S03 - ENCL6_APPLICABLE_SPECIAL_PROVISIONS_REV1_672-20-603_COR.pdf

PDF 116 KB Posted

Attached to
C1DA--NRM (PROJ 672-20-603) A-E Provide Fire Sprinkler System Throughout Main Building Number 1.
Solicitation number
36C24821R0044
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SP #+D14A3:D27SP Title Include Exclude

SP-1 FEE FOR A/E SERVICES

SP-2

SCHEDULE OF PAYMENTS FOR A/E SERVICES (Include if planning monthly Payments)

X

SP-3 DEFINITIONS AND RESPONSIBILITIES

SP-4 OWNERSHIP OF ORIGINAL DOCUMENTS

SP-5

ADJUSTMENT IN CONTRACT AMOUNT DUE TO

CHANGES

X

SP-6 DEFERRAL OF WORK

SP-7 POST-CONSTRUCTION SERVICES X

SP-8 TRAVEL EXPENSES

SP-9 RETENTION OF REVIEW DOCUMENTS X

SP-10 852.236-86 WORKMEN'S COMPENSATION (APR 1984)

SP-11 GOVERNMENT-FURNISHED PLANNING INFORMATION X

SP-12 DESIGN REVIEW AND COMPLETION SCHEDULE X

SP-13

SUBMISSION OF CONTRACT DRAWINGS AND RELATED

MATERIAL FOR DESIGN

X

SP-14

REPRODUCTION OF CONTRACT DRAWINGS AND

SPECIFICATIONS

X

SP-15 RENDERINGS X

SP-16 ATTENDANCE AT CONFERENCES X

SP-17 COMPLIANCE WITH CODES AND STANDARDS X

Special Provision Checklist

Instructions: COR shall request which Special Provisions (SP) shall be included in the contract.

Some may not be applicable. Your SOW may have included intended language that is detailed and contradictory to the SP and therefore would not want to include the SP. For each section, check off which SP you want to include or exclude from contract. Greyed out columns will always be included. Actual SP language is provided in embedded documents.

For informational purposes, Contract Provisions are also embedded.

Special Provisions

Contract Procedures (FYI Only) https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/AE Special Provisions.docx https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/AE Special Provisions.docx https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/AE Special Provisions.docx https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/CP-100 VA Contract Procedures (Architect-Engineering) (005).docx https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/CP-100 VA Contract Procedures (Architect-Engineering) (005).docx https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/CP-100 VA Contract Procedures (Architect-Engineering) (005).docx https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/AE Special Provisions.docx https://vaww.visn8.portal2.va.gov/apps/office/cams/RP Checklist/Example documents/CP-100 VA Contract Procedures (Architect-Engineering) (005).docx

SP-18 PROJECT PHASING (CPM) X

SP-19 STRUCTURAL ECONOMIC ANALYSES X

SP-20 DOCUMENT LIBRARY X

SP-21

SITE SURVEYS, SUBSURFACE, AND OTHER

INVESTIGATIONS

X

SP-22 COORDINATION WITH STATION X

SP-23 MONTHLY DESIGN PROGRESS REPORT X

SP-24 LIABILITY

SP-25

ADVERTISING FOR AND SECURING CONSTRUCTION

BIDS

X

SP-26 CONSTRUCTION PERIOD RESPONSIBILITIES X

SP-27 SHOP DRAWINGS, SUBMITTALS, ETC. X

SP-28

CONTRACTOR'S REQUESTS FOR INFORMATION AND

COST PROPOSALS

X

SP-29 RECORD DRAWINGS AND SPECIFICATIONS X

SP-30 EXPEDITIOUS REPLIES X

SP-31 SITE VISITS X

SP-32 INSPECTIONS OF CONSTRUCTION WORK X

SP-33 RECORD OF SITE VISITS X

File details come from the government source that posted it. Updated .