S06 - 537-21-113 Drawings Issued for Bid and Construction 3-17-2023 1 of 3.pdf
PDF 15 MB Posted
- Attached to
- Z2DA--537-21-113 Remodel Blood Draw
- Solicitation number
- 36C25223B0021
About this file
This file relates to a federal solicitation for construction services. The solicitation number 36C25223B0021 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 seeks proposals for the project "537-21-113 Remodel Blood Draw at Jesse Brown VAMC". Interested parties should submit proposals to remodel the blood draw area at the Jesse Brown VA Medical Center. The due date for proposals was March 17, 2023. The solicitation is for construction services to renovate the existing blood draw facility.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.: 537-21-113
LOCATION MAP
PROJECT TEAM
PROJECT LEADER/ARCHITECT
ELECTRICAL
FIRE PROTECTION
PENN CONSTRUCTION GROOP
JESSE BROWN VETERANS AFFAIRS MEDICAL CENTER
820 S. DAMEN AVENUE
CHICAGO, ILLINOIS 60612
CAMPUS MAP SHEET INDEX
IN THE CASE OF CONFLICTS OR DISCREPANCIES
WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS
OR GREATER QUANTITY OF WORK, AS DETERMINED
BY THE GOVERNMENT, SHALL BE PROVIDED.
MECHANICAL
PENN CONSTRUCTION GROUP
PLUMBING
REMODEL BLOOD DRAW
SHEET NUMBER SHEET NAME
ISSUED FOR
25% PD
4/19/2021
ARCHITECTURAL
AD101
AS101 ARCHITECTURAL BASEMENT & FIRST FLOOR PLANS - NEW
WORK
ISSUED FOR
50% SD
7/25/2021
PENN CONSTRUCTION GROUP
PENN CONSTRUCTION GROUP
PENN CONSTRUCTION GROUP
GENERAL INFORMATION
GI001 TITLE SHEET X
ISSUED FOR
75% DD
10/25/2021
ISSUED FOR
95% CDs
1/24/2022
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Jesse Brown VA Medical Center
537-21-113
Office of
Facilities
Management
11B
March 17, 2023
CONSULTANTS:
820 S. DAMEN AVE.
CHICAGO, IL 60612
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Remodel Blood Draw
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
E
F
ISSUED FOR BID
GI001
KAB
TITLE SHEET
HFB
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
PENN CONSTRUCTION GROUP
PENN CONSTRUCTION GROUP
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
ST. FRANCIS LOCATION
3770 S. PENNSYLVANIA AVE., UNIT 8
ST. FRANCIS,WI 53235
PHONE: (414) 391-2797
PROJECT
LOCATION
JESSE BROWN
VA MEDICAL CENTER
ISSUED FOR
BID
3/17/2023
ARCHITECTURAL FIRST FLOOR REFLECTED CEILING PLANAC101
ARCHITECTURAL SECTIONSA301
NORTH
SITE PLAN
NORTH
ARCHITECTURAL FIRST FLOOR REFLECTED CEILING PLAN -
DEMOLITION
AD101 ARCHITECTURAL BASEMENT & FIRST FLOOR PLANS -
DEMOLITION
AD102
GC101 PHASING PLANS - PHASE 1 X
GC102
GC103
PHASING PLANS - PHASE 2
PHASING PLANS - PHASE 3
GC104 PHASING PLANS - PHASE 4
GC105 PHASING PLANS - PHASE 5
GC106
HAZARDOUS ABATEMENT
HA101
HA102
A001 ARCHITECTURAL LEGENDS, ABBREVIATIONS, AND NOTES
AD105
AD104
AD103 ARCHITECTURAL 2ND - 4TH FLOOR PLANS - DEMOLITION
ARCHITECTURAL 5TH - 7TH FLOOR PLANS - DEMOLITION
ARCHITECTURAL PENTHOUSE FLOOR PLAN - DEMOLITION
AS104
AS103
AS102 ARCHITECTURAL 2ND - 4TH FLOOR PLANS - NEW WORK
ARCHITECTURAL 5TH - 7TH FLOOR PLANS - NEW WORK
ARCHITECTURAL PENTHOUSE FLOOR PLAN - NEW WORK
ARCHITECTURAL DETAILSA501
ARCHITECTURAL DOOR AND ROOM FINISH SCHEDULESA601
FIRE PROTECTION INTERIM FIRE LIFE SAFETY PLANS - PHASES
1 AND 2
FIRE PROTECTION INTERIM FIRE LIFE SAFETY PLANS - PHASES
3 AND 4
HAZARDOUS ABATEMENT BASEMENT FLOOR PLAN
HAZARDOUS ABATEMENT FIRST FLOOR PLAN
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
MECHANICAL
M001 MECHANICAL LEGEND AND ABBREVIATIONS
ELECTRICAL
E001 ELECTRICAL LEGEND, ABBREVIATIONS, AND NOTES
ED101 ELECTRICAL FIRST FLOOR PLAN - DEMOLITION
E601
X
X
MD101 MECHANICAL BASEMENT PLAN - DEMOLITION
X
X
PLUMBING
PLUMBING LEGEND, ABBREVIATIONS, AND SCHEDULESP001 X
M701 MECHANICAL CONTROL DIAGRAMS
PLUMBING FLOOR PLANS - DEMOLITIONPD101
MD102
MECHANICAL PARTIAL PLANS (2ND - 4TH FLOORS) - DEMOLITIONMD103
MECHANICAL PARTIAL PLANS (5TH - 7TH FLOORS) - DEMOLITIONMD104
MECHANICAL PENTHOUSE DUCTWORK FLOOR PLAN - DEMOLITION
X
X
X
X
ELECTRICAL SCHEDULES & ONE-LINE DIAGRAM
X
X
PLUMBING
X
X
X
X
X
ES101 X
XX
X
X
EP101 ELECTRICAL FIRST FLOOR PLAN - POWER
ELECTRICAL FIRST AND PENTHOUSE FLOOR PLANS - SYSTEMS
EP102 ELECTRICAL PENTHOUSE FLOOR PLAN - POWER
E501 ELECTRICAL DETAILS & DIAGRAMS
E502
E503
E602 ELECTRICAL SCHEDULES
X
X
X
X
X
X
X
PP101 X
X
X
PLUMBING FLOOR PLANS - NEW WORK
X
MECHANICAL FIRST FLOOR PLAN - DEMOLITION
X
X
X
X
XMD105
MECHANICAL PENTHOUSE PIPING FLOOR PLAN - DEMOLITION XMD106
MH101
MH102 MECHANICAL PARTIAL PLANS (2ND - 4TH FLOOR) - NEW WORK
MH103 MECHANICAL PARTIAL PLANS (5TH - 7TH FLOORS) - NEW WORK
MH104
MECHANICAL FIRST FLOOR DUCTWORK PLAN - NEW WORK
MP101 MECHANICAL BASEMENT PIPING PLAN - NEW WORK
MP102
MECHANICAL DETAILS AND DIAGRAMSM501
MECHANICAL FIRST FLOOR PIPING PLAN - NEW WORK
M502 MECHANICAL DETAILS AND DIAGRAMS
ELECTRICAL DETAILS & DIAGRAMS
ELECTRICAL DETAILS & DIAGRAMS
X
X
X
X
X
X
X
X
X
X
CIVIL
CS101
C501
CIVIL SITE PLAN
CIVIL DETAILS
X
X
MECHANICAL PENTHOUSE DUCTWORK FLOOR PLAN - NEW WORK
M601 MECHANICAL SCHEDULES X X
M702 MECHANICAL CONTROL DIAGRAMS X
PP401 XPLUMBING ISOMETRIC DIAGRAMS
X
X
X
ARCHITECTURAL DETAILSA502 X
ARCHITECTURAL INTERIOR ELEVATIONSA701 X
ARCHITECTURAL EQUIPMENT PLANAE101
ARCHITECTURAL EQUIPMENTSCHEDULEAE102
X
X
ARCHITECTURAL FINISHES PLANAF101 X
X
X
X
X
X
X
X
X
X
X
X
EP100 ELECTRICAL BASEMENT PLAN - POWER X
X
X
X
X
X
X
X
XPP501 PLUMBING DETAILS AND DIAGRAMS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
GC108 INFECTION CONTROL SECOND THRU PENTHOUSE FLOOR PLANS X
M301 MECHANICAL SECTIONS
M503 MECHANICAL DETAILS AND DIAGRAMS
M703 MECHANICAL FLOW DIAGRAMS
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
GC107 XXINFECTION CONTROL FIRST FLOOR PLANS
INFECTION CONTROL GENERAL NOTES AND DETAILS
ARCHITECTURAL SIGNAGE SCHEDULE AND DETAILSA602 X X
CONVEYING EQUIPMENT
XCONVEYING EQUIPMENT PNEUMATIC TUBE SYSTEM FIRST
FLOOR PLAN
PT101
ED102
ED103
ED104
ELECTRICAL 2ND - 4TH FLOOR PLANS - DEMOLITION
ELECTRICAL 5TH - 7TH FLOOR PLANS - DEMOLITION
ELECTRICAL PENTHOUSE FLOOR PLAN - DEMOLITION
EL101 ELECTRICAL FIRST FLOOR PLAN - LIGHTING
X X
X X X
E701 ELECTRICAL SYSTEMS RISERS X
X
X
X
MP103 MECHANICAL PENTHOUSE PIPING FLOOR PLAN - NEW WORK X X
XX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FL101
FIRE PROTECTION
FIRE PROTECTION - FIRE LIFE SAFETY PLANS
F001 FIRE PROTECTION LEGENDS, ABBREVIATIONS, AND NOTES
FL102
FL103
X
X
X
X
X
FD101 FIRE PROTECTION - FIRST AND PENTHOUSE FLOOR PLANS -
DEMOLITION
X
X X
FA101 FIRE PROTECTION - FIRST FLOOR PLAN - FIRE ALARM PLAN X
XFX101 FIRE PROTECTION - FIRST AND PENTHOUSE FLOOR PLANS - NEW
WORK
X
X
FA102 FIRE PROTECTION - PENTHOUSE FLOOR PLAN - FIRE ALARM PLAN X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
XX X
ACCOMPANYING 36C25223B0021 0001
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Jesse Brown VA Medical Center
537-21-113
Office of
Facilities
Management
11B
March 17, 2023
CONSULTANTS:
