Technical Project Specifications Summary
This is a Technical Project Specifications document prepared by Tait & Associates, Inc. for the City of Lake Forest Public Works Department detailing construction requirements for three street resurfacing projects: Bake Parkway Resurfacing Project Phase 1 (26S01B) and Phase 2 (27S01D), and Normandale Drive and Regency Lane Resurfacing Project. The projects include asphalt concrete pavement repairs and reconstruction, roadway resurfacing, ADA curb ramp and sidewalk removal and replacement, concrete bus pad construction, driveway reconstruction, utility adjustments, traffic control, and public notifications. Work is organized into three bid schedules corresponding to the three project areas, with detailed specifications for demolition, earthwork, roadway surfacing, concrete and masonry construction, signing and striping, utility adjustments, and street lighting and traffic signal work. The specifications modify and amend the 2021 Standard Specifications for Public Works Construction and establish technical conditions that take precedence in case of conflicts.
The document establishes comprehensive construction requirements including mandatory Storm Water Pollution & Prevention Plan (SWPPP) preparation within 14 days of contract award, coordination with OCTA regarding bus stop operations with minimum 14-day notice, concrete improvement completion within five calendar days, and roadway patching completion on the same day as demolition. Payment is structured on a lump sum basis for mobilization, demobilization, cleanup, construction surveying, traffic control, public notification, and SWPPP implementation, with unit pricing for various pavement, concrete, and utility adjustment items measured in cubic yards, square feet, tons, linear feet, or individual units. The specifications emphasize strict quality control requirements for asphalt concrete including density testing at 95 percent relative compaction, fiber-reinforced asphalt overlay specifications with detailed dosage and dispersion requirements, and comprehensive inspection and testing protocols. Contractor responsibilities include tracking each bid item and bid schedule separately, providing pre-construction survey documentation, maintaining monuments, coordinating with multiple utility agencies, and implementing all costs for administrative tracking and coordination within bid item prices with no additional compensation allowed.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55136.00200\31919335.1 i
SECTION 00800
TECHNICAL CONDITIONS
CITY OF LAKE FOREST
BAKE PARKWAY RESURFACING PROJECT -
PHASE 1 (26S01B) AND PHASE 2 (27S01D)
and
NORMANDALE DRIVE AND REGENCY LANE
RESURFACING PROJECT
PROJECT SPECIFICATIONS
JULY 2026
PREPARED BY:
TAIT & ASSOCIATES, INC.
701 N. PARKCENTER DRIVE
SANTA ANA, CA 92705
David Sloan, P.E.
UNDER THE SUPERVISION OF:
CITY OF LAKE FOREST
PUBLIC WORKS DEPARTMENT
100 CIVIC CENTER DRIVE
LAKE FOREST, CA 92630
APPROVED BY: _________________________
Douglas Erdman, P.E.
Director of Public Works/City Engineer
A. THESE ADDITIONS, DELETIONS, AND AMENDMENTS MODIFY THE
SPECIFICATIONS IN THE “STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION”, 2021 EDITION.
B. THESE ADDITIONS, DELETIONS, AND AMENDMENTS SHALL TAKE PRECEDENCE
IN THE EVENT OF A CONFLICT WITH ANY STANDARD SPECIFICATIONS.
C. AS A CONVENIENCE, THESE ADDITIONS, DELETIONS, AND AMENDMENTS HAVE
BEEN ARRANGED IN A FORMAT THAT PARALLELS THE “STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION”, 2021 EDITION.
D. WHERE REFERNCE TO A SECTION DOES NOT CORRELATE WITH THE SUBJECT
MATTER OF THE 2021 STANDARD SPECIFICATION, REFERENCE SHALL BE
UPDATED TO REFFER TO THE APPLICABLE PORTION OF THE PREVIOUS
STANDARD SPECIFICATION
E. AS A CONVENIENCE TO THE CONTRACTOR, SUMMARY PAGES FOR THE
FOLLOWING CONTRACT ITEMS HAVE BEEN PREPARED AT THE FRONT END OF
THE TECHNICAL PROVISIONS:
A. SUMMARY OF PROJECT PLANS & RELATED BID SCHEDULE
B. SUMMARY OF PROJECT SCHEDULING REQUIREMENTS
C. SUMMARY OF PROJECT MEASUREMENT AND PAYMENT CLAUSES
SECTION 00800
TECHNICAL CONDITIONS
PROJECT PLAN AND REFFERENCE DOCUMENT SUMMARY:
The following describes the applicable plans for each bid schedule and their correlating project technical conditions.
Bid Schedule A: Bake Parkway Rehabilitation – Phase 1
The following are the list of applicable plans for this bid schedule:
1. Plans titled “Bake Parkway Rehabilitation Project Phase 1” prepared by TAIT & Associates.
Bid Schedule B: Bake Parkway Rehabilitation – Phase 2
1. Plans titled “Bake Parkway Rehabilitation Project Phase 2” prepared by TAIT &
Bid Schedule C: Normandale Drive and Regency Lane Rehabilitation Exhibit
1. Normandale Drive and Regency Lane Project Location Map
2. Normandale and Regency Lane Proposed Striping Exhibit
SECTION 00800
TECHNICAL CONDITIONS
GENERAL WORK SCHEDULING REQUIREMENTS:
The following scheduling requirements shall apply to all project areas:
Storm Water Pollution & Prevention Plan (SWPPP):
• This project will disturb more than 1 acre of land in aggregate, and as a result, will require the implementation of a SWPPP. Contractor shall be required to prepare a project SWPPP for the entire project. SWPPP shall be prepared and submitted to the City within 14 days of the contract award.
