Amendment 001 to the solicitation. See block 14 for summary of changes.

View the file

Other files

File Type Posted
Kizil_Art_Pass_Q A__1_ __2_(Final_List).pdf PDF
Amended_Kizilart_SOW-FINAL_April_17_2015.docx DOCX document
Kizil_Art_Pass_Q A__1.pdf PDF
SAQMMA15R0243-A003.pdf PDF
SAQMMA15R0243-A002.pdf PDF
Amended_Kizilart_SOW-FINAL_April_16_2015.docx DOCX document
Kizilart_SOW-FINAL.docx DOCX document
J.1_QASP.docx DOCX document
J.2a_Geotechnical_Report_(ENGLISH).pdf PDF
SAQMMA15R0243.pdf PDF
J.2_Geotechnical_Report.pdf PDF
Plans_and_Pictures.zip ZIP file
zPercy_2011_PERCY_AMENDMENT_certification_form.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

A001

3. EFFECTIVE DATE

04/13/2015

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

LMAQMCODE

OFFICE OF ACQUISITION MANAGEMENT

(A/LM/AQM)

PO BOX 9115, ROSSLYN STATION

US DEPARTMENT OF STATE

ARLINGTON, VA 22219

Larry A. Pruitt

NAME

TEL.

pruittla@state.gov

EMAIL

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

SAQMMA15R0243

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

04/09/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to update the following:

1. RFL-F11 RSPOFL Deliverables: Added additional deliverable requirement to provide a copy of bond/insurance to COR;

2. H.7.2: Removed reference to H.11 and changed Safety Plan deliverable from ten (10) days to fifteen (15) days to match RFL-FL RPSOFL Deliverables; and

3. FAR 52.236-7 Permits and Responsibilities: Removed this clause as it is already covered in RFL-H19 RSPOFL - Zoning Approvals and Building Permits

All other terms and conditions remain the same.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Larry A. Pruitt

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

04/13/2015

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SAQMMA15R0243

RFL-F11 RPSOFL - DELIVERABLES

The following items shall be delivered under this contract:

Description Quantity Delivery Date Delivery To:

Bonds/Insurance 2: 1 Original, 1 Copy 15 days after award CO - Original

COR - Copy Safety Plan 1 15 days after award COR Quality Assurance Plan 1 15 days after award COR Construction Schedule 1 30 days after award COR Submittal Register 1 30 days after award COR Inspection Reports 1 N0 later than the close of busi-ness on Tuesday for the previous week

COR

Payment Request 1 No later than seven (7) calendar days from the first of each month for the previous month

COR

Monthly Progress Report 1 No later than seven (7) calendar days from the first of each month for the previous month

COR

Updates to Construction Sched-ule

1 last day of each month COR

Request for Substantial Comple-tion

1 5 days before inspection COR

As built drawings and warranty 1 After final completion, but be-fore final acceptance

COR

Request for Final Acceptance 1 5 days before inspection COR

(end of clause)

RFL-H7 RPSOFL - LAWS AND REGULATIONS

H.7.1 Compliance Required The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. Unless otherwise direc-ted by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations and orders and of the contract. In the event of a conflict among the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer.

H.7.2 Labor, Health and Safety Laws and Customs The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract. Within fifteen (15) days of contract award, the Contractor is required to submit a Safety Plan to the COR for review/approval.

H.7.3 Subcontractors The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others per-forming work on or for the project have obtained all requisite licenses and permits.

SAQMMA15R0243

Line Item Summary

Solicitation Number:

SAQMMA15R0243

Contract Number: Title: Tajikistan Border Crossing Date of Solicitation:

04/13/2015

Line Item No. Description Quantity Unit Unit Price Total Cost pruittla Highlight pruittla Highlight pruittla Highlight pruittla Highlight pruittla Highlight pruittla Highlight

H.7.4 Evidence of Compliance The Contractor shall submit proper documentation and evidence satisfactory to the Contracting Officer demon-strating compliance with this clause at such times as directed by the Contracting Officer.

(End of clause)

Clause 52.236-7 Permits and Responsibilities (Nov 1991) was deleted.

SAQMMA15R0243