820 S. DAMEN AVE.
CHICAGO, IL 60612
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Remodel Blood Draw
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
E
F
ISSUED FOR BID
KEY PLAN
NORTH
PROJECT LOCATION
11B
1B11A
1A
GC101
KABHFB
PHASING PLANS
PHASE 1
1A
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 1A
NORTH
1B
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 1B
NORTH
ACCOMPANYING 36C25223B0021 0001
AutoCAD SHX Text
PHASE 1A NOTES
AutoCAD SHX Text TEMPORARILY CLOSE OFF THE WEST END OF CORRIDOR C1302 AND EXISTING BLOOD DRAW STATIONS #6-8 WITH CONSTRUCTION/DUST CONTROL BARRIERS. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 1 WORK AREA. DEMOLISH THE EXISTING HAC, WOMEN'S TOILET ROOM, AND BLOOD DRAW STATIONS #6-8. DEMOLISH PORTION OF CHASE WALL AND EXISTING MECHANICAL DUCTWORK IN CHASE. COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 1 WORK. EXISTING BLOOD DRAW WAITING ROOM, URINE COLLECTION RESTROOMS, BLOOD DRAW STATIONS #1-5, AND STAFF AREAS TO REMAIN IN PLACE WITH NO CHANGES TO CURRENT PATIENT FLOW.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 1A WORK AREA
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
WOMENS
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
HAC
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STATIONS #6-8
AutoCAD SHX Text 1363C
AutoCAD SHX Text
MULTI
AutoCAD SHX Text
PURPOSE RM
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text 1363A
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text 1363B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1361A
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
AED
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STATIONS #6-8
AutoCAD SHX Text 1363C
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
MULTI
AutoCAD SHX Text
PURPOSE RM
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text 1363A
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text 1363B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1361A
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
AED
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
PHASE 1B NOTES
AutoCAD SHX Text REPLACE MECHANICAL DUCTWORK IN CHASE. CONSTRUCT NEW BLOOD DRAW STORAGE AREA, STAFF TOILET ROOM, AND STAFF OFFICES. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 1 WORK. REMOVE CONSTRUCTION/DUST CONTROL BARRIERS. BLOOD DRAW SUPERVISOR AND STAFF MOVE TO NEW OFFICE AND STAFF/LOCKERS.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 1B WORK AREA
AutoCAD SHX Text
GENERAL NOTE
AutoCAD SHX Text
1. COMPLETE ASBESTOS ABATEMENT IN PIPE COMPLETE ASBESTOS ABATEMENT IN PIPE BASEMENT PRIOR TO PIPE BASEMENT DEMOLITION AND CONSTRUCTION WORK. SEE SHEET HA101.
AutoCAD SHX Text PHASE 1A AFTER-HOURS WORK FOR DUCTWORK REPLACEMENT. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS.
AutoCAD SHX Text PHASE 1B AFTER-HOURS WORK FOR DUCTWORK REPLACEMENT. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Jesse Brown VA Medical Center
537-21-113
Office of
Facilities
Management
11B
March 17, 2023
CONSULTANTS:
820 S. DAMEN AVE.
CHICAGO, IL 60612
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Remodel Blood Draw
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
E
F
ISSUED FOR BID
KEY PLAN
NORTH
PROJECT LOCATION
11B
1B11A
1A
GC102
KABHFB
PHASING PLANS
PHASE 2
2A
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 2A
NORTH
2B
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 2B
NORTH
ACCOMPANYING 36C25223B0021 0001
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text 1363A
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text 1363B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1361A
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
MULTI
AutoCAD SHX Text
PURPOSE RM
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text 1363A
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text 1363B
AutoCAD SHX Text
FEC
AutoCAD SHX Text
AED
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
PHASE 2/3
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text 1355A
AutoCAD SHX Text
AED
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1361A
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
STATION 6
AutoCAD SHX Text 1350H
AutoCAD SHX Text
STATION 4
AutoCAD SHX Text 1350F
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1350B
AutoCAD SHX Text
STATION 7
AutoCAD SHX Text 1350I
AutoCAD SHX Text
STATION 8
AutoCAD SHX Text 1350J
AutoCAD SHX Text
FEC
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
PHASE 2/3
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text 1355A
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text 1350E
AutoCAD SHX Text
AED
AutoCAD SHX Text
PHASE 2A NOTES
AutoCAD SHX Text PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER TO SEPARATE NEW OFFICES FROM PHASE 2 WORK WHILE ALLOWING ACCESS TO EXISTING EXIT DOOR FROM SPACE. PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER TO DIVIDE THE EXISTING WAITING ROOM. PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER BETWEEN THE ATRIUM SPACE AND WORK AREA. RELOCATE CHECK-IN KIOSK WITHIN SMALLER TEMPORARY WAITING ROOM. RELOCATE DEFIBRILLATOR (AED) WITHIN TEMPORARY WAITING ROOM. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 2 WORK AREA. DEMOLISH THE VACATED STAFF OFFICES, MULTIPURPOSE ROOM, AND WAITING ROOM.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 2A WORK AREA
AutoCAD SHX Text
PHASE 2B NOTES
AutoCAD SHX Text CONSTRUCT NEW BLOOD DRAW STATIONS 4 THROUGH 8 (5 TOTAL), ADJACENT PATIENT CIRCULATION, AND NEW EXIT DOOR TO CORRIDOR C1302. CONSTRUCT TEMPORARY WAITING ROOM FOR USE DURING UPCOMING PHASE 3 WORK IN AREA OF FUTURE BLOOD DRAW STATION 3. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 2 WORK. PROVIDE NEW ROUTING FOR PNEUMATIC TUBE SYSTEM. REMOVE CONSTRUCTION/DUST CONTROL BARRIER AT WEST END AND COMPLETE INSTALLATION OF FINISHES AND CABINETRY IN THIS AREA DURING OFF HOURS. EXISTING BLOOD DRAW STATIONS #1-5 TO RELOCATE TO NEW BLOOD DRAW STATIONS 3 THROUGH 8. MAKE FINAL CONNECTIONS FOR PNEUMATIC TUBE SYSTEM.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 2B WORK AREA
AutoCAD SHX Text COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 2 WORK. DEMOLISH PORTION OF THE EXISTING GLASS PARTITION WALL AT THE ATRIUM. EXISTING URINE COLLECTION RESTROOMS AND BLOOD DRAW STATIONS #1-5 TO REMAIN IN PLACE WITH NO CHANGES TO CURRENT PATIENT FLOW.