• Upon approval, Contractor shall promptly upload the SWPPP to the Storm Water Multiple Applicatoin and Report Tracking System (SMARTS system)
• Contractor shall be responsible for payment and scheduling of the permit fee
OCTA Bus Stop Coordination:
• Work on Bake Parkway is anticipated to impact bus stop operations. Contractor shall coordinate with OCTA Stops and Zones Coordinator Kyle Poff, kpoff@octa.net, at 714- 560-5816 a minimum of 14 days prior to mobilizing on site.
• Contractor shall work with OCTA to relocate and accommodate bus stop traffic during construction in order to phase work to minimize impact to the required bus operations.
Concrete Improvements:
• All concrete sidewalk and ramps removed shall be replaced and open to pedestrian traffic within 5 calendar days and, in no instance, shall the ramp or sidewalk remain demolished over a weekend. Should a ramp or sidewalk not be completed prior to a weekend the contractor shall be required to provide an accessible path of travel via temporary paving methods through the work areas over the weekend.
• Sidewalk replacements must be scheduled in a manner to allow adequate detouring of pedestrian traffic around the designated work area. Removals shall be limited to a single side of the street per roadway block and must be replaced with new sidewalk before removals on the subsequent side of the street are allowed.
Roadway Patching:
• All roadway segments requiring localized removal and replacement shall be re-paved on the same day as demolition and excavation.
Roadway Mill & Overlay:
• Final pavement overlay shall be conducted no later than 5 working days after the initial pavement milling operations.
Roadway Reconstruction:
• All lanes of traffic shall be opened at the end of each working day
• Vehicular traffic will not be allowed on Crushed miscellaneous Base (CMB)/Base sections. Base Paving will be required at the end of each day’s work, prior to opening the roadway to traffic.
• Ramping of the joins with temporary Asphalt concrete (AC) will be required at the end of each day to the City’s satisfaction. The Contractor shall maintain the temporary AC ramping within the job limits until the final AC/Asphalt Rubber Hot mix (ARHM) overlay is completed
SECTION 00800
TECHNICAL CONDITIONS
Traffic Control & Phasing:
• At the start of the project, the Contractor shall submit a phasing plan to the City to outline the order of operations and approach for traffic control phasing.
• Upon approval of the phasing plan, Contractor shall prepare detailed traffic control plans for all roadway segments.
• Roadway closures will not be allowed without prior authorization from the City.
Residential & Multi-Family Noticing (Bid Schedule C – Normandale Drive and Regency Lane):
• In addition to the noticing requirements of Section 601, the Contractor shall provide written notice to any homeowners' association or property management company with frontage, common area, or resident ingress/egress adjacent to the work area, if applicable. Where the Contractor cannot verify HOA or property management representation for a given parcel, notice shall instead be hand-delivered or posted directly at the affected property's entrance(s).
• For apartment complexes with resident entrances or driveways fronting the work area, the Contractor shall additionally post notice at each building entrance and common mail/parcel area, in addition to any notice provided to the leasing or property management office.
• For work adjacent to the park on Regency Lane, the Contractor shall post notice along the park's street frontage identifying any anticipated impact to on-street parking, particularly during scheduled active-use periods (leagues, weekend games), and shall coordinate scheduling with the City.
• All written notices required under this subsection and under Section 601 shall be provided in both English and in Spanish, if required.
SECTION 00800
TECHNICAL CONDITIONS
SUMMARY OF MEASUREMENT AND PAYMENT CLAUSES (BID SCHEDULES A – C):
The following items of work pertain to the bid items included within this project:
NOTE: Contractor shall be required to track each bid item and bid schedule separately and provide appropriate backup documents for quantity verification purposes. Contractor shall assume appropriate administrative costs throughout the course of construction in order to track and present the appropriate backup documents. All such tracking costs are assumed to be included in other bid items and no additional compensation will be allowed.
The following items of work pertain to the bid items included within this project:
CONTRACTUAL & REGULATORY BID ITEMS
Bid Item: Project Mobilization, Demobilization & Cleanup Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include all items listed in Section 00700, Article 40 of the general conditions, including but not limited to providing bonds, insurance and financing, establishing a field office, preparing a BMP Plan and construction schedule, obtaining necessary permits from the City and other governing jurisdictions, payment of applicable permit fees, and all other related work as required by the Contract Documents. The Contractor must remove all trash/debris, work trailer and appurtenances, and utility markings in the project area after the conclusion of work as part of this bid item. Compensation for this Bid Item shall at no time be greater than 5% of all Construction Costs, not including this Bid Item.
Bid Item: Construction Surveying, Staking, and Monument Preservation:
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include establishing survey controls, verifying existing grades (including pre construction cut sheets of the existing roadway elevations for all roadway segments to be reconstructed per the specification requirements), Plotting and submittal of the existing cut sheets to the City, coordination with City to verify any final grades or changes, conducting construction staking and setting the necessary field control on identified grades, setting any final grades required by the City, and any other construction survey or staking requirements as outlined in the technical provisions.
This item includes the required pre-construction field and record review to identify the affected monuments, preparation and filing of pre-construction corner records for all affected control/monuments and the replacement and re-filing of updated corner records for all demolished or affected monuments/control upon construction completion.
Verification of existing grades on any street being reconstructed on Bake Parkway as well as the overlay on Normandale and Regency is included under this bid item. At a minimum and prior to conducting pavement removal on the identified segment, the contractor shall be required to conduct a licensed survey of the existing roadway to document the existing pavement section at 25 foot on center with shots taken at lip of gutter, lane line, FS at median and TC of median (if applicable), and Centerline of the street. An intersection grid grade with shots at 15’ on center will be required for all intersections.
Prior to demolition being authorized, Contractor must submit the survey data CAD and PDF files to the City for validation of the roadway profile. The City shall be given 2 weeks to review the
SECTION 00800
TECHNICAL CONDITIONS
provided data and provide the contractor with any suggested modifications to the roadway profiling. Should no new grades be provided, contractor is to match existing lip and FS/CL elevations at joins.
Bid Item: Traffic Control & Public Notification:
Sum (LS) and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the traffic control related work, including the preparation and coordination of detailed traffic control plans, coordinating work phasing, as well as all work involving placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system as specified in the Standard Specifications and these specifications, and as directed by the City. The lump sum price shall also include non-skid steel plates and temporary AC including installation and removal; all associated temporary signing and striping; flashing arrow signs; PCMS’s; flagging and/or flagger costs and no additional compensation will be made therefor. Furthermore, this item shall also include all labor, material, and coordination required to prepare, obtain approval for, print, distribute, and coordinate public notices, including the required public coordination and scheduling of phasing and access operation of businesses, and no additional compensation will be allowed therefor.
Bid Item: SWPPP & Storm Water Protection:
Sum (LS) and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all the tasks associated with the preparation and implementation of the SWPPP. Bid item includes preparation of SWPPP document, routing to the City for review and approval, upload and coordination of certification of the document with the City’s NPDES manager, paying of the permit fees, implementation of all construction BMPs, QSD/P field inspections, reports, and final cleanup/closeout of the permit.
SECTION 300 – DEMOLITION/EARTHWORK RELATED BID ITEMS
Bid Item: Sawcut, Excavate & Dispose Ex. Roadway Section Measurement and payment for work under this item shall be at the contract unit price per Cubic Yard (CY) as measured in the field based on a width and average pavement depth calculation of the proposed pavement surface area for full depth pavement reconstruction segments only, and shall be considered full compensation for furnishing labor, materials, equipment, and incidentals for doing all the work involved, including excavation of all surfacing, saw-cutting, removal and disposal of pavement, base, and subgrade materials to the required depths as noted on the plans, and subgrade/base compaction, as specified in the Standard Specifications and these Special Provisions, as approved by the Engineer and no additional compensation will be allowed therefor. It shall be assumed that if additional excavation due to slight adjustments are needed to the crown of the roadway it shall be included as incidental to the contract and no additional compensation will be allowed therefor. This bid item does not include excavations associated with PCC improvements, bus pads, localized AC patching, or AC Slot Paves, all of which are assumed to be paid for as part of the respective bid items.
SECTION 00800
TECHNICAL CONDITIONS
SECTION 302 – ROADWAY SURFACING RELATED BID ITEMS
Bid Item: 3" Uniform Depth Cold Mill:
2” Uniform Depth Cold Mill:
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include all labor, materials, equipment, and incidentals required for cold milling and disposal of the asphalt roadway to the depth as identified on the plans and all other work items as required to complete the work in place. All costs associated with temporary AC ramping and joins shall be included in other bid items and no additional compensation will be allowed therefor.
Bid Item: Construct 1" AC Leveling Course:
Construct AC Base Course:
Measurement and payment for work under this item shall be at the contract unit price per TON, as measured from the delivered material tickets for material actually installed, and shall include all labor, materials, equipment, and incidentals required for base preparation (including scarification and compaction of subgrade or base material), installation of Tack coat, construction of the AC pavement surface, compaction and protection of work, and all other work associated with this task, complete and in place. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a licensed weighmaster's certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture.
Material that is delivered but not placed within the allotted bid item will not be measured or paid for. This work item shall include all surface preparation and weed abatement as well as labor, materials and work required to fully complete the noted item of work. Payment for slot pavement adjacent to curb and gutter not specifically differentiated in bid schedules shall be considered included in the noted concrete bid items and no additional payment will be allowed.
Bid Item: Construct 2" ARHM Overlay:
Measurement and payment for work under this item shall be at the contract unit price per TON, as measured from the delivered material tickets for material actually installed (Material that is delivered but not placed within the allotted bid item will not be measured or paid for), and shall include all labor, materials, equipment, and incidentals required and shall include full compensation for conducting crack sealing, crack filling, and weed abatement on the cold milled surface, all surface preparation and tack coat, and incidentals and for doing all the work involved, including furnishing, applying and cleaning up excess rock dust blotter. Temporary surface work where required by the Owner's Representative for traffic control or other purposes shall be considered included in the price bid for Traffic Control and no additional compensation will be allowed.
