S02 - Itemized Price Breakdown.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Z1DA--Replace Damaged Doors and Upgrade Card System WR Federal contract opportunity
- Solicitation number
- 36C24123R0181
About this file
This document contains a template for submitting a price breakdown for a federal construction contract opportunity with the Department of Veterans Affairs. The opportunity involves replacing damaged doors and upgrading the card access system at the VA Medical Center in West Roxbury, Massachusetts. The template requires offerors to provide detailed cost breakdowns by construction division for labor, materials, overhead, profit, and bond percentages. Labor and material costs should be entered separately for each division along with total costs. The template also includes sections for providing overall overhead, profit and bond percentages to apply to division subtotals, as well as examples for listing labor details and material/equipment costs by division.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 523A4-12-207 Site Walk 1-10-24.pdf | ||
| 36C24123R0181 0004.docx | DOCX document | |
| S02 - MA WD 01-19-24.txt | TXT text file | |
| 36C24123R0181 0003.docx | DOCX document | |
| Appendix A- VAMC Door List RFI 5.pdf | ||
| Replace Damaged Doors RFI Answers 1-8.docx | DOCX document | |
| 36C24123R0181 0002.docx | DOCX document | |
| S02 - 523A4-12-207 Drawings.pdf | ||
| 36C24123R0181 0001.docx | DOCX document | |
| S02 Past Performance Questionnaire.docx | DOCX document | |
| S02 - W Roxbury - Volume 1 - FINAL.pdf | ||
| S02 - VAMC Doors PACS work narrative.pdf | ||
| S02 - Revised Specifications.pdf | ||
| S02 - SOW.docx | DOCX document | |
| 36C24123R0181 RFP.docx | DOCX document | |
| S02 - MA WD 12-8-2023.txt | TXT text file | |
| S02 - Damaged Doors PCRA.pdf | ||
| S02 - Survey Report W Roxbury Bldg 01.pdf | ||
| S02 - Damaged Door ICRA.pdf | ||
| P03 - SSJ.pdf | ||
| S02 - Lead Report Map.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number:
Edward L Roy: VA assigned project #
| Date: | |
| Project Title |
| Edward L Roy: VA assigned Project Title | Project Location | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Labor Detail
| Sample Example | ||||
| Division | Labor Category | Labor Rate | Hours | Total |
| 1 | Plumber | $35.00 | 123 | $4,305.00 |
| 1 | Laborer | 14.75 | 70 | $1,032.50 |
| $5,337.50 |
Materials and Equipment Details
| Sample Example | ||||
| Division | Item | Rate | Units | Total |
| 1 | Pipe - 150' | $1.50 | 150 | $225.00 |
| 1 | 90 Degree Coupling | $1.10 | 5 | $5.50 |
| 1 | Pump Rental - Hour | $200.00 | 6 | $1,200.00 |
| $1,430.50 |