S02 - Survey Report W Roxbury Bldg 01.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--Replace Damaged Doors and Upgrade Card System WR Federal contract opportunity
- Solicitation number
- 36C24123R0181
About this file
This solicitation is for a construction project to replace damaged doors and upgrade the card access system at the VA Medical Center in West Roxbury, Massachusetts. Work includes demolition, installation of new doors, implementation of a new card access and patient access control system, as well as associated mechanical, electrical and low-voltage work. The project will be performed in accordance with provided specifications, drawings, and applicable federal, state and local codes. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Responses to this solicitation are due on the date specified in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 523A4-12-207 Site Walk 1-10-24.pdf | ||
| 36C24123R0181 0004.docx | DOCX document | |
| Appendix A- VAMC Door List RFI 5.pdf | ||
| Replace Damaged Doors RFI Answers 1-8.docx | DOCX document | |
| S02 - MA WD 01-19-24.txt | TXT text file | |
| 36C24123R0181 0003.docx | DOCX document | |
| 36C24123R0181 0002.docx | DOCX document | |
| S02 - 523A4-12-207 Drawings.pdf | ||
| 36C24123R0181 0001.docx | DOCX document | |
| S02 - Lead Report Map.pdf | ||
| S02 - Damaged Door ICRA.pdf | ||
| P03 - SSJ.pdf | ||
| S02 Past Performance Questionnaire.docx | DOCX document | |
| S02 - Itemized Price Breakdown.xlsx | XLSX spreadsheet | |
| S02 - W Roxbury - Volume 1 - FINAL.pdf | ||
| S02 - VAMC Doors PACS work narrative.pdf | ||
| S02 - Revised Specifications.pdf | ||
| S02 - SOW.docx | DOCX document | |
| 36C24123R0181 RFP.docx | DOCX document | |
| S02 - MA WD 12-8-2023.txt | TXT text file | |
| S02 - Damaged Doors PCRA.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME II
ASBESTOS CONTAINING MATERIAL &
LEAD CONTAINING PAINT
SURVEY REPORT
BUILDING 1
VISN 1
West Roxbury VA Medical Center
1400 VFW Parkway West Roxbury, Massachusetts
Project No. 2009023.002
May 28, 2010
5 Alfred Circle Bedford, MA 01730-2318
Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651 info@mabbett.com www.mabbett.com
© 2010, Mabbett & Associates, Inc.
W Roxbury VAMC - Building 1 May 2010 ©2010, Mabbett & Associates, Inc. Page i Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
ACKNOWLEDGMENT
This Asbestos Containing Materials (ACM) and Lead Containing Paint (LCP) Building Survey Report was prepared for the Veterans Affairs (VA) New England Healthcare System (VISN 1) in accordance with an established scope of work as defined in Contract Number VA241-P-1653. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc. (M&A) during the preparation of this report. If any of the information provided to M&A that was used in preparing this report is incorrect, incomplete, or subject to change, M&A would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to M&A as of the date of this report and considered applicable to this report.
This individual building report from Volume II which contains building specific lead and asbestos findings is part of the Comprehensive VAMC Lead and Asbestos Survey Report consisting of:
Volume I - General
Chapter 1 - Introduction and Executive Summary Chapter 2 - Asbestos Operations & Maintenance (O&M) Manual Chapter 3 - Asbestos Containing Materials (ACM) Survey Tables Chapter 4 - Lead Containing Paint Survey Tables
Volume II – Individual Building Reports
Individual Building Reports Chapters including:
• Cover page with building number
• Building narrative summary
• Floor plans
• Relevant asbestos findings for the building
• Relevant lead containing paint findings for the building
• Relevant photos
Volume III – Appendices and Supporting Data
Appendix A - Asbestos Laboratory Analysis Reports and Laboratory Certifications Appendix B - Inspector Field Data Sheets/Chains-of-Custody Appendix C - Personnel Certifications & Licenses Appendix D - XRF Performance Characteristics/Calibration Records Appendix E - Lead Laboratory Analysis Reports and Laboratory Certifications (If Applicable)
Volume IV – HUD Residential LBP Reports (If Applicable)
©2010, Mabbett & Associates, Inc. Page ii Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
This report was prepared by the following Mabbett & Associates, Inc. personnel:
Michael F. Delaney Project Manager Massachusetts Asbestos Inspector AI031436 Massachusetts Management Planner AP000048
This report has been reviewed and approved by:
MABBETT & ASSOCIATES, INC.
Robert K. McKinley, MPH, CIH, LIH Director of Industrial Hygiene Services Massachusetts Asbestos Inspector AI000314
©2010, Mabbett & Associates, Inc. Page iii Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
TABLE OF CONTENTS
Description Page
1.0 INTRODUCTION & EXECUTIVE SUMMARY
2.0 BUILDING DESCRIPTION
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
3.2 Analytical Methodology
3.3 Summary of Asbestos Containing Materials (ACM) Findings
4.0 LEAD SCREENING SURVEY
4.1 Screening Survey Methodology
4.2 Summary of Lead Screening Survey Findings
5.0 LIMITATIONS
6.0 CLOSING REMARKS
6.1 Asbestos
6.2 Lead Containing Paint
Tables Table 1 – Inaccessible Areas Table 2 – Summary of Positive ACM Samples Table 3 – Summary of Positive XRF Measurements Table 4 – Summary of ACM Quantities for Liability Report Table 5 – Summary of ACM Building Results, including negative results ............................... Appendix A Table 6 – Summary of XRF Measurements............................................................................. Appendix B
Figures Figure 1 – Asbestos Survey Summary Plan - Building 1, Crawl Space Figure 2 – Asbestos Survey Summary Plan - Building 1, Ground Floor Figure 3 – Asbestos Survey Summary Plan - Building 1, Floor 1 Figure 4 – Asbestos Survey Summary Plan - Building 1, Floor 2 Figure 5 – Asbestos Survey Summary Plan - Building 1, Floor 3 Figure 6 – Asbestos Survey Summary Plan - Building 1, Floor 4 Figure 7 – Asbestos Survey Summary Plan - Building 1, Floor 5 Figure 8 – Asbestos Survey Summary Plan - Building 1, Floor 6 Figure 9 – Lead Screening Survey Summary Plan - Building 1, Crawl Space Figure 10 – Lead Screening Survey Summary Plan - Building 1, Ground Floor Figure 11 – Lead Screening Survey Summary Plan - Building 1, Floor 1 Figure 12 – Lead Screening Survey Summary Plan - Building 1, Floor 2 Figure 13 – Lead Screening Survey Summary Plan - Building 1, Floor 3 Figure 14 – Lead Screening Survey Summary Plan - Building 1, Floor 4 Figure 15 – Lead Screening Survey Summary Plan - Building 1, Floor 5 Figure 16 – Lead Screening Survey Summary Plan - Building 1, Floor 6
Appendices Appendix A – Table 5, ACM Building Results Appendix B – Table 6, Summary of XRF Measurements Appendix C – Relevant Photographs of ACM Appendix D – Relevant Photographs of Damaged Lead Containing Paint
©2010, Mabbett & Associates, Inc. Page 1 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
1.0 INTRODUCTION & EXECUTIVE SUMMARY
Mabbett and Associates, Inc. (M&A), with Covino Environmental Associates, Inc. (Covino) and EnviroMed Services, Inc. (EnviroMed) as sub-contractors, performed surveys for suspect asbestos containing building materials (ACM) and screenings of suspect lead containing paint (LCP) surfaces utilizing an X-Ray Fluorescence (XRF) analyzer. Surveys were performed of selected buildings at the VA Medical Center (VAMC) located at 1400 VFW Parkway, West Roxbury, MA, under Contract VA241-P-1653. A complete list of buildings surveyed is in Volume I of this report. Site survey work was performed during January and February, 2010, by appropriately credentialed personnel as required. Collected suspect ACM samples were submitted to a certified analytical laboratory for asbestos analysis by polarized light microscopy (PLM) using positive stop methodology and transmission electron microscopy (TEM) where indicated. When necessary, paint chip samples were collected and submitted to a certified analytical laboratory for lead content analysis using atomic absorption spectroscopy. The survey effort involved the collection of the following samples, resulting in the following conclusions:
• 339 bulk samples for suspect ACM were collected in this building.