Bid Item: Construct 2" Fiber Reinforced ARHM Overlay:
Measurement and payment for work under this item shall be at the contract unit price per TON, as measured from the delivered material tickets for material actually installed (Material that is delivered but not placed within the allotted bid item will not be measured or paid for), and shall include all labor, materials, equipment, and incidentals required and shall include full compensation for conducting crack sealing, crack filling, and weed abatement on the cold milled surface, all surface preparation and tack coat, and incidentals and for doing all the work involved, including furnishing, applying and cleaning up excess rock dust blotter, and furnishing and incorporating the reinforcing fiber additive in accordance with Section 302-9.10 – Reinforcing Fibers for Asphalt of these Special Provisions. Payment under this item is contingent upon demonstrated compliance with the fiber dosage and dispersion requirements of
SECTION 00800
TECHNICAL CONDITIONS
Section 302-9.10. Non-compliant fiber-reinforced asphalt concrete shall be subject to the financial disincentive and/or removal and replacement provisions of Section 302-9.10, Section G.2(f). Temporary surface work where required by the Owner's Representative for traffic control or other purposes, shall be considered included in the price bid for Traffic Control and Noticing and no additional compensation will be allowed.
Bid Item: Localized Full Depth 4.5” AC Patching:
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include all work associated with identifying and marking the limits of the localized pavement removals, sawcutting and removal of the asphalt roadway to the depth as identified on the plans and all other work items as required to complete the work in place.
The contractor will be responsible for the removal and disposal of any petromat material and foreign materials encountered during sawcut and removal operations. Furthermore, this item shall include all labor, materials, equipment, and incidentals required for base preparation, installation of Tack coat, construction of the AC base paving course, compaction and protection of work, and all other work associated with this task, complete and in place. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a licensed weighmaster's certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture. Material that is delivered but not placed within the allotted bid item will not be measured or paid for. This work item shall include all surface preparation as well as labor, materials and work required to fully complete the noted item of work. This bid item shall be completed AFTER the full width grinding and ahead of the pavement overlay in order to allow for a final inspection of the pavement surface and adjustment of patching areas prior to implementation.
ESTIMATED QUANTITY NOTE – This bid item has been prepared with an additional contingency square footage to account for potential growth of roadway patching beyond the limits of the original survey date. As a result, quantity adjustments of greater than 25% may be encountered. As a result, unit price adjustments will not be allowed and the Contractor should account for potential quantity adjustments in their bid.
Bid Item: Sawcut, Remove, and Replace Private AC Pavement Section
Square Foot (SF) and shall include sawcutting and removal of the asphalt roadway to the depth noted on the plans and all other work items as required to complete the work in place. The contractor will be responsible for the removal and disposal of any petromat material and foreign materials encountered during sawcut and removal operations. Furthermore, this item shall include all labor, materials, equipment, and incidentals required for base preparation, installation of Tack coat, construction of the AC paving course (base and surface), compaction and protection of work, and all other work associated with this task, complete and in place. The Contractor shall furnish to the Engineer at the time of delivery of the material on the job site a legible copy of a licensed weighmaster's certificate showing gross, tare, and net weights of each truckload of asphalt concrete mixture. Material that is delivered but not placed within the allotted bid item will not be measured or paid for. This work item shall include all surface preparation as well as labor, materials and work required to fully complete the noted item of work.
SECTION 00800
TECHNICAL CONDITIONS
SECTION 303 – CONCRETE AND MASONRY CONST. RELATED BID ITEMS
Bid Item: Sawcut, Remove & Replace ADA Compliant Curb Ramp Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) as defined as the full limits of removal and construction to complete an ADA compliant curb ramp, curb and gutter, and any adjoining sidewalk required for ADA compliance, and shall include furnishing labor, materials, equipment, and disposal to complete the construction, including the removal of existing improvements, curb and gutter, and sidewalk, construction of the curb and gutter, construction of the curb ramp and adjoining sidewalk leading to the ramp, installation of truncated dome system, paving of the 2-4 foot wide slot pave adjacent to the proposed concrete improvement in order to achieve the required landing distances, protection, modification, and repair of any adjacent private irrigation system affected by the work, and all other items as required to complete the work in place. Adjustment of pull boxes and utilities located within the ramp are included in this bid item as well as the dry packing and forming of curbs around signal poles and footings (where required). The limits of the curb ramp shall be defined as all ramp, sidewalk, retaining curb, and all other items required to construct the curb ramp per standard plan or plan detail and shall be bound by the BCR/ECR of each intersection. Contractor shall review the plans and the site carefully to understand existing site constraints and limits of work at each ramp. The City reserves the right to make field adjustments at each ramp prior to saw cutting, forming, and pouring of the ramp in order to ensure a compliant ramp is constructed at no additional cost. NOTE –Contractor will be responsible for setting field grades on ramps that do not have elevations provided. Hours associated with verifying and setting sawcut limits in the field shall be included in this work item.
Bid Item: Sawcut, Remove & Replace 4" PCC ADA Compliant Sidewalk.
Measurement & Payment for work under this item shall be at the contract unit price per Square Foot (SF) basis as measured in the field in plan view and shall include furnishing all labor, equipment, tools and materials necessary for the item of work including removal and disposal of existing improvements and materials, construction of new sidewalk including coordinating with the City Inspector to verify locations and limits, removals, preparation of subgrade, construction of work item, adjustment of miscellaneous parkway items found within the limits of construction, finishing and protection of the work item and no further compensation will be allowed therefore.
Measurement of this bid item shall not include the area of any planter areas, and shall only include the actual PCC surface area as measured in the plan view. This item shall only apply in areas that are specifically identified on the plans with a separate construction note. All sidewalk that is adjacent to/associated with curb ramps or driveways that are not specifically identified as a sidewalk construction item shall be considered paid for as part of the separate bid item and no additional compensation will be allowed.
Bid Item: Sawcut, Remove & Dispose Ex. AC Pavement, Curb & Gutter & Replace with Monolithic PCC Bus Pad:
Measurement and payment for work under this item shall be at the contract unit price per Square Foot (SF) and shall include Verifying limits of improvements with City Inspector, sawcutting, removing and disposing of the existing curb & gutter and slot pave area within the curb & gutter and bus pad limits, removal and disposal of existing pavement, base, and subgrade materials within the bus pad limits to the required depths per OCPW Standard Plan 1120, sub grade compaction, verifying proposed grades and positive drainage, constructing the monolithic curb & gutter and PCC bus pad to match existing adjacent gutter width, installing required roadway base and Base AC paving or Full depth AC paving for the slot pave area, protection of the improvements, and all other items as required to complete the work in place.
SECTION 00800
TECHNICAL CONDITIONS
Bid Item: Retrofit Curb Ramp with Surface Applied Truncated Domes & Grind Lip to 0” Curb Face:
Measurement and payment for work under this item shall be at the contract unit price per Each Location (EA) and shall include furnishing labor, materials & equipment to complete the installation of the ADA compliant surface mounted truncated dome system at the noted curb ramp or location and all other items as required to complete the work in place. This item only applies to truncated domes applied to existing curb ramps as well as PCC Grinding at existing curb ramp lips to ensure a 0” Curb face is present along the entire width of the curb ramp. All truncated dome systems installed as part of a new curb ramp will be wet set truncated domes and paid for as part of a separate bid item and no additional compensation will be allowed.
Bid Item: Sawcut, Remove, and Replace Existing Driveway:
Square Foot (SF) and shall include Verifying limits of improvements with City, sawcutting, removing and disposing of the existing driveway and slot pave area within the driveway limits, sub grade compaction, verifying proposed grades and positive drainage, constructing the driveway to match existing driveway width, installing required roadway base and Base AC paving, protection of the improvements, and all other items as required to complete the work in place.
Bid Item: Remove & Reconstruct Private Curb & Gutter Measurement and payment for work under this item shall be at the contract unit price per Linear
Foot (LF) and shall include Verifying limits of improvements with City, sawcutting, removing and disposing of the existing curb or curb & gutter and slot pave area within the curb or curb & gutter limits, sub grade compaction, verifying proposed grades and positive drainage, constructing the curb or curb & gutter to match existing gutter width, installing required roadway base and Base
AC paving for the slot pave area, protection of the improvements, and all other items as required to complete the work in place. It shall be the contractor’s responsibility to verify field grades and ensure positive drainage is obtained between the two points of removal and replacement.
SECTION 314 – SIGNING & STRIPING RELATED BID ITEMS
Bid Item: Traffic Signing, Striping, Markings & Legends:
Measurement and payment for work under this item shall be at the contract unit price per Lump Sum (LS) and shall include furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in preparing an existing condition removing existing striping and rpms/signs, placing temporary striping (as needed), permanent striping, legend markings, arrows, raised pavement markers (including fire hydrant markers), traffic signs and posts as shown on the striping plans, restriping of all existing red curbs within the project limits and all other items as required to complete the work in place.
SECTION 00800
TECHNICAL CONDITIONS
403 - UILITY ADJUSTMENT RELATED BID ITEMS
Bid Item: Adjust Sewer Manhole Frame & Cover to Grade Adjust Storm Drain Manhole Frame and Cover to Grade
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include all related demolition, adjustment (prior to and after paving operations), asphalt and PCC work, Coordination with IRWD (as required for applicable frame and covers), protection of the work during PCC curing, paving of the final AC surface course, and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor. No work shall be authorized for IRWD facility utility adjustments prior to IRWD notification and inspection. Payment for this bid item shall only be made upon completion of the final adjustment to grade after ARHM paving. Any additional costs associated with lowering of manholes prior to paving/construction activities shall be included in other bid items and no additional compensation will be allowed.
Bid Item: Remove & Install New IRWD Domestic or Reclaimed Water Valve Frame & Cover to Grade:
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include all related asphalt concrete and PCC work, Coordination with IRWD, traffic control, and protection of the work during PCC curing and all incidentals to accomplish the work as specified herein. New frame and covers for the water vales will be provided by IRWD. Contractor shall assume all necessary hours for coordination, pickup, and delivery of materials to the project site. No work shall be authorized for utility adjustments prior to IRWD notification and inspection. Lowering of valves prior to paving/construction activities shall be included in other bid items and no additional compensation will be allowed.
Bid Item: Adjust City/Orange County Monument Well Frame and Cover to Grade:
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include protection of the existing monument, adjusting, lowering and raising during paving operations the monument well frame and cover to grade per City or County Standards and including all other work items as required to complete the work in place and no additional compensation will be allowed.
SECTION 701 – STREET LIGHTING & TRAFFIC SIGNAL RELATED BID ITEMS
Bid Item: Remove & Install New Pedestrian APS Push Button at 3'-6" above
Grade:
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include removal of existing pedestrian push button and re-installation of pedestrian push button to 3’-6” height above proposed grade per relevant Sections of the American with Disabilities Act (ADA), latest edition, including wiring, mounting, testing, covering any remaining old installation holes with like materials, and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor.
SECTION 00800
TECHNICAL CONDITIONS
Bid Item: Remove & Install New Pedestrian APS Push Button on New Pedestrian Push Button Post
Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include removal of existing pedestrian push button, installation of new wiring and conduit from the existing pull box to the new push button location, and the installation of a new APS pedestrian push button system on a new pedestrian push button post per relevant Sections of the American with Disabilities Act (ADA), latest edition, including wiring, mounting, testing, covering any remaining old installation holes with like materials, and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor.
Bid Item: Update Traffic Signal with Apex Camera System Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) and shall include removal upgrading existing electronics and controls to revise the existing Traffic Signal Detection System to an Apex Camera System, including all wiring, conduits, cabinet work, and all incidentals to accomplish the work as specified herein, and no additional compensation will be allowed therefor.
Bid Item: Remove and Replace Traffic Loop Detector Measurement and payment for work under this item shall be at the contract unit price per Each Item (EA) basis and shall include all materials, labor, and equipment necessary to perform all operations to verify the existing location, configuration, and connection of the traffic loops, remove and dispose of existing conductors, install traffic loops to match existing conditions, connect and test the traffic loops, and ensure full replacement and activation of the traffic loops through the project site during construction, in the areas shown on the Plans, and as directed by the Engineer. Replacement loops shall be as specified in Caltrans Standard Specifications Section 86-5.01A, and as stated herein. Contractor shall coordinate with the Engineer for final placement of loops. Any traffic loops that are damaged during construction, outside the areas shown on the exhibits or shown as protect in-place shall be fully replaced at the Contractors expense and to the satisfaction of the Engineer. No further compensation will be allowed therefor.
SECTION 00800
TECHNICAL CONDITIONS
PART 2
CONSTRUCTION MATERIALS
SECTION 200 – ROCK MATERIAL
200-2 UNTREATED BASE MATERIAL.
200-2.1 General. ADD the following:
Untreated base shall be Crushed Miscellaneous Base conforming to the requirements of Subsection 200-2.4.
SECTION 201 – CONCRETE, MORTAR, AND RELATED MATERIALS
REVISE as follows:
201-1 PORTLAND CEMENT CONCRETE.
201-1.1.2 Concrete Specified by Class and Alternate Class. ADD the following to Table 201- 1.1.2:
REVISE the following in Table 201-1.1.2:
Curb and Gutter and Sidewalk 520-C-3250
Concrete for Utility Adjustments 660-C-3750
201-1.2 Materials.
201-1.2.1 Portland Cement. ADD the following:
All cement to be used or furnished on this Project shall be Type V Portland Cement conforming to ASTM C150.
201-1.2.4 Chemical Admixtures. DELETE Subsection in its entirety and replace with the following:
No admixtures will be allowed unless approved in advance by the Engineer.
201-1.2.6 Reclaimed Concrete Material. DELETE Subsection in its entirety and replace with the following:
No reclaimed concrete material will be allowed.
201-1.4 Mixing.
201-1.4.1 General. ADD the following to the end of the section:
Mixed concrete delivered to the site shall be by Transit Mixer as called for in Section 201-1.4.3 “Transit Mixer” of the Standard Specifications.
SECTION 00800
SECTION 203 - BITUMINOUS MATERIALS
203-3 EMULSIFIED ASPHALT
203-3.1 General. Add the following:
Tack Coat shall be SS-1h type.
203-6 ASPHALT CONCRETE
203-6.1 General. Add the following:
Asphalt Concrete Paving shall be:
• Base Course/Patching: Type III-B2-PG 64-10
• Leveling Course: Type III-D-PG 64-10
203-11 ASPHALT RUBBER HOT MIX (ARHM)
203-11.2 General. ADD the following:
Surface course paving shall be ½” maximum aggregate Type ARHM-GG-C per Section 203-
11.3 of the Standard Specifications
SECTION 214 --- PAVEMENT MARKERS
214-4 NONREFLECTIVE PAVEMENT MARKERS
Add to this Section: “All new non-reflective pavement markers types A and AY shall be ceramic.”
214-5 REFLECTIVE PAVEMENT MARKERS
Add to this Section: “All new reflective pavement markers shall have glass-covered reflective faces.”
SECTION 00800
TECHNICAL CONDITIONS
PART 3
CONSTRUCTION METHODS
SECTION 300 – EARTHWORK
300-1 CLEARING AND GRUBBING
300-1.3 Removal and Disposal of Materials 300-1.3.1 General. After the last paragraph, ADD the following text:
All soils and materials are subject to testing by the Agency.
300-1.3.2 Requirements. after paragraph a), ADD the following text:
The Contractor shall scan the work area using a metal detector of adequate strength prior to any saw cutting, excavation or cold milling of the existing pavement. The Contractor shall be responsible for locating and protecting manhole, water valve, utility access frames and covers or other metal appurtenances buried below the existing pavement surface whether shown on the plans or not.
All existing asphalt concrete pavement that is to be joined by new construction shall be sawcut in a straight line. The Contractor shall not disturb or damage existing improvements to be protected in place. Any damage done by the Contractor and/or its equipment shall be repaired or replaced as called out in Section 7-9 of the Standard Specifications at Contractor's expense.
The Contractor shall call USA prior to excavation and shall "pothole" existing utilities that fall within the proposed pavement "dig-out" areas to determine their depth.
AC pavement shall be sawcut to full depth around entire join perimeter. Removal of existing pavement sections shall be to the depth required for construction of the replacement roadway sections as shown on the plans and will include the removal of existing AC pavement, cement treated base and/or aggregate base. All removed material becomes the property of the Contractor and shall be hauled away and legally disposed of properly outside of the roadway right of way.
The Contractor shall remove slurry/asphalt concrete buildup on the existing gutter lip to the satisfaction of the owner's representative.