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Jesse Brown VA Medical Center
537-21-113
Office of
Facilities
Management
11B
March 17, 2023
CONSULTANTS:
820 S. DAMEN AVE.
CHICAGO, IL 60612
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Remodel Blood Draw
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
E
F
ISSUED FOR BID
KEY PLAN
NORTH
PROJECT LOCATION
11B
1B11A
1A
GC103
KABHFB
PHASING PLANS
PHASE 3
3A
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 3A
NORTH
3B
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 3B
NORTH
ACCOMPANYING 36C25223B0021 0001
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
URINE
AutoCAD SHX Text
SPECIMEN
AutoCAD SHX Text
COLLECTION
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
STATION 6
AutoCAD SHX Text 1350H
AutoCAD SHX Text
STATION 4
AutoCAD SHX Text 1350F
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1350B
AutoCAD SHX Text
STATION 7
AutoCAD SHX Text 1350I
AutoCAD SHX Text
STATION 8
AutoCAD SHX Text 1350J
AutoCAD SHX Text
FEC
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD DRAW/
AutoCAD SHX Text
PHLEBOTOMY
AutoCAD SHX Text
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1361A
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text 1350A
AutoCAD SHX Text
PHASE 2/3
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text 1355A
AutoCAD SHX Text
AED
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
STATION 6
AutoCAD SHX Text 1350H
AutoCAD SHX Text
STATION 4
AutoCAD SHX Text 1350F
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1350B
AutoCAD SHX Text
STATION 7
AutoCAD SHX Text 1350I
AutoCAD SHX Text
STATION 8
AutoCAD SHX Text 1350J
AutoCAD SHX Text
FEC
AutoCAD SHX Text
URINE SPECIMEN
AutoCAD SHX Text
COLLECTION
AutoCAD SHX Text 1350A
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text 1355A
AutoCAD SHX Text
URINE
AutoCAD SHX Text
SPECIMEN
AutoCAD SHX Text
COLLECTION
AutoCAD SHX Text
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text 1350A
AutoCAD SHX Text
PHASE 2/3
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text 1355A
AutoCAD SHX Text
AED
AutoCAD SHX Text
PHASE 3A NOTES
AutoCAD SHX Text PROVIDE A CONSTRUCTION/DUST CONTROL BARRIER TO SEPARATE TEMPORARY WAITING ROOM FROM PHASE 3 WORK. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 3 WORK AREA. DEMOLISH THE VACATED BLOOD DRAW STATIONS, URINE SPECIMEN COLLECTION RESTROOMS, PNEUMATIC TUBE STATION, ADJACENT CIRCULATION AREAS, AND ATRIUM DRINKING FOUNTAIN. COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 3 WORK. NEW STAFF TOILET TO BE USED TEMPORARILY BY PATIENTS FOR URINE SPECIMEN COLLECTION.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 3A WORK AREA
AutoCAD SHX Text
PHASE 3B NOTES
AutoCAD SHX Text CONSTRUCT NEW WAITING AREA AND RESTROOMS FOR URINE SPECIMEN COLLECTION. PROVIDE NEW ADA DRINKING FOUNTAIN AT ATRIUM. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 3 WORK. RELOCATE CHECK-IN KIOSK TO PERMANENT LOCATION IN NEW WAITING ROOM AT END OF PHASE 3.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 3B WORK AREA
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Jesse Brown VA Medical Center
537-21-113
Office of
Facilities
Management
11B
March 17, 2023
CONSULTANTS:
