S02 - VA Form 10-6001a Contract Progress Report.pdf

PDF 529 KB Posted

Attached to
Z2DA--537-21-113 Remodel Blood Draw
Solicitation number
36C25223B0021
Issued by

About this file

This document contains a contract progress report template and information on a related federal contract opportunity for remodeling a blood draw area at a Veterans Affairs medical center. The progress report form is used to track performance on construction contracts with the VA and requires details such as the project number, contract amount, completion dates, values of work completed, payments made, and notes. The related federal opportunity is a solicitation to remodel the blood draw area at the Jesse Brown VA Medical Center for project number 536-21-113 issued by the VA Veterans Health Administration VISN 12. The opportunity type is a solicitation and additional information provided includes the solicitation number and agency involvement.

View the file

Other files

File Type Posted
S06 - 537-21-113 Blood Draw Remodel - Construction SOW_7.25.23.pdf PDF
36C25223B0021 0006.docx DOCX document
36C25223B0021 0005.docx DOCX document
36C25223B0021 0004.docx DOCX document
S06 - 264100 - Facility Lightning Protection.pdf PDF
36C25223B0021 0003.docx DOCX document
36C25223B0021 0002.docx DOCX document
S06 - RFI Attachment- Ogden Penthouse Roofing Replacement Drawings.pdf PDF
S06 - A502 Details_20230705_.pdf PDF
S06 - Bid Schedule_537-21-113_Amend 0002.pdf PDF
36C25223B0021 0001.docx DOCX document
S06 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 2 of 3.pdf PDF
S04 - 537-21-113 Pre-Bid Site Visit Sign-in 6.12.23.pdf PDF
S06 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 1 of 3.pdf PDF
S06 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 3 of 3.pdf PDF
S02 - Jesse Brown VAMC - Asbestos Reinspection Drawings 2019.pdf PDF
S02 - 537-21-113 Specifications Issued for Bid and Construction Vol2 3-17-2023.pdf PDF
S02 - 537-21-113 Specifications Issued for Bid and Construction Vol1 3-17-2023.pdf PDF
S02 - Campus Floor Plan- Taylor Bldg.pdf PDF
S02 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 1 of 3.pdf PDF
S02 - Campus Floor Plan- Atrium Bldg.pdf PDF
S02 - Subcontractor Payment Summary.xlsx XLSX spreadsheet
S02 - Campus Floor Plan- Damen Bldg.pdf PDF
S02 - Campus Floor Plan- Bed Tower Bldg.pdf PDF
S02 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 2 of 3.pdf PDF
36C25223B0021_1.docx DOCX document
S02 - VA Form 10101 Contractor Production Report.pdf PDF
S02 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 3 of 3.pdf PDF
S02 - 537-21-113 Construction Project Tracker.xlsx XLSX spreadsheet
S02 - Campus Floor Plan- Ogden Bldg.pdf PDF
S02 - Wage Determination_effective 5.12.23.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT PROGRESS REPORT

LOCATION OF PROJECT

TO

Centra Texas Health Care System (CTVHCS) 1901 Memorial Drive Temple, TX 76504

1. PROJECT NO. 2. CONTRACT NO. 3. DATE CONTRACT AWARD 4. DATE NOTICE TO PROCEED RECEIVED

6. NAME AND ADDRESS OF CONTRACTOR 7. DESCRIPTION OF CONTRACT

12. EXTENDED CONTRACT COMPLETION DATE

ITEM

NO.

15.

VA FORM

JUN 2012 10-6001a

5. DATE CONST. STARTED

BRANCH OF WORK TOTAL VALUE VALUE OF WORK IN

PLACE-END LAST PERIOD

VALUE OF WORK INSTALLED

IN CURRENT PERIOD(A) (B)

(C) (D)

13. ESTIMATED COMPLETION DATE

OMB Approval No. 2900-0208 Estimated burden 12 minutes

16.

17.

18.

19.

20.

21.

22.

23.

14. DATE COMPLETED

8. ORIGINAL CONTRACT AMOUNT

9. SCHEDULED PERCENT COMPLETION

10. ACTUAL PERCENT COMPLETION

11. ORIGINAL CONTRACT COMPLETION DATE

REPORT FOR PERIOD ENDING

VA FORM

JUN 2012 10-6001a

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

SUPPLEMENTAL AGREEMENT - ADD

SUPPLEMENTAL AGREEMENT - DEDUCT

TOTAL $$$

CONTRACT FISCAL DATA

CHANGE ORDERS, SUPPLEMENTAL AGREEMENTS, AND TIME EXTENSIONS

41.

42.

43.

44.

45.

46.

47.

48.

49.

50.

55A.

55B.

55C.

55D.

56.

57.

58.

59.

60.

CURRENT CONTRACT AMOUNT (From Item 40, Col. B)

VALUE - UNUSED MATERIALS PAID FOR THIS PERIOD

RETAINAGE (Based on Item 45 less cost of bond premiums)

PAYMENT THIS PERIOD

TOTAL PAYMENT TO DATE (Item 47 plus 48)

CO CHANGE ORD., PREV. REPORTED, NO.

ISSUED THIS PERIOD

ISSUED THIS PERIOD

ISSUED THIS PERIOD

ISSUED THIS PERIOD

TO INCL.CO SUPPL. AGREE. PREV. REPORTED, SYM

TO

TO

TO

TO INCL.

INCL.

INCL.

INCL.

51. EQUIPMENT STATUS 52. MATERIALS STATUS 53A. WORK PROGRESS 53B. PROGRESS FACTOR 54. SUBMISSIONS OVERDUE

ITEM

NO.

61. REMARKS

62. SIGNATURE OF RESIDENT ENGINEER 63. DATE

ADDITIONS DEDUCTIONS

(C) (D) (E)

DATE

APPROVED

(B)

DAYS

EXTENSIONSYMBOLS

(A)

VALUE - CONTRACT NOT EARNED (Item 41 minus 45)

VALUE - WORK IN PLACE TO DATE (Item 40, Cols. C plus D)

VALUE - UNUSED MATERIALS PREVIOUSLY PAID FOR

EARNED TO DATE (Items 42 plus 43 plus 44)

TOTAL PREVIOUS PAYMENTS

FIELD SUPPL. AGREE. PREV. REPORTED, NO.

FIELD CHANGE ORD. PREV. REPORTED, SYM.

TIME EXTENS. PREV. REPORTED, NO.

VA FORM

JUN 2012 10-6001a

The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 12 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

D:19970130153324Z

CONTRACT PROGRESS REPORT

CONTRACT PROGRESS REPORT

LOCATION OF PROJECT

LOCATION OF PROJECT

TO

TO

Centra Texas Health Care System (CTVHCS) 1901 Memorial Drive Temple, TX 76504 Centra Texas Health Care System (CTVHCS) 1901 Memorial Drive Temple, TX 76504

1. PROJECT NO.

1. PROJECT NO.

2. CONTRACT NO.

2. CONTRACT NO.

3. DATE CONTRACT AWARD

3. DATE CONTRACT AWARD

4. DATE NOTICE TO PROCEED RECEIVED

4. DATE NOTICE TO PROCEED RECEIVED

6. NAME AND ADDRESS OF CONTRACTOR

6. NAME AND ADDRESS OF CONTRACTOR

7. DESCRIPTION OF CONTRACT

7. DESCRIPTION OF CONTRACT

12. EXTENDED CONTRACT COMPLETION DATE

12. EXTENDED CONTRACT COMPLETION DATE

ITEM

NO.

15.

VA FORM

JUN 2012

10-6001a

5. DATE CONST. STARTED

5. DATE CONST. STARTED

BRANCH OF WORK

BRANCH OF WORK

TOTAL VALUE

TOTAL VALUE

VALUE OF WORK IN

PLACE-END LAST PERIOD

VALUE OF WORK IN

PLACE-END LAST PERIOD

VALUE OF WORK INSTALLED

IN CURRENT PERIOD

VALUE OF WORK INSTALLED

IN CURRENT PERIOD

(A) (B) (C) (D) \\iaimain\apps1\Pam_Ward\Logos\Formlogo.jpg Department of Veterans Affairs

13. ESTIMATED COMPLETION DATE

13. ESTIMATED COMPLETION DATE

OMB Approval No. 2900-0208 Estimated burden 12 minutes 16.

17.

18.

19.

20.

21.

22.

23.

14. DATE COMPLETED

14. DATE COMPLETED

8. ORIGINAL CONTRACT AMOUNT

8. ORIGINAL CONTRACT AMOUNT

9. SCHEDULED PERCENT COMPLETION

9. SCHEDULED PERCENT COMPLETION

10. ACTUAL PERCENT COMPLETION

10. ACTUAL PERCENT COMPLETION

11. ORIGINAL CONTRACT COMPLETION DATE

11. ORIGINAL CONTRACT COMPLETION DATE

REPORT FOR PERIOD ENDING

REPORT FOR PERIOD ENDING

VA FORM

JUN 2012

10-6001a 24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

35.

36.

37.

38.

39.

40.

SUPPLEMENTAL AGREEMENT - ADD

38. SUPPLEMENTAL AGREEMENT - ADD

SUPPLEMENTAL AGREEMENT - DEDUCT

39. SUPPLEMENTAL AGREEMENT - DEDUCT

TOTAL

40. TOTAL

CONTRACT FISCAL DATA

CHANGE ORDERS, SUPPLEMENTAL AGREEMENTS, AND TIME EXTENSIONS

41.

42.

43.

44.

45.

46.

47.

48.

49.

50.

55A.

55B.

55C.

55D.

56.

57.

58.

59.

60.

CURRENT CONTRACT AMOUNT (From Item 40, Col. B)

41. CURRENT CONTRACT AMOUNT (From Item 40, Col. B)

VALUE - UNUSED MATERIALS PAID FOR THIS PERIOD

44. VALUE - UNUSED MATERIALS PAID FOR THIS PERIOD

RETAINAGE (Based on Item 45 less cost of bond premiums)

46. RETAINAGE (Based on Item 45 less cost of bond premiums)

PAYMENT THIS PERIOD

48. PAYMENT THIS PERIOD

TOTAL PAYMENT TO DATE (Item 47 plus 48)

49. TOTAL PAYMENT TO DATE (Item 47 plus 48)

CO CHANGE ORD., PREV. REPORTED, NO.

55B. CO CHANGE ORD., PREV. REPORTED, NO.

ISSUED THIS PERIOD

57. ISSUED THIS PERIOD

ISSUED THIS PERIOD

58. ISSUED THIS PERIOD

ISSUED THIS PERIOD

59. ISSUED THIS PERIOD

ISSUED THIS PERIOD

60. ISSUED THIS PERIOD

TO

INCL.

CO SUPPL. AGREE. PREV. REPORTED, SYM

55A. CO SUPPL. AGREE. PREV. REPORTED, SYM

TO

TO

TO

TO

INCL.

INCL.

INCL.

INCL.

51. EQUIPMENT STATUS

51. EQUIPMENT STATUS

52. MATERIALS STATUS

52. MATERIALS STATUS

53A. WORK PROGRESS

53A. WORK PROGRESS

53B. PROGRESS FACTOR

53B. PROGRESS FACTOR

54. SUBMISSIONS OVERDUE

54. SUBMISSIONS OVERDUE

ITEM

NO.

61. REMARKS

61. REMARKS

62. SIGNATURE OF RESIDENT ENGINEER

62. SIGNATURE OF RESIDENT ENGINEER

63. DATE

63. DATE

ADDITIONS

ADDITIONS

DEDUCTIONS

DEDUCTIONS

(C) (D) (E)

DATE

APPROVED

DATE APPROVED

(B)

DAYS

EXTENSION

DAYS EXTENSION

SYMBOLS

(A) VALUE - CONTRACT NOT EARNED (Item 41 minus 45)

50. VALUE - CONTRACT NOT EARNED (Item 41 minus 45) VALUE - WORK IN PLACE TO DATE (Item 40, Cols. C plus D)

42. VALUE - WORK IN PLACE TO DATE (Item 40, Cols. C plus D)

VALUE - UNUSED MATERIALS PREVIOUSLY PAID FOR

43. VALUE - UNUSED MATERIALS PREVIOUSLY PAID FOR

EARNED TO DATE (Items 42 plus 43 plus 44)

45. EARNED TO DATE (Items 42 plus 43 plus 44)

TOTAL PREVIOUS PAYMENTS

47. TOTAL PREVIOUS PAYMENTS

FIELD SUPPL. AGREE. PREV. REPORTED, NO.

55C. FIELD SUPPL. AGREE. PREV. REPORTED, NO.

FIELD CHANGE ORD. PREV. REPORTED, SYM.

55D. FIELD CHANGE ORD. PREV. REPORTED, SYM.

TIME EXTENS. PREV. REPORTED, NO.

56. TIME EXTENS. PREV. REPORTED, NO.

VA FORM

JUN 2012

10-6001a The Paperwork Reduction Act of 1995 requires us to notify you that this information collection is in accordance with the clearance requirements of section 3507 of the Paperwork Reduction Act of 1995. We may not conduct or sponsor, and you are not required to respond to, a collection of information unless it displays a valid OMB number. We anticipate that the time expended by all individuals who must complete this form will average 12 minutes. This includes the time it will take to read instructions, gather the necessary facts and fill out the form. If your firm does not already have a similar form, this is used to record the data necessary to assure the contractor provides sufficient labor and materials to accomplish the contract work. This form or a similar document is required to guarantee the performance of the work necessary to complete the project.

D40. TOTAL: Jesse Brown VAMC
D40. TOTAL: 537-21-113
TextField2:

File details come from the government source that posted it. Updated .