No crushing operations by Contractor will be allowed at the job site or within the Irvine City limits. Contractor shall price the unclassified excavation and other related bid items accordingly.
After paragraph c), ADD the following text:
The following items of work are included in concrete pavement excavation:
• Saw-cutting, removal and disposal of existing concrete curb and gutter sidewalk, cross gutter and concrete ramps within the project site and as shown on the plan or directed by the Engineer, and in addition, 1- foot full-depth AC pavement removal adjacent to the proposed concrete improvements.
• Removal of excess spoil from milling, excavation, disposal of debris, shrubs, rubbish and excess material away from site and disposal and payment of all required fees at a licensed disposal site.
• Maintaining dust control at all times by watering.
• Removal and disposal of any additional items not specifically mentioned herein, which may be found within the work limits or are shown on the plans to be removed.
• Removal and disposal of unnamed concrete improvements.
• Restoration and clean-up of the site.
• Providing for traffic control and maintenance of access, security and safety including signs, barricades, flashers, covers, plates and chain link fencing as specified elsewhere in the Special Provisions.
• Protecting in place of existing water mains, sewers, storm drains, meters, valve covers, walls, fences, curbs, fire hydrants, telephone and power poles, and other existing structures.
• Providing all necessary means to avoid tracking of asphaltic material on existing or new asphalt pavement during paving operations including landscaped and hardscaped facilities.
• Removing and relocating all sprinkler lines, heads, valves, etc. interfering with construction of improvements.
All materials removed will be lawfully disposed of at a site secured by the Contractor. The Contractor will make every effort to recycle excavated and demolition materials. The Contractor will provide the Engineer with a letter indicating the final disposition of all excavated and demolition materials from the project within five (5) working days after project completion.
No excavated or demolition materials will be left in the public right of way overnight.
All existing improvements to be joined shall be sawcut in a clean straight line along the join line by use of a concrete cutting saw. Compensation for this requirement shall be considered as included in the price bid in the proposal form and no additional compensation will be allowed therefore.
Saw-cutting shall consist of cutting existing Portland cement concrete to facilitate its removal.
Cutting shall be accomplished by the use of a power driven saw. The depth of the cut shall be deep enough to provide a clean, straight break without loosening, cracking, or damaging adjoining asphalt or concrete. Under this item, the use of a grinder will not be allowed in lieu of power-driven saw. Residue from saw-cutting shall be vacuumed up while saw-cutting.
SECTION 00800
TECHNICAL CONDITIONS
SECTION 301 – TREATED SOIL, SUBGRADE PREPARATION, AND
PLACEMENT OF BASE MATERIALS
301-1 SUBGRADE PREPARATION.
301-1.1 General. Add the following:
Subgrade soils shall be moisture conditioned to a minimum 2% above optimum moisture content to a depth of at least 12 inches, compacted to 95% relative compaction per ASTM D1557, unless there is underlying untreated base materials in the pavement section. This subgrade soil will be evaluated, for verification and approval by the Engineer, prior to payment. Where highly granular soils are encountered in fills, deviations to this moisture criterion may be considered on a case-by-case basis based on field conditions and review/acceptance by the Geotechnical Consultant.
The City will furnish the first tests at no cost to the Contractor. Any retesting required due to first test failures shall be made by the City’s Engineer at the Contractor's expense, cost of which shall be deducted from the Contractor's final payment.
The cost of furnishing and applying water and all other work necessary for subgrade preparation, as directed by the Engineer, shall be included in the Contractor's bid price for other items.
Subgrade soils should be in a stable, non-pumping condition prior to placing proposed improvements.
301-1 SUBGRADE PREPARATION
301-1.6 Adjustment of Manhole Frame and Cover Sets to Grade. After the last paragraph, ADD the following text:
Adjustment of utility appurtenances to grade shall be in conformance with 301-1.6 and 302-5.8 of the Standard Specifications and these Special Provisions:
Adjusting City of Lake Forest storm drain manhole and storm drain cleanout covers to grade shall conform to SPPWC Std. Plan No. 205-2.
All IRWD water can and lids shall be removed and replaced with new cans and lids provided by IRWD and adjusted to grade. Adjusting Irvine Ranch Water District (IRWD) water valves to grade shall conform to IRWD Standard Plan W-7, adjusting IRWD sewer manhole frames and covers to grade shall conform to IRWD Standard Plan S-1.
Contractor shall coordinate with the Gas Company regarding the adjustment of all gas can and lids. Gas can and lids shall be adjusted to grade based on coordination and shall be accomplished per the Gas Company’s latest Standard Plans
All surface utility covers (even those to be adjusted to grade by others) shall be located in the field prior to beginning any work on this project. The Contractor shall remove existing concrete pads or collars that might interfere with the adjustment of the valve cover to the grade of the asphalt concrete surface. Any damage to existing utility systems or appurtenances by the Contractor shall be replaced at the Contractor's expense.
All IRWD water valves shall be accessible at all times. The Contractor shall notify the Engineer to contact IRWD inspector at (949) 476-7500 for inspection of this work.
