S06 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 1 of 3.pdf

PDF 15 MB Posted

Attached to
Z2DA--537-21-113 Remodel Blood Draw
Solicitation number
36C25223B0021
Issued by

About this file

This file relates to a federal solicitation for construction services. The solicitation number 36C25223B0021 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 seeks proposals for the project "537-21-113 Remodel Blood Draw at Jesse Brown VAMC". Interested parties should submit proposals to remodel the blood draw area at the Jesse Brown VA Medical Center. The due date for proposals was March 17, 2023. The solicitation is for construction services to renovate the existing blood draw facility.

View the file

Other files

File Type Posted
S06 - 537-21-113 Blood Draw Remodel - Construction SOW_7.25.23.pdf PDF
36C25223B0021 0006.docx DOCX document
36C25223B0021 0005.docx DOCX document
36C25223B0021 0004.docx DOCX document
S06 - 264100 - Facility Lightning Protection.pdf PDF
36C25223B0021 0003.docx DOCX document
36C25223B0021 0002.docx DOCX document
S06 - RFI Attachment- Ogden Penthouse Roofing Replacement Drawings.pdf PDF
S06 - A502 Details_20230705_.pdf PDF
S06 - Bid Schedule_537-21-113_Amend 0002.pdf PDF
36C25223B0021 0001.docx DOCX document
S06 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 2 of 3.pdf PDF
S04 - 537-21-113 Pre-Bid Site Visit Sign-in 6.12.23.pdf PDF
S06 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 3 of 3.pdf PDF
S02 - Jesse Brown VAMC - Asbestos Reinspection Drawings 2019.pdf PDF
S02 - 537-21-113 Specifications Issued for Bid and Construction Vol2 3-17-2023.pdf PDF
S02 - 537-21-113 Specifications Issued for Bid and Construction Vol1 3-17-2023.pdf PDF
S02 - Campus Floor Plan- Taylor Bldg.pdf PDF
S02 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 1 of 3.pdf PDF
S02 - Campus Floor Plan- Atrium Bldg.pdf PDF
S02 - Subcontractor Payment Summary.xlsx XLSX spreadsheet
S02 - Campus Floor Plan- Damen Bldg.pdf PDF
S02 - Campus Floor Plan- Bed Tower Bldg.pdf PDF
S02 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 2 of 3.pdf PDF
36C25223B0021_1.docx DOCX document
S02 - VA Form 10-6001a Contract Progress Report.pdf PDF
S02 - VA Form 10101 Contractor Production Report.pdf PDF
S02 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 3 of 3.pdf PDF
S02 - 537-21-113 Construction Project Tracker.xlsx XLSX spreadsheet
S02 - Campus Floor Plan- Ogden Bldg.pdf PDF
S02 - Wage Determination_effective 5.12.23.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.: 537-21-113

LOCATION MAP

PROJECT TEAM

PROJECT LEADER/ARCHITECT

ELECTRICAL

FIRE PROTECTION

PENN CONSTRUCTION GROOP

JESSE BROWN VETERANS AFFAIRS MEDICAL CENTER

820 S. DAMEN AVENUE

CHICAGO, ILLINOIS 60612

CAMPUS MAP SHEET INDEX

IN THE CASE OF CONFLICTS OR DISCREPANCIES

WITHIN OR AMONG THE CONTRACT DRAWINGS, THE

BETTER QUALITY, MORE STRINGENT REQUIREMENTS

OR GREATER QUANTITY OF WORK, AS DETERMINED

BY THE GOVERNMENT, SHALL BE PROVIDED.

MECHANICAL

PENN CONSTRUCTION GROUP

PLUMBING

REMODEL BLOOD DRAW

SHEET NUMBER SHEET NAME

ISSUED FOR

25% PD

4/19/2021

ARCHITECTURAL

AD101

AS101 ARCHITECTURAL BASEMENT & FIRST FLOOR PLANS - NEW

WORK

ISSUED FOR

50% SD

7/25/2021

PENN CONSTRUCTION GROUP

PENN CONSTRUCTION GROUP

PENN CONSTRUCTION GROUP

GENERAL INFORMATION

GI001 TITLE SHEET X

ISSUED FOR

75% DD

10/25/2021

ISSUED FOR

95% CDs

1/24/2022

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Jesse Brown VA Medical Center

537-21-113

Office of

Facilities

Management

11B

March 17, 2023

CONSULTANTS:

820 S. DAMEN AVE.

CHICAGO, IL 60612

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Remodel Blood Draw

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

E

F

ISSUED FOR BID

GI001

KAB

TITLE SHEET

HFB

ST. FRANCIS LOCATION

3770 S. PENNSYLVANIA AVE., UNIT 8

ST. FRANCIS,WI 53235

PHONE: (414) 391-2797

PENN CONSTRUCTION GROUP

PENN CONSTRUCTION GROUP

ST. FRANCIS LOCATION

3770 S. PENNSYLVANIA AVE., UNIT 8

ST. FRANCIS,WI 53235

PHONE: (414) 391-2797

ST. FRANCIS LOCATION

3770 S. PENNSYLVANIA AVE., UNIT 8

ST. FRANCIS,WI 53235

PHONE: (414) 391-2797

ST. FRANCIS LOCATION

3770 S. PENNSYLVANIA AVE., UNIT 8

ST. FRANCIS,WI 53235

PHONE: (414) 391-2797

ST. FRANCIS LOCATION

3770 S. PENNSYLVANIA AVE., UNIT 8

ST. FRANCIS,WI 53235

PHONE: (414) 391-2797

PROJECT

LOCATION

JESSE BROWN

VA MEDICAL CENTER

ISSUED FOR

BID

3/17/2023

ARCHITECTURAL FIRST FLOOR REFLECTED CEILING PLANAC101

ARCHITECTURAL SECTIONSA301

NORTH

SITE PLAN

NORTH

ARCHITECTURAL FIRST FLOOR REFLECTED CEILING PLAN -

DEMOLITION

AD101 ARCHITECTURAL BASEMENT & FIRST FLOOR PLANS -

DEMOLITION

AD102

GC101 PHASING PLANS - PHASE 1 X

GC102

GC103

PHASING PLANS - PHASE 2

PHASING PLANS - PHASE 3

GC104 PHASING PLANS - PHASE 4

GC105 PHASING PLANS - PHASE 5

GC106

HAZARDOUS ABATEMENT

HA101

HA102

A001 ARCHITECTURAL LEGENDS, ABBREVIATIONS, AND NOTES

AD105

AD104

AD103 ARCHITECTURAL 2ND - 4TH FLOOR PLANS - DEMOLITION

ARCHITECTURAL 5TH - 7TH FLOOR PLANS - DEMOLITION

ARCHITECTURAL PENTHOUSE FLOOR PLAN - DEMOLITION

AS104

AS103

AS102 ARCHITECTURAL 2ND - 4TH FLOOR PLANS - NEW WORK

ARCHITECTURAL 5TH - 7TH FLOOR PLANS - NEW WORK

ARCHITECTURAL PENTHOUSE FLOOR PLAN - NEW WORK

ARCHITECTURAL DETAILSA501

ARCHITECTURAL DOOR AND ROOM FINISH SCHEDULESA601

FIRE PROTECTION INTERIM FIRE LIFE SAFETY PLANS - PHASES

1 AND 2

FIRE PROTECTION INTERIM FIRE LIFE SAFETY PLANS - PHASES

3 AND 4

HAZARDOUS ABATEMENT BASEMENT FLOOR PLAN

HAZARDOUS ABATEMENT FIRST FLOOR PLAN

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

MECHANICAL

M001 MECHANICAL LEGEND AND ABBREVIATIONS

ELECTRICAL

E001 ELECTRICAL LEGEND, ABBREVIATIONS, AND NOTES

ED101 ELECTRICAL FIRST FLOOR PLAN - DEMOLITION

E601

X

X

MD101 MECHANICAL BASEMENT PLAN - DEMOLITION

X

X

PLUMBING

PLUMBING LEGEND, ABBREVIATIONS, AND SCHEDULESP001 X

M701 MECHANICAL CONTROL DIAGRAMS

PLUMBING FLOOR PLANS - DEMOLITIONPD101

MD102

MECHANICAL PARTIAL PLANS (2ND - 4TH FLOORS) - DEMOLITIONMD103

MECHANICAL PARTIAL PLANS (5TH - 7TH FLOORS) - DEMOLITIONMD104

MECHANICAL PENTHOUSE DUCTWORK FLOOR PLAN - DEMOLITION

X

X

X

X

ELECTRICAL SCHEDULES & ONE-LINE DIAGRAM

X

X

PLUMBING

X

X

X

X

X

ES101 X

XX

X

X

EP101 ELECTRICAL FIRST FLOOR PLAN - POWER

ELECTRICAL FIRST AND PENTHOUSE FLOOR PLANS - SYSTEMS

EP102 ELECTRICAL PENTHOUSE FLOOR PLAN - POWER

E501 ELECTRICAL DETAILS & DIAGRAMS

E502

E503

E602 ELECTRICAL SCHEDULES

X

X

X

X

X

X

X

PP101 X

X

X

PLUMBING FLOOR PLANS - NEW WORK

X

MECHANICAL FIRST FLOOR PLAN - DEMOLITION

X

X

X

X

XMD105

MECHANICAL PENTHOUSE PIPING FLOOR PLAN - DEMOLITION XMD106

MH101

MH102 MECHANICAL PARTIAL PLANS (2ND - 4TH FLOOR) - NEW WORK

MH103 MECHANICAL PARTIAL PLANS (5TH - 7TH FLOORS) - NEW WORK

MH104

MECHANICAL FIRST FLOOR DUCTWORK PLAN - NEW WORK

MP101 MECHANICAL BASEMENT PIPING PLAN - NEW WORK

MP102

MECHANICAL DETAILS AND DIAGRAMSM501

MECHANICAL FIRST FLOOR PIPING PLAN - NEW WORK

M502 MECHANICAL DETAILS AND DIAGRAMS

ELECTRICAL DETAILS & DIAGRAMS

ELECTRICAL DETAILS & DIAGRAMS

X

X

X

X

X

X

X

X

X

X

CIVIL

CS101

C501

CIVIL SITE PLAN

CIVIL DETAILS

X

X

MECHANICAL PENTHOUSE DUCTWORK FLOOR PLAN - NEW WORK

M601 MECHANICAL SCHEDULES X X

M702 MECHANICAL CONTROL DIAGRAMS X

PP401 XPLUMBING ISOMETRIC DIAGRAMS

X

X

X

ARCHITECTURAL DETAILSA502 X

ARCHITECTURAL INTERIOR ELEVATIONSA701 X

ARCHITECTURAL EQUIPMENT PLANAE101

ARCHITECTURAL EQUIPMENTSCHEDULEAE102

X

X

ARCHITECTURAL FINISHES PLANAF101 X

X

X

X

X

X

X

X

X

X

X

X

EP100 ELECTRICAL BASEMENT PLAN - POWER X

X

X

X

X

X

X

X

XPP501 PLUMBING DETAILS AND DIAGRAMS

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

GC108 INFECTION CONTROL SECOND THRU PENTHOUSE FLOOR PLANS X

M301 MECHANICAL SECTIONS

M503 MECHANICAL DETAILS AND DIAGRAMS

M703 MECHANICAL FLOW DIAGRAMS

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

GC107 XXINFECTION CONTROL FIRST FLOOR PLANS

INFECTION CONTROL GENERAL NOTES AND DETAILS

ARCHITECTURAL SIGNAGE SCHEDULE AND DETAILSA602 X X

CONVEYING EQUIPMENT

XCONVEYING EQUIPMENT PNEUMATIC TUBE SYSTEM FIRST

FLOOR PLAN

PT101

ED102

ED103

ED104

ELECTRICAL 2ND - 4TH FLOOR PLANS - DEMOLITION

ELECTRICAL 5TH - 7TH FLOOR PLANS - DEMOLITION

ELECTRICAL PENTHOUSE FLOOR PLAN - DEMOLITION

EL101 ELECTRICAL FIRST FLOOR PLAN - LIGHTING

X X

X X X

E701 ELECTRICAL SYSTEMS RISERS X

X

X

X

MP103 MECHANICAL PENTHOUSE PIPING FLOOR PLAN - NEW WORK X X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

FL101

FIRE PROTECTION

FIRE PROTECTION - FIRE LIFE SAFETY PLANS

F001 FIRE PROTECTION LEGENDS, ABBREVIATIONS, AND NOTES

FL102

FL103

X

X

X

X

X

FD101 FIRE PROTECTION - FIRST AND PENTHOUSE FLOOR PLANS -

DEMOLITION

X

X X

FA101 FIRE PROTECTION - FIRST FLOOR PLAN - FIRE ALARM PLAN X

XFX101 FIRE PROTECTION - FIRST AND PENTHOUSE FLOOR PLANS - NEW

WORK

X

X

FA102 FIRE PROTECTION - PENTHOUSE FLOOR PLAN - FIRE ALARM PLAN X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

XX X

ACCOMPANYING 36C25223B0021 0001

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Jesse Brown VA Medical Center

537-21-113

Office of

Facilities

Management

11B

March 17, 2023

CONSULTANTS:

820 S. DAMEN AVE.

CHICAGO, IL 60612

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Remodel Blood Draw

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

E

F

ISSUED FOR BID

KEY PLAN

NORTH

PROJECT LOCATION

11B

1B11A

1A

GC101

KABHFB

PHASING PLANS

PHASE 1

1A

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 1A

NORTH

1B

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 1B

NORTH

ACCOMPANYING 36C25223B0021 0001

AutoCAD SHX Text

PHASE 1A NOTES

AutoCAD SHX Text TEMPORARILY CLOSE OFF THE WEST END OF CORRIDOR C1302 AND EXISTING BLOOD DRAW STATIONS #6-8 WITH CONSTRUCTION/DUST CONTROL BARRIERS. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 1 WORK AREA. DEMOLISH THE EXISTING HAC, WOMEN'S TOILET ROOM, AND BLOOD DRAW STATIONS #6-8. DEMOLISH PORTION OF CHASE WALL AND EXISTING MECHANICAL DUCTWORK IN CHASE. COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 1 WORK. EXISTING BLOOD DRAW WAITING ROOM, URINE COLLECTION RESTROOMS, BLOOD DRAW STATIONS #1-5, AND STAFF AREAS TO REMAIN IN PLACE WITH NO CHANGES TO CURRENT PATIENT FLOW.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 1A WORK AREA

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

WOMENS

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

HAC

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STATIONS #6-8

AutoCAD SHX Text 1363C

AutoCAD SHX Text

MULTI

AutoCAD SHX Text

PURPOSE RM

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text 1363A

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text 1363B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1361A

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

AED

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STATIONS #6-8

AutoCAD SHX Text 1363C

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FEC

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

MULTI

AutoCAD SHX Text

PURPOSE RM

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text 1363A

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text 1363B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1361A

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

AED

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

AutoCAD SHX Text

PHASE 1B NOTES

AutoCAD SHX Text REPLACE MECHANICAL DUCTWORK IN CHASE. CONSTRUCT NEW BLOOD DRAW STORAGE AREA, STAFF TOILET ROOM, AND STAFF OFFICES. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 1 WORK. REMOVE CONSTRUCTION/DUST CONTROL BARRIERS. BLOOD DRAW SUPERVISOR AND STAFF MOVE TO NEW OFFICE AND STAFF/LOCKERS.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 1B WORK AREA

AutoCAD SHX Text

GENERAL NOTE

AutoCAD SHX Text

1. COMPLETE ASBESTOS ABATEMENT IN PIPE COMPLETE ASBESTOS ABATEMENT IN PIPE BASEMENT PRIOR TO PIPE BASEMENT DEMOLITION AND CONSTRUCTION WORK. SEE SHEET HA101.

AutoCAD SHX Text PHASE 1A AFTER-HOURS WORK FOR DUCTWORK REPLACEMENT. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS.

AutoCAD SHX Text PHASE 1B AFTER-HOURS WORK FOR DUCTWORK REPLACEMENT. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Jesse Brown VA Medical Center

537-21-113

Office of

Facilities

Management

11B

March 17, 2023

CONSULTANTS:

820 S. DAMEN AVE.

CHICAGO, IL 60612

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Remodel Blood Draw

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

E

F

ISSUED FOR BID

KEY PLAN

NORTH

PROJECT LOCATION

11B

1B11A

1A

GC102

KABHFB

PHASING PLANS

PHASE 2

2A

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 2A

NORTH

2B

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 2B

NORTH

ACCOMPANYING 36C25223B0021 0001

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text 1363A

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text 1363B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1361A

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

MULTI

AutoCAD SHX Text

PURPOSE RM

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text 1363A

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOUNGE

AutoCAD SHX Text 1363B

AutoCAD SHX Text

FEC

AutoCAD SHX Text

AED

AutoCAD SHX Text

PHASE 2

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

PHASE 2/3

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text 1355A

AutoCAD SHX Text

AED

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1361A

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

AutoCAD SHX Text

STATION 6

AutoCAD SHX Text 1350H

AutoCAD SHX Text

STATION 4

AutoCAD SHX Text 1350F

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1350B

AutoCAD SHX Text

STATION 7

AutoCAD SHX Text 1350I

AutoCAD SHX Text

STATION 8

AutoCAD SHX Text 1350J

AutoCAD SHX Text

FEC

AutoCAD SHX Text

PHASE 2

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

PHASE 2/3

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text 1355A

AutoCAD SHX Text

PHASE 3

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text 1350E

AutoCAD SHX Text

AED

AutoCAD SHX Text

PHASE 2A NOTES

AutoCAD SHX Text PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER TO SEPARATE NEW OFFICES FROM PHASE 2 WORK WHILE ALLOWING ACCESS TO EXISTING EXIT DOOR FROM SPACE. PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER TO DIVIDE THE EXISTING WAITING ROOM. PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER BETWEEN THE ATRIUM SPACE AND WORK AREA. RELOCATE CHECK-IN KIOSK WITHIN SMALLER TEMPORARY WAITING ROOM. RELOCATE DEFIBRILLATOR (AED) WITHIN TEMPORARY WAITING ROOM. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 2 WORK AREA. DEMOLISH THE VACATED STAFF OFFICES, MULTIPURPOSE ROOM, AND WAITING ROOM.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 2A WORK AREA

AutoCAD SHX Text

PHASE 2B NOTES

AutoCAD SHX Text CONSTRUCT NEW BLOOD DRAW STATIONS 4 THROUGH 8 (5 TOTAL), ADJACENT PATIENT CIRCULATION, AND NEW EXIT DOOR TO CORRIDOR C1302. CONSTRUCT TEMPORARY WAITING ROOM FOR USE DURING UPCOMING PHASE 3 WORK IN AREA OF FUTURE BLOOD DRAW STATION 3. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 2 WORK. PROVIDE NEW ROUTING FOR PNEUMATIC TUBE SYSTEM. REMOVE CONSTRUCTION/DUST CONTROL BARRIER AT WEST END AND COMPLETE INSTALLATION OF FINISHES AND CABINETRY IN THIS AREA DURING OFF HOURS. EXISTING BLOOD DRAW STATIONS #1-5 TO RELOCATE TO NEW BLOOD DRAW STATIONS 3 THROUGH 8. MAKE FINAL CONNECTIONS FOR PNEUMATIC TUBE SYSTEM.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 2B WORK AREA

AutoCAD SHX Text COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 2 WORK. DEMOLISH PORTION OF THE EXISTING GLASS PARTITION WALL AT THE ATRIUM. EXISTING URINE COLLECTION RESTROOMS AND BLOOD DRAW STATIONS #1-5 TO REMAIN IN PLACE WITH NO CHANGES TO CURRENT PATIENT FLOW.

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Jesse Brown VA Medical Center

537-21-113

Office of

Facilities

Management

11B

March 17, 2023

CONSULTANTS:

820 S. DAMEN AVE.

CHICAGO, IL 60612

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Remodel Blood Draw

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

E

F

ISSUED FOR BID

KEY PLAN

NORTH

PROJECT LOCATION

11B

1B11A

1A

GC103

KABHFB

PHASING PLANS

PHASE 3

3A

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 3A

NORTH

3B

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 3B

NORTH

ACCOMPANYING 36C25223B0021 0001

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

URINE

AutoCAD SHX Text

SPECIMEN

AutoCAD SHX Text

COLLECTION

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

AutoCAD SHX Text

STATION 6

AutoCAD SHX Text 1350H

AutoCAD SHX Text

STATION 4

AutoCAD SHX Text 1350F

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1350B

AutoCAD SHX Text

STATION 7

AutoCAD SHX Text 1350I

AutoCAD SHX Text

STATION 8

AutoCAD SHX Text 1350J

AutoCAD SHX Text

FEC

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

BLOOD DRAW/

AutoCAD SHX Text

PHLEBOTOMY

AutoCAD SHX Text

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1361A

AutoCAD SHX Text

PHASE 3

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text 1350A

AutoCAD SHX Text

PHASE 2/3

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text 1355A

AutoCAD SHX Text

AED

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

AutoCAD SHX Text

STATION 6

AutoCAD SHX Text 1350H

AutoCAD SHX Text

STATION 4

AutoCAD SHX Text 1350F

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1350B

AutoCAD SHX Text

STATION 7

AutoCAD SHX Text 1350I

AutoCAD SHX Text

STATION 8

AutoCAD SHX Text 1350J

AutoCAD SHX Text

FEC

AutoCAD SHX Text

URINE SPECIMEN

AutoCAD SHX Text

COLLECTION

AutoCAD SHX Text 1350A

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text 1355A

AutoCAD SHX Text

URINE

AutoCAD SHX Text

SPECIMEN

AutoCAD SHX Text

COLLECTION

AutoCAD SHX Text

AutoCAD SHX Text

PHASE 3

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text 1350A

AutoCAD SHX Text

PHASE 2/3

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text 1355A

AutoCAD SHX Text

AED

AutoCAD SHX Text

PHASE 3A NOTES

AutoCAD SHX Text PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER TO SEPARATE TEMPORARY WAITING ROOM FROM PHASE 3 WORK. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 3 WORK AREA. DEMOLISH THE VACATED BLOOD DRAW STATIONS, URINE SPECIMEN COLLECTION RESTROOMS, PNEUMATIC TUBE STATION, ADJACENT CIRCULATION AREAS, AND ATRIUM DRINKING FOUNTAIN. COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 3 WORK. NEW STAFF TOILET TO BE USED TEMPORARILY BY PATIENTS FOR URINE SPECIMEN COLLECTION.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 3A WORK AREA

AutoCAD SHX Text

PHASE 3B NOTES

AutoCAD SHX Text CONSTRUCT NEW WAITING AREA AND RESTROOMS FOR URINE SPECIMEN COLLECTION. PROVIDE NEW ADA DRINKING FOUNTAIN AT ATRIUM. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 3 WORK. RELOCATE CHECK-IN KIOSK TO PERMANENT LOCATION IN NEW WAITING ROOM AT END OF PHASE 3.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 3B WORK AREA

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Jesse Brown VA Medical Center

537-21-113

Office of

Facilities

Management

11B

March 17, 2023

CONSULTANTS:

820 S. DAMEN AVE.

CHICAGO, IL 60612

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Remodel Blood Draw

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

E

F

ISSUED FOR BID

KEY PLAN

NORTH

PROJECT LOCATION

11B

1B11A

1A

GC104

KABHFB

PHASING PLANS

PHASE 4

4A

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 4A

NORTH

4B

1/4" = 1'-0"

FIRST FLOOR PLAN - PHASE 4B

NORTH

ACCOMPANYING 36C25223B0021 0001

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

AutoCAD SHX Text

STATION 6

AutoCAD SHX Text 1350H

AutoCAD SHX Text

STATION 4

AutoCAD SHX Text 1350F

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1350B

AutoCAD SHX Text

STATION 7

AutoCAD SHX Text 1350I

AutoCAD SHX Text

STATION 8

AutoCAD SHX Text 1350J

AutoCAD SHX Text

FEC

AutoCAD SHX Text

URINE SPECIMEN

AutoCAD SHX Text

COLLECTION

AutoCAD SHX Text 1350A

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text 1355A

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

PHASE 3

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text 1350A

AutoCAD SHX Text

STATION 5

AutoCAD SHX Text 1350G

AutoCAD SHX Text

AED

AutoCAD SHX Text

MALE

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-7B

AutoCAD SHX Text

FUTURE

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-6B

AutoCAD SHX Text

ENTRANCE/LOBBY

AutoCAD SHX Text C1103

AutoCAD SHX Text

STAIR

AutoCAD SHX Text

NO 7

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

TEL PHONE/

AutoCAD SHX Text

DATA RM

AutoCAD SHX Text 13T1

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-8B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text P-9B

AutoCAD SHX Text

ELEVATOR

AutoCAD SHX Text S-10B

AutoCAD SHX Text

OUTPATIENT

AutoCAD SHX Text

RADIOLOGY

AutoCAD SHX Text

WAITING AREA

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

PHONE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E4

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 13E5

AutoCAD SHX Text

FIRE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text X

AutoCAD SHX Text W

AutoCAD SHX Text U

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

PROJECT CONSTRUCTION LIMITS

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

STAFF

AutoCAD SHX Text

TOILET

AutoCAD SHX Text

AutoCAD SHX Text

FEC

AutoCAD SHX Text

STAFF/

AutoCAD SHX Text

LOCKERS

AutoCAD SHX Text

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

BLOOD DRAW

AutoCAD SHX Text

AutoCAD SHX Text

STATION 6

AutoCAD SHX Text 1350H

AutoCAD SHX Text

STATION 4

AutoCAD SHX Text 1350F

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1350B

AutoCAD SHX Text

STATION 7

AutoCAD SHX Text 1350I

AutoCAD SHX Text

STATION 8

AutoCAD SHX Text 1350J

AutoCAD SHX Text

FEC

AutoCAD SHX Text

URINE SPECIMEN

AutoCAD SHX Text

COLLECTION

AutoCAD SHX Text 1350A

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

REST RM

AutoCAD SHX Text

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text

AutoCAD SHX Text

CHECK-IN

AutoCAD SHX Text

KIOSK

AutoCAD SHX Text 1355A

AutoCAD SHX Text

STATION 3

AutoCAD SHX Text 1350E

AutoCAD SHX Text

STATION 1

AutoCAD SHX Text 1350C

AutoCAD SHX Text

STATION 2

AutoCAD SHX Text 1350D

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1302

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1303

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1304

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C1301

AutoCAD SHX Text

AED

AutoCAD SHX Text

PHASE 4A NOTES

AutoCAD SHX Text PROVIDE CONSTRUCTION/DUST CONTROL BARRIERS TO SEPARATE FINISHED AREA FROM PHASE 4 WORK AREAS. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 4 WORK AREA. DEMOLISH THE VACATED TEMPORARY WAITING RM. DEMOLISH REMAINING GLASS PARTITION WALL AT THE ATRIUM. DEMOLISH EXISTING MECHANICAL DUCTWORK, CEILING GRID AND TILES, AND LIGHT FIXTURES IN ELEVATOR LOBBY C1304 AND ADJACENT CORRIDORS C1301 AND C1303 DURING OFF HOURS. MAINTAIN PATIENT AND STAFF ACCESS TO ELEVATORS AND CORRIDORS DURING FACILITY BUSINESS HOURS. COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 4 WORK. REMOVE FINISHES FROM CORRIDOR C1302 DURING OFF HOURS. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 4A WORK AREA

AutoCAD SHX Text

PHASE 4B NOTES

AutoCAD SHX Text CONSTRUCT NEW BLOOD DRAW STATIONS 1 THROUGH 3. PROVIDE NEW MECHANICAL DUCTWORK AT ELEVATOR LOBBY C1304 AND AT ADJACENT CORRIDORS C1301 AND C1303. REPLACE EXISTING CEILING GRID, TILES AND LIGHT FIXTURES. MAINTAIN PATIENT AND STAFF ACCESS TO ELEVATOR LOBBY AND CORRIDORS DURING FACILITY BUSINESS HOURS. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 4 WORK. PROVIDE NEW FINISHES AT CORRIDOR C1302 DURING OFF HOURS. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS. REMOVE CONSTRUCTION/DUST CONTROL BARRIER.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 4B WORK AREA

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

CLINIC

WOMENS HEALTH

CLINIC

METAL DOOR

IRM OFFICE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Jesse Brown VA Medical Center

537-21-113

Office of

Facilities

Management

11B

March 17, 2023

CONSULTANTS:

820 S. DAMEN AVE.

CHICAGO, IL 60612

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Remodel Blood Draw

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

E

F

ISSUED FOR BID

KEY PLAN

NORTH

PROJECT LOCATION

11B

1B11A

1A

1/8" = 1'-0"

SECOND FLOOR PLAN

GC105

KABHFB

PHASING PLANS

PHASE 5

1/8" = 1'-0"

THIRD FLOOR PLAN

1/8" = 1'-0"

FOURTH FLOOR PLAN

1/8" = 1'-0"

FIFTH FLOOR PLAN

1/8" = 1'-0"

SIXTH FLOOR PLAN

1/8" = 1'-0"

SEVENTH FLOOR PLAN

1/8" = 1'-0"

EIGHTH FLOOR PLAN

ACCOMPANYING 36C25223B0021 0001

AutoCAD SHX Text

PHASE 5 NOTES

AutoCAD SHX Text NOTE: PHASE 5 WORK SHALL BE SCHEDULED TO OCCUR CONCURRENTLY WITH PHASE 1 DUCTWORK DEMOLITION AND INSTALLATION AT FIRST FLOOR. PREPARE THE EXISTING ROOF WEST OF EXISTING AHU S-3 FOR A TEMPORARY AHU. PROVIDE A TEMPORARY EQUIPMENT CURB ON THE ROOF TO SET THE TEMPORARY AHU. BEGIN ROUTING TEMPORARY CHILLED WATER HYDRONIC HEATING WATER, STEAM, CONDENSATE, DDC CONTROLS AND ELECTRICAL POWER TO THE TEMPORARY AHU. OPEN THE EXISTING EXTERIOR MECHANICAL ROOM WALL FOR SUPPLY AIR DUCTWORK AND RETURN AIR DUCTWORK. PROVIDE TEMPORARY COVERS AND INSULATION ACROSS TEMPORARY OPENING. CUT IN NEW TEMPORARY DUCTS TO EXISTING RISER DUCTS TO FEED EXISTING BUILDING WHILE EXISTING AHU IS REMOVED. COMMISSION TEMPORARY AHU, INCLUDING DDC SYSTEM INTEGRATION WITH EXISTING BAS. REMOVE EXISTING AHU, DUCTWORK, PIPING AND CONTROLS. INSTALL NEW AHU INCLUDING ALL EQUIPMENT, DUCTWORK, PIPING AND CONTROLS. START-UP AND COMMISSION NEW AHU PRIOR TO REMOVAL OF TEMPORARY AHU. ONCE THE NEW AHU IS FULLY COMMISSIONED, REMOVE THE TEMPORARY AHU, DUCTWORK, PIPING AND CONTROLS. PERMANENTLY BLANK OFF TEMPORARY DUCTWORK; PROVIDE BLIND FLANGES AND A DUST-OFF VALVE AT ALL THE TEMPORARY PIPING TAKE-OFFS. INSTALL NEW DOOR FRAME, DOORS AND HARDWARE AT NEW WALL OPENING. REMOVE ALL DEBRIS, UNUSED HANGERS, AND ABANDONED PIPE AND DUCTS FROM MECHANICAL ROOM AND ROOF. AFTER THE NEW AHU IS FULLY OPERATIONAL, BEGIN REMOVAL AND REPLACEMENT OF THE SUPPLY AND RETURN DUCT RISERS:

AutoCAD SHX Text OPEN THE FIRE-RATED CHASE IN PENTHOUSE TO EXPOSE RISERS. ONLY REMOVE ENOUGH OF THE WALL TO USE THE CHASE AS A RETURN DUCT. BOTH THE SUPPLY AND RETURN DUCT RISERS ARE REPLACED. BETWEEN 6 PM AND 5 AM SET UP TEMPORARY RETURN DUCT IN PENTHOUSE AND CONNECT TO THE NEW RETURN DUCTWORK TO NEW AHU S-3. REMOVE THE EXISTING RETURN DUCT RISER FROM THE PENTHOUSE TO THE GROUND FLOOR. BETWEEN 6 PM AND 5 AM CREATE OPENINGS AT ALL THE FLOORS FROM THE PENTHOUSE TO THE GROUND FLOOR TO EXPOSE THE DUCT RISERS. PROTECT ALL OPENINGS WITH INFECTION CONTROL MEASURES. PROVIDE TEMPORARY FLOOR AT EACH CHASE OPENING. REMOVE ENTIRE EXISTING RETURN DUCT RISER. DISCONNECT EACH FLOOR'S RETURN DUCT AT THE CHASE WALL. PROVIDE NEW RETURN DUCT CONNECTIONS AT EACH FLOOR. PROVIDE NEW RETURN DUCT RISER FROM GROUND FLOOR TO PENTHOUSE. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE TEMPORARY SUPPLY DUCT FROM S-3 SUPPLY DUCT TO THE CHASE. AT THE SAME TIME, OPEN OR REMOVE A SECTION OF THE EXISTING SUPPLY RISER TO ALLOW SUPPLY AIR INTO THE EXISTING SUPPLY RISER. REMOVE AND REPLACE THE SUPPLY RISER FROM THE GROUND FLOOR TO THE PENTHOUSE. DISCONNECT THE SUPPLY AT EACH FLOOR AND RE-CONNECT TO THE NEW SUPPLY RISER. ONCE BOTH THE SUPPLY RISER AND RETURN RISER HAVE BEEN COMPLETELY REPLACED AND ALL FLOOR CONNECTIONS ARE COMPLETED, ALL THE SUPPORTS ARE IN, ALL THE SEAMS ARE SEALED AND THE INSULATION IS COMPLETED, REPLACE EACH OPENING AT EACH FLOOR. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE PERMANENT DUCTWORK SUPPLY AND RETURN FROM THE CHASE TO AHU S-3. COMPLETELY FINISH THE CHASE WALL. ALL CHASE WALL REPLACEMENTS SHALL MEET THE REQUIREMENTS OF A 2-HOUR RATED WALL FROM GROUND FLOOR TO THE PENTHOUSE.

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 25.1

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text

HH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 25.1

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text

HH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 25.1

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text

HH

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text C5301

AutoCAD SHX Text

NURSE

AutoCAD SHX Text

INTAKE

AutoCAD SHX Text

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 25.1

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text

HH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 25.1

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text

HH

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 25.1

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text

HH

AutoCAD SHX Text

HE-15F

AutoCAD SHX Text

HE-15A

AutoCAD SHX Text E-15E

AutoCAD SHX Text E-24

AutoCAD SHX Text

AHU-19

AutoCAD SHX Text

AHU-6

AutoCAD SHX Text

ROOF

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 25.1

AutoCAD SHX Text

AutoCAD SHX Text

EE

AutoCAD SHX Text

FF

AutoCAD SHX Text

AA

AutoCAD SHX Text

HH

AutoCAD SHX Text

AutoCAD SHX Text

JJ

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DISCHARGE PLENUM

AutoCAD SHX Text

FINAL FILTER

AutoCAD SHX Text

FAN SECTION

AutoCAD SHX Text

PRE-FILTER 1 AND 2

AutoCAD SHX Text

HEATING COIL

AutoCAD SHX Text

COOLING COIL

AutoCAD SHX Text

MIXING SECTION

AutoCAD SHX Text B

AutoCAD SHX Text M301

AutoCAD SHX Text C

AutoCAD SHX Text M301

AutoCAD SHX Text

AIR BLENDER AND ACCESS SECTION

AutoCAD SHX Text D

AutoCAD SHX Text M301

AutoCAD SHX Text

ACCESS SECTION

AutoCAD SHX Text

ACCESS SECTION

AutoCAD SHX Text OPEN THE FIRE-RATED CHASE IN PENTHOUSE TO EXPOSE RISERS. ONLY REMOVE ENOUGH OF THE WALL TO USE THE CHASE AS A RETURN DUCT. BOTH THE SUPPLY AND RETURN DUCT RISERS ARE REPLACED. BETWEEN 6 PM AND 5 AM SET UP TEMPORARY RETURN DUCT IN PENTHOUSE AND CONNECT TO THE NEW RETURN DUCTWORK TO NEW AHU S-3. REMOVE THE EXISTING RETURN DUCT RISER FROM THE PENTHOUSE TO THE GROUND FLOOR. BETWEEN 6 PM AND 5 AM CREATE OPENINGS AT ALL THE FLOORS FROM THE PENTHOUSE TO THE GROUND FLOOR TO EXPOSE THE DUCT RISERS. PROTECT ALL OPENINGS WITH INFECTION CONTROL MEASURES. PROVIDE TEMPORARY FLOOR AT EACH CHASE OPENING. REMOVE ENTIRE EXISTING RETURN DUCT RISER. DISCONNECT EACH FLOOR'S RETURN DUCT AT THE CHASE WALL. PROVIDE NEW RETURN DUCT CONNECTIONS AT EACH FLOOR. PROVIDE NEW RETURN DUCT RISER FROM GROUND FLOOR TO PENTHOUSE. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE TEMPORARY SUPPLY DUCT FROM S-3 SUPPLY DUCT TO THE CHASE. AT THE SAME TIME, OPEN OR REMOVE A SECTION OF THE EXISTING SUPPLY RISER TO ALLOW SUPPLY AIR INTO THE EXISTING SUPPLY RISER. REMOVE AND REPLACE THE SUPPLY RISER FROM THE GROUND FLOOR TO THE PENTHOUSE. DISCONNECT THE SUPPLY AT EACH FLOOR AND RE-CONNECT TO THE NEW SUPPLY RISER. ONCE BOTH THE SUPPLY RISER AND RETURN RISER HAVE BEEN COMPLETELY REPLACED AND ALL FLOOR CONNECTIONS ARE COMPLETED, ALL THE SUPPORTS ARE IN, ALL THE SEAMS ARE SEALED AND THE INSULATION IS COMPLETED, REPLACE EACH OPENING AT EACH FLOOR. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE PERMANENT DUCTWORK SUPPLY AND RETURN FROM THE CHASE TO AHU S-3. COMPLETELY FINISH THE CHASE WALL. ALL CHASE WALL REPLACEMENTS SHALL MEET THE REQUIREMENTS OF A 2-HOUR RATED WALL FROM GROUND FLOOR TO THE PENTHOUSE.

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

PHASE 5 WORK AREA

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

GC106

KAB

INFECTION CONTROL

GENERAL NOTES AND

DETAILS

HFB

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked By:

Building Number

Project Number

Drawing Number

Drawn By:

Revisions: Date

PROJECT LEADER:

B

A

C

D

E

F

1 2 3 4 5 6 87 9

D

C

B

A

97 8654321

Jesse Brown VA Medical Center

537-21-113

Office of

Facilities

Management

11B

March 17, 2023

CONSULTANTS:

820 S. DAMEN AVE.

CHICAGO, IL 60612

MEDICAL CENTER

VETERANS AFFAIRS

FULLY SPRINKLERED

Remodel Blood Draw

3770 S. Pennsylvania Avenue, Unit 8

St. Francis, Wisconsin 53235

E

F

ISSUED FOR BID

INFECTION CONTROL GENERAL NOTES:

INFECTION CONTROL RISK ASSESSMENT:

1/2" = 1'-0"

1 HOUR CONSTRUCTION (UL #465) & INFECTION CONTROL BARRIER

ICB-1

1/2" = 1'-0"

ICB-2

6 MIL. POLY CRITICAL BARRIER

ACCOMPANYING 36C25223B0021 0001

AutoCAD SHX Text

6 MIL. POLY CRITICAL BARRIER CEILING PENETRATION

AutoCAD SHX Text

NOTE: ALL CORNERS TO BE 90 DEGREE ANGLE WITH NO RADIUS

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text SEAL ALL CRACKS WITH DUCT TAPE & 6 MIL. POLY CRITICAL BARRIER OVER DOORS & WINDOWS

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

6 MIL. POLY OVER EQUIPMENT OR FURNISHING

AutoCAD SHX Text

6 MIL. POLY WALL OPENING CRITICAL BARRIER

AutoCAD SHX Text

WALL PROTRUSION SEAL WITH DUCT TAPE ALL SIDES

AutoCAD SHX Text

CEILING

AutoCAD SHX Text

NOTE: ALL CORNERS TO BE 90 DEGREE ANGLE WITH NO RADIUS

AutoCAD SHX Text SEAL ALL CRACKS WITH DUCT TAPE & 6 MIL. POLY CRITICAL BARRIER OVER DOORS & WINDOWS

AutoCAD SHX Text

DOOR

AutoCAD SHX Text

WALL PROTRUSION SEAL WITH DUCT TAPE ALL SIDES

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

CEILING

AutoCAD SHX Text

STRUCTURE

AutoCAD SHX Text

ELECTRIC LOCK W/ CARD READER

AutoCAD SHX Text

HAND SANITIZER

AutoCAD SHX Text

PRESSURE MONITOR

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text

1. SEE SPECIFICATION SECTIONS 010000-IC AND 013526 FOR INFECTION SEE SPECIFICATION SECTIONS 010000-IC AND 013526 FOR INFECTION CONTROL DESIGN REQUIREMENTS. 2. CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE BEEN SCREENED FOR TUBERCULOSIS WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORKSITE AND HAVE BEEN FOUND TO HAVE NEGATIVE SCREENING REACTIONS. 3. THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS IN THE HOSPITAL WHO HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION AREA. 4. PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA COR 5. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK ISOLATION MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF. CONTRACTOR SHALL PROVIDE EXISTING POWER CONNECTIONS FOR TRIATEK ISOLATION MONITORS OR PROVIDE TEMPORARY POWER TO TRIATEK ISOLATION MONITORS DURING CONSTRUCTION. 6. PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT WORK SERVING THE AFFECTED AREA. TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL TIMES AS INDICATED IN NOTE BELOW. DAMPERS TO REMAIN IN DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY. 7. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA. 8. AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE SPECIFICATION SECTION 013526 "SAFETY REQUIREMENTS") AND THEREON, REQUEST A NEW "INFECTION CONTROL CONSTRUCTION PERMIT" FROM THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH PERMIT. 9. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO DECK/FLOOR ABOVE. SEE DETAIL 3/GC104 & SPECIFICATION SECTION 013526. EXCEPTION: IF BARRIER IS ADJACENT TO A SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR TO ABOVE CORRIDOR CEILING WITH 6 MIL POLY BEING SEALED ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS. 10. GENERAL CONTRACTOR SHALL PROVIDE NEW YELLOW CONSTRUCTION ACCESS GENERAL CONTRACTOR SHALL PROVIDE NEW YELLOW CONSTRUCTION ACCESS DOORS AND PROXIMITY CARD READERS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 A.M. AND AFTER 8:00 P.M. IN OCCUPIED AREAS. 12. EGRESS IS TO BE MAINTAINED TO THE STAIRWELLS AT ALL TIMES. 13. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER. 14. A PORTION OF THE CORRIDOR MAY BE MADE AVAILABLE TO CREATE AN INFECTION CONTROL AREA; HOWEVER, A MINIMUM OF 3'-6" MUST BE MAINTAINED OPEN FOR THE MOVEMENT OF PERSONNEL.

This is the start of the file's text. The full file is on GovTribe.