Sample_Spot_Work_Agreement.pdf

PDF 87 KB Posted

Attached to
JOC for Roadway Repair and Maintenance
Solicitation number
230010
Issued by
Pima County, Arizona

About this file

This document is a Sample Spot Work Agreement template, which appears to be used by C.O.T. (City of Territory or similar) Engineering department for documenting specific work projects. The form is designed to capture details of existing and new work agreement items, including bid item numbers, quantities, units, descriptions, unit costs, and total costs. The template provides spaces to record critical project information such as job number, type of work, location, start and completion dates, with designated approval sections for both the contractor and C.O.T. Engineering.

The form is structured to allow flexible documentation of project costs, with separate tables for existing and new work agreement items. It includes fields for calculating an estimated total project cost, capturing comments or required actions, and providing official approvals. The template appears intended to serve as a standardized method for documenting smaller, specific work assignments or modifications to existing contracts, allowing precise tracking of project scope, costs, and responsibilities between the contracting parties.

View the file

Other files

File Type Posted
JOC_for_Roadway_Repair_and_Maintenance.pdf PDF
SBE_Provisions_.pdf PDF
DBE_Program_Provisions_JOC_March_2021.pdf PDF
Prevailing_Wage_Language.pdf PDF
Anti-Kickback_Act.pdf PDF
HUD_5369.PDF PDF
HUD_5370.pdf PDF
HUD_5369-A.PDF PDF
HUD_4010.pdf PDF
HUD_SECTION_3.pdf PDF
HUD_92554m_-_SUPPLEMENTARY_CONDITIONS_FOR_CONSTRUCTION.pdf PDF
FTA_BOILERPLATE_.pdf PDF
OFFER_AND_ACCEPTANCE.RFQ.pdf PDF
FTA_DBE_Provisions_.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAMPLE SPOT WORK AGREEMENT

DATE: LOCATION:

JOB # TYPE OF WORK:

EXISTING BID ITEMS:

BID ITEM

NUMBER

QUANTITY UNIT DESCRIPTION UNIT COST TOTAL

COST

NEW WORK AGREEMENT ITEMS:

BID ITEM

NUMBER

QUANTITY UNIT DESCRIPTION UNIT COST TOTAL

COST

ESTIMATED TOTAL: $

COMMENTS / ACTION REQUIRED:

START DATE: COMPLETION DATE:

CONTRACTOR APPROVAL:

DATE

C.O.T. ENGINEERING APPROVAL:

DATE

SAMPLE SPOT WORK AGREEMENT
DATE: LOCATION:
ESTIMATED TOTAL: $