Sample_Public_Notification_Letter.pdf
PDF 1 MB Posted
- Solicitation number
- 26S01B & 27S01D
- Issued by
- Orange County, California
About this file
This is a public notification letter from the City of Lake Forest, California, regarding four street improvement projects: Bake Parkway Resurfacing Project Phase 1 (26S01B) and Phase 2 (27S01D), Normandale Drive Resurfacing Project, and Regency Lane Resurfacing Project. The projects aim to rehabilitate pavement, improve ride quality, extend roadway service life, and complete associated accessibility and concrete improvements. Work scope includes asphalt concrete pavement repairs and reconstruction, roadway resurfacing, restoration of signing and striping, removal and replacement of ADA curb ramps and sidewalks, construction of concrete bus pads, driveway reconstruction, utility adjustments to grade, traffic control, and public notifications. Specific project limits are defined: Bake Parkway Phase 1 extends from South Pointe Drive to north of Commercentre Drive; Phase 2 extends from south of Commercentre Drive to Rancho Parkway South; Normandale Drive extends from El Toro Road to Osterman Road; and Regency Lane extends from Lake Forest Drive to Normandale Drive.
The City of Lake Forest is seeking a responsive and responsible bidder to execute these street improvement projects. The notification letter serves to inform the public of the pending bid opportunity and associated project details. No specific pricing information, set-asides, incumbent contractor details, response deadlines, or contract term details are provided in this notification document.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX 4
File details come from the government source that posted it. Updated .