• Based on laboratory analysis of suspect ACM, 85 of the collected samples contained asbestos greater than or equal to 1% asbestos.
• 438 XRF analyzer measurements of building surfaces were taken in this building.
• 162 of the XRF measurements revealed concentrations of lead that exceeded 0.1 mg/cm2.
This building report consists of a summary of findings, floor plans indicating positive sample locations, detailed analytical findings for the specific surveyed building materials, and photos of identified ACM. In addition, photos of lead containing paint greater than 1.0 mg/cm2 and in an other than intact condition, when observed, were provided. Laboratory certificates of analysis and field data sheets for this building report are available in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC Office of Facilities Management and observations made by the M&A team at the time of the survey, Building 1 was a seven-story Hospital built in 1943 and occupied approximately 195,458 square feet.
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
A visual screening inspection was conducted by state licensed asbestos inspectors throughout the building to identify locations of suspect ACM. Only areas that were accessible during the field work phase were inspected. Every effort was made during the initial field survey work to access areas as necessary to complete the survey. However, if any areas remained inaccessible to the survey team, they are indicated in Table 1 below.
©2010, Mabbett & Associates, Inc. Page 2 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 1 – Specific Inaccessible Areas
West Roxbury VA Medical Center, Building 1
Building Floor Room No.
Reason Area Was Inaccessible and Survey Impacts, If Applicable
No inaccessible areas were identified during the field activities.
Other general areas that were inaccessible or where the survey was limited to visual observation only are identified below:
• Within walls • Within fire doors
• Enclosed pipe/duct chases • Inside mechanical equipment/ductwork
• Above fixed drywall or plaster ceilings
ACM surveys should be performed prior to any proposed renovations or maintenance involving inaccessible areas.
Bulk samples were collected of suspect ACM in accordance with US Environmental Protection Agency (EPA) Asbestos Hazard and Emergency Response Act (AHERA) and VISN 1 approved M&A VISN 1 Survey Program Standard Operating Procedure (SOP). Roofing materials were not sampled unless otherwise indicated in order to maintain applicable warranties. Bulk suspect ACM sampling was conducted according to the following sampling plan:
(a) Surfacing material:
(1) At least three bulk samples shall be collected from each homogeneous area that is 1,000 ft2 or less.
(2) At least five bulk samples shall be collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.
(3) At least seven bulk samples shall be collected from each homogeneous area that is greater than 5,000 ft2.
(b) Thermal system insulation:
(1) At least three bulk samples shall be collected from each homogeneous area of thermal system insulation.
(2) At least one bulk sample shall be collected from each homogeneous area of patched area of thermal system insulation.
(3) Sufficient samples shall be collected from elbows and fittings to determine if it contains
ACM.
(4) Bulk samples shall not be collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.
©2010, Mabbett & Associates, Inc. Page 3 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
(c) Miscellaneous material:
(1) At least one bulk sample shall be collected from each homogeneous area that is less than 100 ft2.
(2) At least three bulk samples shall be collected from each homogeneous area that is greater than 100 ft2.
3.2 Analytical Methodology
The collected bulk samples were submitted under chain of custody procedures to ProScience Analytical Services, Inc. (ProScience) of Woburn, MA for polarized light microscopy (PLM) analysis of bulk materials via EPA 600/R-93/116 Method. If applicable, sample results that revealed trace concentrations of asbestos by PLM were re-analyzed using transmission electron microscopy (TEM) analysis. ProScience is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200090-0). Duplicate bulk samples were submitted to Covino. Covino is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 101781-0). A summary table containing the duplicate bulk sample results is provided in Volume I, Table 5. Copies of the laboratory accreditations are included in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.
Bulk sample results are summarized in Table 5 – ACM Building Survey Results. The EPA, Occupational Safety and Health Administration (OSHA), and the Commonwealth of Massachusetts Division of Occupational Safety (DOS) defines any material that contains greater than one percent (>1%) asbestos as being an ACM. The Commonwealth of Massachusetts Department of Environmental Protection (DEP) defines any material that contains equal to or greater than one percent (≥1%) asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive for asbestos that met the regulatory criteria of equal to or greater than one percent (≥1%) asbestos.
3.3 Summary of Asbestos Containing Materials (ACM) Findings
3.3.1 Data Tables, Laboratory Results, and Field Notes
Collected bulk samples confirmed by the analytical laboratory to contain ≥1% asbestos are listed in Table 2 - Summary of Positive ACM Samples. Samples analyzed by PLM containing trace levels of asbestos, defined as < 1%, are listed in Table 5 with the TEM analysis results. Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report includes copies of the laboratory certificates of analysis (including duplicate samples) and Inspector Data Sheets.
