General Decision Number: LA080003 05/09/2008 LA3
Superseded General Decision Number: LA20070005
State: Louisiana
Construction Type: Building
Counties: Allen, Assumption, Avoyelles, Beauregard, Bienville, Caldwell, Cameron, Catahoula, Claiborne, Concordia, De Soto, East Carroll, East Feliciana, Evangeline, Franklin, Grant, Iberia, Iberville, Jackson, Jefferson Davis, La Salle, Lincoln, Madison, Morehouse, Natchitoches, Pointe Coupee, Red River, Richland, Sabine, St Helena, St Mary, Tangipahoa, Tensas, Union, Vermilion, Vernon, Washington, West Carroll, West Feliciana and Winn Counties in Louisiana.
BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes & apartments up to and including 4 stories)
Modification Number Publication Date 0 02/08/2008 1 03/07/2008 2 04/04/2008 3 05/09/2008
ELEC0130-001 12/01/2006
ASSUMPTION and ST. MARY (Northeast of Atchafalaya River)
PARISHES
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, computers, and temperature controls)........................$ 22.09 7.90
ELEC0194-001 03/06/2008
BIENVILLE, CLAIBORNE, DE SOTO, NATCHITOCHES (Northeast of the Red River), AND RED RIVER PARISHES voltage wiring and installation of fire alarms, security systems, telephones, computers, and temperature controls)........................$ 22.90 8.58
ELEC0446-001 01/01/2008
CALDWELL, EAST CARROLL, FRANKLIN, JACKSON, LINCOLN, MADISON,
MOREHOUSE, RICHLAND, TENSAS, UNION AND WEST CARROLL PARISHES
voltage wiring and installation of fire alarms, security systems, telephones, computers, and temperature controls)........................$ 19.40 7.66
ELEC0576-001 01/01/2008
AVOYELLES, CATAHOULA, CONCORDIA, EVANGELINE, GRANT, LA SALLE,
NATCHITOCHES (Southwest of Red River), SABINE, VERNON AND WINN
PARISHES:
voltage wiring and installation of fire alarms, security systems, telephones, computers, and temperature controls)........................$ 21.40 5.06
ELEC0861-001 09/01/2006
ALLEN, BEAUREGARD, CAMERON, IBERIA, JEFFERSON DAVIS, ST. MARY
(Southwest of Atchafalaya River) AND VERMILION PARISHES voltage wiring and installation of fire alarms, security systems, telephones, computers, and temperature controls)........................$ 21.54 7.81
ELEC0995-001 01/01/2008
EAST FELICIANA, IBERVILLE, POINTE COUPEE, ST. HELENA, AND WEST
FELICIANA PARISHES
voltage wiring and installation of fire alarms, security systems, telephones, computers, and temperature controls)........................$ 21.00 7.69
* ELEC1077-001 03/01/2008
TANGIPAHOA AND WASHINGTON PARISHES
Rates Fringes
ELECTRICIAN (includes low voltage wiring and installation of fire alarms, security systems, telephones, computers, and temperature controls)........................$ 20.75 5.73
IRON0058-001 06/01/2006
TANGIPAHOA (Southeastern Portion) AND WASHINGTON PARISHES:
Rates Fringes
Ironworkers, Structural..........$ 18.70 6.18
IRON0591-001 06/01/2006
BIENVILLE, CLAIBORNE, DESOTO, NATCHITOCHES, RED RIVER, AND
SABINE PARISHES:
IRONWORKER, STRUCTURAL...........$ 18.75 5.79
IRON0623-001 06/01/2006
ASSUMPTION, AVOYELLES, CATAHOULA (Southern Tip Only), CONCORDIA (Southern Portion), EAST FELICIANA, IBERIA, IBERVILLE, POINTE COUPEE, ST. HELENA, ST. MARY, TANGIPAHOA (Northwestern Portion), AND WEST FELICIANA PARISHES:
IRONWORKER, STRUCTURAL...........$ 18.85 5.74
IRON0710-001 06/01/2006
ALLEN, BEAUREGARD, CALDWELL, CAMERON, CATAHOULA, CONCORDIA
(Northern Portion), EAST CARROLL, EVANGELINE, FRANKLIN, GRANT, JACKSON, JEFFERSON DAVIS, LASALLE, LINCOLN, MADISON, MOREHOUSE, RICHLAND, TENSAS, UNION, VERMILION, VERNON, WEST CARROLL, AND
WINN PARISHES:
IRONWORKER, STRUCTURAL...........$ 18.75 5.84
SFLA0669-001 04/01/2008
Rates Fringes
SPRINKLER FITTER.................$ 25.22 11.05
SHEE0214-001 07/01/2007
Washington Parish
Rates Fringes
SHEET METAL WORKER (includes HVAC Duct).......................$ 22.86 8.72
SHEE0214-004 08/01/2007
Allen, Assumption, Beauregard, Cameron, East Feliciana, Evangeline, Iberia, Iberville, Jefferson Davis, Pointe Coupee, St. Helena, St. Mary, Tangipahoa, Vermilion, and West Feliciana Parishes
SHEET METAL WORKER (includes HVAC Duct).......................$ 23.36 8.315
SHEE0361-001 01/01/2008
AVOYELLES, BIENVILLE, CALDWELL, CATAHOULA, CLAIBORNE,
CONCORDIA, DE SOTO, EAST CARROLL, FRANKLIN, GRANT, JACKSON, LA
SALLE, LINCOLN, MADISON, MOREHOUSE, NATCHITOCHES, RED RIVER,
RICHLAND, SABINE, TENSAS, UNION, VERNON, WEST CARROLL AND WINN
PARISHES:
Sheet Metal Worker (includes HVAC duct).......................$ 23.75 8.67
SULA2004-004 03/25/2004
Rates Fringes
Carpenters Drywall & Metal Stud Installation................$ 14.05 0.00 Formbuilding/Formsetting....$ 13.31 0.00 All Other Work..............$ 12.70 1.21
LABORER
Common......................$ 8.74 0.00 Grade Checker...............$ 10.00 0.00
PAINTER
Brush, Roller, & Spray......$ 10.00 0.00
PLUMBER (including HVAC pipe)....$ 16.90 0.00
Power Equipment Operator Backhoe/Excavator...........$ 13.50 0.00 Bulldozer...................$ 14.83 1.62 Forklift....................$ 14.29 0.00 Front End Loader............$ 12.88 0.00 Roller......................$ 11.50 0.00 Trackhoe....................$ 14.63 1.62
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Other files
| File | Type | Posted |
|---|---|---|
| Amend6.doc | DOC document | |
| Amend5.doc | DOC document | |
| Amend4.doc | DOC document | |
| TAR_Roustabout.PDF | ||
| Amend3.doc | DOC document | |
| Amend2.doc | DOC document | |
| J-20_OMS-10 04302008.pdf | ||
| J-22_CDSS Plan 2008.doc | DOC document | |
| Amend1.doc | DOC document | |
| Pre-Prop Conf Powerpoint 611.ppt | PPT presentation | |
| J-20_CTT-10 04302008.pdf | ||
| J-12_Square Foot table.doc | DOC document | |
| J-17_National Staff Compensation Report.xls | XLS spreadsheet | |
| J-8_Entergy3.5.08.xls | XLS spreadsheet | |
| J-13_EPMS Report with cost.pdf | ||
| J-20_MSO 20 04302008.pdf | ||
| J-14_Site Plan.jpg | JPG image | |
| J-13_EPMS Report.pdf | ||
| J-23_Inventory-Vehicles.htm | HTM file | |
| J-20_MPO35 04302008.pdf | ||
| J-16_SCA_05-2231.txt | TXT text file | |
| Carville-RFP.doc | DOC document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .