Kizil_Art_Pass_Q A__1.pdf

PDF 72 KB Posted

Attached to
Two Story Modular Structure - Kizil Art Pass, Tajikistan
Solicitation number
SAQMMA15R0243_KIZIL_ART_PASS
Issued by

About this file

Kizil Art Q A 1

View the file

Other files

File Type Posted
Kizil_Art_Pass_Q A__1_ __2_(Final_List).pdf PDF
Amended_Kizilart_SOW-FINAL_April_17_2015.docx DOCX document
SAQMMA15R0243-A003.pdf PDF
SAQMMA15R0243-A002.pdf PDF
Amended_Kizilart_SOW-FINAL_April_16_2015.docx DOCX document
SAQMMA15R0243-A001.pdf PDF
Kizilart_SOW-FINAL.docx DOCX document
J.1_QASP.docx DOCX document
J.2a_Geotechnical_Report_(ENGLISH).pdf PDF
SAQMMA15R0243.pdf PDF
J.2_Geotechnical_Report.pdf PDF
Plans_and_Pictures.zip ZIP file
zPercy_2011_PERCY_AMENDMENT_certification_form.doc DOC document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building &

Floor Drawing/Spec.

Reference Subject Description Responses 1 N/A SF 1442 - Block 12a;

RFL-F11; RFL-H1 RPSO

FL; 52.228-15; 52.228-

2; 52.228-14; L.1 & M.1

Bonds / Bonding Please tell us the Bond which you requested we have collocated before award with our proposal of after award of the contracts for the solicitation # SAQMMA15R0243

Evidence of bonding capability is required to be submitted with the proposal. This could be a letter from a bonding agent indicating your firm has the capacity to get a bond. The actual bond(s) are not required until 15 days after the award of the contract.

2 N/A SOW - CLIN 0001; SOW

C.8.3.3; SOW- C.11.1;

652.242-73; 52.236-7

Registration and Licenses

Please kindly advise if we need to hold registration and license of Tajikistan, or Dubai registration would be enough?

Statement of Work, Section C.11.1 defines licensing requirements, but also indicates these requirements may be waived on a case by case basis by the Contracting Officer. If licenses are held in another country, clearly identify when submitting proposal.

3 N/A Item 13 Solicitation Requirements

Proposal Delivery Please note that the delivery of documents from Dushanbe to Arlington carried out by DHL within 5-7 days. This reduces the time for preparation of proposals.

We ask you allow submit our offers on your email.

Yes, electronic delivery of proposals will be accepted. The solicitation will be revised in Amendment 003 to reflect this change.

4 Both SOW and Drawings Measurements The word SOW document mentions the following dimensions for the building (p.3 point A): 9 m x 18 m whereas the layout attached (pdf in Russian) refers to different dimensions such as 11 m x 18 m. Therefore, are one of these measurement a « must have » or is this point a bit flexible so we can redesign the closest dimensions of the building with standard products (cost optimization) ?

Statement of Work, Section C.3 has been amended to match dimensions of drawings 11 m X 18 m.

5 N/A SF-1442, Block 13 Due Date of Proposals

I didn’t see any deadline to make our offer (I saw a deadline for the execution as at end of August), is there any ?

The due date of proposals is 10:00 AM EST, April 28, 2015

6 Both SOW and Drawings Measurements The drawings provided in the RFP show building dimensions of 11 X 18 meters; the SOW paragraph C.3.0 CLIN 0001, Item A calls for a 9 X 18 meter building. Which is correct?

Statement of Work, Section C.3 has been changed to match dimensions of drawings 11 m X 18 m.

16 N/A SOW - CLIN 0001; SOW

C.8.3.3; SOW- C.11.1;

652.242-73; 52.236-7

Registration and Licenses

Is the offeror required to be a Tajik business registered in Tajikistan? Statement of Work, Section C.11.1 defines licensing requirements, but also indicates these requirements may be waived on a case by case basis by the Contracting Officer. If licenses are held in another country, clearly identify when submitting proposal.

17 N/A Solicitation Provision

DOSAR 652.236-71

10% Price Preference

Clause 652.236-71: We usually see this clause for projects above 5,000,000 in estimated magnitude. Can you please confirm that there will be a preference to American Owned Firms, although the project magnitude is selected to be between 500,000-1,000,000?

Clause has been removed. There will be no preference given for U.S. firms.

Compliation

File details come from the government source that posted it. Updated .