820 S. DAMEN AVE.
CHICAGO, IL 60612
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Remodel Blood Draw
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
E
F
ISSUED FOR BID
KEY PLAN
NORTH
PROJECT LOCATION
11B
1B11A
1A
GC104
KABHFB
PHASING PLANS
PHASE 4
4A
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 4A
NORTH
4B
1/4" = 1'-0"
FIRST FLOOR PLAN - PHASE 4B
NORTH
ACCOMPANYING 36C25223B0021 0001
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
STATION 6
AutoCAD SHX Text 1350H
AutoCAD SHX Text
STATION 4
AutoCAD SHX Text 1350F
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1350B
AutoCAD SHX Text
STATION 7
AutoCAD SHX Text 1350I
AutoCAD SHX Text
STATION 8
AutoCAD SHX Text 1350J
AutoCAD SHX Text
FEC
AutoCAD SHX Text
URINE SPECIMEN
AutoCAD SHX Text
COLLECTION
AutoCAD SHX Text 1350A
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text 1355A
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text 1350A
AutoCAD SHX Text
STATION 5
AutoCAD SHX Text 1350G
AutoCAD SHX Text
AED
AutoCAD SHX Text
MALE
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-7B
AutoCAD SHX Text
FUTURE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-6B
AutoCAD SHX Text
ENTRANCE/LOBBY
AutoCAD SHX Text C1103
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
NO 7
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
TEL PHONE/
AutoCAD SHX Text
DATA RM
AutoCAD SHX Text 13T1
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-8B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text P-9B
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text S-10B
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
RADIOLOGY
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
PHONE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E4
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 13E5
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text X
AutoCAD SHX Text W
AutoCAD SHX Text U
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
PROJECT CONSTRUCTION LIMITS
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
FEC
AutoCAD SHX Text
STAFF/
AutoCAD SHX Text
LOCKERS
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
BLOOD DRAW
AutoCAD SHX Text
AutoCAD SHX Text
STATION 6
AutoCAD SHX Text 1350H
AutoCAD SHX Text
STATION 4
AutoCAD SHX Text 1350F
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1350B
AutoCAD SHX Text
STATION 7
AutoCAD SHX Text 1350I
AutoCAD SHX Text
STATION 8
AutoCAD SHX Text 1350J
AutoCAD SHX Text
FEC
AutoCAD SHX Text
URINE SPECIMEN
AutoCAD SHX Text
COLLECTION
AutoCAD SHX Text 1350A
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
REST RM
AutoCAD SHX Text
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text
AutoCAD SHX Text
CHECK-IN
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text 1355A
AutoCAD SHX Text
STATION 3
AutoCAD SHX Text 1350E
AutoCAD SHX Text
STATION 1
AutoCAD SHX Text 1350C
AutoCAD SHX Text
STATION 2
AutoCAD SHX Text 1350D
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1302
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1303
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1304
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1301
AutoCAD SHX Text
AED
AutoCAD SHX Text
PHASE 4A NOTES
AutoCAD SHX Text PROVIDE CONSTRUCTION/DUST CONTROL BARRIERS TO SEPARATE FINISHED AREA FROM PHASE 4 WORK AREAS. COMPLETE ASBESTOS ABATEMENT WHERE ACM IS FOUND IN EXISTING CHASES WITHIN PHASE 4 WORK AREA. DEMOLISH THE VACATED TEMPORARY WAITING RM. DEMOLISH REMAINING GLASS PARTITION WALL AT THE ATRIUM. DEMOLISH EXISTING MECHANICAL DUCTWORK, CEILING GRID AND TILES, AND LIGHT FIXTURES IN ELEVATOR LOBBY C1304 AND ADJACENT CORRIDORS C1301 AND C1303 DURING OFF HOURS. MAINTAIN PATIENT AND STAFF ACCESS TO ELEVATORS AND CORRIDORS DURING FACILITY BUSINESS HOURS. COMPLETE MEP DEMOLITION IN BASEMENT RELATED TO PHASE 4 WORK. REMOVE FINISHES FROM CORRIDOR C1302 DURING OFF HOURS. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 4A WORK AREA
AutoCAD SHX Text
PHASE 4B NOTES
AutoCAD SHX Text CONSTRUCT NEW BLOOD DRAW STATIONS 1 THROUGH 3. PROVIDE NEW MECHANICAL DUCTWORK AT ELEVATOR LOBBY C1304 AND AT ADJACENT CORRIDORS C1301 AND C1303. REPLACE EXISTING CEILING GRID, TILES AND LIGHT FIXTURES. MAINTAIN PATIENT AND STAFF ACCESS TO ELEVATOR LOBBY AND CORRIDORS DURING FACILITY BUSINESS HOURS. COMPLETE NEW MEP WORK IN BASEMENT RELATED TO PHASE 4 WORK. PROVIDE NEW FINISHES AT CORRIDOR C1302 DURING OFF HOURS. MAINTAIN PATIENT AND STAFF ACCESS TO CORRIDOR DURING FACILITY BUSINESS HOURS. REMOVE CONSTRUCTION/DUST CONTROL BARRIER.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 4B WORK AREA
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
CLINIC
WOMENS HEALTH
CLINIC
METAL DOOR
IRM OFFICE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Jesse Brown VA Medical Center
537-21-113
Office of
Facilities
Management
11B
March 17, 2023
CONSULTANTS:
820 S. DAMEN AVE.
CHICAGO, IL 60612
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Remodel Blood Draw
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
E
F
ISSUED FOR BID
KEY PLAN
NORTH
PROJECT LOCATION
11B
1B11A
1A
1/8" = 1'-0"
SECOND FLOOR PLAN
GC105
KABHFB
PHASING PLANS
PHASE 5
1/8" = 1'-0"
THIRD FLOOR PLAN
1/8" = 1'-0"
FOURTH FLOOR PLAN
1/8" = 1'-0"
FIFTH FLOOR PLAN
1/8" = 1'-0"
SIXTH FLOOR PLAN
1/8" = 1'-0"
SEVENTH FLOOR PLAN
1/8" = 1'-0"
EIGHTH FLOOR PLAN
ACCOMPANYING 36C25223B0021 0001
AutoCAD SHX Text
PHASE 5 NOTES
AutoCAD SHX Text NOTE: PHASE 5 WORK SHALL BE SCHEDULED TO OCCUR CONCURRENTLY WITH PHASE 1 DUCTWORK DEMOLITION AND INSTALLATION AT FIRST FLOOR. PREPARE THE EXISTING ROOF WEST OF EXISTING AHU S-3 FOR A TEMPORARY AHU. PROVIDE A TEMPORARY EQUIPMENT CURB ON THE ROOF TO SET THE TEMPORARY AHU. BEGIN ROUTING TEMPORARY CHILLED WATER HYDRONIC HEATING WATER, STEAM, CONDENSATE, DDC CONTROLS AND ELECTRICAL POWER TO THE TEMPORARY AHU. OPEN THE EXISTING EXTERIOR MECHANICAL ROOM WALL FOR SUPPLY AIR DUCTWORK AND RETURN AIR DUCTWORK. PROVIDE TEMPORARY COVERS AND INSULATION ACROSS TEMPORARY OPENING. CUT IN NEW TEMPORARY DUCTS TO EXISTING RISER DUCTS TO FEED EXISTING BUILDING WHILE EXISTING AHU IS REMOVED. COMMISSION TEMPORARY AHU, INCLUDING DDC SYSTEM INTEGRATION WITH EXISTING BAS. REMOVE EXISTING AHU, DUCTWORK, PIPING AND CONTROLS. INSTALL NEW AHU INCLUDING ALL EQUIPMENT, DUCTWORK, PIPING AND CONTROLS. START-UP AND COMMISSION NEW AHU PRIOR TO REMOVAL OF TEMPORARY AHU. ONCE THE NEW AHU IS FULLY COMMISSIONED, REMOVE THE TEMPORARY AHU, DUCTWORK, PIPING AND CONTROLS. PERMANENTLY BLANK OFF TEMPORARY DUCTWORK; PROVIDE BLIND FLANGES AND A DUST-OFF VALVE AT ALL THE TEMPORARY PIPING TAKE-OFFS. INSTALL NEW DOOR FRAME, DOORS AND HARDWARE AT NEW WALL OPENING. REMOVE ALL DEBRIS, UNUSED HANGERS, AND ABANDONED PIPE AND DUCTS FROM MECHANICAL ROOM AND ROOF. AFTER THE NEW AHU IS FULLY OPERATIONAL, BEGIN REMOVAL AND REPLACEMENT OF THE SUPPLY AND RETURN DUCT RISERS:
AutoCAD SHX Text OPEN THE FIRE-RATED CHASE IN PENTHOUSE TO EXPOSE RISERS. ONLY REMOVE ENOUGH OF THE WALL TO USE THE CHASE AS A RETURN DUCT. BOTH THE SUPPLY AND RETURN DUCT RISERS ARE REPLACED. BETWEEN 6 PM AND 5 AM SET UP TEMPORARY RETURN DUCT IN PENTHOUSE AND CONNECT TO THE NEW RETURN DUCTWORK TO NEW AHU S-3. REMOVE THE EXISTING RETURN DUCT RISER FROM THE PENTHOUSE TO THE GROUND FLOOR. BETWEEN 6 PM AND 5 AM CREATE OPENINGS AT ALL THE FLOORS FROM THE PENTHOUSE TO THE GROUND FLOOR TO EXPOSE THE DUCT RISERS. PROTECT ALL OPENINGS WITH INFECTION CONTROL MEASURES. PROVIDE TEMPORARY FLOOR AT EACH CHASE OPENING. REMOVE ENTIRE EXISTING RETURN DUCT RISER. DISCONNECT EACH FLOOR'S RETURN DUCT AT THE CHASE WALL. PROVIDE NEW RETURN DUCT CONNECTIONS AT EACH FLOOR. PROVIDE NEW RETURN DUCT RISER FROM GROUND FLOOR TO PENTHOUSE. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE TEMPORARY SUPPLY DUCT FROM S-3 SUPPLY DUCT TO THE CHASE. AT THE SAME TIME, OPEN OR REMOVE A SECTION OF THE EXISTING SUPPLY RISER TO ALLOW SUPPLY AIR INTO THE EXISTING SUPPLY RISER. REMOVE AND REPLACE THE SUPPLY RISER FROM THE GROUND FLOOR TO THE PENTHOUSE. DISCONNECT THE SUPPLY AT EACH FLOOR AND RE-CONNECT TO THE NEW SUPPLY RISER. ONCE BOTH THE SUPPLY RISER AND RETURN RISER HAVE BEEN COMPLETELY REPLACED AND ALL FLOOR CONNECTIONS ARE COMPLETED, ALL THE SUPPORTS ARE IN, ALL THE SEAMS ARE SEALED AND THE INSULATION IS COMPLETED, REPLACE EACH OPENING AT EACH FLOOR. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE PERMANENT DUCTWORK SUPPLY AND RETURN FROM THE CHASE TO AHU S-3. COMPLETELY FINISH THE CHASE WALL. ALL CHASE WALL REPLACEMENTS SHALL MEET THE REQUIREMENTS OF A 2-HOUR RATED WALL FROM GROUND FLOOR TO THE PENTHOUSE.