The following method shall be utilized to adjust manhole frames and covers, water valve frame and covers (if necessary), and survey well monument covers.
a) After the asphalt concrete pavement overlay has been completed, circular holes shall be cut where the cover exists. The diameter of the circular hole shall be at least twenty-four inches (24") larger than the outer diameter of the cover.
b) The cover shall then be raised to the finished pavement grade and suitably blocked and concreted in place to the satisfaction of the Owner’s Representative.
c) A PCC collar shall be poured around the cover to an elevation no more than two inches (2”) below finished pavement grade. Said PCC collar shall have a minimum depth of eight inches (8") or (as shown per plan) and be placed over four inches (4") of crushed aggregate base (CAB), thoroughly compacted to 95% minimum relative compaction.
d) After the concrete has cured sufficiently, a tack coat shall be applied and ARHM-GG-C surface course material shall be placed to finished pavement grade.
All utility facilities other than City, IRWD facilities, or County Monumentation Wells within the paving limits shall be protected in place by the General Contractor. Existing SCE vaults/manholes existing within the project limits shall be adjusted by the respective Utility Company. Temporary asphalt ramping shall be required around each vault/manhole until the completion of the final paving operations. Temp AC ramping to be included in traffic control costs and no additional compensation will be allowed. Adjustment of said utility manhole covers will be conducted by the utility owner.
All existing SCG slip can lids shall slipped/raised to grade during the paving operations.
Adjustment of monument well frame and cover to grade shall include the protection of the existing monument in place. Any damage caused to the monument shall require the Contractor to re-set and file the existing monument per County of Orange Surveyor requirements.
The contact information for the utility agencies notified and present within the project limits are as follows:
Utility Agency Utility Coordinator Phone Number
AT&T - DISTRIBUTION Bob Fleisher (949) 480-6066
COX COMMUNICATIONS Debbi Borroel (949)546-2750
CROWN CASTLE- LA & VEN Bryant Lowe (724)416-2193
EL TORO WATER DISTRICT Bobby Young (949)837-7050
IRVINE RANCH WATER DISTRICT Belisario Rios (949)453-5394
LEVEL 3 COMMUNICATIONS John Trujillo (720)888-4465
ORANGE COUNTY PUBLIC WORKS
OCFCD Sal Gutierrez (704)647-3992
SECTION 00800
TECHNICAL CONDITIONS
Utility Agency Utility Coordinator Phone Number
SC GAS - ALISO VIEJO Brad Morrison (714)634-3061
SC GAS - TRANSMISSION Rosalyn Squires (818)701-4546
SCE - TELECOM Eric Lopez 626-422-9256
TRANSPORTATION CORRIDOR
AGENCIES David Lowe (949)754-3488
TRBUCO CANYON WATER DISTRICT Neil Mckenna (949)858-0277
SCE Manhole & Vault Adjustments:
SCE manholes & Vault lids will require adjustment and/or protection in place as noted on the plans. Where manholes/vaults are noted as adjusted to grade, SCE will be responsible for conducting all necessary utility adjustments. Contractor shall coordinate directly with SCE to verify the construction timelines necessary for adjusting the noted vault lids to grade. Notice should be given to SCE upon award of the contract to coordinate anticipated construction timelines by the City’s Contractor.
It will be the Contractor’s responsibility to adjust construction schedule and work zones based on SCE’s utility adjustment schedules. It is the intent of this project that the SCE utility adjustments be conducted concurrently with the contractor’s operations (no extension of working days). Should delays be encountered solely as a result of the SCE utility vault and manhole adjustments, contract working days will not be charged to the contractor for the given delays, however, no Contract work may be conducted during the given delay/grace period.
SECTION 00800
TECHNICAL CONDITIONS
SECTION 302 – ROADWAY SURFACING
302-1 COLD MILLING OF EXISTING PAVEMENT
302-1.1 General. After the last paragraph, ADD the following text:
Cold milling shall be a variable or constant depth cut for the various widths of cold millings called for on the plans. Cold milling shall conform to the details shown on the plans and these Special Provisions. All temporary striping required after cold milling operations shall be installed per City Standards. All required temporary striping shall be considered paid for under the bid item for Traffic Control. No additional compensation will be allowed.
The uniform and variable depth Cold milling shall not be performed more than three calendar (3) days ahead of final paving operations.
Residue from grinding shall not be permitted to flow or travel into gutters, onto adjacent street surfaces or parkways. All residues shall be completely removed by a vacuum sweeper and properly disposed. Sweeping is to take place immediately after the grinding has been completed, continue daily until all residue is removed, and as directed by the Engineer. No washing of any residue into gutters and/or drainage structures shall be allowed. The Contractor shall cover and protect all storm drain inlets prior to the start of cold milling operations.
All pavement transitions and temporary striping/markings shall be in place prior to the opening of a lane for traffic. Any pavement grade differential between adjacent lanes that will, with the permission of the Engineer, remain during non-working hours shall be indicated with the appropriate warning signage.
Cold mix A.C. shall be placed and maintained at the interface between milled and non-milled areas to eliminate the hazard caused by sudden elevation differences, especially in pedestrian path of travel areas adjacent to wheelchair ramps, and shall be removed prior to placement of surface course pavement.
The Contractor shall provide ADA access and detours at all times for pedestrian facilities and bike lanes when cold milling.
The Contractor is to notify the Engineer at least two (2) working days prior to and immediately after the cold mill operations so that observations and measurements may be made of areas before the placement of permanent asphalt.
SECTION 00800
TECHNICAL CONDITIONS
302-5 ASPHALT CONCRETE PAVEMENT
302-5.1 General. After the last paragraph, ADD the following text:
Pavement Investigation and Requirements:
The project pavement investigation has been included as part of the contract bid documents for the Contractor’s review and reference. All recommendations related to surface preparation, subgrade treatment, crack sealing, material composition, compaction, and all other recommendations…