©2010, Mabbett & Associates, Inc. Page 4 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 2 - Summary of Positive ACM Sample Results
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of
Asbestos Condition Estimated
Quantity
VISN 1
RISK
AHERA
Hazard
Category 1-4*
03C A-CO-2
12”x12” White-
White Vinyl Floor Tile
2% Chrysotile Good 4
04A 04B 04C
A-CO-2
Ground Floor Connecting
Corridor Link to Bldg 2
12”x12” White- White Vinyl Floor
Tile - Mastic
3% Chrysotile Good
200 SF
06A 06B
06C
CG-9
12”x12” Old White Brown
Vinyl Floor Tile - Mastic
5% Chrysotile Good 4
08A 08B 08C
CG-9
Ground Floor Staff Elevator lobby 12”x12” Old Off- White Vinyl Floor
Tile - Mastic
5 % Chrysotile Good
180 SF
13C ST-8-1
12”x12” Beige With Purple
Specs Vinyl Floor Tile
2% Chrysotile Good 4
14A ST 1-G
14B C1-G
14C ST-8-1
Stairways, 1st Floor South Wing, 2nd
Floor Elevator Lobbies and Connecting
Corridor
12”x12” Beige With Purple
Specs Vinyl Floor Tile Mastic
10% Chrysotile Good
3,620 SF
34A C1-13 34B C1-13 34C 1D-138
1st Floor North Wing
Teal Vinyl Sheet Flooring - Yellow
Mastic
5% Chrysotile Good 1,800 SF 4
43A 1C-121 43B 43C
1C-120
1st Floor Electrical
Closet
Green Terrazzo Linoleum
50% Chrysotile Good 50 SF 4
44A 1C-121
44B 44C
1C-120
1st-4th Floor Electrical Closets
9”x9” Gray Vinyl Floor Tile
5% Chrysotile Good 200 SF 4
47C C1-7B
1st Floor Staff Elevator
Lobby and South Wing
Corridor
9”x9” Light Brown Vinyl Floor Tile With White And
Dark Brown Streaks - Yellow
Mastic
2% Chrysotile Good 500 SF 4
53A 53B
53C 1C-100
Inset Radiators
Throughout Transite Panel 20%
Chrysotile Good 25 EA 4
©2010, Mabbett & Associates, Inc. Page 5 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 2 - Summary of Positive ACM Sample Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of
Asbestos Condition Estimated
Quantity
VISN 1
RISK
AHERA
Hazard
Category 1-4*
55 1B-100 Main lobby TSI Debris Inside Radiator
10% Chrysotile
50% Amosite Damaged 1 SF 1
59A C2-6 59B C4-5
59C 5B-110
Staff Elevator Lobbies, in
Chase Above Drop Ceiling and S. Side
Attic
Small Diameter Pipe Insulation
10% Chrysotile
40% Amosite Damaged 100 LF 1
66A C3-5 66B C3-10 66C C3-5
12”x12” Brown Vinyl Floor Tile
2% Chrysotile Good 4
67B C3-10
67C C3-5
12”x12” Brown Vinyl Floor Tile -
Black Mastic
5% Chrysotile Good 4
74A 3D-112
74B C3-7
74C C3-5
12”x12” Gray Vinyl Floor Tile
2% Chrysotile Good 4
75A 3D-112 75B C3-7 75C C3-5
3rd Floor North Wing Corridor and
Patient Rooms and
Elevator Lobbies and Connecting
Corridor 12”x12” Gray
Vinyl Floor Tile - Black Mastic
20% Chrysotile Good
6,300 SF
79A 3D-107 79B 3D-107
79C 3D-107
Soiled Linen Room
12”x12” Brown/beige Mottled Vinyl
Floor Tile - Black Mastic
2% Chrysotile Good 80 SF 4
80A 3D-112 80B 3D-119 80C 3D-112
Patient Room 12”x12” Green Vinyl Floor Tile Trace2 Good 4
81A 3D-112 81B 3D-119 81C 3D-112
12”x12” Green Vinyl Floor Tile -
Mastic
2% Chrysotile Good 4
86A C3-10
86B C3-9
86C C3-5
12”x12” Brown Vinyl Floor Tile -
Type II
2% Chrysotile Good 4
87A C3-10 87B C3-9
87C C3-5
3rd Floor North Wing 4th Floor North and
Central Wing 5th Floor
Central Wing and North and South Corridors
12”x12” Brown Vinyl Floor Tile - Black Mastic –
Type II
5% Chrysotile Good
12,200 SF
©2010, Mabbett & Associates, Inc. Page 6 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 2 - Summary of Positive ACM Sample Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of
Asbestos Condition Estimated
Quantity
VISN 1
RISK
AHERA
Hazard
Category 1-4*
88A 3D-142 88B 3D-108
88C 3D-114 Patient Room
12"x12" Red/Orange
Floor Tile Trace2 Good 4
89A 3D-142 89B 3D-108
89C 3D-114 Patient Room
12”x12” Red/Orange
Floor Tile - Mastic
10% Chrysotile Good 4
94A 5D-105
94B 5D-105
94C 5D-105
Storage Room
Brown Mosaic Sheet Flooring
40% Chrysotile Good 60 SF 4
97 5C-103 Ante room Sink Undercoat 2% Chrysotile Good 1 Sink 4
99A 99B 99C
PH6C-105 Attic Old Metal Window Caulking
2% Chrysotile Damaged 3
Windows 4
100A NAD
100B 2.54% Chrysotile1
100C
PH6C-105 Attic Old Metal Window Glazing
NAD
Damaged 3 Windows 4
101A Exterior East
101B Exterior South
101C Exterior South
Exterior Black Window Caulking
5% Chrysotile Good 584
Windows 4
102A Exterior East 1.23% Anthophyllite1
102B Exterior Southeast
1.58% Anthophyllite1
102C
Exterior Exterior Inside
Corners of Building
Gray Building Caulking
5% Chrysotile
Good 300 LF 4
105A Exterior East
105B Exterior South
105C
Exterior North, Center Front
Exterior Doors
Door Jamb - Brown Caulking
2% Chrysotile Good 14 Doors 4
©2010, Mabbett & Associates, Inc. Page 7 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 2 - Summary of Positive ACM Sample Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of
Asbestos Condition Estimated
Quantity
VISN 1
RISK
AHERA
Hazard
Category 1-4*
Entrance
109A 109B 109C
Exterior southwest See Drawing White Window
Glaze 2%
Chrysotile Good 1 Window 4
Footnotes:
1 – Analyzed by TEM 2 – Trace floor tile with positive mastic
SF – Square Feet LF – Linear feet
* The VISN 1 AHERA hazard assessment scale 1 – 4 is a relative indicator of the risk and need for response/remediation. (1) represents the highest priority (e.g. removal or encapsulation) where as a (4) represents the lowest priority (monitor as part of 6 month O&M program). The rating assigned by an Asbestos Management Planner, takes into account: condition, friable vs. non-friable, accessibility, occupancy (e.g. continuous, intermittent or occasional and patients/staff/visitors), potential for air erosion, potential for vibration damage, potential for disturbance/damage (e.g. exposed and in an accessible location), and potential for water damage.
3.3.2 Photographs
Representative photographs of identified ACM are provided in Appendix D of this report.
3.3.3 CADD Drawings
The location of each ACM sample and its abridged sample ID is shown on the CADD drawings in the Figures Section of this report. The sample ID on the drawings has been abridged (by excluding the individual room number from the full sample ID) for aesthetic purposes. Each positive ACM sample location is colored red and marked with an asterisk (*). Building areas containing ACM have been indicated with hatching to identify the location of the identified ACM.
4.0 LEAD SCREENING SURVEY
4.1 Screening Survey Methodology
M&A completed a Lead Containing Paint Risk Analysis in accordance with the SOP and determined that a LCP screening survey was warranted in this building. The LCP screening survey was performed by trained lead inspectors/screeners meeting the qualifications outlined in the SOP. The screening survey measured lead concentrations in accessible building surfaces by using a Niton XLp 303A XRF (serial number 18580 and 22552). The XRF instrument was calibrated at the frequency specified in the SOP.
©2010, Mabbett & Associates, Inc. Page 8 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
4.2 Summary of Lead Screening Survey Findings
4.2.1 Data Tables
As specified by VISN 1, a description of XRF-screened painted interior and exterior building components containing lead at concentrations greater than 0.1 mg/cm2 have been included in Table 3:
Table 3 - Summary of Positive XRF Measurements
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
281 Ground GD-14 Plaster Wall North Intact White 0.9
287 Ground GD-14 Wood Window Casing North Intact White 7.6
288 Ground GD-14 Plaster Window Sill North Intact White 12.7
291 Ground ST1-1 Metal Newel Post West Intact Purple 0.25
308 Ground GD-103 Wood Window Casing South Cracked White 7.5
309 Ground GD-103 Plaster Window Sill South Intact White 8.1
318 Ground GD-103 Plaster Wall South Intact White 0.7
319 Ground GD-103 Wood Window Casing South Intact White 6.8
320 Ground GD-103 Plaster Window Sill South Intact White 5.3
322 Ground GD-100 Plaster Wall South Intact White 0.6 323 Ground GD-118B Plaster Wall South Intact White 0.5
324 Ground GD-118B Wood Window Casing South Intact White 10.1
325 Ground GD-118B Wood Window Sill South Intact White 5.6
345 Ground Stair 2-1 Wood Newel Post West Intact Brown 1.5
346 Ground Stair 2-1 Wood Spindle West Intact White 8.3 349 Ground Stair 2-1 Concrete Stringer North Intact White 0.26 351 Ground Stair 2-1 Concrete Wall South Peeling White 0.21 354 Ground Stair 2-1 Wood Chair Rail West Intact White 0.5 355 Ground Stair 2-1 Metal Door West Intact White 5.7
356 Ground Stair 2-1 Metal Door Casing West Intact White 0.6
357 Ground Stair 2-1 Wood Handrail West Intact White 6.6 360 Ground GD-13 Plaster Wall West Intact White 0.12 385 Ground GC-111 Concrete Floor NA Intact Brown 0.6 387 Ground GC-111 Concrete Floor NA Intact Brown 0.3 396 Ground GC-111 Concrete Floor NA Intact Brown 0.23 399 Ground GC-111 Concrete Floor NA Intact Brown 0.25
©2010, Mabbett & Associates, Inc. Page 9 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 3 - Summary of Positive XRF Measurements
West Roxbury VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
403 Ground GC-107 Concrete Column South Intact White 0.15 406 Ground GC-107 Concrete Wall South Intact White 0.11 407 Ground GC-106B Concrete Wall East Peeling Gray 0.11 425 Ground GC-106 Concrete Column East Peeling Yellow 0.12 432 Ground Stair 4-1 Plaster Wall North Intact White 0.12
433 Ground Stair 4-1 Wood Newel Post East Intact Brown 1.5
434 Ground Stair 4-1 Wood Spindle South Intact White 9.2 435 Ground GB-128 Concrete Floor NA Cracked Brown 0.21
455 First 1C100 -
MAIN
LOBBY
Plaster Wall West Intact White 0.6
464 First 1D-113B Wood Window Casing North Intact White 9.7
466 First 1D-113B Plaster Wall North Intact White 1.8 467 First 1D-113B Plaster Wall North Intact White 1.7 468 First 1D-113B Plaster Wall North Intact White 1.8
488 First C1-7B Wood Window Casing West Intact White 8.5
491 First C1-7B Wood Window Sill South Intact White 1.2
497 First 1C-113A Wood Window Casing South Intact White 9.6
498 First Stair 5-1 Concrete Tread East Fair Yellow 7.2
499 First Stair 5-1 Wood Newel Post East Fair Brown 1.7
501 First Stair 5-1 Wood Spindle East Cracked White 4.4 503 First Stair 5-1 Plaster Wall South Intact White 0.17 505 First Stair 5-1 Plaster Wall North Intact White 0.11
507 First Loading Dock Metal Column East Poor Yellow 2.1
508 First Loading Dock Metal Trim East Poor Yellow 1.3
509 First Loading Dock Metal Handrail East Poor Yellow 2.1
510 First Loading Dock Concrete Tread East Poor Yellow 1.8
511 First Loading Dock Metal Trim East Poor Yellow 8.8
512 First Loading Dock Metal Column East Poor Yellow 1.8
513 First Loading Dock Metal Handrail East Poor Yellow 2
516 First 1D-113D Plaster Wall South Intact White 1.8 517 First 1D-113D Plaster Wall South Intact White 1.6
©2010, Mabbett & Associates, Inc. Page 10 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 3 - Summary of Positive XRF Measurements
West Roxbury VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
526 First 1D-115 Plaster Wall North Intact White 1.6 530 First 1D-116 Plaster Wall North Intact White 1.8 531 First 1D-108 Plaster Wall North Intact White 0.7 534 First 1D-106 Plaster Wall West Intact White 3.1 539 First 1D-109 Plaster Wall North Intact White 0.4 541 First 1D-127 Plaster Wall North Intact White 0.13 543 First 1D-134 Plaster Wall South Intact White 3.8 545 First 1D-135 Drywall Wall South Intact White 2.3 547 First 1D-130 Plaster Wall North Intact White 0.5 548 First 1D-130 Plaster Wall North Intact White 0.5 550 First 1D-131 Plaster Wall North Intact White 0.5 552 First 1D-138 Plaster Wall South Intact White 6 553 First 1D-138 Drywall Wall East Intact White 8 554 First 1D-138 Drywall Wall East Intact White 8.3 555 First 1D-139 Plaster Wall South Intact White 1.4 557 First Stair 2-1 Plaster Wall East Intact White 0.13 565 First 1D-103 Plaster Wall South Intact Blue 1.2 569 First 1D-143 Plaster Wall East Intact White 5.3 570 First 1D-102 Plaster Wall West Intact White 5.3
578 First Fire
Equipment Closet
Plaster Wall North Intact Red 0.5
579 First Fire
Equipment Closet
Plaster Wall North Intact Red 1.4
580 First Fire
Equipment Closet
Concrete Floor NA Intact Red 0.22
583 First 1B-130 Plaster Wall North Intact White 2.7 589 First 1B-125 Concrete Floor East Intact Brown 0.11 593 First 1B-108 Drywall Wall North Intact White 3.2 594 First 1B-108 Plaster Wall North Intact White 0.8 595 First 1B-108 Plaster Wall North Intact White 0.6 598 First 1B-108 Plaster Wall South Intact White 2.4 599 First 1D-1 Metal Door North Intact Gray 6.2
600 First 1D-1 Metal Door Casing North Intact White 8.8
606 First 1B-111A Metal Window Blind Frame North Fair White 0.27
©2010, Mabbett & Associates, Inc. Page 11 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 3 - Summary of Positive XRF Measurements
West Roxbury VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
607 First 1B-111A Metal Window Blind Frame Right Fair White 0.18
613 First Stair 7-1
Intermediate Landing
Plaster Wall West Intact Yellow 0.5
634 Second 2B-102 Plaster Wall East Intact White 0.25
649 Second Fire Hose &
Exiting.
Cabinet
Metal Door Casing East Intact Red 0.8
651 Second Fire Hose &
Exiting.
Cabinet
Plaster Wall East Intact Red 0.28
656 Second 2C-110 Plaster Wall South Intact White 0.15 657 Second 2C-110 Plaster Wall South Intact White 0.16 661 Second 2C-110 Plaster Column South Peeling White 0.26
664 Second 2C-110 Metal Radiator Cover South Intact White 0.6
666 Second 2C-110 Wood Window Casing South Intact Blue 9.7
667 Second 2C-110 Wood Window Sill South Intact Blue 9.8
669 Second 2C-108 Metal Radiator Cover South Intact White 0.6
671 Second 2C-108 Metal Door South Intact Red 0.14
672 Second 2C-108 Metal Door Casing South Intact Red 0.18
687 Second 2C-117 Concrete Floor West Intact Yellow 1.5 688 Second 2C-117 Concrete Floor East Intact Yellow 1.6
714 Second Stair 4-1 Wood Window Casing South Intact White 11.6
715 Second Stair 4-1 Wood Window Sill South Intact White 10.7
716 Second Stair 4-1 Metal Radiator Cover South Intact White 3.9
717 Second Stair 4-1 Plaster Wall South Intact White 0.6 718 Second Stair 4-1 Plaster Wall South Intact White 0.17
719 Third Stair 4-1 Metal Radiator Cover South Intact White 5.8
729 Third 3c-108 Wood Window Casing East Peeling White 5.7
757 Third 3c-7 Metal Door Casing East Intact Red 1.9
758 Third 3c-7 Plaster Wall East Intact Red 0.14 760 Third 3b-100 Plaster Wall East Intact White 0.6
761 Third C3-7 Metal Door Casing East Intact White 1.6
©2010, Mabbett & Associates, Inc. Page 12 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 3 - Summary of Positive XRF Measurements
West Roxbury VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
776 Third Stair 5-1 Plaster Wall East Peeling White 0.17 777 Third 4C-106B Plaster Wall South Peeling White 0.5
778 Third Crawlspace Above Third Floor Aud.
Metal Beam South Peeling Gray 13.6
779 Third 4C-106B Metal Ladder North Peeling Black 7.5 780 Third 4C-106B Metal Ladder North Peeling Black 5.3 781 Third 4C-106B Concrete Floor NA Cracked Gray 0.6
782 Third 4C-106B Metal Door Casing East Cracked White 0.5
783 Third 4C-106B Metal Door East Cracked White 4.1 784 Third 4C-106B Metal Door East Cracked White 11
785 Third 4C-106B Metal Door Casing East Peeling White 0.5
786 Third 4C-106B Metal Door Casing East Peeling White 0.4
787 Fifth Stair 5-1 Metal Door Casing East Fair Brown 0.4
788 Fifth Crawlspace
Above Auditorium
Metal Beam South Intact Gray 21.7
789 Second Stair 5-1 Concrete Tread South Poor Yellow 10.4
790 First C110 Metal Floor Expansion Plate NA Poor Black 1.7
791 Fourth C4-4 Plaster Wall South Intact Pink 0.6
799 Fourth 4D-140 Wood Window Casing East Intact White 9.6
800 Fourth 4D-140 Wood Window Sill East Intact White 6.9
804 Fourth D4-7 Metal Door South Intact Red 0.29
807 Fourth D4-8 Metal Door Casing South Intact Red 2
810 Fourth D4-8 Wood Door South Intact Red 0.13
820 Fourth 4D-112 Metal Door Casing North Fair White 1.4
822 Fourth 4D-112 Metal Door Casing North Fair White 0.8
825 Fourth STAIR 7-1 Plaster Wall West Fair Yellow 0.2 827 Fifth 5B-110 Brick Wall South Intact White 0.4 828 Fifth 5B-110 Concrete Floor East Intact Yellow 2.2 829 Fifth 5B-110 Concrete Floor East Intact Yellow 1.6 841 Fifth 5C-1 Wood Door East Intact Clear 43.6 845 Fifth 5D-103 Drywall Wall East Intact White 8.8
851 First G1-7 Metal Floor Expansion Plate West Intact Black 1.8
©2010, Mabbett & Associates, Inc. Page 13 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 3 - Summary of Positive XRF Measurements
West Roxbury VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
852 Sixth G1-7 Metal Floor Expansion Plate South Intact Black 0.6
853 Sixth G1-7 Metal Floor Expansion Plate South Intact Black 1.9
854 Sixth G1-7 Metal Handrail West Intact Gray 1.4 856 Sixth PH-604 Metal Handrail South Intact Black 2.4 862 Sixth PH-604 Concrete Floor North Intact Red 0.18
863 Sixth PH-604 Metal Counter
Flashing At Window
North Intact Gray 7.6
864 Sixth PH-604 Metal Counter
Flashing At Window
South Peeling Orange 15.5
865 Sixth PH-604 Metal Ladder South Fair Black 9.6 869 Sixth PH-600 Metal Door West Intact Brown 4.9
870 Sixth PH-600 Metal Door Casing West Intact Brown 0.16
874 Sixth PH-603 Metal Counter
Flashing At Window
West Fair Orange 1.4
876 Sixth PH-603A Concrete Floor North Fair Yellow 1.5
496 EXTERIOR bldg 1
METAL FIRE
HYDRANT FRONT FAIR RED 0.5
497 EXTERIOR bldg 1
METAL
FLAGPOLE FRONT FAIR WHITE 0.4
498 EXTERIOR bldg 1
METAL
FLAGPOLE FRONT FAIR WHITE 0.5
500 EXTERIOR bldg 1
METAL
FLAGPOLE FRONT FAIR WHITE 0.5
501 EXTERIOR bldg 1
METAL
FLAGPOLE
BASE FRONT FAIR WHITE 0.3
504 EXTERIOR bldg 1
METAL FIRE
HYDRANT NEAR MRI FAIR RED 1.3
NA – Not Applicable
In addition, XRF measurements collected during the screening survey of interior and exterior building components are included in Table 6 – Summary of XRF Measurements. Table 6 includes a description of each screened surface and resulting XRF-measured lead concentration.
4.2.2 Photographs
Representative photographs of building materials greater than or equal to 1.0 mg/cm2 and where in other in intact condition (e.g. fair, peeling, cracking) are provided in Appendix D of this report.
©2010, Mabbett & Associates, Inc. Page 14 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
4.2.3 CADD Drawings
Based on the results of the lead screening survey a table of LCP components identified with > 0.1 mg/cm2 was developed. This table is available on the CADD drawings for use by the VAMC for exposure assessments and preliminary renovation planning. Based on the results of the survey these components identified in the CADD table and on the plan should be assumed to be LCP unless otherwise determined.
5.0 LIMITATIONS
This inspection report is the result of a diligent search of the building for ACM and LCP. Only accessible areas were included in this survey. However comprehensive this inspection appears, it does not claim to have identified all of the ACM and LCP that could be present in the facility.
M&A’s survey was performed with limitations inherent to visual inspections. M&A has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. There can be no assurances, and M&A makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results provided.
6.0 CLOSING REMARKS
Prior to initiating plans for maintenance, renovation or demolition activities, the VAMC should review the asbestos and lead survey results to determine if any of these materials will be disturbed by proposed work activities.
6.1 Asbestos
The purpose of the ACM survey was to identify ACM in the building within the limitations of the survey for worker protection purposes and future renovation or demolition planning purposes. In regards to asbestos, any suspect material encountered during renovation/demolition that is not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, that was not inspected should be assumed to contain asbestos if discovered during any renovation process or until otherwise verified. If ACM must be disturbed, the ACM must be removed by a licensed asbestos abatement contractor and be performed in accordance with applicable regulations. If proposed work activities will not disturb ACM, continuous monitoring of ACM should be conducted throughout work activities to ensure the ACM remains in an intact condition. Additionally, prior to commencing work activities, contractors involved with the work activities should be made aware of the location of ACM, within the building in which they will be working. Additional information regarding asbestos management and the Operations & Maintenance (O&M) program is outlined in the VAMC campus wide Asbestos Management Plan available in Volume I of the Comprehensive VAMC Lead and Asbestos Survey Report.
The VAMC must submit a quarterly ACM liability report. At the time of the survey the following estimated quantities of ACM were identified and should be included in the liability report until removed from the building.
©2010, Mabbett & Associates, Inc. Page 15 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 4 – Summary of ACM Quantities for Liability Report
General Description of Material Estimated Quantity
Floor Tile and/or Mastic 23,280 SF
Terrazzo Flooring 50 SF
Sheet Flooring and/or Mastic 1,860 SF
Pipe Insulation 100 LF
TSI Debris 1 SF
Window Caulking 9,392 LF
Window Glazing 64 LF
Door Caulking 210 LF
Building Caulking 300 LF
Sink Undercoat 1 Sink
Transite Panel at Radiators 25 EA.
SF – Square feet LF – Linear Feet
6.2 Lead Containing Paint
The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey, representative interior and exterior building components were tested. The regulations addressing LCP in non-residential building are focused on protecting workers who are involved with paint disturbing activities and related waste disposal activities.
Worker protection is regulated by OSHA regulations as well as applicable state regulations. These regulations involve air monitoring of workers to determine exposure levels when disturbing paint containing measurable lead. A lead based paint determination can not determine a safe level of lead, but is intended to provide guidance as to the locations of what are considered industry standards for lead in paint. VA employees and contractors may use this information to better determine exposures of workers to airborne lead by understanding the different concentrations of
©2010, Mabbett & Associates, Inc. Page 16 of 16 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc lead paint on representative components and surfaces. Worker exposure controls can then be implemented and air monitoring can then be performed during activities that disturb paint on representative surfaces.
A concentration of lead greater than or equal to 1.0 mg/cm2 exceeds HUD residential standards and is an indicator of risk. OSHA does not specify a safe concentration of LCP. However, for the purposes of this LCP screening survey the lead concentrations greater than 0.1 mg/cm2 have been utilized as a threshold established by VISN 1 for areas where possible worker exposures may occur.
Figures
Appendix A
Table 5
Summary of ACM Building Results
©2010, Mabbett & Associates, Inc. Table 5 – Page 1 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
01A GB-159 Storage 12”x12” Beige mottled floor tile
NAD - - -
01B GB-159 Storage 12”x12” Beige mottled floor tile
NAD - - -
01C GB-157 Cleaning / utility
12”x12” Beige mottled floor tile
NAD - - -
02A GB-159 Storage
12”x12” Beige mottled floor tile - yellow mastic
NAD - - -
02B GB-159 Storage
12”x12” Beige mottled floor tile - yellow mastic
NAD - - -
02C GB-157 Cleaning / utility
12”x12” Beige mottled floor tile - yellow mastic
NAD - - -
03A A-CO-2 Connecting corridor link
12”x12” White-white vinyl floor tile
TRACE - - -
03B A-CO-2 Connecting corridor link
12”x12” White-white vinyl floor tile
TRACE - - -
03C A-CO-2 Connecting corridor link
12”x12” White-white vinyl floor tile
2% Chrysotile 200 SF Good 4
04A A-CO-2 Connecting corridor link
12”x12” White-white vinyl floor tile -mastic
3% Chrysotile 200 SF Good 4
04B A-CO-2 Connecting corridor link
12”x12” White-white vinyl floor tile -mastic
Stop Positive See 4A
04C A-CO-2 Connecting corridor link
12”x12” White-white vinyl floor tile -mastic
Stop Positive See 4A
©2010, Mabbett & Associates, Inc. Table 5 – Page 2 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
05A CG-9 Lobby 12”x12” Old white brown vinyl floor tile
NAD - - -
05B CG-9 Lobby 12”x12” Old white brown vinyl floor tile
NAD - - -
05C CG-9 Lobby 12”x12” Old white brown vinyl floor tile
NAD - - -
06A CG-9 Lobby
12”x12” Old white brown vinyl floor tile -mastic
5% Chrysotile 180 SF Good 4
06B CG-9 Lobby
12”x12” Old white brown vinyl floor tile -mastic
Stop Positive See 6A
06C CG-9 Lobby
12”x12” Old white brown vinyl floor tile -mastic
Stop Positive See 6A
07A CG-9 Lobby 12”x12” Old off-white vinyl floor tile
NAD - - -
07B CG-9 Lobby 12”x12” Old off-white vinyl floor tile
NAD - - -
07C CG-9 Lobby 12”x12” Old off-white vinyl floor tile
NAD - - -
08A CG-9 Lobby
12”x12” Old off-white vinyl floor tile -mastic
5 % Chrysotile 180 SF Good 4
08B CG-9 Lobby
12”x12” Old off-white vinyl floor tile -mastic
Stop Positive see 8A
08C CG-9 Lobby
12”x12” Old off-white vinyl floor tile -
Stop Positive see 8A
©2010, Mabbett & Associates, Inc. Table 5 – Page 3 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
09A GC-112 Electrical closet
9”x9” Light brown vinyl floor tile with white streaks
NAD - - -
09B CG-112 Electrical closet
9”x9” Light brown vinyl floor tile with white streaks
NAD - - -
09C CG-112 Electrical closet
9”x9” Light brown vinyl floor tile with white streaks
NAD - - -
10A GC-112 Electrical closet
9”x9” Light brown vinyl floor tile with white streaks -mastic
NAD (TEM) - - -
10B GC-112 Electrical closet
9”x9” Light brown vinyl floor tile with white streaks -mastic
TRACE1 - - -
10C GC-112 Electrical closet
9”x9” Light brown vinyl floor tile with white streaks -mastic
TRACE1 - - -
11A GB-108A Electric closet 12”x12” White vinyl floor tile NAD - - -
11B GD-121B Telephone closet
12”x12” White vinyl floor tile NAD - - -
11C 1D-104 Telephone closet
12”x12” White vinyl floor tile NAD - - -
12A GB-108A Electric closet 12”x12” White vinyl floor tile -
NAD - - -
©2010, Mabbett & Associates, Inc. Table 5 – Page 4 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
12B GD-121B Telephone closet
12”x12” White vinyl floor tile -mastic
NAD - - -
12C 1D-104 Telephone closet
12”x12” White vinyl floor tile -mastic
NAD - - -
13A ST 1-G Stair
12”x12” Beige with purple specs vinyl floor tile
TRACE - - -
13B C1-3 Hallway by 1B-144
12”x12” Beige with purple specs vinyl floor tile
TRACE - - -
13C ST-8-1 Stair
12”x12” Beige with purple specs vinyl floor tile
2% Chrysotile 3620 SF Good 4
14A ST 1-G Stair
12”x12” Beige with purple specs vinyl floor tile -mastic
10% Chrysotile 3620 SF Good 4
14B C1-3 Hallway by 1B-144
12”x12” Beige with purple specs vinyl floor tile -mastic
Stop Positive See 14A
14C ST-8-1 Stair
12”x12” Beige with purple specs vinyl floor tile -mastic
Stop Positive See 14A
15A ST 1-G Stair 6" beige vinyl cove base -glue
NAD - - -
15B 1B-148 Corridor 6" beige vinyl cove base -glue
NAD - - -
15C STR-3 Stair 6" beige vinyl cove base -glue
©2010, Mabbett & Associates, Inc. Table 5 – Page 5 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
16A CG-9 Lobby Yellow terrazzo flooring
NAD - - -
16B C1-2 Corridor Yellow terrazzo flooring
NAD - - -
16C STR-2 Stair Yellow terrazzo flooring
NAD - - -
17A GB-157 Cleaning / utility
4" Vinyl cove base - glue NAD - - -
17B 3D-122 Nurse manager office
4" Vinyl cove base - glue NAD - - -
3D-122 17C
Nurse manager office
4" Vinyl cove base - glue NAD - - -
18A GD-121B Telephone closet
Skim coat plaster wall NAD - - -
18B GB-109 Closet Skim coat plaster wall NAD - - -
18C 1B-106A Telephone room
Skim coat plaster wall NAD - - -
18D 1D-140 Electrical closet
Skim coat plaster wall NAD - - -
18E 2D-105 Electrical room
Skim coat plaster wall NAD - - -
18F C2-6 Staff elevator lobby
Skim coat plaster wall NAD - - -
18G 3B-112 Electric Room Skim coat plaster wall NAD - - -
19A GD-121B Telephone closet
Base coat plaster wall NAD - - -
©2010, Mabbett & Associates, Inc. Table 5 – Page 6 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
19B GB-109 Closet Base coat plaster wall NAD - - -
19C 1B-106A Telephone room
Base coat plaster wall NAD - - -
19D 1D-140 Electrical closet
Base coat plaster wall NAD - - -
19E 2D-105 Electrical room
Base coat plaster wall NAD - - -
19F C2-6 Staff elevator lobby
Base coat plaster wall NAD - - -
19G 3B-112 Electric Room Base coat plaster wall NAD - - -
20 GD-121B Telephone closet
Gray wall patch NAD - - -
21A GD-121B Telephone closet Red fire stop NAD - - -
21B GD-107 Mechanical room Red fire stop NAD - - -
21C 1B-101 Telephone closet Red fire stop NAD - - -
22A GD-121A Electric closet Skim coat plaster ceiling NAD - - -
22B GB-107 CT Scanner / Waiting
Skim coat plaster ceiling NAD - - -
22C 1D-113B Reusable medical equipment
Skim coat plaster ceiling NAD - - -
©2010, Mabbett & Associates, Inc. Table 5 – Page 7 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
22D 4C-106 Storage Skim coat plaster ceiling NAD - - -
22E C4-4 Corridor Skim coat plaster ceiling NAD - - -
22F 2C-109 Food prep Skim coat plaster ceiling NAD - - -
22G 5B-100 Electric closet Skim coat plaster ceiling NAD - - -
23A GD-121A Electric closet Base coat plaster ceiling NAD - - -
23B GB-107 CT Scanner / Waiting
Base coat plaster ceiling NAD - - -
23C 1D-113B Reusabe medical equipment
Base coat plaster ceiling NAD - - -
23D 4C-106 Storage Base coat plaster ceiling NAD - - -
23E C4-4 Corridor Base coat plaster ceiling NAD - - -
23F 2C-109 Food prep Base coat plaster ceiling NAD - - -
23G 5B-100 Electric closet Base coat plaster ceiling NAD - - -
24A GD-121 Electric closet alcove
2'x2' Ceiling tile pin dot NAD - - -
24B C1-10 Corridor across from 1D-144
2'x2' Ceiling tile pin dot NAD - - -
©2010, Mabbett & Associates, Inc. Table 5 – Page 8 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
24C CG-8A
Corridor across from staff elevator
2'x2' Ceiling tile pin dot NAD - - -
25A GD-107 Mechanical room Pink fire stop NAD - - -
25B GB-128 Mechanical room Pink fire stop NAD - - -
25C 1D-103 Electrical closet Pink fire stop NAD - - -
26A CG-10 Corridor 2'x2' Ceiling tile fissured with pin dot
NAD - - -
26B 3D-134 Storage closet 2'x2' Ceiling tile fissured with pin dot
NAD - - -
26C C4-4 Corridor near staff elevator
2'x2' Ceiling tile fissured with pin dot
NAD - - -
27A GC-104 Receiving vestibule
Brown duct sealant NAD - - -
27B GC-106 EMS storage Brown duct sealant NAD - - -
27C 1D-133 Mechanical room
Brown duct sealant NAD - - -
28 GC-104 Receiving vestibule
Gray caulking at double doors
NAD - - -
29 GC-104 Receiving vestibule
Residual black caulking NAD - - -
30A GD-107 Mechanical room
Gray duct sealant NAD - - -
©2010, Mabbett & Associates, Inc. Table 5 – Page 9 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
30B C1-2 Corridor Gray duct sealant NAD - - -
30C 4B-118 Mechanical room
Gray duct sealant NAD - - -
31A 1B-109 Bathroom
12”x12” Yellowish vinyl floor tile with brown streak
NAD - - -
31B 1B-109 Bathroom
12”x12” Yellowish vinyl floor tile with brown streak
NAD - - -
31C 1B-109 Bathroom
12”x12” Yellowish vinyl floor tile with brown streak
NAD - - -
32A 1B-109 Bathroom
12”x12” Yellowish vinyl floor tile with brown streak -yellow mastic
NAD - - -
32B 1B-109 Bathroom
12”x12” Yellowish vinyl floor tile with brown streak -yellow mastic
NAD - - -
32C 1B-109 Bathroom
12”x12” Yellowish vinyl floor tile with brown streak -yellow mastic
NAD - - -
33A C1-13 Corridor Teal vinyl sheet flooring NAD - - -
33B C1-13 Corridor Teal vinyl sheet flooring NAD - - -
33C 1D-138 Corridor Teal vinyl sheet flooring NAD - - -
©2010, Mabbett & Associates, Inc. Table 5 – Page 10 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
34A C1-13 Corridor Teal vinyl sheet flooring -yellow mastic
5% Chrysotile 1800 SF Good 4
34B C1-13 Corridor Teal vinyl sheet flooring -yellow mastic
Stop Positive See 34A
34C 1D-138 Corridor Teal vinyl sheet flooring -yellow mastic
Stop Positive See 34A
35A 1D-136 Storage room White vinyl sheet flooring NAD - - -
35B 1B-109 X-ray room 2 White vinyl sheet flooring NAD - - -
35C 3D-125 Ward storage White vinyl sheet flooring NAD - - -
36A 1D-136 Storage room White vinyl sheet flooring -yellow mastic
NAD - - -
36B 1B-108 X-ray room 2 White vinyl sheet flooring -yellow mastic
NAD - - -
36C 3D-125 Ward storage White vinyl sheet flooring -yellow mastic
NAD - - -
37A C1-13 Corridor Gray granular vinyl sheet flooring
NAD - - -
37B 1B-148 Corridor Gray granular vinyl sheet flooring
NAD - - -
37C 3D-136 Terminal alcove
Gray granular vinyl sheet flooring
NAD - - -
38A C1-13 Corridor Gray granular vinyl sheet
©2010, Mabbett & Associates, Inc. Table 5 – Page 11 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4* flooring -yellow mastic
38B 1B-148 Corridor
Gray granular vinyl sheet flooring -yellow mastic
NAD - - -
38C 3D-136 Terminal alcove
Gray granular vinyl sheet flooring -yellow mastic
NAD - - -
39A 1B-111A Barium prep room
12”x12” Peach vinyl floor tile with white and brown streak
NAD - - -
39B 1B-111A Barium prep room
12”x12” Peach vinyl floor tile with white and brown streak
NAD - - -
39C 1B-111A Barium prep room
12”x12” Peach vinyl floor tile with white and brown streak
NAD - - -
40A 1B-111A Barium prep room
12”x12” Peach vinyl floor tile with white and brown streak -yellow glue
NAD - - -
40B 1B-111A Barium prep room
12”x12” Peach vinyl floor tile with white and brown streak -yellow glue
NAD - - -
40C 1B-111A Barium prep room
12”x12” Peach vinyl floor tile with white and brown streak -yellow glue
NAD - - -
41A C2-1 Hall by 2B-
12”x12” Gray vinyl floor tile NAD - - -
41B C2-1 Hall by 2B-
12”x12” Gray vinyl floor tile NAD - - -
41C 3C-114 Hall by 3C-
12”x12” Gray vinyl floor tile
©2010, Mabbett & Associates, Inc. Table 5 – Page 12 of 28 Survey Report W Roxbury Bldg 01 FINAL 5-28-10.doc
Table 5 - Summary of ACM Building Results West Roxbury VA Medical Center, Building 1
Sample No.
Sample Location
Area Designation
Description of Material
Percent and Type of
Asbestos
Estimated Quantity Condition
VISN 1
RISK
AHERA
Hazard
Category 1-4*
42A C2-1 Hall by 2B-
12”x12” Gray vinyl floor tile -yellow mastic
NAD - - -
42B C2-1 Hall by 2B-
12”x12” Gray…