S02 - Itemized Price Breakdown.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Z1DA--Replace Damaged Doors and Upgrade Card System WR Federal contract opportunity
Solicitation number
36C24123R0181
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document contains a template for submitting a price breakdown for a federal construction contract opportunity with the Department of Veterans Affairs. The opportunity involves replacing damaged doors and upgrading the card access system at the VA Medical Center in West Roxbury, Massachusetts. The template requires offerors to provide detailed cost breakdowns by construction division for labor, materials, overhead, profit, and bond percentages. Labor and material costs should be entered separately for each division along with total costs. The template also includes sections for providing overall overhead, profit and bond percentages to apply to division subtotals, as well as examples for listing labor details and material/equipment costs by division.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Damaged Doors and Upgrade Card System WR, newest first.
File Type Posted
523A4-12-207 Site Walk 1-10-24.pdf PDF
36C24123R0181 0004.docx DOCX document
S02 - MA WD 01-19-24.txt TXT text file
36C24123R0181 0003.docx DOCX document
Appendix A- VAMC Door List RFI 5.pdf PDF
Replace Damaged Doors RFI Answers 1-8.docx DOCX document
36C24123R0181 0002.docx DOCX document
S02 - 523A4-12-207 Drawings.pdf PDF
36C24123R0181 0001.docx DOCX document
S02 Past Performance Questionnaire.docx DOCX document
S02 - W Roxbury - Volume 1 - FINAL.pdf PDF
S02 - VAMC Doors PACS work narrative.pdf PDF
S02 - Revised Specifications.pdf PDF
S02 - SOW.docx DOCX document
36C24123R0181 RFP.docx DOCX document
S02 - MA WD 12-8-2023.txt TXT text file
S02 - Damaged Doors PCRA.pdf PDF
S02 - Survey Report W Roxbury Bldg 01.pdf PDF
S02 - Damaged Door ICRA.pdf PDF
P03 - SSJ.pdf PDF
S02 - Lead Report Map.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Labor Detail

Sample Example
DivisionLabor CategoryLabor RateHoursTotal
1Plumber$35.00123$4,305.00
1Laborer14.7570$1,032.50
$5,337.50

Materials and Equipment Details

Sample Example
DivisionItemRateUnitsTotal
1Pipe - 150'$1.50150$225.00
190 Degree Coupling$1.105$5.50
1Pump Rental - Hour$200.006$1,200.00
$1,430.50

File details come from the government source that posted it. Updated .