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 25.1
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text
HH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 25.1
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text
HH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 25.1
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text
HH
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C5301
AutoCAD SHX Text
NURSE
AutoCAD SHX Text
INTAKE
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 25.1
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text
HH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 25.1
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text
HH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 25.1
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text
HH
AutoCAD SHX Text
HE-15F
AutoCAD SHX Text
HE-15A
AutoCAD SHX Text E-15E
AutoCAD SHX Text E-24
AutoCAD SHX Text
AHU-19
AutoCAD SHX Text
AHU-6
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 25.1
AutoCAD SHX Text
AutoCAD SHX Text
EE
AutoCAD SHX Text
FF
AutoCAD SHX Text
AA
AutoCAD SHX Text
HH
AutoCAD SHX Text
AutoCAD SHX Text
JJ
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DISCHARGE PLENUM
AutoCAD SHX Text
FINAL FILTER
AutoCAD SHX Text
FAN SECTION
AutoCAD SHX Text
PRE-FILTER 1 AND 2
AutoCAD SHX Text
HEATING COIL
AutoCAD SHX Text
COOLING COIL
AutoCAD SHX Text
MIXING SECTION
AutoCAD SHX Text B
AutoCAD SHX Text M301
AutoCAD SHX Text C
AutoCAD SHX Text M301
AutoCAD SHX Text
AIR BLENDER AND ACCESS SECTION
AutoCAD SHX Text D
AutoCAD SHX Text M301
AutoCAD SHX Text
ACCESS SECTION
AutoCAD SHX Text
ACCESS SECTION
AutoCAD SHX Text OPEN THE FIRE-RATED CHASE IN PENTHOUSE TO EXPOSE RISERS. ONLY REMOVE ENOUGH OF THE WALL TO USE THE CHASE AS A RETURN DUCT. BOTH THE SUPPLY AND RETURN DUCT RISERS ARE REPLACED. BETWEEN 6 PM AND 5 AM SET UP TEMPORARY RETURN DUCT IN PENTHOUSE AND CONNECT TO THE NEW RETURN DUCTWORK TO NEW AHU S-3. REMOVE THE EXISTING RETURN DUCT RISER FROM THE PENTHOUSE TO THE GROUND FLOOR. BETWEEN 6 PM AND 5 AM CREATE OPENINGS AT ALL THE FLOORS FROM THE PENTHOUSE TO THE GROUND FLOOR TO EXPOSE THE DUCT RISERS. PROTECT ALL OPENINGS WITH INFECTION CONTROL MEASURES. PROVIDE TEMPORARY FLOOR AT EACH CHASE OPENING. REMOVE ENTIRE EXISTING RETURN DUCT RISER. DISCONNECT EACH FLOOR'S RETURN DUCT AT THE CHASE WALL. PROVIDE NEW RETURN DUCT CONNECTIONS AT EACH FLOOR. PROVIDE NEW RETURN DUCT RISER FROM GROUND FLOOR TO PENTHOUSE. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE TEMPORARY SUPPLY DUCT FROM S-3 SUPPLY DUCT TO THE CHASE. AT THE SAME TIME, OPEN OR REMOVE A SECTION OF THE EXISTING SUPPLY RISER TO ALLOW SUPPLY AIR INTO THE EXISTING SUPPLY RISER. REMOVE AND REPLACE THE SUPPLY RISER FROM THE GROUND FLOOR TO THE PENTHOUSE. DISCONNECT THE SUPPLY AT EACH FLOOR AND RE-CONNECT TO THE NEW SUPPLY RISER. ONCE BOTH THE SUPPLY RISER AND RETURN RISER HAVE BEEN COMPLETELY REPLACED AND ALL FLOOR CONNECTIONS ARE COMPLETED, ALL THE SUPPORTS ARE IN, ALL THE SEAMS ARE SEALED AND THE INSULATION IS COMPLETED, REPLACE EACH OPENING AT EACH FLOOR. BETWEEN 6 PM AND 5 AM IN PENTHOUSE PROVIDE PERMANENT DUCTWORK SUPPLY AND RETURN FROM THE CHASE TO AHU S-3. COMPLETELY FINISH THE CHASE WALL. ALL CHASE WALL REPLACEMENTS SHALL MEET THE REQUIREMENTS OF A 2-HOUR RATED WALL FROM GROUND FLOOR TO THE PENTHOUSE.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
PHASE 5 WORK AREA
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
GC106
KAB
INFECTION CONTROL
GENERAL NOTES AND
DETAILS
HFB
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked By:
Building Number
Project Number
Drawing Number
Drawn By:
Revisions: Date
PROJECT LEADER:
B
A
C
D
E
F
1 2 3 4 5 6 87 9
D
C
B
A
97 8654321
Jesse Brown VA Medical Center
537-21-113
Office of
Facilities
Management
11B
March 17, 2023
CONSULTANTS:
820 S. DAMEN AVE.
CHICAGO, IL 60612
MEDICAL CENTER
VETERANS AFFAIRS
FULLY SPRINKLERED
Remodel Blood Draw
3770 S. Pennsylvania Avenue, Unit 8
St. Francis, Wisconsin 53235
E
F
ISSUED FOR BID
INFECTION CONTROL GENERAL NOTES:
INFECTION CONTROL RISK ASSESSMENT:
1/2" = 1'-0"
1 HOUR CONSTRUCTION (UL #465) & INFECTION CONTROL BARRIER
ICB-1
1/2" = 1'-0"
ICB-2
6 MIL. POLY CRITICAL BARRIER
ACCOMPANYING 36C25223B0021 0001
AutoCAD SHX Text
6 MIL. POLY CRITICAL BARRIER CEILING PENETRATION
AutoCAD SHX Text
NOTE: ALL CORNERS TO BE 90 DEGREE ANGLE WITH NO RADIUS
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text SEAL ALL CRACKS WITH DUCT TAPE & 6 MIL. POLY CRITICAL BARRIER OVER DOORS & WINDOWS
AutoCAD SHX Text
DOOR
AutoCAD SHX Text
6 MIL. POLY OVER EQUIPMENT OR FURNISHING
AutoCAD SHX Text
6 MIL. POLY WALL OPENING CRITICAL BARRIER
AutoCAD SHX Text
WALL PROTRUSION SEAL WITH DUCT TAPE ALL SIDES
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
NOTE: ALL CORNERS TO BE 90 DEGREE ANGLE WITH NO RADIUS
AutoCAD SHX Text SEAL ALL CRACKS WITH DUCT TAPE & 6 MIL. POLY CRITICAL BARRIER OVER DOORS & WINDOWS
AutoCAD SHX Text
DOOR
AutoCAD SHX Text
WALL PROTRUSION SEAL WITH DUCT TAPE ALL SIDES
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
STRUCTURE
AutoCAD SHX Text
ELECTRIC LOCK W/ CARD READER
AutoCAD SHX Text
HAND SANITIZER
AutoCAD SHX Text
PRESSURE MONITOR
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text
1. SEE SPECIFICATION SECTIONS 010000-IC AND 013526 FOR INFECTION SEE SPECIFICATION SECTIONS 010000-IC AND 013526 FOR INFECTION CONTROL DESIGN REQUIREMENTS. 2. CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT CONTRACTOR SHALL PROVIDE WRITTEN CERTIFICATION THAT ALL CONTRACT WORKERS ON SITE HAVE BEEN SCREENED FOR TUBERCULOSIS WITHIN 90 DAYS PRIOR TO ASSIGNMENT TO THE WORKSITE AND HAVE BEEN FOUND TO HAVE NEGATIVE SCREENING REACTIONS. 3. THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS THE INTENT OF INFECTION CONTROL (IC) ISOLATION IS TO PROTECT PATIENTS IN THE HOSPITAL WHO HAVE LOW IMMUNE LEVELS. THEREFORE, CONSTRUCTION OPERATIONS NEED TO BE DIRECTED TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION AREA. 4. PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV PROVIDE TRIATEK ISOLATION MONITORS DURING CLASS III OR CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA COR 5. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA USE TRIATEK ISOLATION MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND 10000 SF. CONTRACTOR SHALL PROVIDE EXISTING POWER CONNECTIONS FOR TRIATEK ISOLATION MONITORS OR PROVIDE TEMPORARY POWER TO TRIATEK ISOLATION MONITORS DURING CONSTRUCTION. 6. PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT PROVIDE BALANCING DAMPER IN THE BRANCH SUPPLY & EXHAUST DUCT WORK SERVING THE AFFECTED AREA. TEMPORARILY BALANCE AIR FLOW TO PROVIDE NEGATIVE AIR FLOW IN CONSTRUCTION ZONE AT ALL TIMES AS INDICATED IN NOTE BELOW. DAMPERS TO REMAIN IN DUCT AFTER CONSTRUCTION IS COMPLETE AND IS TO BE SECURED IN FINAL BALANCING POSITION PRIOR TO TURNING SYSTEM OVER FOR OCCUPANCY. 7. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA. 8. AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE AS CONSTRUCTION PROGRESSES FROM TYPE D TO TYPE C (SEE SPECIFICATION SECTION 013526 "SAFETY REQUIREMENTS") AND THEREON, REQUEST A NEW "INFECTION CONTROL CONSTRUCTION PERMIT" FROM THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST 10 DAYS NOTICE FOR EACH PERMIT. 9. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER FROM FLOOR TO DECK/FLOOR ABOVE. SEE DETAIL 3/GC104 & SPECIFICATION SECTION 013526. EXCEPTION: IF BARRIER IS ADJACENT TO A SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR TO ABOVE CORRIDOR CEILING WITH 6 MIL POLY BEING SEALED ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS. 10. GENERAL CONTRACTOR SHALL PROVIDE NEW YELLOW CONSTRUCTION ACCESS GENERAL CONTRACTOR SHALL PROVIDE NEW YELLOW CONSTRUCTION ACCESS DOORS AND PROXIMITY CARD READERS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 A.M. AND AFTER 8:00 P.M. IN OCCUPIED AREAS. 12. EGRESS IS TO BE MAINTAINED TO THE STAIRWELLS AT ALL TIMES. 13. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER. 14. A PORTION OF THE CORRIDOR MAY BE MADE AVAILABLE TO CREATE AN INFECTION CONTROL AREA; HOWEVER, A MINIMUM OF 3'-6" MUST BE MAINTAINED OPEN FOR THE MOVEMENT OF PERSONNEL.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .