Amend1 J attch.doc

DOC document 92 KB Posted

Attached to
Operation of the Gary Job Corps Center
Solicitation number
S11F6TX018
Issued by

About this file

Amend 1 - Sec J attachmts Rev pg 139

View the file

Other files

File Type Posted
AMENDMENT 3.doc DOC document
Amend 2.doc DOC document
J-8 Rev Utility Cost.xls XLS spreadsheet
Energy Sav Perf Contr.pdf PDF
Enrgy Cost Sav Rep 2008.pdf PDF
J-23 Inventory.pdf PDF
J-17 Nat Staff Comp Report.xls XLS spreadsheet
J-20 Perf Report Cards.pdf PDF
J-8 Utilities.pdf PDF
J-13 EPMS Smry Rep.pdf PDF
J-14 Site Map.pdf PDF
J-22 CDSS Plan.doc DOC document
J-19 Facil Srvy- Vol I.pdf PDF
J-12 Space Utlization Table.pdf PDF
J-19 Facil Srvy- Vol II-2.pdf PDF
J-19 Facil Srvy- Vol II-3.pdf PDF
J-19 Facil Srvy- Vol II-1.pdf PDF
GaryRFP.doc DOC document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number S11F6TX018 Gary Job Corps Center RFP

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

February 5, 2010

4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)

6. ISSUED BY

CODE

U.S. DEPARTMENT OF LABOR

Office of the Asst. Secy for Admin. & Mgmt.

Unit of JOB CORPS Support 525 S. Griffin Street RM 707 Dallas, Texas 75202

7. ADMINISTERED BY (If other than Item 6)

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

9A. AMENDMENT OF SOLICITATION NO.

S11F6TX018

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ________ copies of the amendment; (b) by acknowledging receipt of this amendment on each copy of the offer submitted; or (c) by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATE (If required) Job Corps

13.

THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

()
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office)ADVANCE \x48 SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

Basic Contract, Clause 52.243-2

D. OTHER (Specify type of modification and authority) Section G.

E. IMPORTANT: Contractor_ X _is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment posts the following attachments from Section J of this RFP to fbo.gov:

J-8, Utilities’ usage; J-12, Space utilization; J-13 EPMS summary report; J-14, Site map; J-17, National Staff Compensation table; J-19, Facility Survey- Volumes I & II; J-20, Performance report cards; J-22, Regional CDSS plan; and J-23, Inventory.

This amendment also provides corrected page 139 (page 2 of this amendment) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Linda Bynum, Contracting Officer – OASAM 972-850-4423

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. Date Signed
16B. UNITED STATES OF AMERICA

BY _____________________________________________

(Signature of Contracting Officer) 16C.Date Signed

2/5/2010

NSN 7540-01-152-8070

30-105

STANDARD FORM 30

Prescribed by GSA

FAR (48 CFR) 53.243

S11F6TX018

(1) To what extent are the systems, procedures and approaches proposed clear, complete, concrete, and consistent with the Job Corps mission and policies?

(2) How effectively does the offeror’s proposal recognize and tailor programs to operate in the context of the center’s student population, site condition, configuration, geographic location, the local and regional labor market, the regional CDSS plan and any other data provided by the Government?

(3) How effective is the proposal in offering feasible strategies and methods to ensure the achievement of Job Corps’ specified outcomes and quality indicators?

C. Weights Evaluation points assigned to each category or part of a proposal indicate the degree of importance that has been assigned to it. Offerors should keep this in mind when addressing the content.

STEP 1: WRITTEN PROPOSAL

Maximum Points Grid
Clear, Concrete, Consistent with Mission & Policies
Tailored to Local Needs
Effective to meet performance outcomes and quality indicators
Total
Outreach
1
3
2
6
Admissions
1
3
2
6
CPP
1
2
3
6
CDP
2
4
3
9
Adm & Mgmt Support
1
2
3
6
CTS
2
4
3
9

Total:

8
18
16
42

File details come from the government source that posted it. Updated .