S03 - ENCL4_SAMPLE VAF_08-6298 AE FEE PROPOSAL.xlsx

XLSX spreadsheet 103 KB Posted

Attached to
C1DA--NRM (PROJ 672-20-603) A-E Provide Fire Sprinkler System Throughout Main Building Number 1.
Solicitation number
36C24821R0044
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

ARCHITECT-ENGINEER FEE PROPOSALVersion 3VA Department of Veterans AffairsBRIEFING ON A/E NEGOTIATIONSDATE\P{MENUCALL COL_MENU}\C{MENUCALL CHANGE}\E{MENUCALL COL_MENU3}
+++++++++++++++++++43987.0{BRANCH \P}{BRANCH \P}
ESTIMATED NO. OF CONTRACT DRAWINGS|DATE OF PROPOSAL Type Proposal DatePROJECT TITLE
|===COLUMN-MACRO MENU=====COLUMN-MACRO MENU=
DESCRIPTIONA/EVAFINAL|PROJECT NO. 672-XX-XXXPROJECT NUMBERPROJECT LOCATIONCOL_MENUABCDEFMoreQuitCOL_MENU3ESCALATERESTOREQuit
|Combined Fee Sheet "A"Fee Sheet "B"Sheet "C"Sheet "D"Sheet "E"Sheet "F"More optionsEnd macroEscalate Hourly SalariesRestore Hourly Salaries to original valueEnd macro
ARCHITECTURAL|Type Project TitleNAME AND LOCATION OF A/ETYPE OF CONTRACT{SH_A}{SH_B}{SH_C}{SH_D}{SH_E}{SH_F}{MENUCALL COL_MENU2}{QUIT}{MENUCALL COL_MENU4}{MENUCALL COL_MENU5}{QUIT}
SITE AND LANDSCAPING|
STRUCTURAL AND BORINGS|CODE :===COLUMN-MACRO MENU=====COLUMN-MACRO MENU==
SANITARY|NAME OF ARCHITECT-ENGINEER:ADDITIONAL SERVICES TO BE PERFORMEDCOL_MENU2GHIJKLBRIEFINGQuitCOL_MENU4A/EVAFINALQuit
PLUMBING|Sheet "G"Sheet "H"Sheet "I"Sheet "J"Sheet "K"Sheet "L"Briefing On A/E NegotiationsEnd macroEscalate A/E Hourly Salaries columnEscalate VA Hourly Salaries columnEscalate FINAL Hourly Salaries columnEnd macro
HEATING AND AIR CONDITIONING|{SH_G}{SH_H}{SH_I}{SH_J}{SH_K}{SH_L}{BRIEFING}{QUIT}{ESCL_AE}{ESCL_VA}{ESCL_FINAL}{QUIT}
ELECTRICAL|A/E COST TARGETBASED ON BOECKH INDEX OFAS OF
|=COLUMN-MACRO MENU=COLUMN-MACRO MENU=COLUMN-MACRO MENU==
|CITYSTATEPRINTERHPAPPLECHANGE PRINTER LABELS referencesGRAPHICSDRAFTVAXQuitCOL_MENU4\5A/EVAFINALQuit
|HP LaserJet IIIApple LaserWriterPrint Graphically (Best Quality)Print without Graphics (Fastest Printing)Print from Allin1 Lotus 123 on VAXEnd macroRestore A/E Hourly Salaries column to original valueRestore VA Hourly Salaries column to original valueRestore FINAL Hourly Salaries column to original valueEnd macro
TOTAL NO. OF DRAWINGS0.00.0|CURRENT CONSTRUCITON EST.COST RANGETYPE OF CONSTRUCTION{HP}{APPLE}{GRAPHIC}{DRAFT}{VAX}{QUIT}{REST_AE}{REST_VA}{REST_FINAL}{QUIT}
+++++++++++++++++++
PART 1 - PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONSPROJECT AREA (NEW)PROJECT AREA (RENOVATED)=COLUMN-MACRO MENU\0{PANELOFF clear}{GOTO}A:AA67~:dofnqq{?}:dofeqq{PANELON}{home}/rnd\0~ESCL_AEESCL_VAESCL_FINAL
-------------------SQUARE FEETSQUARE FEETINTERFACE123Escalate{goto}m303~/wgrm/cn300.n396~t300~Escalation~{right}/rfp~~0~{goto}m303~/wgrm/co300.o396~u300~Escalation~{right}{right}/rfp~~0~{goto}m303~/wgrm/cp300.p396~v300~Escalation~{right}{right}{right}/rfp~~0~
LINEA. SALARY COSTSEMPLOYEE-HOURSHOURLY SALARIESCOSTSFUNDINGLPT1 or Device 1LPT2 or Device 2LPT3 or Device 3{goto}n304~{goto}o304~{goto}p304~
NO.A/EVAFINALA/EVAFINALA/EVAFINALFISCAL YEAR{LPT1}{LPT2}{LPT3}+N25*(1+N303)~/rff~~{down}+O25*(1+O303)~/rff~~{down}+P25*(1+P303)~/rff~~{down}
-------------------AVAILABLEAMOUNT+N26*(1+N303)~/rff~~{down}+O26*(1+O303)~/rff~~{down}+P26*(1+P303)~/rff~~{down}
ARCHITECTURALAFPWYSIWYGQUICK PRINTLOTUS ON VAX+N27*(1+N303)~/rff~~{down}+O27*(1+O303)~/rff~~{down}+P27*(1+P303)~/rff~~{down}
1ASUPERVISORS000DESIGNSH_A{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSA:A1.A:S66,A:A67.A:S128,A:A130.A:S186,A:A188.A:S251,A:A253.A:S312,A:A314.A:S373,A:A375.A:S438,A:A440.A:S498,A:A500.A:S560,A:A562.A:S625,A:A627.A:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/ppra:a1.a:s689~q{MENUCALL PRINTER}same as quick print+N28*(1+N303)~/rff~~{down}+O28*(1+O303)~/rff~~{down}+P28*(1+P303)~/rff~~{down}
1BDESIGNERS000CONSTRUCTION+N30*(1+N303)~/rff~~{down}+O30*(1+O303)~/rff~~{down}+P30*(1+P303)~/rff~~{down}
1CDRAFTERS000OTHER (ENERGY, ETC.)BRIEFING{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}{GOTO}A:A67~:WPDQ{HOME}:PRCRSA:U1.A:Z68~CP2I6OPQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/ppra:u1.a:z68~q/rncHP~A:AE51~/rncAPPLE~A:AE53~{MENUCALL PRINTER}/ppra:u1.a:z68~q/rncHP~A:AG51~/rncAPPLE~A:AG53~{MENUCALL PRINTER}+N31*(1+N303)~/rff~~{down}+O31*(1+O303)~/rff~~{down}+P31*(1+P303)~/rff~~{down}
1DSPECIFICATION WRITERS000TOTAL ==>$0+N32*(1+N303)~/rff~~{down}+O32*(1+O303)~/rff~~{down}+P32*(1+P303)~/rff~~{down}
1ETYPISTS000BUDGET CATEGORYSH_B{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSB:A1.B:S66,B:A67.B:S128,B:A130.B:S186,B:A188.B:S251,B:A253.B:S312,B:A314.B:S373,B:A375.B:S438,B:A440.B:S498,B:A500.B:S560,B:A562.B:S625,B:A627.B:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprb:a1.b:s689~q{MENUCALL PRINTER}same as quick print{goto}n320~{goto}o320~{goto}p320~
1FESTIMATORS000+N36*(1+N303)~/rff~~{down}+O36*(1+O303)~/rff~~{down}+P36*(1+P303)~/rff~~{down}
1G000START SCHEMATICSSTART DESIGN DEVELOPMENTSH_C{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSC:A1.C:S66,C:A67.C:S128,C:A130.C:S186,C:A188.C:S251,C:A253.C:S312,C:A314.C:S373,C:A375.C:S438,C:A440.C:S498,C:A500.C:S560,C:A562.C:S625,C:A627.C:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprc:a1.c:s689~q{MENUCALL PRINTER}same as quick print+N37*(1+N303)~/rff~~{down}+O37*(1+O303)~/rff~~{down}+P37*(1+P303)~/rff~~{down}
1H000+N38*(1+N303)~/rff~~{down}+O38*(1+O303)~/rff~~{down}+P38*(1+P303)~/rff~~{down}
1ISUB-TOTAL0.00.00.0000COMPLETE DESIGN DEVELOPMENTSTART CONSTRUCTION DOCS.START CONSTR.SH_D{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSD:A1.D:S66,D:A67.D:S128,D:A130.D:S186,D:A188.D:S251,D:A253.D:S312,D:A314.D:S373,D:A375.D:S438,D:A440.D:S498,D:A500.D:S560,D:A562.D:S625,D:A627.D:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprd:a1.d:s689~q{MENUCALL PRINTER}same as quick print+N39*(1+N303)~/rff~~{down}+O39*(1+O303)~/rff~~{down}+P39*(1+P303)~/rff~~{down}
-------------------+N41*(1+N303)~/rff~~{down}+O41*(1+O303)~/rff~~{down}+P41*(1+P303)~/rff~~{down}
SITE AND LANDSCAPINGOVERHEAD AND PROFIT RATES FOR A/E CONSULTANTS (WEIGHTED AVERAGE)SH_E{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSE:A1.E:S66,E:A67.E:S128,E:A130.E:S186,E:A188.E:S251,E:A253.E:S312,E:A314.E:S373,E:A375.E:S438,E:A440.E:S498,E:A500.E:S560,E:A562.E:S625,E:A627.E:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/ppre:a1.e:s689~q{MENUCALL PRINTER}same as quick print+N42*(1+N303)~/rff~~{down}+O42*(1+O303)~/rff~~{down}+P42*(1+P303)~/rff~~{down}
2ASUPERVISORS0.00.0000Overhead =0.00%Profit =0.00%+N43*(1+N303)~/rff~~{down}+O43*(1+O303)~/rff~~{down}+P43*(1+P303)~/rff~~{down}
2BDESIGNERS0.00.0000PREVIOUS VA PROJECT BY THIS A/ESH_F{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSF:A1.F:S66,F:A67.F:S128,F:A130.F:S186,F:A188.F:S251,F:A253.F:S312,F:A314.F:S373,F:A375.F:S438,F:A440.F:S498,F:A500.F:S560,F:A562.F:S625,F:A627.F:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprf:a1.f:s689~q{MENUCALL PRINTER}same as quick print{goto}n330~{goto}o330~{goto}p330~
2CDRAFTERS0.00.0000+N47*(1+N303)~/rff~~{down}+O47*(1+O303)~/rff~~{down}+P47*(1+P303)~/rff~~{down}
2DSPECIFICATION WRITERS0.00.0000SH_G{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSG:A1.G:S66,G:A67.G:S128,G:A130.G:S186,G:A188.G:S251,G:A253.G:S312,G:A314.G:S373,G:A375.G:S438,G:A440.G:S498,G:A500.G:S560,G:A562.G:S625,G:A627.G:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprg:a1.g:s689~q{MENUCALL PRINTER}same as quick print+N48*(1+N303)~/rff~~{down}+O48*(1+O303)~/rff~~{down}+P48*(1+P303)~/rff~~{down}
2ETYPISTS0.00.0000PREVIOUSORIGINALORIGINALNEGOTIATEDPERCENT OF+N49*(1+N303)~/rff~~{down}+O49*(1+O303)~/rff~~{down}+P49*(1+P303)~/rff~~{down}
2FESTIMATORS0.00.0000CONTRACTA/E PROPOSALVA ESTIMATEFEECONSTRUCTIONSH_H{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSH:A1.H:S66,H:A67.H:S128,H:A130.H:S186,H:A188.H:S251,H:A253.H:S312,H:A314.H:S373,H:A375.H:S438,H:A440.H:S498,H:A500.H:S560,H:A562.H:S625,H:A627.H:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprh:a1.h:s689~q{MENUCALL PRINTER}same as quick print+N50*(1+N303)~/rff~~{down}+O50*(1+O303)~/rff~~{down}+P50*(1+P303)~/rff~~{down}
2G0.00.0000TECHNICAL EVALUATION+N52*(1+N303)~/rff~~{down}+O52*(1+O303)~/rff~~{down}+P52*(1+P303)~/rff~~{down}
2H0.00.0000SCHEMATICSNOSH_I{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSI:A1.I:S66,I:A67.I:S128,I:A130.I:S186,I:A188.I:S251,I:A253.I:S312,I:A314.I:S373,I:A375.I:S438,I:A440.I:S498,I:A500.I:S560,I:A562.I:S625,I:A627.I:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/ppri:a1.i:s689~q{MENUCALL PRINTER}same as quick print+N53*(1+N303)~/rff~~{down}+O53*(1+O303)~/rff~~{down}+P53*(1+P303)~/rff~~{down}
2ISUB-TOTAL0.00.00.0000DESIGN DEVELOPMENTNO{goto}n339~{goto}o339~{goto}p339~
-------------------PART I - CONSTRUCTION DOCS.SH_J{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSJ:A1.J:S66,J:A67.J:S128,J:A130.J:S186,J:A188.J:S251,J:A253.J:S312,J:A314.J:S373,J:A375.J:S438,J:A440.J:S498,J:A500.J:S560,J:A562.J:S625,J:A627.J:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprj:a1.j:s689~q{MENUCALL PRINTER}same as quick print+N58*(1+N303)~/rff~~{down}+O58*(1+O303)~/rff~~{down}+P58*(1+P303)~/rff~~{down}
STRUCTURAL AND BORINGSPART II - CONST. PERIOD SVCS.+N59*(1+N303)~/rff~~{down}+O59*(1+O303)~/rff~~{down}+P59*(1+P303)~/rff~~{down}
3ASUPERVISORS000PART III - SITE VISITSSH_K{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSK:A1.K:S66,K:A67.K:S128,K:A130.K:S186,K:A188.K:S251,K:A253.K:S312,K:A314.K:S373,K:A375.K:S438,K:A440.K:S498,K:A500.K:S560,K:A562.K:S625,K:A627.K:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprk:a1.k:s689~q{MENUCALL PRINTER}same as quick print+N60*(1+N303)~/rff~~{down}+O60*(1+O303)~/rff~~{down}+P60*(1+P303)~/rff~~{down}
3BDESIGNERS000TOTAL THIS CONTRACT==>ERROR:#N/AERROR:#N/AERROR:#N/AERROR:#N/A+N61*(1+N303)~/rff~~{down}+O61*(1+O303)~/rff~~{down}+P61*(1+P303)~/rff~~{down}
3CDRAFTERS000TOTAL ALL CONTRACTS==>$0$0$0ERROR:#DIV/0!SH_L{INDICATE "WAIT"}{PANELOFF}{WINDOWSOFF}:PRCRSL:A1.L:S66,L:A67.L:S128,L:A130.L:S186,L:A188.L:S251,L:A253.L:S312,L:A314.L:S373,L:A375.L:S438,L:A440.L:S498,L:A500.L:S560,L:A562.L:S625,L:A627.L:S689~LCAQCP2I6OLQQ{WINDOWSON}{INDICATE "READY"}{MENUCALL PRINTER}/pprl:a1.l:s689~q{MENUCALL PRINTER}same as quick print+N63*(1+N303)~/rff~~{down}+O63*(1+O303)~/rff~~{down}+P63*(1+P303)~/rff~~{down}
3DSPECIFICATION WRITERS000STATUS OF AUDIT+N64*(1+N303)~/rff~~{down}+O64*(1+O303)~/rff~~{down}+P64*(1+P303)~/rff~~{down}
3ETYPISTS000HP{INDICATE "WAIT"}{WINDOWSOFF}:PCP2QQ{WINDOWSON}{INDICATE "READY"}{MENUCALL INTERFACE}/ppcfooumt0~mb0~ml2~mr177~p66~s\027&l1o5.40C\027(s0p16.66H~adn2qqq{MENUCALL INTERFACE}/ppcfooumt0~mb0~ml2~mr177~p66~s\027&l1o5.40C\027(s0p16.66H~adn2qqq/rncHP~A:AD51~/rncAPPLE~A:AD53~{MENUCALL INTERFACE}/ppcfooumt0~mb0~ml2~mr177~p66~s\027&l1o5.40C\027(s0p16.66H~qq{MENUCALL INTERFACE}/ppcfooumt0~mb0~ml2~mr100~p80~s\027&l0o5.40C\027(s0p16.66H~qq/rncHP~AF51~/rncAPPLE~AF53~{MENUCALL INTERFACE}{goto}n348~{goto}o348~{goto}p348~
3FESTIMATORS000SPECIAL COMMENTS (Indicate who did prior design if applicable)+N73*(1+N303)~/rff~~{down}+O73*(1+O303)~/rff~~{down}+P73*(1+P303)~/rff~~{down}
3G000APPLE{INDICATE "WAIT"}{WINDOWSOFF}:PCP1QQ{WINDOWSON}{MENUCALL INTERFACE}{INDICATE "READY"}/ppcfoofmt0~mb0~ml2~mr180~p50~adn1lpclcolqqqq{MENUCALL INTERFACE}/ppcfoofmt0~mb0~ml2~mr180~p50~adn1lpclcolqqqq/rncHP~A:AD51~/rncAPPLE~A:AD53~{MENUCALL INTERFACE}{INDICATE "OPTION DOES NOT WORK YET"}{QUIT}{INDICATE "OPTION DOES NOT WORK YET"}/rncHP~AF51~/rncAPPLE~AF53~{QUIT}+N74*(1+N303)~/rff~~{down}+O74*(1+O303)~/rff~~{down}+P74*(1+P303)~/rff~~{down}
3H000+N75*(1+N303)~/rff~~{down}+O75*(1+O303)~/rff~~{down}+P75*(1+P303)~/rff~~{down}
3ISUB-TOTAL0.0000LPT1{INDICATE "WAIT"}{WINDOWSOFF}:PCI5QG{GOTO}A:A67~:WPRQ{INDICATE "READY"}{HOME}/ppoadi5qqagq/rncHP~A:AD51~/rncAPPLE~A:AD53~/ppoadn1qqagq+N76*(1+N303)~/rff~~{down}+O76*(1+O303)~/rff~~{down}+P76*(1+P303)~/rff~~{down}
-------------------+N78*(1+N303)~/rff~~{down}+O78*(1+O303)~/rff~~{down}+P78*(1+P303)~/rff~~{down}
SANITARYBORINGSTOPO SURVEYREPRODUCTIONOTHERTOTALLPT2{INDICATE "WAIT"}{WINDOWSOFF}:PCI6QG{GOTO}A:A67~:WPRQ{INDICATE "READY"}{HOME}/ppoadi6qqagq/rncHP~A:AD51~/rncAPPLE~A:AD53~/ppoadn2qqagq+N79*(1+N303)~/rff~~{down}+O79*(1+O303)~/rff~~{down}+P79*(1+P303)~/rff~~{down}
4ASUPERVISORS0.00.0000OF DRAWINGS{goto}n357~{goto}o357~{goto}p357~
4BDESIGNERS0.00.0000ALLOWANCE FORLPT3{INDICATE "WAIT"}{WINDOWSOFF}:PCI7QG{GOTO}A:A67~:WPRQ{INDICATE "READY"}{HOME}/ppoadi7qqagq/rncHP~A:AD51~/rncAPPLE~A:AD53~/ppoadn3qqagq+N84*(1+N303)~/rff~~{down}+O84*(1+O303)~/rff~~{down}+P84*(1+P303)~/rff~~{down}
4CDRAFTERS0.00.0000REIMBURSABLES$0+N85*(1+N303)~/rff~~{down}+O85*(1+O303)~/rff~~{down}+P85*(1+P303)~/rff~~{down}
4DSPECIFICATION WRITERS0.00.0000LIST OF COMPARATIVE PROJECTSGRAPHIC/RNCSH_A~AB25~/RNCBRIEFING~AB27~/RNCSH_B~AB29~/RNCSH_C~AB31~/RNCSH_D~AB33~/RNCSH_E~AB35~/RNCSH_F~AB37~/RNCSH_G~AB39~/RNCSH_H~AB41~/RNCSH_I~AB43~/RNCSH_J~AB45~/RNCSH_K~AB47~/RNCSH_L~AB49~/RNC\P~AB1~/RNCHP~AB51~/RNCAPPLE~AB53~/RNCLPT1~AB55~/RNCLPT2~AB57~/RN+N86*(1+N303)~/rff~~{down}+O86*(1+O303)~/rff~~{down}+P86*(1+P303)~/rff~~{down}
4ETYPISTS0.00.0000PROJECT TITLEPROJ. LOCATIONPROJECT NO.CONSTRUCT COSTPART ITOTAL FEE+N87*(1+N303)~/rff~~{down}+O87*(1+O303)~/rff~~{down}+P87*(1+P303)~/rff~~{down}
4FESTIMATORS0.00.0000DRAFT/RNCSH_A~AD25~/RNCBRIEFING~AD27~/RNCSH_B~AD29~/RNCSH_C~AD31~/RNCSH_D~AD33~/RNCSH_E~AD35~/RNCSH_F~AD37~/RNCSH_G~AD39~/RNCSH_H~AD41~/RNCSH_I~AD43~/RNCSH_J~AD45~/RNCSH_K~AD47~/RNCSH_L~AD49~/RNC\P~AB1~/RNCHP~AD51~/RNCAPPLE~AD53~/RNCLPT1~AD55~/RNCLPT2~AD57~/RN+N89*(1+N303)~/rff~~{down}+O89*(1+O303)~/rff~~{down}+P89*(1+P303)~/rff~~{down}
4G0.00.0000+N90*(1+N303)~/rff~~{down}+O90*(1+O303)~/rff~~{down}+P90*(1+P303)~/rff~~{down}
4H0.00.0000VAX/RNCSH_A~AD25~/RNCBRIEFING~AF27~/RNCSH_B~AD29~/RNCSH_C~AD31~/RNCSH_D~AD33~/RNCSH_E~AD35~/RNCSH_F~AD37~/RNCSH_G~AD39~/RNCSH_H~AD41~/RNCSH_I~AD43~/RNCSH_J~AD45~/RNCSH_K~AD47~/RNCSH_L~AD49~/RNC\P~AB1~/RNCHP~AF51~/RNCAPPLE~AF53~/RNCLPT1~AF55~/RNCLPT2~AF57~/RN{goto}n366~{goto}o366~{goto}p366~
4ISUB-TOTAL0.00.00.0000+N95*(1+N303)~/rff~~{down}+O95*(1+O303)~/rff~~{down}+P95*(1+P303)~/rff~~{down}
PART 1 - PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONS (Continued)+N96*(1+N303)~/rff~~{down}+O96*(1+O303)~/rff~~{down}+P96*(1+P303)~/rff~~{down}
-------------------+N97*(1+N303)~/rff~~{down}+O97*(1+O303)~/rff~~{down}+P97*(1+P303)~/rff~~{down}
LINEA. SALARY COSTS (Continued)EMPLOYEE-HOURSHOURLY SALARIESCOSTS+N98*(1+N303)~/rff~~{down}+O98*(1+O303)~/rff~~{down}+P98*(1+P303)~/rff~~{down}
NO.A/EVAFINALA/EVAFINALA/EVAFINALSpecial Instructions+N100*(1+N303)~/rff~~{down}+O100*(1+O303)~/rff~~{down}+P100*(1+P303)~/rff~~{down}
-------------------+N101*(1+N303)~/rff~~{down}+O101*(1+O303)~/rff~~{down}+P101*(1+P303)~/rff~~{down}
PLUMBINGI. Combining Individual A/E Fee Spreadsheets{goto}n381~{goto}o381~{goto}p381~
5ASUPERVISORS0001. Move to cell A1 of sheet where you want file to reside.+N106*(1+N303)~/rff~~{down}+O106*(1+O303)~/rff~~{down}+P106*(1+P303)~/rff~~{down}
5BDESIGNERS0002. /File-Combine-Copy-Entire OR Alt-L+N107*(1+N303)~/rff~~{down}+O107*(1+O303)~/rff~~{down}+P107*(1+P303)~/rff~~{down}
5CDRAFTERS0003. Repeat steps 1 & 2 until all sheets have been imported.+N108*(1+N303)~/rff~~{down}+O108*(1+O303)~/rff~~{down}+P108*(1+P303)~/rff~~{down}
5DSPECIFICATION WRITERS0004. Move to combined sheet "A".+N109*(1+N303)~/rff~~{down}+O109*(1+O303)~/rff~~{down}+P109*(1+P303)~/rff~~{down}
5ETYPISTS0005. /Worksheet-Global-Group-Enable+N111*(1+N303)~/rff~~{down}+O111*(1+O303)~/rff~~{down}+P111*(1+P303)~/rff~~{down}
5FESTIMATORS000II. Print Macros+N112*(1+N303)~/rff~~{down}+O112*(1+O303)~/rff~~{down}+P112*(1+P303)~/rff~~{down}
5G0001. Change printing style.Alt-C{goto}n390~{goto}o390~{goto}p390~
5H000a. Graphic+N117*(1+N303)~/rff~~{down}+O117*(1+O303)~/rff~~{down}+P117*(1+P303)~/rff~~{down}
5ISUB-TOTAL0.0000b. Draft+N118*(1+N303)~/rff~~{down}+O118*(1+O303)~/rff~~{down}+P118*(1+P303)~/rff~~{down}
-------------------c. VAX from Lotus 123 in Allin1+N119*(1+N303)~/rff~~{down}+O119*(1+O303)~/rff~~{down}+P119*(1+P303)~/rff~~{down}
HEATING AND AIR CONDITIONING2. Print Sheet(s)Alt-P+N120*(1+N303)~/rff~~{down}+O120*(1+O303)~/rff~~{down}+P120*(1+P303)~/rff~~{down}
6ASUPERVISORS000III. Escalate Hourly Salaries for Part IIAlt-E+N122*(1+N303)~/rff~~{down}+O122*(1+O303)~/rff~~{down}+P122*(1+P303)~/rff~~{down}
6BDESIGNERS000IV. Printer this screenAlt-H+N123*(1+N303)~/rff~~{down}+O123*(1+O303)~/rff~~{down}+P123*(1+P303)~/rff~~{down}
6CDRAFTERS000press ENTER to continue...{goto}m403~/cn400.n486~t400~Escalation~{right}/rfp~~0~{goto}m403~/co400.o486~u400~Escalation~{right}{right}/rfp~~0~{goto}m403~/cp400.p486~v400~Escalation~{right}{right}{right}/rfp~~0~
6DSPECIFICATION WRITERS000{goto}n404~{goto}o404~{goto}p404~
6ETYPISTS000\H{GOTO}A:A67~:WPDQ:PRSAA68.AH86~COLQQ{MENUCALL PRINTER}+N25*(1+N403)~/rff~~{down}+O25*(1+O403)~/rff~~{down}+P25*(1+P403)~/rff~~{down}
6FESTIMATORS000+N26*(1+N403)~/rff~~{down}+O26*(1+O403)~/rff~~{down}+P26*(1+P403)~/rff~~{down}
6G000\L{MENUCALL COL_MENU6}+N27*(1+N403)~/rff~~{down}+O27*(1+O403)~/rff~~{down}+P27*(1+P403)~/rff~~{down}
6H000+N28*(1+N403)~/rff~~{down}+O28*(1+O403)~/rff~~{down}+P28*(1+P403)~/rff~~{down}
6ISUB-TOTAL0.00.00.0000+N30*(1+N403)~/rff~~{down}+O30*(1+O403)~/rff~~{down}+P30*(1+P403)~/rff~~{down}
-------------------=COLUMN-MACRO MENU=+N31*(1+N403)~/rff~~{down}+O31*(1+O403)~/rff~~{down}+P31*(1+P403)~/rff~~{down}
ELECTRICALCOL_MENU6ORIGINAL FEEREVISED FEEQuit{goto}n413~{goto}o413~{goto}p413~
7ASUPERVISORS000Combine Individual A/E Fee SpreadsheetsLoad Revised A/E Fee into Final ColumnEnd macro+N36*(1+N403)~/rff~~{down}+O36*(1+O403)~/rff~~{down}+P36*(1+P403)~/rff~~{down}
7BDESIGNERS000{ORIGINAL_FEE}{REVISED_FEE}{QUIT}+N37*(1+N403)~/rff~~{down}+O37*(1+O403)~/rff~~{down}+P37*(1+P403)~/rff~~{down}
