The document provided is a Performance Bond and a Payment Bond for the "South Jordan City 2024 PEDESTRIAN RAMPS PROJECT" to be executed between the South Jordan City Corporation (the Owner) and the Contractor, with the Surety as the guarantor. The Performance Bond requires the Surety to ensure the Contractor's proper performance of the Construction Contract, while the Payment Bond obligates the Surety to ensure the Contractor's payment of all sums due to Claimants who provided labor, materials, or equipment for the project. The Contract involves the replacement of pedestrian ramps within the City of South Jordan, Utah.
The bonds specify the procedures for the Owner to declare the Contractor or the Surety in default and the Surety's options to complete the work or pay the Owner. The bonds also outline the notice requirements, the Surety's obligations, and the venue for any legal actions. No specific pricing terms, set asides, incumbent information, or funding sources are provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1257495-event.pdf | ||
| Bid Schedule template_City Hall Roof Replacement Re-bid.docx | DOCX document | |
| RFP City Hall Roof Replacement Re-bid.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXAMPLE ONLY
DOCUMENT 00610
PERFORMANCE BOND
PART 1 GENERAL
1.1 BOND
A. Number: ______________________________
B. Amount:
dollars ($ ________________).
1.2 SURETY
A. Name:
B. Address:
C. Telephone number: _____________________________
D. Facsimile number: _____________________________
1.3 CONTRACTOR
A. Name:
B. Address:
C. Telephone number: _____________________________
D. Facsimile number: _____________________________
1.4 OWNER
A. South Jordan City Corporation
1.5 CONSTRUCTION CONTRACT
A. The Construction Contract is known as South Jordan City
2024 PEDESTRIAN RAMPS PROJECT
1.6 DEFINED TERMS
A. Terms used in this Performance Bond which are defined in Article 1.1 of the General Conditions will have the meanings indicated in the General Conditions.
PART 2 COVENANTS
2.1 SURETY'S AND CONTRACTOR'S RELATIONSHIP
A. Surety as surety, and CONTRACTOR as principal, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the OWNER as obligee, for the performance of the Construction Contract, whether awarded or about to be awarded.
B. If CONTRACTOR performs the Construction Contract, the Surety and the CONTRACTOR shall have no obligation under this Bond, except to participate in conferences indicated in Article 2.3.
2.2 NOTICE
A. Notice to the Surety, the OWNER or the CONTRACTOR shall be sent by certified mail, facsimile, or hand delivered to the address shown on this Bond agreement.
B. Notices sent as required by paragraph 2.2A shall be effective on the date on which such notice was sent.
C. Notice may be sent by facsimile. Facsimile notice shall be effective on the date of transmission provided that a confirmation establishing the successful transmission of the notice is sent by first-class mail, postage prepaid, along with a copy of the notice transmitted, no later than twenty-four (24) hours after the facsimile notice is transmitted.
D. If any notice requires a period of less than seven (7) days for response, the notice shall be sent by facsimile.
E. If the time for response to any notice expires on a Saturday, Sunday or a legal holiday in the State of Utah, the time shall be extended to the next working day.
2.3 PROCEDURE TO INVOKE SURETY'S OBLIGATION
A. If the CONTRACTOR fails to perform or to comply with the terms of the Construction Contract, and such failure to perform or to comply has not been waived by the OWNER, the OWNER may notify the CONTRACTOR and the Surety, at their addresses described above, that the OWNER is considering declaring the CONTRACTOR in default.
B. Before declaring the default, the OWNER shall request and attempt to arrange a conference with the CONTRACTOR and the Surety to be held at a time and place required by the OWNER to discuss methods of performing the Work.
C. If the CONTRACTOR does not attend the conference or agree to cure any deficiencies in the CONTRACTOR's performance of the Work to the satisfaction of the OWNER, the OWNER may declare the CONTRACTOR in default and formally terminate the CONTRACTOR's right to complete the Work. Such default shall not be declared earlier than 10 days after the CONTRACTOR and the Surety have received notice as provided in article 2.2.
D. If the Contract with the CONTRACTOR is terminated, the OWNER agrees to pay the unpaid Balance of the Contract Price to the Surety for completion of the Work in accordance with the terms of the Construction Contract or to a contractor selected by the Surety to perform the Work in accordance with the terms of the Construction Contract.
2.4 SURETY'S OPTIONS AT CONTRACTOR TERMINATION
A. Surety Completes the Work: The Surety may undertake to perform and complete the Work itself, through its agents or through independent contractors.
B. Surety Obtains Bids or Proposals: The Surety may obtain bids or negotiated proposals from qualified contractors acceptable to the OWNER for a contract for performance and completion of the Work.
1. Such bids or proposals shall be prepared by the Surety for execution by the OWNER and the completion contractor selected.
2. Surety shall secure the contract with Performance and Payment Bonds executed by a qualified surety equivalent to this Performance Bond and the payment Bond (Document 00620); and
3. Surety shall pay to the OWNER the amount of damages as described in paragraph 2.6 in excess of the balance of the Contract Price incurred by the OWNER resulting from the CONTRACTOR's default.
C. Surety to Pay OWNER: Surety may determine the amount not to exceed the amount of this bond specified in paragraph 1.1B, for which Surety believes it may be liable to pay, and tender payment thereof to the OWNER. OWNER has sole discretion to accept payment. If the OWNER refuses the payment tendered, or the Surety has denied liability in whole or in part, without further notice the OWNER shall be entitled to enforce any remedy available to the OWNER.
2.5 PROCEDURE FOR OWNER TO DECLARE SURETY IN DEFAULT
A. The OWNER may declare the Surety to be in default upon the following procedures.
1. The OWNER shall issue an additional written notice to the Surety, after declaring the CONTRACTOR in default as provided in Article 2.3, demanding that the Surety perform its obligations under this Bond.
2. Surety shall respond to the OWNER within 15 days after receipt of the OWNER's additional notice, either denying the claim or accepting liability and exercising its' options under Article 2.4.
2.6 SURETY'S OBLIGATIONS
A. After the OWNER has terminated the CONTRACTOR's right to complete the Construction Contract, and if the Surety elects to complete the Construction Contract as provided in Article 2.4, then the responsibilities of the Surety to the OWNER shall not be greater than those of the CONTRACTOR under the Construction Contract, and the responsibilities of the OWNER to the Surety shall not be greater than those of the OWNER under the Construction Contract.
B. To the limit of the amount of this Bond, but subject to commitment by the OWNER to pay all valid and proper payments made to or on behalf of the CONTRACTOR under the Construction Contract, the Surety is obligated, without duplication, for:
1. the responsibilities of the CONTRACTOR for correction of Defective Work and completion of the Construction Contract;
2. design professional and delay costs resulting from the CONTRACTOR's default, and resulting from the actions or failure to act of the Surety under article 2.4; and
3. liquidated damages which are or may become due for any reason.
2.7 UNRELATED OBLIGATIONS OF THE CONTRACTOR
A. The Surety and the OWNER shall not be liable to others for obligations of the CONTRACTOR that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or changed on account of any such unrelated obligations.
B. No right of action shall accrue on this Bond to any person or entity other than the OWNER or its heirs, executors, administrators, or successors.
2.8 SURETY WAIVES NOTICE OF ANY CHANGE
A. Surety hereby waives notice of any change, including changes of Contract Time, Contract Price and scope of Work, to the Construction Contract or to related subcontracts, purchase orders and other obligations.
2.9 VENUE
A. Any suit or action commenced by OWNER under this Bond shall be for action in a court of competent jurisdiction in the State of Utah.
PART 3 EXECUTION
3.1 EFFECTIVE DATE
A. Surety and CONTRACTOR execute this Bond agreement and declare it to be in effect as of the ______day of _______________________, ____.
3.2 CONTRACTOR'S SUBSCRIPTION AND ACKNOWLEDGMENT
| A. | Type of organization: _____________________________________________________ | |
| (corporation, partnership, individual, etc.) |
B. If CONTRACTOR is a corporation, attach a corporate resolution evidencing CONTRACTOR's authority to sign.
C. CONTRACTOR's signature:
D. Please print name here:
E. Title:
F. Notary Acknowledgement: In the County of _______________________________, State of ________________, on the _______ day of ______________________, 20 ___, the foregoing instrument was acknowledged before me
(Person acknowledging and title or representative capacity, if any).
Notary’s signature
Residing at
My commission expires: Notary's seal
3.3 SURETY'S SUBSCRIPTION AND ACKNOWLEDGMENT
A. Attach evidence of Surety's corporate authority to sign.
B. Surety's signature:
C. Please print name here:
D. Title:
E. Acknowledgment: In the County of _________________________________________, State of ________________, on the _______ day of ______________________, _____, before me, the undersigned notary, personally appeared _________________________, who proved to me his/her identity through documentary evidence in the form of a ______________________________________________________________ to be the person whose name is signed as the authorized Surety and acknowledged to me that this document was signed voluntarily for its stated purpose.
| ___________________________ | |
| Notary Public signature | Notary Public seal |
END OF DOCUMENT
Performance Bond 00610 - 2
Performance Bond 00610
EXAMPLE ONLY
DOCUMENT 00620
PAYMENT BOND
PART 1 GENERAL
1.1 BOND
A. Number:
B. Amount:
dollars ($ ________________).
1.2 SURETY
A. Name:
B. Address:
C. Telephone number: _____________________________
D. Facsimile number: _____________________________
1.3 CONTRACTOR
A. Name:
B. Address:
C. Telephone number: _____________________________
D. Facsimile number: _____________________________
1.4 OWNER
A. South Jordan City Corporation
1.5 CONSTRUCTION CONTRACT
A. The Construction Contract is known as South Jordan City
2024 PEDESTRIAN RAMPS PROJECT
1.6 DEFINED TERMS
A. Terms used in this Payment Bond which are defined in article 1.1 of the General Conditions will have the meanings indicated in the General Conditions.
PART 2 COVENANTS
2.1 SURETY'S AND CONTRACTOR'S RELATIONSHIP
A. Surety as surety, and CONTRACTOR as principal, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the OWNER as obligee, for the performance of the Construction Contract, whether awarded or about to be awarded.
B. If CONTRACTOR performs the Construction Contract, the Surety and the CONTRACTOR shall have no obligation under this Bond.
2.2 NOTICE
A. Notice to the Surety, the OWNER or the CONTRACTOR shall be sent by certified mail, facsimile, or hand delivered to the address shown on this Bond agreement.
B. Notices sent as required by paragraph 2.2A shall be effective on the date on which such notice was sent.
C. Notice may be sent by facsimile. Facsimile notice shall be effective on the date of transmission provided that a confirmation establishing the successful transmission of the notice is sent by first-class mail, postage prepaid, along with a copy of the notice transmitted, no later than twenty-four (24) hours after the facsimile notice is transmitted.
D. If any notice requires a period of less than seven (7) days for response, the notice shall be sent by facsimile.
E. If the time for response to any notice expires on a Saturday, Sunday or a legal holiday in the State of Utah, the time shall be extended to the next working day.
2.3 CONDITIONS OF SURETY'S LIABILITY
A. With respect to the OWNER, this Bond agreement shall be null and void if the CONTRACTOR promptly takes the following actions:
1. Promptly makes payment, directly or indirectly, for all sums due Claimants, and
2. Defends, indemnifies and saves harmless the OWNER from all claims, demands, Liens or suits by any person or entity who furnished labor, materials or equipment for use in the performance of the Work, provided the OWNER has tendered defense of such claims, demands, liens or suits to the CONTRACTOR and the Surety.
2.4 PROCEDURE TO INVOKE SURETY'S OBLIGATION
A. Concerning Claimants who have a Direct Contract with the CONTRACTOR: The Surety shall have no obligation to Claimants under this Bond who are employed by or have a direct contract with the CONTRACTOR until Claimants have given notice to the Surety at the address shown on this Bond agreement and sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim.
B. Concerning Claimant who does not have a Direct Contract with the CONTRACTOR: The Surety shall have no obligation to Claimant under this Bond who does not have a direct contract with the CONTRACTOR until Claimant takes the following actions.
1. The Claimant shall furnish written notice to the CONTRACTOR and send a copy, or notice thereof, to the OWNER, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed.
2. The Claimant shall have either received a rejection in whole or in part from the CONTRACTOR, or not received within 15 days of furnishing the above notice any communication from the CONTRACTOR by which the CONTRACTOR has indicated the claim will be paid directly or indirectly.
3. Not having been paid within the above 15 days, the Claimant shall have sent a written notice to the Surety at the address described on this Bond agreement and sent a copy, or notice thereof, to the OWNER stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the CONTRACTOR.
2.5 SURETY'S OPTION TO SETTLE CLAIMS
A. When the Claimant has satisfied the conditions of article 2.4, the Surety shall promptly and at the Surety's expense take the following actions.
1. Send an answer to the Claimant, with a copy to the OWNER, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed; and
2. Pay or arrange for payment of any undisputed amounts.
2.6 SURETY'S OBLIGATION
A. Surety's total obligations under this bond shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety.
2.7 USE OF FUNDS
A. Amounts owed by OWNER to CONTRACTOR under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, against the Performance Bond (Document 00610). By the CONTRACTOR furnishing and the OWNER accepting this Bond, they agree that all funds earned by the CONTRACTOR in the performance of the Work are dedicated as follows:
1. The OWNER has first priority to use the funds for the completion of the Work.
2. The CONTRACTOR and the Surety have second priority to use the funds to satisfy the obligations of the CONTRACTOR and the Surety under this Bond.
2.8 UNRELATED OBLIGATIONS OF THE CONTRACTOR
A. The Surety and the OWNER shall not be liable to Claimants or others for obligations of the CONTRACTOR that are unrelated to the Construction Contract.
B. The OWNER shall not be liable for payment of any damages, costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond.
2.9 SURETY WAIVES NOTICE OF ANY CHANGE
A. Surety hereby waives notice of any change to the Construction Contract including changes of Contract Time, Contract Price, and scope of Work, or to related subcontracts, purchase orders or other obligations.
2.10 VENUE
| A. | Any suit or action commenced by a Claimant under this Bond shall be for action in a court of competent jurisdiction in the State of Utah. | |
| 2.11 | COPIES OF THIS BOND |
A. Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the CONTRACTOR or OWNER shall promptly furnish a copy of this Bond or shall permit a copy to be made.
PART 3 EXECUTION
3.1 EFFECTIVE DATE
A. Surety and CONTRACTOR executed this Bond agreement and declared it to be in effect as of the ______day of _______________________, ____.
3.2 CONTRACTOR'S SUBSCRIPTION AND ACKNOWLEDGMENT
A. Type of organization: _____________________________________________________ (corporation, partnership, individual, etc.)
B. If CONTRACTOR is a corporation, attach a corporate resolution evidencing CONTRACTOR's authority to sign.
C. CONTRACTOR's signature:
D. Please print name here:
E. Title:
F. Notary Acknowledgement: In the County of _______________________________, State of ________________, on the _______ day of ______________________, 20 ___, the foregoing instrument was acknowledged before me
(Person acknowledging and title or representative capacity, if any).
Notary’s signature
Residing at
My commission expires: Notary's seal
3.3 SURETY'S SUBSCRIPTION AND ACKNOWLEDGMENT
A. Attach evidence of Surety's corporate authority to sign.
B. Surety's signature:
C. Please print name here:
D. Title:
E. Notary Acknowledgment: In the County of ___________________________________, State of ________________, on the _______ day of ______________________, 20 ___, before me, the undersigned notary, personally appeared _________________________, who proved to me his/her identity through documentary evidence in the form of a ______________________________________________________________ to be the person whose name is signed as the authorized Surety and acknowledged to me that this document was signed voluntarily for its stated purpose.
Notary’s signature
Residing at
My commission expires: Notary's seal
END OF DOCUMENT
Payment Bond 00620 - 6
Payment Bond 00620