
| 6.10.08E | Inspection boxes 0,40x0, 40 in concrete with reinforced cover | GBL | 1.00 | ||||
| 6.10.09E | Distribution boxes 1.20 x1, 20 in concrete with reinforced cover | GBL | 1.00 | ||||
| 6.11 | STORM DRAINGAE SYSTEM | $ 0.00 | |||||
| 6.11.01E | Novafort pvc Pipe 6 " | GBL | 1.00 | ||||
| 6.11.02E | Accessories Pvcs Novafort 6 " | GBL | 1.00 | ||||
| 6.11.03E | Pvc pipe Novafort 8 " | GBL | 1.00 | ||||
| 6.11.04E | Accessories pvcs Novafort 8 " | GBL | 1.00 | ||||
| 6.11.05E | Inspection boxes 80x80 | GBL | 1.00 | ||||
| 6.12 | STORM DRAINAGE SYSTEM ROOF | $ 0.00 | |||||
| 6.12.01E | Pvcs Pipe 4 " | GBL | 1.00 | ||||
| 6.23.02E | Accessories pvcs 4 " | GBL | 1.00 | ||||
| 6.23.03E | Traps and / or elbow 4 " | GBL | 1.00 | ||||
| 6.13 | MAIN CONNECTION TO WATER EXISTING NETWORK | $ 0.00 | |||||
| 6.25.01E | Pvcp pipe 1 to 1/2 " | GBL | 1.00 | ||||
| 6.25.02E | Pvcp Accessories 1-1/2 " | GBL | 1.00 | ||||
| 6.25.03E | Butterfly Valve type Wafer1-1/2 " | GBL | 1.00 | ||||
| 6.25.04E | Pvc Flange 2 " | GBL | 1.00 | ||||
| 6.25.05E | Universal HG 3/4 " | GBL | 1.00 | ||||
| 6.25.06E | Mechanical ball cock with check valve and accessories. 3/4 " | GBL | 1.00 | ||||
| 6.25.07E | Reinforced polyester tank of 15000 liters (includes ballast, camera enhancement in brick manhole, valve boxes and lids in Alfajor sheet) | GBL | 1.00 | ||||
| 6.14 | PRESSURE EQUIPMENT | $ 0.00 | |||||
| 6.14.01E | Supply of Hydro-pneumatic equipment, includes two 6 HP pumps, galvanized steel valves, pipe and accessories for connection. | GBL | 1.00 | ||||
| 6.14.02E | Bombas de achique ( | UN | 2.00 | ||||
| 6.15 | GENERAL NETWORK FOR COLD WATER | $ 0.00 | |||||
| 6.15.01E | Pvcp Pipe 1 1/2 " | GBL | 1.00 | ||||
| 6.15.02E | Pvcp Accessories 1-1/2 " | GBL | 1.00 | ||||
| 6.15.03E | Ball Valve 1-1/2 "(Includes box and cover sheet type alfajor) | GBL | 1.00 | ||||
| 6.16 | AF SUPPLY NETWORK | $ 0.00 | |||||
| 6.16.01E | Pvcp Pipe 1/2 " | GBL | 1.00 | ||||
| 6.16.02E | Accessories Pvcp 1/2 " | GBL | 1.00 | ||||
| 6.16.03E | Puntos hidráulicos de agua fría PVCP | GBL | 1.00 | ||||
| 6.16.04E | Hose bibb valve, with hose threads 1/2 " | GBL | 1.00 | ||||
| 6.17 | PRE-OPERATION SYSTEM | $ 0.00 | |||||
| 6.17.01E | Hydrostatic Testing | GBL | 1.00 | ||||
| 6.17.02E | Disinfection according to specifications | GBL | 1.00 | ||||
| 6.17.03E | Washing according to specifications. | GBL | 1.00 | ||||
| 6.17.04E | As-built drawings according to specifications. | GBL | 1.00 | ||||
| 6.17.05E | Operation and maintenece manual and training for final user | GBL | 1.00 | ||||
| 6.18 | EARTHWORKS | $ 0.00 | |||||
| 6.18.01E | Excavation in common material | GBL | 1.00 | ||||
| 6.18.02E | Clasified filling material | GBL | 1.00 | ||||
| 6.18.03E | B200 Filling material | GBL | 1.00 | ||||
| 6.18.04E | Common filling material | GBL | 1.00 | ||||
| 6.18.05E | Excess disposal | GBL | 1.00 | ||||
| 6.18.06E | Sand of rock | GBL | 1.00 | ||||
| 7 | ELECTRICAL AND TELECOMMUNICATIONS | $ 0.00 | |||||
| 7.01 | LIGHTING AND TOMAS | $ 0.00 | |||||
| 7,01,01 | Cabling MTAWG No. 2, XLPE 133% | GBL | 1.00 | ||||
| 7,01,02 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.02 | BOARDS | $ 0.00 | |||||
| 7,02,01 | Fuse 25A, HH | GBL | 1.00 | ||||
| 7,02,02 | Fuse support X 3 | GBL | 1.00 | ||||
| 7,02,03 | Pole Installation Accessories | GBL | 1.00 | ||||
| 7,02,04 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.03 | LIGHTNING IN MT SYSTEM | $ 0.00 | |||||
| 7,03,01 | Lightning 15KV, 5kA LA228 | GBL | 1.00 | ||||
| 7,03,02 | Galvanized piping 3/4 inch | GBL | 1.00 | ||||
| 7,03,03 | Galvanized piping 2 inch | GBL | 1.00 | ||||
| 7,03,04 | Grounding line in copper wire AWG # 2 | GBL | 1.00 | ||||
| 7,03,05 | Grounding rod, copper 2.4m, 5/8 and fixture ground wire | GBL | 1.00 | ||||
| 7,03,06 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.04 | MV METALLIC HOLDER, DIAGONALS AND FIXING ACCESSORIES FOR POSTS | $ 0.00 | |||||
| 7,04,01 | Accessories LA, brackets, crossarms, galvanized tape, insulators | GBL | 1.00 | ||||
| 7,04,02 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.05 | MV RETENTION CLAMPS | $ 0.00 | |||||
| 7,05,01 | Retaining clips | GBL | 1.00 | ||||
| 7,05,02 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.06 | MV POLE | $ 0.00 | |||||
| 7,06,01 | Concrete pole H=12m, 750kg | GBL | 1.00 | ||||
| 7,06,02 | Installation and transportation | GBL | 1.00 | ||||
| 7.07 | MV METALLIC RACEWAY IN POLE | $ 0.00 | |||||
| 7,07,01 | Duct 4 inch galvanized | GBL | 1.00 | ||||
| 7,07,02 | Terminals and Adaptors from PVC to galvanized | GBL | 1.00 | ||||
| 7,07,03 | 3M labels for piping according to RETIE | GBL | 1.00 | ||||
| 7,07,04 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.08 | MV UNDERGROUND RACEWAY | $ 0.00 | |||||
| 7,08,01 | Excavation, backfill, compaction, transport and debris removal 0.6mX0, 6mX20m | GBL | 1.00 | ||||
| 7,08,02 | Corrugated Duct 4 inch PVC DB | GBL | 1.00 | ||||
| 7,08,03 | Labels 3M pipe according to RETIE | GBL | 1.00 | ||||
| 7,08,04 | Terminals and Adapters | GBL | 1.00 | ||||
| 7,08,05 | Labor (workers) | GBL | 1.00 | ||||
| 7.09 | JUNCTION BOXES FOR MV DISTRIBUTION | $ 0.00 | |||||
| 7,09,01 | Construction of junction box type CS 275 | GBL | 1.00 | ||||
| 7.10 | CONCRETE PAD | $ 0.00 | |||||
| 7,10,01 | 2.5mX2.5m concrete pad in 3000 psi | GBL | 1.00 | ||||
| 7,10,02 | Labor (workers) | GBL | 1.00 | ||||
| 7.11 | MV/LV SUBSTATION- PAD MOUNTED | $ 0.00 | |||||
| 7,11,01 | Subestation of 225KVA | GBL | 1.00 | ||||
| 1,11,02 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.12 | LOW VOLTAGE (LV) CIRCUIT BRANCHES FROM SUB-STATION TO GENERAL PANEL BOARD | $ 0.00 | |||||
| 7,12,01 | THHN/THWN 2(4X350MCM). | GBL | 1.00 | ||||
| 7,12,02 | THHN/THWN 2(TXNo.4/0). | GBL | 1.00 | ||||
| 7,12,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.13 | LV UNDERGROUND RACEWAY | $ 0.00 | |||||
| 7,13,01 | Excavation, backfill, compaction, transport and debris removal 0.6mX0, 6mX30m | GBL | 1.00 | ||||
| 7,13,02 | Corrugated Duct 4 inch PVC DB | GBL | 1.00 | ||||
| 7,13,03 | Labels 3M pipe according to RETIE | GBL | 1.00 | ||||
| 7,13,04 | Terminals and Adapters | GBL | 1.00 | ||||
| 7,13,05 | Labor (workers) | GBL | 1.00 | ||||
| 7.14 | LV JUNCTION BOXES FOR MAIN CIRCUIT BRANCH | $ 0.00 | |||||
| 7,14,01 | Constructción caja de paso CS274 | GBL | 1.00 | ||||
| 7.15 | LV ENCLOSURE FOR POWER METER | $ 0.00 | |||||
| 7,15,01 | Metal enclosure, 80cmX80cmX30cm weather type, inspection window and doors, size BGW # 14 | GBL | 1.00 | ||||
| 7,15,02 | Measuring equipment in accordance with regulations of Electro Caribbean and the Naval Academy | GBL | 1.00 | ||||
| 7,15,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.16 | LV GENERAL PANEL BOARD | $ 0.00 | |||||
| 7,16,01 | Metal enclosure 80cmX40cmX180cm | GBL | 1.00 | ||||
| 7,16,02 | Electrical Board for 36 circuits, 1000A and thermomagnetic protection of 3X600A | GBL | 1.00 | ||||
| 7,16,03 | TVSS class C 200 KA, Three-phase type | GBL | 1.00 | ||||
| 7,16,04 | Power analyzer PM820 or equivalent | GBL | 1.00 | ||||
| 7,16,05 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.17 | LV DISTRIBUTION PANEL BOARDS | $ 0.00 | |||||
| 7,17,01 | 24 circuits, three-phase space, protection 3X20A | GBL | 1.00 | ||||
| 7,17,02 | 24 circuits, three-phase space, protection3X50A | GBL | 1.00 | ||||
| 7,17,03 | 24 circuits, three-phase space, protection 3X250A | GBL | 1.00 | ||||
| 7,17,04 | 24 circuits, three-phase space, protection 3X200A | GBL | 1.00 | ||||
| 7,17,05 | 24 circuits, three-phase space, protection 3X70A | GBL | 1.00 | ||||
| 7,17,06 | TVSS Class B, 120KA, Three-phase | GBL | 1.00 | ||||
| 7,17,07 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.18 | LV SECONDARY CABLING | $ 0.00 | |||||
| 7,18,01 | THHN/THWN AWG 4x8 + 1x10 | GBL | 1.00 | ||||
| 7,18,02 | THHN/THWN AWG 4x8 + 1x10 | GBL | 1.00 | ||||
| 7,18,03 | THHN/THWN AWG 4x8 + 1x10 | GBL | 1.00 | ||||
| 7,18,04 | THHN/THWN AWG 4x6 + 1x8 | GBL | 1.00 | ||||
| 7,18,05 | THHN/THWN AWG 4x4 + 1x6 | GBL | 1.00 | ||||
| 7,18,06 | THHN/THWN AWG 4x6 + 1x8 | GBL | 1.00 | ||||
| 7,18,07 | THHN/THWN AWG 4x6 + 1x8 | GBL | 1.00 | ||||
| 7,18,08 | 2 X (THHN/THWN AWG 4 X 1/0 + 1x2) | GBL | 1.00 | ||||
| 7,18,09 | 2 X (THHN/THWN AWG 4 X 1/0 + 1x2) | GBL | 1.00 | ||||
| 7,18,10 | THHN THWN No 8 | GBL | 1.00 | ||||
| 7,18,11 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.19 | LV SECONDARY RACEWAY SYSTEM | $ 0.00 | |||||
| 7,19,01 | 1 inch EMT conduit | GBL | 1.00 | ||||
| 7,19,02 | Ladder cable tray with lid 60cmX20cm | GBL | 1.00 | ||||
| 7,19,03 | Metal conduit 12cmX5cm | GBL | 1.00 | ||||
| 7,19,04 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.20 | SINGLE-PHASE DUPLEX RECEPTACLE 120VAC | $ 0.00 | |||||
| 7,20,01 | Single-phase duplex receptacle120VAC duplex, isolated grounding | GBL | 1.00 | ||||
| 7,20,02 | THHN/THNW 3XNo. 12 | GBL | 1.00 | ||||
| 7,20,03 | Piping EMT 3/4 inch | GBL | 1.00 | ||||
| 7,20,04 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.21 | THREE-PHASE RECEPTACLE (208VAC/30A) | $ 0.00 | |||||
| 7,21,01 | Three-phase receptacle,208VAC/30A | GBL | 1.00 | ||||
| 7,21,02 | THHN/THNW 4XNo. 10 | GBL | 1.00 | ||||
| 7,21,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.22 | SINGLE RECEPTACLE | $ 0.00 | |||||
| 7,22,01 | Single receptacle 120VAC, 15A only for lamps | GBL | 1.00 | ||||
| 7,22,02 | THHN/THNW 3XNo. 12 | GBL | 1.00 | ||||
| 7,22,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7.23 | FLUORESCENT LAMPS 4X17, T8 | $ 0.00 | |||||
| 7,23,01 | Fluorescent lamps 4X17, T8 according to specifications | GBL | 1.00 | ||||
| 7,23,02 | THHN/THNW 3XNo. 12 | GBL | 1.00 | ||||
| 7,23,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7,23,04 | Toggle switch | GBL | 1.00 | ||||
| 7.24 | ENERGY-SAVING LAMPS | $ 0.00 | |||||
| 7,24,01 | Energy-Saving Lamps 2X26W, socket E27 | GBL | 1.00 | ||||
| 7,24,02 | THHN/THNW 3XNo. 12 | GBL | 1.00 | ||||
| 7,24,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7,24,04 | Toggle switch | GBL | 1.00 | ||||
| 7.25 | DIMMING FLUORESCENT LAMPS 4X17, T5 | $ 0.00 | |||||
| 7,25,01 | Dimming Fluorescent lamps 4X17, T5 according to specifications (control wiring included) | GBL | 1.00 | ||||
| 7,25,02 | THHN/THNW 3XNo. 12 | GBL | 1.00 | ||||
| 7,25,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7,25,04 | Lighting control panel | GBL | 1.00 | ||||
| 7.26 | FLUORESCENT LAMPS 2X32W, T8 | $ 0.00 | |||||
| 7,26,01 | Fluorescent lamps 2X32W, T8 according to specifications | GBL | 1.00 | ||||
| 7,26,02 | THHN/THNW 3XNo. 12 | GBL | 1.00 | ||||
| 7,26,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7,26,04 | Toggle switch | GBL | 1.00 | ||||
| 7.27 | EMERGENCY LAMPS | $ 0.00 | |||||
| 7,27,01 | Emergency lamps, dual reflector, 60W, 120 VAC | GBL | 1.00 | ||||
| 7,27,02 | THHN/THNW 3XNo. 12 | GBL | 1.00 | ||||
| 7,27,03 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 7,27,04 | Single receptacle 120VAC, 15A | GBL | 1.00 | ||||
| 7.28 | GROUNDING SYSTEM | $ 0.00 | |||||
| 7,28,01 | Grounding line AWG 4/0 copper | GBL | 1.00 | ||||
| 7,28,02 | Grounding inspection boxes | GBL | 1.00 | ||||
| 7,28,03 | Electrode copper 99% 2.4m, 5/8 and exothermic welding | GBL | 1.00 | ||||
| 7.29 | LIGHTNING PROTECTION | $ 0.00 | |||||
| 7,29,01 | Electrode, copper 99.9%, Franklin type, 5/8 | GBL | 1.00 | ||||
| 7,29,02 | Grounding line AWG # 1/0 | GBL | 1.00 | ||||
| 7.30 | Air conditioning system | $ 0.00 | |||||
| 7,30,01 | Supply and installation A/C12KBU two- phase includes installation | GBL | 1.00 | ||||
| 7,30,02 | Supply and installation A/C24KBU two- phase includes installation | GBL | 1.00 | ||||
| 7,30,03 | Supply and installation A/C36KBU two- phase includes installation | GBL | 1.00 | ||||
| 7,30,04 | Supply and installation A/C48KBU two- phase includes installation | GBL | 1.00 | ||||
| 7,30,05 | Preventive maintenance AC System | GBL | 1.00 | ||||
| 7,30,06 | Air Extractor (Only for Restrooms) | GBL | 1.00 | ||||
| 8.00 | STRUCTURED WIRING SYSTEM | $ 0.00 | |||||
| 8.01 | DATA DROPS CAT 6A | $ 0.00 | |||||
| 8,01,01 | Data drops CAT 6A according to specifications | GBL | 1.00 | ||||
| 8,01,02 | CAT 6A Cabling UTPO | GBL | 1.00 | ||||
| 8,01,03 | Administration board | GBL | 1.00 | ||||
| 8,01,04 | Patch Cords 5 feet | GBL | 1.00 | ||||
| 8,01,05 | Patch Cords 7 feet | GBL | 1.00 | ||||
| 8,01,06 | Marking, labeling and rings | GBL | 1.00 | ||||
| 8,01,07 | Labor (Supervisor and two technicians) | GBL | 1.00 | ||||
| 8.02 | COMMUNICATIONS CABINETS | $ 0.00 | |||||
| 8,02,01 | Telecommunication closet (TC) according to specifications | GBL | 1.00 | ||||
| 8,02,02 | UPS 3KVA | GBL | 1.00 | ||||
| 8,02,03 | TVSS Class a Multitake 12kA | GBL | 1.00 | ||||
| 8,02,04 | Internetworking device | GBL | 1.00 | ||||
| 8,02,05 | Wireless Router | GBL | 1.00 | ||||
| 8.03 | FIRE ALARM SYSTEM | $ 0.00 | |||||
| 8,03,01 | Control Panel Center according to specifications | GBL | 1.00 | ||||
| 8,03,02 | Photo detectors and alarm devices according to specifications | GBL | 1.00 | ||||
| 8,03,03 | Manual stations and stroboscope light | GBL | 1.00 | ||||
| 8,03,04 | EMT piping 3/4 inch | GBL | 1.00 | ||||
| 8,03,05 | Safety signs/icons and banners | GBL | 1.00 | ||||
| 8,03,06 | 10 pounds extinguishers type ABC | GBL | 1.00 | ||||
| 8,03,07 | Emergency lights | GBL | 1.00 | ||||
| 9.00 | PLASTERING AND PAINTING | $ 0.00 | |||||
| 9.01 | PLASTERING ON WALLS | $ 0.00 | |||||
| 9.01.01E | Outdoor Weatherproof plaster smooth, mortar M: 1:4 includes edges and joints (According Architectural Design) | GBL | 1.00 | ||||
| 9.01.02E | Smooth plaster waterproofed for exterior beams, mortar M: 1:4 includes edges and joints | GBL | 1.00 | ||||
| 9.01.0E3 | Indoor smoth plaster, mortar M: 1:4 includes edges and joints | GBL | 1.00 | ||||
| 9.01.04E | Indoor smoth plaster, mortar M: 1:4 includes edges and joints | GBL | 1.00 | ||||
| 9.01.05E | Indoor smoth plaster, mortar M: 1:4 includes edges and joints for ceramic tiles | GBL | 1.00 | ||||
| 9.02 | PAINTING | $ 0.00 | |||||
| 9.02.01E | Stucco and vinyl 3 coats on plaster for interior walls (including edges and joints) | GBL | 1.00 | ||||
| 9.02.02E | Exterior painting type KORAZA on plasters(Includes edges and joints) | GBL | 1.00 | ||||
| 10.00 | FLOORS | $ 0.00 | |||||
| 10.01 | BASES AND LEVELINGS | $ 0.00 | |||||
| 10.01.01E | Plastering for sink with slope in mortar 1:4, e = 2 cm | GBL | 1.00 | ||||
| 10.01.02E | 1:4 leveling mortar T= 0.03 cm | GBL | 1.00 | ||||
| 10.01.03E | Leveling smooth concrete , f'c= 4000 psi for laboratories floor | GBL | 1.00 | ||||
| 10.02 | FLOORS | $ 0.00 | |||||
| 10.02.01E | Supply and installation of beige sealed porcelain tile floor of 0.60 x 0.60 m, Corona type or equivalent. | GBL | 1.00 | ||||
| 10.02.02E | Supply and installation of black floor type Pizarra of 0.45 m x 0.45 m for bathrooms | GBL | 1.00 | ||||
| 10.02.03E | Washed gravel doorknob | GBL | 1.00 | ||||
| 10.03 | BASE BOARD | $ 0.00 | |||||
| 10.03.01E | Base board in porcelain beige H: 10cm | GBL | 1.00 | ||||
| 11.00 | ROOFING AND WATERPROOFING | $ 0.00 | |||||
| 11.01 | WATERPROOFING AND INSULATION | $ 0.00 | |||||
| 11,01,01E | Waterproof mortar finish1:4 for chanel beam | GBL | 1.00 | ||||
| 11.02 | LIGHT ROOF | $ 0.00 | |||||
| 11,02,01E | Roofing type sandwich, 28m gauge galvanized steel thickness 30 mm, injected with high density polyurethane foam, tyoe Ajover or equivalent type, white inside and blue outside color, including installation and accessories for its proper functioning, and ridge cap | GBL | 1.00 | ||||
| 11,02,02E | Supply and installation of flanche in 18 gauge galvanized development 0.40m | GBL | 1.00 | ||||
| 11.04 | ACRYLIC AND / OR POLYCARBONATE ROOF | $ 0.00 | |||||
| 11,04,01E | Supply and instasllation of polycarbonate tilies T=6mm colored glass (Includes structure metallic and accessories required for proper Installation) | GBL | 1.00 | ||||
| 12.00 | METAL CARPENTRY | $ 0.00 | |||||
| 12.01 | SUPPLY AND INSTALLATION OF METAL DOORS | $ 0.00 | |||||
| 12.01.01E | Supply and installation of door type P1, in aluminum, natural color according to drawings and specifications. Including frame, 4mm float clear glass and accessories for proper installation. | GBL | 1.00 | ||||
| 12.01.02E | Supply and installation of door type P2, in aluminum, natural color according to drawings and specifications. Including frame, side windows, 4mm float clear glass and accessories for proper installation. | GBL | 1.00 | ||||
| 12.01.03E | Supply and installation of door type P3, in aluminum, natural color according to drawings and specifications. Including frame, side windows, 4mm float clear glass and accessories for proper installation. | GBL | 1.00 | ||||
| 12.01.04E | Supply and installation of door type P4, in aluminum, natural color according to drawings and specifications. Including frame, side windows, 4mm float clear glass and accessories for proper installation. | GBL | 1.00 | ||||
| 12.01.04E | Supply and installation of door type P5, in aluminum, natural color according to drawings and specifications.Including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12.01.04E | Supply and installation of door type P6, in aluminum, natural color according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12.01.04E | Supply and installation of door type P7, in aluminum, natural color according to drawings and specifications. Including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12.02 | RAILINGS AND HANDRAILS | $ 0.00 | |||||
| 12.02.01E | Supply and installation of aluminum railings with 2 "pipe, anchor plate, and anchors. | GBL | 1.00 | ||||
| 12.03 | SUPPLY AND INSTALLATION OF WINDOW | $ 0.00 | |||||
| 12,03,01E | Supply and installation of Window type V1, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,02E | Supply and installation of Window type V2, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,03E | Supply and installation of Window type V3, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,04E | Supply and installation of Window type V4, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,05E | Supply and installation of Window type V5, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,06E | Supply and installation of Window type V6, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,07E | Supply and installation of Window type V7, natural aluminum, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,08E | Supply and installation of Window type V8, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,09E | Supply and installation of Window type V9, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,10E | Supply and installation of Window type V10, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,11E | Supply and installation of Window type V11, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,12E | Supply and installation of Window type V12, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,13E | Supply and installation of Window type V13, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,14E | Supply and installation of Window type V14, natural aluminum, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,15E | Supply and installation of Window type V15, natural aluminum with 4mm float clear glass, according to drawings and specifications, including frame and accessories for proper installation. | GBL | 1.00 | ||||
| 12,03,15E | Supply and installation of Window type V16 (Overhaed coiling window) , galvanized steel according to drawings including rails, lock and accessories for proper installation. | GBL | 1.00 | ||||
| 12.04 | SUPPLY AND INSTALLATION OF BLIND | $ 0.00 | |||||
| 12,04,01E | VP 1 in aluminum natural color as design. | GBL | 1.00 | ||||
| 12,04,02E | VP 2 aluminum natural color as design. | GBL | 1.00 | ||||
| 12.05 | BATHROOM DIVISION | $ 0.00 | |||||
| 12,05,01E | Partitions colorless aluminum for bathrooms | GBL | 1.00 | ||||
| 13.00 | WOOD CARPENTRY | $ 0.00 | |||||
| 13.01 | DOORS AND FRAMES | $ 0.00 | |||||
| 13,01,01E | Supply and installation of door type P8, in cedarwood with joints, protector for lock and exposed steel surface according to drawings and specifications include frame and accessories for proper installation. | GBL | 1.00 | ||||
| 13,01,02E | Supply and installation of door type P9, in cedarwood with joints, protector for lock and exposed steel surface according to drawings and specifications include frame and accessories for proper installation. | GBL | 1.00 | ||||
| 13,01,03E | Supply and installation of double door type P10, in cedarwood with joints, protector for lock and exposed steel surface according to drawings and specifications include frame and accessories for proper installation. | GBL | 1.00 | ||||
| 13,01,03E | Supply and installation of sliding double door type P11, in cedarwood with joints, protector for lock and exposed steel surface according to drawings and specifications include frame and accessories for proper installation. | GBL | 1.00 | ||||
| 13,01,04E | Supply and installation of door type P12, in cedarwood with joints, protector for lock and exposed steel surface according to drawings and specifications include frame and accessories for proper installation. | GBL | 1.00 | ||||
| 13,01,05E | Supply and installation of door type P13, in cedarwood with joints, protector for lock and exposed steel surface according to drawings and specifications include frame and accessories for proper installation. | GBL | 1.00 | ||||
| 13,01,06E | Supply and installation of double door type P14, in cedarwood with joints, protector for lock and exposed steel surface according to drawings and specifications include frame and accessories for proper installation. | GBL | 1.00 | ||||
| 13.02 | SCHOOL FURNITURE | $ 0.00 | |||||
| 13,02,01E | Furniture for control room | GBL | 1.00 | ||||
| 13.03 | VARIOUS SCHOOL | $ 0.00 | |||||
| 13,03,01E | Supply and installation of Low furniture and wall cabinet cafeteria 2.1 mts | GBL | 1.00 | ||||
| 14.00 | CERAMIC TILES | $ 0.00 | |||||
| 14.01 | CERAMIC TILES | $ 0.00 | |||||
| 14.01.01E | Ceramic tiile for bathrooms bright white ceramic 25 x 40 cm ref. Mont Blanc or equivalent | GBL | 1.00 | ||||
| 14.01.02E | Sink counter in Polished Granite 60 cm, includes dash and skirt | GBL | 1.00 | ||||
| 14.01.03E | Cafeteria counter in Polished Granite Veneer 60 cm, includes dash and skirt | GBL | 1.00 | ||||
| 14.01.04E | Concrete counters depth of 0.60 m | GBL | 1.00 | ||||
| 14.02 | VARIOUS SCHOOL | $ 0.00 | |||||
| 14,02,01E | Cleaning sink | GBL | 1.00 | ||||
| 15.00 | SANITARY EQUIPMENT AND ACCESSORIES | $ 0.00 | |||||
| 15.01 | SANITARY DEVICES | $ 0.00 | |||||
| 15,01,01E | Supply and installation of San Giorgio Dual toilet or equivalent, white color, round and dual flush (4 liters and 6 liters and include Fiittings) | GBL | 1.00 | ||||
| 15,01,02E | Supply and installation of washbasin type Corona, ref. marsella or equivalent, white color for superimpose | GBL | 1.00 | ||||
| 15,01,03E | Supply and installation of washbasin with pedestal white color, type Avanti or equivalent | GBL | 1.00 | ||||
| 15,01,04E | Supply and installation of big Urinal white color, type Corona or equivalent (Include Fiittings) | GBL | 1.00 | ||||
| 15.02 | BATHROOM FITTINGS | $ 0.00 | |||||
| 15,02,01E | Supply and installation of taps, faucets chrome metal ref 146689 fenix grival line or equivalent | GBL | 1.00 | ||||
| 15,02,02E | Hose bibb valve, with hose threads type Grival or equivalent | GBL | 1.00 | ||||
| 15,02,03E | Fittings for dishwasher chrome color, type Epica or equivalent | GBL | 1.00 | ||||
| 15.03 | MIRRORS | $ 0.00 | |||||
| 15,03,01E | Supply and installation 4mm glass mirrors. shined and polished edges without bevel,separated from the wall 2 cms | GBL | 1.00 | ||||
| 15.04 | ACCESSORIES | $ 0.00 | |||||
| 15,04,02E | Supply and installation of Soap dispenser in stainless steel 1,2 liters | GBL | 1.00 | ||||
| 15,04,03E | Supply and installation cabinet for paper towels dispenser in stainless steel | GBL | 1.00 | ||||
| 15,04,04E | Supply and installation of toilet tissue dispenser, chrome metal type Corona, ref. ISIS or equivalent | GBL | 1.00 | ||||
| 15,04,05E | Supply and installation soap holder, chrome metal type Corona Isis, ref: IS6080001 or Equivlanete | GBL | 1.00 | ||||
| 15,04,06E | Towel rod type Corona ISIS, Ref.IS6010001 or Equivalent | GBL | 1.00 | ||||
| 16.00 | CEILINGS AND PARTITIONS | $ 0.00 | |||||
| 16.01 | DRYWALL CEILING | $ 0.00 | |||||
| 16,01,01E | Drywall suspended ceiling without joint (Metal framing Cl 26. Structure each 40 cms.) Includes three (3) coats of paint. | GBL | 1.00 | ||||
| 16,01,02A | Superboard suspended ceiling without joint (Metal framing Cl 26. Structure each 40 cms.) Includes three (3) coats of paint.(wet zones) | GBL | 1.00 | ||||
| 17.00 | LOCKS | $ 0.00 | |||||
| 17.01 | LOCKS DOORS | $ 0.00 | |||||
| 17,01,01E | Lock with handle, chrome plated, type steelock or equivalent for classrooms, laboratories and offices | GBL | 1.00 | ||||
| 17,01,02E | Lock with handle, chrome plated, type steelock or equivalent for bathrooms | GBL | 1.00 | ||||
| 17,01,03E | Lock for main entrance type Monticello or equivalent with stainless steel handles, 3 steel pins, double cylinder and coded key. | GBL | 1.00 | ||||
| 17,01,04E | Panic lock double, type mul-t-lock with manila | GBL | 1.00 | ||||
| 18.00 | CLEANLINESS AND OTHER | $ 0.00 | |||||
| 18.01 | CLEANING | $ 0.00 | |||||
| 18,01,01E | Final cleaning for hand over | GBL | 1.00 | ||||
| 19.00 | EXTERIOR AREAS | $ 0.00 | |||||
| 19.01 | COURTYARDS AND SQUARES ACCESS | $ 0.00 | |||||
| 19,01,01E | Supply and installation of 15 x 5 concrete curb, f'c=3000 psi | GBL | 1.00 | ||||
| 19,01,02E | Supply and installation of 0,20 x 0,35x 0,80 concrete curb, ftype A-80 | GBL | 1.00 | ||||
| 19,01,03E | Supply, spread and compacting of filling material type SBG-1 | GBL | 1.00 | ||||
| 19,01,04A | Cement tile 40 x 40 cm gray stripes | GBL | 1.00 | ||||
| VALUE DIRECT COSTS | $ 0.00 | ||||||
| A.I.U. - VAT | $ 0.00 | ||||||
| $ 0.00 | |||||||
| A . I . U | $ 0.00 | ||||||
| Administration | % | ||||||
| Unforenseens | % | ||||||
| Profit | % | ||||||
| VAT(Over the profit toal value) | % | ||||||
| TOTAL PROJECT(US Dollars) | $ 0.00 | ||||||
| PERFORMANCE TIME (in calendar days) |
Detailed Bidding Chart
| DETAILED BIDDING CHART - Guide- | |||||
| Item | Description | Unit | Quantity | Unit Price | Total Price |
| These are examples of how to present this chart. Note this is a guide and just some few examples were included and are not referenced to this specific project. | |||||
| Civil works | |||||
| Excavations for piping | m3 | 35 | |||
| Excavations for foundations | m3 | 150 | |||
| Back fill for slab | m3 | 100 | |||
| Plaster for walls | M2 | 50 | |||
| Electrical and Cabling works | |||||
| 110 Outlets | Un | 20 | |||
| Voice and data outlets | Un | 14 | |||
| Electrical channeling | Ml | 80 | |||
| Furniture | |||||
| Interlocutor Chairs | Un | 18 | |||
| Work stations 1.50 | Un | 18 | |||
| Floor to ceiling panels | Ml | 60 | |||
| DIRECT COST | |||||
| Admin costs | % | ||||
| Unforeseen | |||||
| Profit | % | ||||
| SUBTOTAL | |||||
| Taxes IVA | |||||
| TOTAL |
MBD02A036C2
File details come from the government source that posted it. Updated .