7CDRAFTERS000+N38*(1+N403)~/rff~~{down}+O38*(1+O403)~/rff~~{down}+P38*(1+P403)~/rff~~{down}
7DSPECIFICATION WRITERS000ORIGINAL_FEEDOES NOT WORK YET.+N39*(1+N403)~/rff~~{down}+O39*(1+O403)~/rff~~{down}+P39*(1+P403)~/rff~~{down}
7ETYPISTS000+N41*(1+N403)~/rff~~{down}+O41*(1+O403)~/rff~~{down}+P41*(1+P403)~/rff~~{down}
7FESTIMATORS000REVISED_FEE/FOA{?}~/FS{ESC 3}{CE}C:\AELOAD~/WDF{r}~+N42*(1+N403)~/rff~~{down}+O42*(1+O403)~/rff~~{down}+P42*(1+P403)~/rff~~{down}
7G000/WGRM{GOTO}J7~/FCCNH7.H16~{CE}C:\AELOAD.WK3~{GOTO}M304~/FCCNK304.K310~{CE}C:\AELOAD.WK3~{goto}n422~{goto}o422~{goto}p422~
7H000{GOTO}M25~/FCCNK25.K32~{CE}C:\AELOAD.WK3~{GOTO}M320~/FCCNK320.K326~{CE}C:\AELOAD.WK3~+N47*(1+N403)~/rff~~{down}+O47*(1+O403)~/rff~~{down}+P47*(1+P403)~/rff~~{down}
7ISUB-TOTAL0.0000{GOTO}M36~/FCCNK36.K43~{CE}C:\AELOAD.WK3~{GOTO}M330~/FCCNK330.K335~{CE}C:\AELOAD.WK3~+N48*(1+N403)~/rff~~{down}+O48*(1+O403)~/rff~~{down}+P48*(1+P403)~/rff~~{down}
-------------------{GOTO}M47~/FCCNK47.K54~{CE}C:\AELOAD.WK3~{GOTO}M339~/FCCNK339.K344~{CE}C:\AELOAD.WK3~+N49*(1+N403)~/rff~~{down}+O49*(1+O403)~/rff~~{down}+P49*(1+P403)~/rff~~{down}
{GOTO}M58~/FCCNK58.K65~{CE}C:\AELOAD.WK3~{GOTO}M348~/FCCNK348.K353~{CE}C:\AELOAD.WK3~+N50*(1+N403)~/rff~~{down}+O50*(1+O403)~/rff~~{down}+P50*(1+P403)~/rff~~{down}
8ASUPERVISORS0.00.0000{GOTO}M73~/FCCNK73.K80~{CE}C:\AELOAD.WK3~{GOTO}M357~/FCCNK357.K362~{CE}C:\AELOAD.WK3~+N52*(1+N403)~/rff~~{down}+O52*(1+O403)~/rff~~{down}+P52*(1+P403)~/rff~~{down}
8BDESIGNERS0.00.0000{GOTO}M84~/FCCNK84.K91~{CE}C:\AELOAD.WK3~{GOTO}M366~/FCCNK366.K371~{CE}C:\AELOAD.WK3~+N53*(1+N403)~/rff~~{down}+O53*(1+O403)~/rff~~{down}+P53*(1+P403)~/rff~~{down}
8CDRAFTERS0.00.0000{GOTO}M95~/FCCNK95.K102~{CE}C:\AELOAD.WK3~{GOTO}M381~/FCCNK381.K386~{CE}C:\AELOAD.WK3~{goto}n431~{goto}o431~{goto}p431~
8DSPECIFICATION WRITERS0.00.0000{GOTO}M106~/FCCNK106.K113~{CE}C:\AELOAD.WK3~{GOTO}M390~/FCCNK390.K395~{CE}C:\AELOAD.WK3~+N58*(1+N403)~/rff~~{down}+O58*(1+O403)~/rff~~{down}+P58*(1+P403)~/rff~~{down}
8ETYPISTS0.00.0000{GOTO}M117~/FCCNK117.K124~{CE}C:\AELOAD.WK3~{GOTO}M404~/FCCNK404.K409~{CE}C:\AELOAD.WK3~+N59*(1+N403)~/rff~~{down}+O59*(1+O403)~/rff~~{down}+P59*(1+P403)~/rff~~{down}
8FESTIMATORS0.00.0000{GOTO}J138~/FCANH138.H143~{CE}C:\AELOAD.WK3~{GOTO}M413~/FCCNK413.K417~{CE}C:\AELOAD.WK3~+N60*(1+N403)~/rff~~{down}+O60*(1+O403)~/rff~~{down}+P60*(1+P403)~/rff~~{down}
8G0.00.0000{GOTO}J150~/FCANH150.H153~{CE}C:\AELOAD.WK3~{GOTO}M422~/FCCNK422.K426~{CE}C:\AELOAD.WK3~+N61*(1+N403)~/rff~~{down}+O61*(1+O403)~/rff~~{down}+P61*(1+P403)~/rff~~{down}
8H0.00.0000{GOTO}J160~/FCANH160.H163~{CE}C:\AELOAD.WK3~{GOTO}M431~/FCCNK431.K436~{CE}C:\AELOAD.WK3~+N63*(1+N403)~/rff~~{down}+O63*(1+O403)~/rff~~{down}+P63*(1+P403)~/rff~~{down}
8ISUB-TOTAL0.00.00.0000{GOTO}M167~/FCCNK167.K173~{CE}C:\AELOAD.WK3~{GOTO}M446~/FCCNK446.K451~{CE}C:\AELOAD.WK3~+N64*(1+N403)~/rff~~{down}+O64*(1+O403)~/rff~~{down}+P64*(1+P403)~/rff~~{down}
-------------------{GOTO}E180~/FCCND180.D182~{CE}C:\AELOAD.WK3~{GOTO}M455~/FCCNK455.K460~{CE}C:\AELOAD.WK3~{goto}n446~{goto}o446~{goto}p446~
{GOTO}G196~/FCANE196.E200~{CE}C:\AELOAD.WK3~{GOTO}M464~/FCCNK464.K469~{CE}C:\AELOAD.WK3~+N73*(1+N403)~/rff~~{down}+O73*(1+O403)~/rff~~{down}+P73*(1+P403)~/rff~~{down}
9ASUPERVISORS0.00.0000{GOTO}J196~/FCCNH196.H196~{CE}C:\AELOAD.WK3~{GOTO}M473~/FCCNK473.K477~{CE}C:\AELOAD.WK3~+N74*(1+N403)~/rff~~{down}+O74*(1+O403)~/rff~~{down}+P74*(1+P403)~/rff~~{down}
9BDESIGNERS0.00.0000{GOTO}M196~/FCCNK196.K200~{CE}C:\AELOAD.WK3~{GOTO}M481~/FCCNK481.K485~{CE}C:\AELOAD.WK3~+N75*(1+N403)~/rff~~{down}+O75*(1+O403)~/rff~~{down}+P75*(1+P403)~/rff~~{down}
9CDRAFTERS0.00.0000{GOTO}G208~/FCANE208.E211~{CE}C:\AELOAD.WK3~{GOTO}G506~/FCCNE506.E509~{CE}C:\AELOAD.WK3~+N76*(1+N403)~/rff~~{down}+O76*(1+O403)~/rff~~{down}+P76*(1+P403)~/rff~~{down}
9DSPECIFICATION WRITERS0.00.0000{GOTO}G219~/FCANE219.E222~{CE}C:\AELOAD.WK3~{GOTO}J506~/FCCNH506.H509~{CE}C:\AELOAD.WK3~+N78*(1+N403)~/rff~~{down}+O78*(1+O403)~/rff~~{down}+P78*(1+P403)~/rff~~{down}
9ETYPISTS0.00.0000{GOTO}G227~/FCCNE227.E231~{CE}C:\AELOAD.WK3~{GOTO}M506~/FCCNK506.K509~{CE}C:\AELOAD.WK3~+N79*(1+N403)~/rff~~{down}+O79*(1+O403)~/rff~~{down}+P79*(1+P403)~/rff~~{down}
9FESTIMATORS0.00.0000{GOTO}J227~/FCANH227.H231~{CE}C:\AELOAD.WK3~{GOTO}P506~/FCCNN506.N509~{CE}C:\AELOAD.WK3~{goto}n455~{goto}o455~{goto}p455~
9G0.00.0000{GOTO}M227~/FCCNK227.K231~{CE}C:\AELOAD.WK3~{GOTO}G513~/FCCNE513.E516~{CE}C:\AELOAD.WK3~+N84*(1+N403)~/rff~~{down}+O84*(1+O403)~/rff~~{down}+P84*(1+P403)~/rff~~{down}
9H0.00.0000{GOTO}P227~/FCCNN227.N231~{CE}C:\AELOAD.WK3~{GOTO}J513~/FCCNH513.H516~{CE}C:\AELOAD.WK3~+N85*(1+N403)~/rff~~{down}+O85*(1+O403)~/rff~~{down}+P85*(1+P403)~/rff~~{down}
9ISUB-TOTAL0.00.00.0000{GOTO}G236~/FCCNE236.E240~{CE}C:\AELOAD.WK3~{GOTO}M513~/FCCNK513.K516~{CE}C:\AELOAD.WK3~+N86*(1+N403)~/rff~~{down}+O86*(1+O403)~/rff~~{down}+P86*(1+P403)~/rff~~{down}
-------------------{GOTO}J236~/FCCNH236.H240~{CE}C:\AELOAD.WK3~{GOTO}P513~/FCCNN513.N516~{CE}C:\AELOAD.WK3~+N87*(1+N403)~/rff~~{down}+O87*(1+O403)~/rff~~{down}+P87*(1+P403)~/rff~~{down}
10TOTAL EMPLOYEE HOURS0.00.00.0TOTAL SALARY COSTS000{GOTO}M236~/FCCNK236.K240~{CE}C:\AELOAD.WK3~{GOTO}G520~/FCCNE520.E523~{CE}C:\AELOAD.WK3~+N89*(1+N403)~/rff~~{down}+O89*(1+O403)~/rff~~{down}+P89*(1+P403)~/rff~~{down}
==================={GOTO}P236~/FCCNN236.N240~{CE}C:\AELOAD.WK3~{GOTO}J520~/FCCNH520.H523~{CE}C:\AELOAD.WK3~+N90*(1+N403)~/rff~~{down}+O90*(1+O403)~/rff~~{down}+P90*(1+P403)~/rff~~{down}
PART 1 - PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONS (Continued){GOTO}J245~/FCCNH245.H249~{CE}C:\AELOAD.WK3~{GOTO}P520~/FCCNN520.N523~{CE}C:\AELOAD.WK3~+N95*(1+N403)~/rff~~{down}+O95*(1+O403)~/rff~~{down}+P95*(1+P403)~/rff~~{down}
-------------------{GOTO}M245~/FCCNK245.K249~{CE}C:\AELOAD.WK3~{GOTO}J538~/FCCNH538.H558~{CE}C:\AELOAD.WK3~/FEW{CE}C:\AELOAD.WK3~Y/WGRA{GOTO}A1~+N96*(1+N403)~/rff~~{down}+O96*(1+O403)~/rff~~{down}+P96*(1+P403)~/rff~~{down}
LINEB. MISCELLANEOUS SALARY COSTS{GOTO}P245~/FCCNN245.N249~{CE}C:\AELOAD.WK3~+N97*(1+N403)~/rff~~{down}+O97*(1+O403)~/rff~~{down}+P97*(1+P403)~/rff~~{down}
-------------------{GOTO}J261~/FCCNH261.H264~{CE}C:\AELOAD.WK3~+N98*(1+N403)~/rff~~{down}+O98*(1+O403)~/rff~~{down}+P98*(1+P403)~/rff~~{down}
DESIGN REVIEW TRIPSEMPLOYEE-DAYSEMPLOYEE-HOURSHOURLY SALARIESCOSTS{GOTO}P261~/FCCNN261.N264~{CE}C:\AELOAD.WK3~+N100*(1+N403)~/rff~~{down}+O100*(1+O403)~/rff~~{down}+P100*(1+P403)~/rff~~{down}
NO. REQUIREDNO.NO. PERS.A/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINAL{GOTO}J271~/FCCNH271.H272~{CE}C:\AELOAD.WK3~+N101*(1+N403)~/rff~~{down}+O101*(1+O403)~/rff~~{down}+P101*(1+P403)~/rff~~{down}
11A0.0DAYSREQUIRED{GOTO}P271~/FCCNN271.N272~{CE}C:\AELOAD.WK3~{goto}n473~{goto}o473~{goto}p473~
-------------------{GOTO}J276~/FCCNH276.H280~{CE}C:\AELOAD.WK3~+N106*(1+N403)~/rff~~{down}+O106*(1+O403)~/rff~~{down}+P106*(1+P403)~/rff~~{down}
11BSUPERVISORS0.00.00.00.00.00.00.00.00.00.0000{GOTO}P276~/FCCNN276.N280~{CE}C:\AELOAD.WK3~+N107*(1+N403)~/rff~~{down}+O107*(1+O403)~/rff~~{down}+P107*(1+P403)~/rff~~{down}
11CDESIGNERS0.00.00.00.00.00.00.00.00.00.0000{GOTO}J284~/FCCNH284.H288~{CE}C:\AELOAD.WK3~+N108*(1+N403)~/rff~~{down}+O108*(1+O403)~/rff~~{down}+P108*(1+P403)~/rff~~{down}
11DDRAFTERS0.00.00.00.00.00.00.00.0000{GOTO}P284~/FCCNN284.N288~{CE}C:\AELOAD.WK3~{BRANCH AC101}+N109*(1+N403)~/rff~~{down}+O109*(1+O403)~/rff~~{down}+P109*(1+P403)~/rff~~{down}
11ESPEC. WRITERS0.00.00.00.00.00.00.00.0000+N111*(1+N403)~/rff~~{down}+O111*(1+O403)~/rff~~{down}+P111*(1+P403)~/rff~~{down}
11F0.00.00.00.00.00.0000{goto}n481~{goto}o481~{goto}p481~
11G0.00.00.00.00.00.0000+N117*(1+N403)~/rff~~{down}+O117*(1+O403)~/rff~~{down}+P117*(1+P403)~/rff~~{down}
11HSUB-TOTAL0.00.00.00.00.00.0000+N118*(1+N403)~/rff~~{down}+O118*(1+O403)~/rff~~{down}+P118*(1+P403)~/rff~~{down}
-------------------+N119*(1+N403)~/rff~~{down}+O119*(1+O403)~/rff~~{down}+P119*(1+P403)~/rff~~{down}
DESIGN STAFF SITE TRIPS+N120*(1+N403)~/rff~~{down}+O120*(1+O403)~/rff~~{down}+P120*(1+P403)~/rff~~{down}
NO. REQUIRED+N122*(1+N403)~/rff~~{down}/wgra{goto}m303~+O122*(1+O403)~/rff~~{down}/wgra{goto}m303~+P122*(1+P403)~/rff~~{down}/wgra{goto}m303~
12A0.0
-------------------
12BSUPERVISORS0.00.00.00.00.00.00.00.00.00.0000REST_AEREST_VAREST_FINAL
12CDESIGNERS0.00.00.00.00.00.00.00.00.00.0000Restore/ct300.t396~n300~/ret300.t396~/cu300.u396~o300~/reu300.u396~/cv300.v396~p300~/rev300.v396~
12D0.00.00.00.00.00.0000/ct400.t486~n400~/ret400.t486~/cu400.u486~o400~/reu400.u486~/cv400.v486~p400~/rev400.v486~
12E0.00.00.00.00.00.0000
12FSUB-TOTAL0.00.00.00.00.00.0000
-------------------
PRE-BID (CPM) CONFERENCE
NO. REQUIRED
13A
-------------------
13BSUPERVISORS0.00.00.00.00.00.0000
13CDESIGNERS0.00.00.00.00.00.0000
13D0.00.00.00.00.0000
13E0.00.00.00.00.0000
13FSUB-TOTAL0.00.00.00.00.00.0000
-------------------
ANSWERING INQ. & ISSUING AMENDM'TS.
14ASUPERVISORS0.00.00.0000
14BDESIGNERS0.00.00.0000
14CDRAFTERS0.00.00.0000
14DSPECIFICATION WRITERS0.00.00.0000
14ETYPISTS0.00.00.0000
14F0.00.00.0000
14G0.00.00.0000
14HSUB-TOTAL0.00.00.0000
-------------------
15TOTAL EMPLOYEE HOURS0.00.00.0TOTAL MISC. SALARY COSTS000
===================
16TOTAL SALARY COSTS(LINES 10 + 15)000
A/EVAFINAL
17OVERHEAD0.00.0% OF LINE 16000
18PROFIT0.00.0% OF (LINES 16 + 17)000
-------------------
19TOTAL SALARY PROPOSAL (LINES 16 + 17 + 18)000
+++++++++++++++++++
PART 1 - PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONS (Continued)
-------------------
LINEC. INCIDENTAL COSTS
-------------------
DESIGN REVIEW TRIPSEMP. TRIPSTRAVEL COSTSEMP. DAYSPER DIEMCOSTS
# REQUIREDNO.NO. PERS.
20A0.0DAYSREQUIREDA/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
20BFIRST0.00.00.00.00.00.00.00.0000
20CSECOND0.00.00.00.00.00.00.00.00.0000
20DTHIRD0.00.00.00.00.00.0000
20EFOURTH0.00.00.00.00.00.0000
20F0.00.00.00.00.0000
20GSUB-TOTAL0.00.00.00.00.00.0000
----------------
DESIGN STAFF SITE TRIPS
NO. REQUIRED
21A1.0
-------------------
21BSUPERVISORS4.01.01.00.00.00.00.00.00.00.00.00.0000
21CDESIGNERS4.01.01.00.00.00.00.00.00.00.00.00.0000
21D0.00.00.00.00.00.00.00.00.00.00.00.0000
21E0.00.00.00.00.00.00.00.00.00.00.00.0000
21FSUB-TOTAL0.00.00.00.00.00.00.00.00.0000
-------------------
PRE-BID (CPM) CONFERENCE
NO. REQUIRED
22A0.0
-------------------
22BSUPERVISORS0.00.00.00.00.00.00.00.00.00.00.00.0000
22CDESIGNERS0.00.00.00.00.00.00.00.00.00.00.00.0000
22D0.00.00.00.00.00.00.00.00.00.00.00.0000
22E0.00.00.00.00.00.00.00.00.00.00.00.0000
22FSUB-TOTAL0.00.00.00.00.00.00.00.00.0000
-------------------
23A000
23B000
23C000
23D000
23E000
23FSUB-TOTAL0.00.00.00.00.00.0000
-------------------
24A000
24B000
24C000
24D000
24E000
24FSUB-TOTAL0.00.00.00.00.00.0000
-------------------
25A000
25B000
25C000
25D000
25E000
25FSUB-TOTAL0.00.00.00.00.00.0000
-------------------
PART 1 - PREPARATION OF CONTRACT DRAWINGS AND SPECIFICATIONS (Continued)
-------------------
C. INCIDENTAL COSTS (Continued)
-------------------
LINEQUANTITYUNIT COSTCOSTS
NO.A/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
REPRODUCTION OF REVIEW MATERIAL
26ASepias000
26BBluelines000
26C000
26D000
26ESUB-TOTAL0.00.00.0000
-------------------
RENDERINGS (PRESPECTIVES)
NO. REQUIRED
27A
-------------------
27B000
27C000
27DSUB-TOTAL0.00.00.0000
-------------------
28A000
28B000
28C000
28D000
28E000
28FSUB-TOTAL0.00.00.0000
-------------------
29A000
29B000
29C000
29D000
29E000
29FSUB-TOTAL0.00.00.0000
-------------------
30TOTAL INCIDENTAL COSTS0.00.00.00.00.00.0000
===================
31*TOTAL PROPOSAL (LINE 19 + 30)000
-------------------
* NOTE - This part of the fee is that which falls within the 6% fee limitation. See FAR 15.903(d)(1)(ii) and VAAR 836.606-73 for definitive information.
+++++++++++++++++++
PART II - CONSTRUCTION PERIOD SERVICES
-------------------
LINEA. SHOP DRAWINGS, SUBMITTALS, ETC.EMPLOYEE - HOURSHOURLY SALARIESCOSTS
NO.SALARY COSTSA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
ARCHITECTURAL
32ASUPERVISORS0.00.00.0000
32BDESIGNERS0.00.00.0000
32CDRAFTERS0.00.00.0000
32DSPECIFICATION WRITERS0.00.00.0000
32EESTIMATORS0.00.00.0000
32F0.00.00.0000
32G0.00.00.0000
32HSUB-TOTAL0.00.00.0000
-------------------
PART II - CONSTRUCTION PERIOD SERVICES (Continued)
-------------------
LINEA. SHOP DRAWINGS, SUBMITTALS, ETC. (Continued)EMPLOYEE - HOURSHOURLY SALARIESCOSTS
NO.SALARY COSTSA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
SITE AND LANDSCAPING
33ASUPERVISORS0.00.00.0000
33BDESIGNERS0.00.00.0000
33CDRAFTERS0.00.00.0000
33DSPECIFICATION WRITERS0.00.00.0000
33EESTIMATORS0.00.00.0000
33F0.00.00.0000
33G0.00.00.0000
33HSUB-TOTAL0.00.00.0000
-------------------
STRUCTURAL AND BORINGS
34ASUPERVISORS0.00.00.00.0000
34BDESIGNERS0.00.00.00.0000
34CDRAFTERS0.00.00.00.0000
34DSPECIFICATION WRITERS0.00.00.0000
34EESTIMATORS0.00.00.0000
34F0.00.00.0000
34GSUB-TOTAL0.00.00.0000
-------------------
SANITARY
35ASUPERVISORS0.00.00.0000
35BDESIGNERS0.00.00.0000
35CDRAFTERS0.00.00.0000
35DSPECIFICATION WRITERS0.00.00.0000
35EESTIMATORS0.00.00.0000
35F0.00.00.0000
35GSUB-TOTAL0.00.00.0000
-------------------
PLUMBING
36ASUPERVISORS0.00.00.00.0000
36BDESIGNERS0.00.00.00.0000
36CDRAFTERS0.00.00.00.0000
36DSPECIFICATION WRITERS0.00.00.0000
36EESTIMATORS0.00.00.0000
36FCLERICAL0.00.00.0000
36GSUB-TOTAL0.00.00.0000
-------------------
HEATING AND AIR CONDITIONING
37ASUPERVISORS0.00.00.00.0000
37BDESIGNERS0.00.00.00.0000
37CDRAFTERS0.00.00.00.0000
37DSPECIFICATION WRITERS0.00.00.0000
37EESTIMATORS0.00.00.0000
37FCLERICAL0.00.00.0000
37GSUB-TOTAL0.00.00.0000
-------------------
ELECTRICAL
38ASUPERVISORS0.00.00.00.0000
38BDESIGNERS0.00.00.00.0000
38CDRAFTERS0.00.00.00.0000
38DSPECIFICATION WRITERS0.00.00.0000
38EESTIMATORS0.00.00.0000
38FCLERICAL0.00.00.0000
38GSUB-TOTAL0.00.00.0000
-------------------
PART II - CONSTRUCTION PERIOD SERVICES (Continued)
-------------------
LINEA. SHOP DRAWINGS, SUBMITTALS, ETC. (Continued)EMPLOYEE - HOURSHOURLY SALARIESCOSTS
NO.SALARY COSTSA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
39ASUPERVISORS0.00.00.0000
39BDESIGNERS0.00.00.0000
39CDRAFTERS0.00.00.0000
39DSPECIFICATION WRITERS0.00.00.0000
39EESTIMATORS0.00.00.0000
39F0.00.00.0000
39GSUB-TOTAL0.00.00.0000
-------------------
40ASUPERVISORS0.00.00.0000
40BDESIGNERS0.00.00.0000
40CDRAFTERS0.00.00.0000
40DSPECIFICATION WRITERS0.00.00.0000
40EESTIMATORS0.00.00.0000
40F0.00.00.0000
40GSUB-TOTAL0.00.00.0000
-------------------
41TOTAL EMPLOYEE HOURS0.00.00.0TOTAL SALARY COSTS000
===================
LINEB. RECORD (AS BUILT) DRAWINGS AND SPECIFICATIONSEMPLOYEE - HOURSHOURLY SALARIESCOSTS
NO.SALARY COSTSA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
ARCHITECTURAL
42ASUPERVISORS0.00.00.0000
42BDESIGNERS0.00.00.0000
42CDRAFTERS0.00.00.0000
42DSPECIFICATION WRITERS0.00.00.0000
42EESTIMATORS0.00.00.0000
42F0.00.00.0000
42GSUB-TOTAL0.00.00.0000
-------------------
SITE AND LANDSCAPING
43ASUPERVISORS0.00.00.0000
43BDESIGNERS0.00.00.0000
43CDRAFTERS0.00.00.0000
43DSPECIFICATION WRITERS0.00.00.0000
43EESTIMATORS0.00.00.0000
43F0.00.00.0000
43GSUB-TOTAL0.00.00.0000
-------------------
STRUCTURAL AND BORINGS
44ASUPERVISORS0.00.00.00.0000
44BDESIGNERS0.00.00.00.0000
44CDRAFTERS0.00.00.00.0000
44DSPECIFICATION WRITERS0.00.00.0000
44EESTIMATORS0.00.00.0000
44F0.00.00.0000
44GSUB-TOTAL0.00.00.0000
-------------------
SANITARY
45ASUPERVISORS0.00.00.0000
45BDESIGNERS0.00.00.0000
45CDRAFTERS0.00.00.0000
45DSPECIFICATION WRITERS0.00.00.0000
45EESTIMATORS0.00.00.0000
45F0.00.00.0000
45GSUB-TOTAL0.00.00.0000
-------------------
PART II - CONSTRUCTION PERIOD SERVICES (Continued)
-------------------
LINEB. RECORD (AS BUILT) DRAWINGS AND SPECIFICATIONS (Continued)EMPLOYEE - HOURSHOURLY SALARIESCOSTS
NO.SALARY COSTSA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
PLUMBING
46ASUPERVISORS0.00.00.0000
46BDESIGNERS0.00.00.0000
46CDRAFTERS0.00.00.0000
46DSPECIFICATION WRITERS0.00.00.0000
46EESTIMATORS0.00.00.0000
46F0.00.00.0000
46GSUB-TOTAL0.00.0000
------------------
HEATING AND AIR CONDITIONING
47ASUPERVISORS0.00.00.0000
47BDESIGNERS0.00.00.0000
47CDRAFTERS0.00.00.0000
47DSPECIFICATION WRITERS0.00.00.0000
47EESTIMATORS0.00.00.0000
47F0.00.00.0000
47GSUB-TOTAL0.00.0000
------------------
ELECTRICAL
48ASUPERVISORS0.00.00.0000
48BDESIGNERS0.00.00.0000
48CDRAFTERS0.00.00.0000
48DSPECIFICATION WRITERS0.00.00.0000
48EESTIMATORS0.00.00.0000
48F0.00.00.0000
48GSUB-TOTAL0.00.0000
-------------------
49ASUPERVISORS0.00.00.0000
49BDESIGNERS0.00.00.0000
49CDRAFTERS0.00.00.0000
49DSPECIFICATION WRITERS0.00.00.0000
49EESTIMATORS0.00.00.0000
49FSUB-TOTAL0.00.00.0000
-------------------
50ASUPERVISORS0.00.00.0000
50BDESIGNERS0.00.00.0000
50CDRAFTERS0.00.00.0000
50DSPECIFICATION WRITERS0.00.00.0000
50EESTIMATORS0.00.00.0000
50FSUB-TOTAL0.00.00.0000
-------------------
51TOTAL EMPLOYEE HOURS0.00.00.0TOTAL SALARY COSTS000
===================
52TOTAL SALARY COSTS (LINES 41 + 51)000
A/EVAFINAL
53OVERHEAD0.0% OF LINE 52000
54PROFIT0.0% OF (LINES 52 + 53)000
-------------------
55TOTAL LABOR PROPOSAL (LINES 52 + 53 + 54)000
+++++++++++++++++++
PART II - CONSTRUCTION PERIOD SERVICES (Continued)
-------------------
C. INCIDENTAL COSTSEMP. TRIPSTRAVEL COSTSEMP. DAYSPER DIEMCOSTS
LINEA/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
56A000
56B000
56C000
56D000
56ESUB-TOTAL0.00.00.00.00.00.0000
-------------------
57A000
57B000
57C000
57D000
57ESUB-TOTAL0.00.00.00.00.00.0000
-------------------
58A000
58B000
58C000
58D000
58ESUB-TOTAL0.00.00.00.00.00.0000
-------------------
59INCIDENTAL COSTS0.00.00.00.00.00.0000
===================
60TOTAL PROPOSAL (LINES 55 + 59)000
+++++++++++++++++++
PART III - SITE VISITS
-------------------
LINEA. SALARY COSTSEMPLOYEE TRIPSTOTAL HOURSHOURLY SALARIESCOSTS
NO.A/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
PRECONSTRUCTION CONFERENCE , NOT REQUIRED
NO. VISITSNO. DAYSEMP. PER DAY
61A0.00.00.00.00.00.00.00.00.0000
-------------------
SITE VISITS - DURING CONSTRUCTION - 1 PERSON, 3 DAYS
NO. VISITS, ONE EMPLOYEE-DAY EACH
61B0.00.00.00.00.00.00.00.0000
-------------------
FIELD INVESTIGATION/ DESIGN KICKOFF - 2 engineers
NO. INSP.NO. DAY EA.EMP. PER DAY
61C0.00.00.00.00.00.00.00.00.00.0000
-------------------
FINAL INSPECTION
NO. DAYSEMP. PER DAY
61D0.00.00.00.00.00.00.00.00.0000
-------------------
PRE BID CONFERENCE - NONE REQUIRED
NO. VISITSNO. DAYSEMP. PER DAY
61E0.00.00.00.00.00.00.00.00.0000
-------------------
Design Meetings one arch and two engineer , 3 DAYS
NO. VISITSNO. DAYSEMP. PER DAY
61F0.00.00.00.00.00.00.00.00.00.0000
===================
62SALARY COSTS:0.00.00.0SITE VISITS @$0.00$0.00$0.00EACH000
PART III - SITE VISITS (Continued)
-------------------
A/EVAFINAL
63OVERHEAD0.0% OF LINE 62000
64PROFIT0.0% OF (LINES 62 + 63)000
-------------------
65TOTAL SALARY COSTS (LINES 62 + 63 + 64)000
+++++++++++++++++++
B. TRAVEL COSTSEMP. TRIPSTRAVEL COSTSEMP. DAYSPER DIEMCOSTS
A/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINALA/EVAFINAL
-------------------
PRECONSTRUCTION CONFERENCE , NOT REQUIRED
NO.EMP.
NO. VISITSDAYSPER DAY
66A0.00.00.00.00.00.00.00.00.00.00.00.00.0000
-------------------
SITE VISITS - DURING CONSTRUCTION - 1 PERSON, 3 DAYS
NO. VISITS
ONE EMPLOYEE-DAY EACH
66B0.00.00.00.00.00.00.00.00.0000
-------------------
FIELD INVESTIGATION/ DESIGN KICKOFF - 2 engineers
NO.EMP.
NO. VISITSDAYSPER DAY
66C0.00.00.00.00.00.00.00.00.0000
-------------------
FINAL INSPECTION
NO. DAYSEMP. PER DAY
66D0.00.00.00.00.00.00.00.00.00.00.00.00.00.0000
-------------------
PRE BID CONFERENCE - NONE REQUIRED
NO. VISITS

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .