This is a Statement of Objectives (SOO) for surgical instrument maintenance and repair services at the Central Iowa Veterans Health Administration (VHA) Health Care System. The solicitation number is 36C26326Q0870, with a question deadline of July 3, 2026, at 5:00 PM Central Time and an offer deadline of July 17, 2026, at 5:00 PM Central Time. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23.
The solicitation requires contractors to provide comprehensive maintenance and repair services for surgical instruments used at the Central Iowa VHA facility. Offerors must carefully review all directions and pay particular attention to the Addendum to Instructions to Offerors FAR 52.212-1 for proper offer submission procedures. Interested parties are advised to utilize the most recent version of the solicitation available on SAM.gov to ensure compliance with current forms and information requirements. The specific pricing terms, contract type, period of performance, and detailed technical requirements are contained within the complete solicitation documentation on SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 Amendment 36C26326Q0870 0003.docx | DOCX document | |
| S06 Response to Vendor Questions 36C26326Q0870 0002.docx | DOCX document | |
| Instrument Trays Utilization 7.13.26.xlsx | XLSX spreadsheet | |
| S06 Offer Deadline Extension 36C26326Q0870 0001.docx | DOCX document | |
| Supplemental Instrument Classes and Repairs.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
636-26-4-3068-0014
36C26326Q0870 06-25-2026 Jeffrey Brown 651-293-3009 07-17-2026 17:00
CDT
36C263
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
X
Y 811210 $34 Million
N/A
Department of Veterans Affairs Central Iowa Health Care System
3600 30th Street Des Moines IA 68803
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
Y
DEPARTMENT OF VETERANS AFFAIRS
FINANCIAL SERVICES CENTER
PO BOX 149971
AUSTIN TX 78714-9971
See CONTINUATION Page The Contractor shall provide surgical instrument maintenance and repair services to the Central Iowa Health Care System in accordance with the Schedule and Statement of Work below.
Prior to submitting a quote, review all documentation withi
Review and follow the instructions in the INSTRUCTIONS TO OFFERORS in the Clause 52.212-1 Addendum.
Failure to follow instructions may result in an offer being rendered nonacceptable.
Contract Ordering Period with pricing periods of:
Base Pricing Period: 08/01/2026-07/31/2027 Year One Pricing Period: 08/01/2027-07/31/2028 Year Two Pricing Period: 08/01/2028-07/31/2029 Year Three Pricing Period: 08/01/2029-07/31/20230 Year Four Pricing Period: 08/01/2030-07/31/2031
See CONTINUATION Page
Jeffrey Brown
VA-VHA-RPOC-2024-0033
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 SINGLE AWARD ORDER CONTRACT | 4 |
| B.3 PRICE/COST SCHEDULE | 4 |
| ITEM INFORMATION | 4 |
| B.4 Statement of Work | 7 |
| SECTION C - CONTRACT CLAUSES | 23 |
| C.1 52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Deviation OCT 2025) | 23 |
| C.2 52.216-18 ORDERING (AUG 2020) | 28 |
| C.3 52.216-19 ORDER LIMITATIONS (OCT 1995) | 29 |
| C.4 52.216-22 INDEFINITE QUANTITY (NOV 2025) (DEVIATION) ALTERNATE II (NOV 2025) | 29 |
| C.5 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 30 |
| C.6 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) | 30 |
| C.7 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 31 |
| C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 41 |
| C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION FEB 2025) | 42 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 51 |
| See attached document: Supplemental Instrument Classes and Repairs. | 51 |
| SECTION E - SOLICITATION PROVISIONS | 51 |
| E.1 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services (DEVIATION OCT 2025) | 51 |
| ADDENDUM to 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services. | 55 |
| E.2 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 57 |
| E.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 61 |
| E.4 52.212-2 Evaluation—Commercial Products and Commercial Services. (November 2021) | 62 |
| E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION FEB 2025) | 63 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C263 Jeffrey Brown
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 23
316 ROBERT STREET N, SUITE 506
SAINT PAUL MN 55101
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Monthly |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
B.2 SINGLE AWARD ORDER CONTRACT
Quantities listed are estimated only and are not guaranteed.
This is a 5-year Commercial Firm Fixed Price, Single Award Indefinite Delivery / Indefinite Quantity (IDIQ) contract, for surgical instrument maintenance and repair services to support the Central Iowa Health Care System (CIHCS).
Accordingly, funds are not obligated on this contract at the award; rather, funds are obligated via orders issued against the contract. Orders shall only be issued by a warranted VA Contracting Officer (CO). VA CO will issue task orders to the contractor authorizing services via Standard Form 1449. Each order shall clearly identify the dollar amount authorized under the individual task order and the period of performance of the individual order. When an order period of performance is completed, additional services shall not be provided unless a new order is issued in accordance with this IDIQ.
References to options in the schedule below refers to the pricing periods identified on the 1449 form of this document as this contract does not contain options.
The minimum dollar amount guaranteed under this contract for the performance period of the five year is $1,000.00. The maximum dollar amount or contract ceiling for this contract is $320,000.00. The maximum amount is not guaranteed. The combined total of all orders placed against this contract cannot exceed the maximum amount/ceiling of this contract.
(End of Clause)
B.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 210.00 |
| EA |
| __________________ |
| __________________ |
Critical instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Base POP Begin: 08-01-2026 POP End: 07-31-2027 PRINCIPAL NAICS CODE: 811210 - Electronic and Precision Equipment Repair and Maintenance PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 740.00 |
| EA |
| __________________ |
| __________________ |
Routine instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Base POP Begin: 08-01-2026 POP End: 07-31-2027
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 210.00 |
| EA |
| __________________ |
| __________________ |
Critical instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 1 POP Begin: 08-01-2027 POP End: 07-31-2028
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 740.00 |
| EA |
| __________________ |
| __________________ |
Routine instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 1 POP Begin: 08-01-2027 POP End: 07-31-2028
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 210.00 |
| EA |
| __________________ |
| __________________ |
Critical instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 2 POP Begin: 08-01-2028 POP End: 07-31-2029
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 740.00 |
| EA |
| __________________ |
| __________________ |
Routine instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 2 POP Begin: 08-01-2028 POP End: 07-31-2029
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 210.00 |
| EA |
| __________________ |
| __________________ |
Critical instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 3 POP Begin: 08-01-2029 POP End: 07-31-2030
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 740.00 |
| EA |
| __________________ |
| __________________ |
Routine instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 3 POP Begin: 08-01-2029 POP End: 07-31-2030
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 210.00 |
| EA |
| __________________ |
| __________________ |
Critical instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 4 POP Begin: 08-01-2030 POP End: 07-31-2031
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| 740.00 |
| EA |
| __________________ |
| __________________ |
Routine instrument set maintenance and repair in accordance with the Statement of Work Contract Period: Option 4 POP Begin: 08-01-2030 POP End: 07-31-2031
PRODUCT/SERVICE CODE: J066 - Maintenance, Repair, and Rebuilding of Equipment - Instruments and Laboratory Equipment
| GRAND TOTAL |
| __________________ |
B.4 Statement of Work Central Iowa Veterans Health Administration Health Care System Surgical Instrument Maintenance and Repair
The Central Iowa Administration Health Care System (CIHCS) requires surgical instrument Preventative Maintenance (PM) and repair services for their Surgical Processing Suite (SPS). The Contractor shall provide an online digital inventory system, or digital tracker, to track instrument repair status and requests that is accessible by the CIHCS.
1. Preventative Maintenance and Repair
a. “Instrument(s)” for this requirement mean: individual general surgical instrument identified during assembly inspection or front line use as not functional and requires evaluation and repair.
b. “Instrument Set(s)/Trays” for this requirement mean: a uniquely named instrument set/tray used to contain a series of instruments defined by an instrument count sheet. Sets are between 1 and up to 612 individual instruments used during invasive procedures.
i. The instrument set is assembled and held inside of a container system where most instruments will stay inside the set over repeated use.
ii. An instrument set may include multiple levels of instruments inside one instrument set.
iii. All instruments sent out within the instrument set must return with the instrument set.
c. “Critical Instrument set”: Instrument sets listed below in Appendix A. Critical sets cannot be removed from circulation for more than two to three days at a time without approval of the SPS Chief or designee.
d. “Routine Instrument Set”: All non-critical instruments sets, identified in Appendix B.
e. Preventative maintenance of surgical instruments shall be done by the inspection of entire trays.
f. Repairs and preventative maintenance shall align with the original manufacturer’s design and product specifications.
g. Instruments subject to repairs and preventative maintenance shall be returned to a state near or at its original OEM specifications in terms of functionality and appearance.
h. Any modification or repair performed during repair that deviates from the OEM functional or physical specifications for the instrument will render the instrument “damaged beyond repair” and will need to be replaced at the expense of the repairer per FAR 52.212-4(b).
i. The Contractor shall ensure repairs and service functions are performed in conformance, the Center for Disease Control (CDC) regulations, Healthcare Sterile Processing Association (HSPA), Association of Peri-Operative Registered Nurses (AORN) Standards, Associate for Professionals in Infection Control and Epidemiology (APIC), the American National Standards Institute (ANSI) and Association for the Advancement of Medical Instrumentation (AAMI).
j. The following instruments general repairs and preventative maintenance shall be provided as appropriate:
i. sharpened,
ii. adjusted,
iii. aligned,
iv. straightened,
v. calibrated,
vi. cleared of rust or debris,
vii. oiled
viii. removal of stains, sharp edges and/or scratches
ix. cannulated/lumened items shall have interior lumen flushed and visually inspected.
x. all instruments able to be disassembled, shall be disassembled and undergo a detailed inspection.
k. The above list of instrument general repairs and preventative maintenance under j. and section 14 “Covered Instrument Classes” are supplemented by the attached “Instrument Classes and Repairs” that outlines all the potential classes of instruments that may require repair under this contract and all the potential repairs necessary for those instruments. The instrument and repair list in the attachment is not representative of the current instrument inventory at the CIHCS, it is to be used to establish all possible instruments and repairs/preventative maintenance that are covered under this contract under the circumstances those instruments were added into or already exist in the CIHCS inventory.
l. Returned Instruments shall have legible QR Code, manufacturer name, and instrument catalog number.
m. The Contractor shall provide maintenance and repair for rigid instrument containers to ensure that all lid gasket vent devices are fully functional, in accordance with manufacturer specifications.
n. Items deemed unrepairable need to be returned to facility with clear identification as such.
o. Any non-OEM parts used to repair an instrument must have product part numbers provided and must have a Food and Drug Administration (FDA) approved Instructions for Use (IFU) that outlines all steps for reprocessing.
p. The repairer must be able to provide onsite, twice weekly repairs for:
i. Unscheduled repair needs
ii. same day PM services for critical sets
q. Site visits shall follow a set schedule and be arranged so there is a minimum of 2 weeks between service site visits.
r. During repair and PM, all instruments are to be evaluated for a 2D QR scan code. When a device does not have a 2D laser code, the repairer will place a laser marked QR code on the instrument, as part of the PM service contract or will flag the instrument.
i. Devices with new QR codes shall be returned as part of the set it arrived in.
ii. Notification of code placement needs to be communicated to facility via the digital tracker for entry into Censitrac, information to be documented on the digital tracker are:
1. Device product number,
2. Device description
3. Device serial number (if applicable)
4. QR code numeric assignment.
iii. The Contractor shall place a QR code on the instrument using a laser etching system if no etch is present.
s. Delicate sharp, pointed instruments delivered in puncture proof containers shall returned be returned in puncture proof containers.
t. Routine individual instruments that need to have part replacements or more complex repairs, can be relocated to facility repair shop with updates of location change provided via the digital tracker.
u. Any instruments that fail the quality check upon return to CIHCS shall be resubmitted to the Contractor for repair at the Contractor’s expense per Federal Acquisition Regulations (FAR) 52.212-4(a).
v. All single instruments and surgical trays picked up and delivered back to the hospital shall be updated by the Contractor on the digital tracker and following information shall be included for each:
i. Instrument
1. Name of instrument,
2. Manufacture catalog number,
3. Serial number (when applicable),
4. Quantity of items for accountability,
5. QR code number assigned to the item.
ii. Instrument set:
1. Instrument set name,
2. Tray actual number,
3. # of instruments included.
2. Prohibited Repairs
a. Any instrument found having an unreadable or non-existent Manufacturer’s name AND product number visible on the instrument are NOT considered valid reusable instruments.
i. These instruments shall be marked as “damaged beyond repair” and returned to SPS.
ii. Any repairs performed on these instruments will not result in compensation.
b. The Repairer is prohibited from knowingly altering or modifying an original instrument in ANY WAY from the original manufacturers intended design.
c. Any instrument rendered damaged beyond repair due to performance of the repair or preventative maintenance will be replaced at the Contractor’s expense. This can include but not limited to:
i. Sandblasting shiny instruments to make them dull.
ii. Removing the manufacturer’s name or product number found on the instrument.
iii. Altering the product dimensions, angles, length, or adding/removing materials.
iv. Creating a “custom” instrument.
3. Refusal to Repair
a. The contractor shall not classify any instrument(s) as irreparable without providing, concurrently with the return of the instrument(s) to CIHCS:
i. Written justification citing the specific conditions preventing repair.
ii. Photographic documentation.
iii. Evidence of repair attempt.
iv. Approval of the instrument(s) by a CIHCS representative.
b.
4. Repairer Response window:
a. Urgent instrument repair service: Unscheduled repair of critical individual instrument or instrument set which the following applies:
i. The damage is identified on a day where no onsite visit is anticipated.
ii. The damaged item is a critical instrument for the instrument set.
iii. No alternative substitution available in house to meet the need while waiting for repair.
iv. Patient care delays or cancellations.
b. The Contractor has 48 hours to complete urgent instrument repairs. Forty-eight hours starts at the time of notification by CIHCS to the Contractor.
c. Instruments or sets necessitating emergency repairs may be shipped to Contractor facilities if necessary.
5. Place of Performance
a. The mobile repair lab will provide onsite repairs at the VA Central Iowa Health Care System, 3600 30th Street, Des Moines, Iowa 50310.
b. Instruments are to be picked up from the SPS Preparation Area and OR.
c. Instruments are to be returned to the SPS Decontamination Area.
d. Off-site repairs: For Contractor's designated facility the address and certification (ISO 13485:2016 certification or VA determined equivalent) provided to COR prior to performance and upon any change.
6. Scheduled PM for Critical Instrument Sets:
a. See Appendix A for the list of critical instruments.
b. Preventative maintenance of critical instrument sets shall be scheduled, and work completed with the same day turnaround. Any exception to the same day turnaround time is permissible from the COR or another CIH representative.
c. In the event this is not attainable this is to be communicated directly and immediately with SPS Designee to include what complications are creating a barrier and an ETA of expected downtime.
d. Off-site repair is allowable for critical instrument sets assuming the repairs are completed within the required timelines for critical instrument sets.
7. Scheduled PM for Routine Instruments Sets:
a. See Appendix B for the list of routine instrument sets.
b. The Contractor shall have seven (7) calendar days to complete routine preventative maintenance on surgical instrument trays with day of pick up considered as day one (1).
c. If a set will be removed from circulation for longer than seven (7) days, this needs to be directly communicated with the SPS designee and an explanation as to why.
d. Off-site repair is allowable for routine instrument sets.
8. Mobile Repair Lab Requirements
a. Instrument repairs completed onsite at the Central Iowa Veterans Administration Medical Center (VAMC) shall occur in a mobile repair lab/vehicle in a designated space. CIHCS is not responsible for the supply of any items or utility services of any kind needed for the sustainable functioning of the mobile unit.
b. Safety cones shall be utilized around the perimeter of the mobile repair vehicle to ensure the safety of hospital and Contractor staff.
c. Any equipment requiring set up at the mobile repair lab at the hospital shall be done at the expense of the Contractor.
d. Mobile Repair Unit shall properly display the Contractor’s name and permit numbers.
e. The contractor shall provide access to repair facilities (mobile or otherwise) upon request by the VA to ensure compliance with the contract and applicable regulatory standards.
f. Contractor mobile unit(s) shall be registered with the CIHCS Police Department.
9. Contractor documentation and tracking requirements
a. Accessible online service dashboard that displays and tracks all repair and maintenance activities.
b. Contractor uses an online dashboard that displays and tracks all repair and maintenance activities.
c. The dashboard must be online and must be accessible to SPS designees 24 hours a day, 365 days a year except for maintenance related down times.
d. The following dashboard functions must be included:
i. Repair request function,
ii. Scheduled maintenance request function,
iii. Critical repair request function,
iv. Display request is received with date of anticipated repair,
v. Status updates while active repair is being performed,
vi. Closed “completed” repairs with all associated documentation attached,
vii. Visible annual calendar that establishes an annual PM schedule for sets attached in the appendixes,
viii. The dashboard shall allow for all repairer documentation to be attached directly to the repair request
ix. This shall include a preventative maintenance checklist with at least:
1. Repair performed,
2. What parts were ordered,
3. Invoices,
4. Any other related documentation,
e. Repair services that Interface with current equipment and Censitrac program are preferred.
10. Contract Monitoring:
a. The CIHCS SPS shall designate a representative to monitor Contractor employee work services through one or a combination of the following mechanisms:
i. The SPS representative, SPS Chief, Reusable Medical Equipment (RME) Coordinator and/or Contracting Officer Representative (COR) shall monitor Contractor instrument pick-up and drop-off through the inhouse Censitrac system to ensure that services called for in the contract have been received by the CIHCS.
ii. SPS shall utilize Contractor’s digital dashboard to request services from Contractor. Daily monitoring of digital dashboard and repair status to ensure all requests are being handled appropriately.
iii. Documentation of services performed shall be reviewed by the Contracting Officer Representative prior to certifying payment.
iv. The SPS representative will conduct periodic customer service interviews with end users to confirm quality repair services are being performed to their standards.
v. Contract monitoring and recordkeeping procedures shall be sufficient to ensure proper payment and confirmation that services were provided.
vi. Monthly invoices shall be submitted to the SPS Representative and COR at the beginning of the contract, until it is determined that billing documentation meets requirements. Once billing practices have been found to be acceptable then invoices may be directly submitted to Tungsten. The COR shall verify that services were performed against Contractor’s certified delivery repairs document. Only after verification are invoices certified for payment. Billing disagreements that cannot be resolved by the COR shall be forwarded to the Contracting Officer for review and resolution.
vii. The CIHCS SPS representatives retain the option to perform site visits of Contractor repair facilities to confirm that repairs are being performed in accordance with the requirements listed above.
viii. The Contractor shall provide monthly reports as requested, detailing the work performed that month.
11. Contractor Requirement
a. Contractor shall have a training program or third-party training program for their staff who will be providing services on this contract. Any Contractor staff performing services on this contract shall have completed the aforementioned training.
b. The Contractor shall provide documentation of staff training, competencies, and any pertinent certifications in relation to the repairs they shall be conducting upon CIHCS request.
c. The contractor shall provide CIHCS SPS staff with in-service training on as needed basis, at the request of the facility. Up to a total of six (6) hours, two (2) per shift, CEU eligible in-services, on instrumentation, per year.
12. Security Clearance
a. The following security language is applicable to Contractor staff who will regularly enter CIHCS facilities.
b. Contractor staff will utilize a temporary Contractor’s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.
c. The Contractor shall comply with Central Iowa VAMC security, access, and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain a security access badge.
d. All Contractor staff will need a valid individual personal or professional email account that can be easily checked. Notifications regarding fingerprint scheduling/appointments, background investigation tasks, and Training Management System (TMS) required classes will be sent to their email address throughout the badging process.
e. The Contractor will submit all required security badging documents for each employee within fifteen (15) business days from the award date of contract to the COR. All documents must be legible. The following documents will be sent to the Contractor via email after contract is awarded.
i. OF 306 – Must be Typed. Submission of handwritten forms will not be acceptable.
ii. Self-Certification
iii. VA 10-2417
iv. Employee Fingerprint Resource Form
f. Appropriate Contractor staff (as determined by the VA) performing the duties of the Statement of Work shall complete the computer-based training course “TMS 10176 Infosec/Rules of Behavior”.
g. Contractor staff shall be escorted while in CIHCS sensitive locations or without a security badge or PIV badge.
13. Additional Information
a. National Holidays. There are eleven (11) holidays observed by the Government as follows: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. SPS is a 24/7 operation and continues sterilization operations on these holidays.
b. Repairs must be performed in a clean and orderly environment.
14. Covered Instrument Classes (Including but not limited to):
| General Scissors: |
| Metz Scissors, Mayo Scissors, Cast/Bandage Scissors, Iris Scissors, Suture Scissors, Serrated Scissors, Delicate Scissors |
| Osteotomes: |
| Total Joint Osteotomes, Podiatry Osteotomes and ENT Osteotomes |
| Curettes: |
| Total Joint, Curettes, D & C Curettes, Adenoid Curettes |
| Elevators: |
| Periosteal Elevators, Cobb Elevators, Key Elevators, Freer Elevators, DIE Elevators |
| Gouges: |
| Total Hip Gouges |
| Small Knives: |
| Amputation Knives, Cartilage Knives, Meniscus Knives, Knife Handles |
| Rongeurs: |
| AB Rongeurs, Pituitary Rongeurs, Kerrison Rongeurs, Kerrison Punches, Dermal Punches |
| Cutters: |
| Bone Cutters, Wire Cutters, Pin Cutters, Rib Cutting Forceps |
| Forceps/Clamps: |
| Artery Forceps, Sponge Forceps, Kelly Forceps, Adson Forceps, Allis Forceps Tissue Forceps, Mosquito Forceps, Biopsy Forceps, Hemostats, Clip Appliers, Kocher Clamps, Towel Clips/Clamps, Bone Clamps |
| Miscellaneous Instruments: |
| Reamers, Total Hip Cup Graters, Cranial Burrs, Enlarging Burr, Retractors, Balfour Retractor, Hand Retractors, Dental Instruments and Hand Pieces, Perforating Twist/Spinal Drills, Chisels, Tonsillectomies, Adenotomes, Trocars, Skin Hooks, Skin Rakes, Suction Tips/Tubes, Dissectors, Rasps, Mouth Gags, Saw Blades, Speculums, Dilators, Dental Instruments, all needle holders, Acetabular Cutters |
| Ophthalmic Instruments: |
| Speculums, Retractors, Knives (not diamond), Spoons, Punches, Spatulas, Manipulators, Loops, Hooks, Markers, Calipers, Scissors, Forceps |
| Arthroscopic Instruments: |
| Punches, Shavers, Scissors, Intra-Articular Hooks, Intra-Articular Knives, Intra-Articular Graspers, Forceps |
| Align/Sharpen Laparoscopic Instruments: |
| Laparoscopic Punches, Laparoscopic Shavers, Laparoscopic Scissors, Laparoscopic Hooks, Laparoscopic Knives, Laparoscopic Graspers, Laparoscopic Forceps |
| Micro Instruments: |
| Verres Needles, Biopsy Needles, Corneal Scissors, Urethra tomes, Micro Rongeurs, Micro Forceps Micro Scissors |
| Bi-Polar Repairs: |
| Standard Bipolar, Irrigating Bipolar, Standard Bipolar, Irrigating Bipolar |
| Sterilization Container Repair: |
| Aesculap, Katena, Case Medical |
| Endoscopic and Laparoscopic Instruments (modular and non-modular): |
| Graspers, dissectors, scissors, clamps, biopsy instruments and forceps (to include with or without ratchets). |
| Light Cables and adaptors to fit all manufacturers: |
| Light Cable 3mm x 6 ft w/2 adaptors, Light Cable 3mm x 8 ft w/2 adaptors, Light Cable 4mm x 6 ft w/2 adaptors, Light Cable 5mm x 6 ft w/2 adaptors, Light Cable 5mm x 8 ft w/2 adaptors |
The lists provided below are not all inclusive of the instruments that will be on the contract over its lifetime and may be subject to change over time.
APPENDIX A:
· Critical sets: Appendix A- high risk, low volume.
| Service |
| Container Name |
| Number of Sets |
| Instrument |
| OR - Eye |
| Cataract Trays |
| 10 |
| 35 |
| Dental |
| Straumann Implant Kit with AS |
| 5 |
| 16 |
| OR – Pain |
| Halyard Nitinol RF Probe, 145mm STR |
| 8 |
| 2 |
| OR - Retractor |
| Retractor Set |
| 5 |
| 27 |
| OR - TPX |
| TPX Set New |
| 5 |
| 17 |
| OR - Lesion |
| Lesion Set |
| 6 |
| 28 |
| OR - Basic |
| Basic Set |
| 4 |
| 44 |
| OR - Eye |
| Toric Instrument Set |
| 4 |
| 4 |
| OR - Pain |
| Halyard Nitinol RF Probe, 100mm STR |
| 8 |
| 2 |
| OR - Ortho |
| Ortho Basic |
| 4 |
| 44 |
| OR - General |
| Lap Chole Set New 2018 |
| 4 |
| 22 |
| Clinic |
| Minor Clinic |
| 2 |
| 19 |
| Dental |
| Standard Oral Surgery |
| 6 |
| 25 |
| OR - Power |
| Stryker System 7 Large Power |
| 4 |
| 11 |
| OR - Laparoscopic |
| Stryker LAP 4K Camera |
| 8 |
| 2 |
| OR - General |
| Rectal Set |
| 3 |
| 26 |
| OR - Power |
| Saw, Precision Oscillating Tip |
| 4 |
| 1 |
| OR - Power |
| Stryker CD4 Small Power |
| 3 |
| 11 |
| OR - General |
| Needle Holder & Knot Pusher 2018 |
| 2 |
| 5 |
| OR - Eye |
| Lacrimal Duct Probes |
| 1 |
| 4 |
| OR - General |
| Closure Tray |
| 2 |
| 19 |
| OR - Delicate |
| Duet Forcep |
| 2 |
| 3 |
| OR - Eye |
| Pterygium (Plastics Eye Tray) |
| 2 |
| 26 |
| OR - General |
| Bookwalter Bars |
| 1 |
| 8 |
| OR - General |
| Bookwalter Blades |
| 2 |
| 21 |
| OR - General |
| Bookwalter Bar #2 |
| 1 |
| 9 |
| OR - Vascular |
| CV Set New |
| 3 |
| 44 |
| OR-Vascular |
| CV Extra’s Set |
| 1 |
| 14 |
| OR - Laparoscopic |
| Karl Storz Scope Holder |
| 2 |
| 6 |
| OR - Retractor |
| Balfour Retractor Regular |
| 1 |
| 8 |
| OR - Retractor |
| DeBakey Balfour Retractor Deep |
| 2 |
| 4 |
| OR - Pain |
| Halyard Nitinol RF Probes, 54mm STR |
| 2 |
| 2 |
| OR - General |
| Lap Chole Extras 2018 |
| 2 |
| 12 |
| OR - Laparoscopic |
| Princeton Long Laparoscopic Set |
| 2 |
| 43 |
| OR - General |
| Adjustable Bookwalter Ring/Bar (Codman) |
| 1 |
| 12 |
| OR - Ortho |
| Ankle Distractor |
| 1 |
| 3 |
| OR - General |
| Bookwalter Blades Extras |
| 1 |
| 10 |
| OR - Retractors |
| St. Mark Retractor 9” Angled Lip Fiberoptic |
| 2 |
| 3 |
| OR - Eye |
| Katena Cataract Extras |
| 4 |
| 4 |
| OR - Vascular |
| Thompson Bar |
| 2 |
| 5 |
| OR - Vascular |
| Thompson Blade Pan |
| 2 |
| 19 |
| OR - Retractor |
| Grand/Henley Retractor |
| 1 |
| 7 |
| OR - Retractor |
| Henley Smooth Blades |
| 1 |
| 3 |
| OR - Retractor |
| Lighted Thorlakson Retractors |
| 1 |
| 3 |
| OR - Retractor |
| Retractor Anal Parks Set |
| 1 |
| 7 |
| OR - Vascular |
| Thompson Carotid Extras |
| 1 |
| 6 |
| OR - Vascular |
| Thompson Liver Blade Extras |
| 1 |
| 8 |
| OR - Retractors |
| Thorlakson Retractors |
| 1 |
| 3 |
| OR - Vascular |
| Thompson Carotid Bar Set |
| 2 |
| 3 |
| OR - Vascular |
| Thompson Carotid Bar Pan |
| 2 |
| 25 |
| OR -Vascular |
| Thompson Knuckles & Discs |
| 2 |
| 32 |
| OR - Retractor |
| Retractor Balfour Pedi Abdominal 3 ½” |
| 1 |
| 6 |
| OR - Vascular |
| Vascular Extras |
| 1 |
| 13 |
| OR/Clinic - GU |
| Vasectomy |
| 5 |
| 11 |
| OR - GU |
| Cysto Offset Ureteroscope |
| 1 |
| 3 |
| OR - Vascular |
| Carotid Bar with 1 Knuckle set |
| 1 |
| 3 |
| OR - Scope |
| Thoracoscopy Set |
| 1 |
| 18 |
| OR - Vascular |
| Scanlon Tunneler Set |
| 3 |
| 5 |
APPENDIX B:
Routine Sets: Appendix B: Preventative Maintenance Schedule – May be removed from site for up to 7 DAYs
| Service |
| Container Name |
| Number Of Set |
| Inst |
| Dental |
| Restoration |
| 20 |
| 32 |
| Dental |
| Hygiene |
| 28 |
| 15 |
| OR - Podiatry |
| Podiatry Set |
| 6 |
| 57 |
| Dental |
| Dental Exam |
| 43 |
| 5 |
| Dental |
| Dental Hygiene Student |
| 12 |
| 13 |
| Dental |
| Straumann Implant Kit |
| 10 |
| 1 |
| Dental |
| 3 Shape Trios 4 Scanner Tip |
| 5 |
| 13 |
| Dental |
| Triodent V-Ring Kit |
| 10 |
| 2 |
| OR - Ortho |
| De Mayo Knee Positioner Base Case |
| 3 |
| 1 |
| ER |
| Facial Laceration Tray |
| 8 |
| 6 |
| Dermatology |
| Derm Tray |
| 8 |
| 9 |
| Dental |
| Dental Lamb Extras |
| 2 |
| 1 |
| OR - Ortho |
| Hand Set |
| 4 |
| 36 |
| OR - Ortho |
| New OR De Mayo Knee Positioner Acc Case |
| 3 |
| 2 |
| Dental |
| Dental Denture Adjustment Kits |
| 30 |
| 8 |
| OR - General |
| Acufex Set |
| 1 |
| 15 |
| OR - Ortho |
| Knee Universal Patellar INST Tray |
| 2 |
| 35 |
| OR - Laparoscopic |
| Laparoscopic TEP Extras |
| 1 |
| 9 |
| OR - Ortho |
| Stryker Fluted Headless Pins (x4) |
| 5 |
| 4 |
| Specials |
| SPR Lesion Set |
| 7 |
| 10 |
| OR - Ortho |
| Stryker Ortho Biters |
| 1 |
| 19 |
| OR - Ortho |
| Ortho Shaver Set |
| 3 |
| 16 |
| Dental |
| Dental Cindy Extras |
| 2 |
| 9 |
| OR - Ortho |
| S&N GEN II Reamers 10-12-14MM |
| 2 |
| 3 |
| OR - Ortho |
| Elevators Key Ortho |
| 1 |
| 5 |
| Dental |
| Straumann Novaloc |
| 4 |
| 3 |
| OR - Ortho |
| Synthes Mini Frag Set (Back-up) |
| 1 |
| 34 |
| Dental |
| Dental Hygiene Perio |
| 6 |
| 16 |
| OR - Arthroscope |
| Stryker 4mm 30 degree Arthroscope Set |
| 3 |
| 2 |
| OR - Retractors |
| Hill Ferguson Retractors Set |
| 4 |
| 3 |
| OR - Ortho |
| Stryker Backup Ortho Biters |
| 7 |
| 64 |
| Dental |
| Dental Titanium Implant Scaler Kit K-1800 |
| 6 |
| 5 |
| OR - Ortho |
| Stryker Small Joint Inst. |
| 2 |
| 15 |
| OR - General |
| Retractor Hill/Ferg Lighted (Rectal) |
| 2 |
| 4 |
| OR - General |
| New Hemorrhoid Bander Set |
| 8 |
| 5 |
| OR - General Surgery |
| Long Instrument sets |
| 4 |
| 30 |
| Dental |
| Lundy Extras |
| 2 |
| 10 |
| Dental |
| Nobel Implant Kit |
| 2 |
| 3 |
| OR - Podiatry |
| Arthrex Ankle Distractor |
| 2 |
| 8 |
| OR - General |
| Bowel Clamps |
| 4 |
| 12 |
| OR - Ortho |
| Shukla Mini Screw Extraction Set |
| 2 |
| 29 |
| OR - Retractor |
| Henly Retractor Set |
| 3 |
| 7 |
| Dental |
| Dental Garrison Ring Kit |
| 4 |
| 3 |
| Dental |
| Dental Student Extras |
| 2 |
| 3 |
| OR - Ortho |
| Shukla Univ. Screw Extraction Set |
| 2 |
| 29 |
| OR - Ortho |
| Bone Holding Forcep & Large Ankle Forcep |
| 1 |
| 11 |
| OR - Ortho |
| Cement Removal Instruments |
| 1 |
| 32 |
| OR - Ortho |
| Currettes (Ortho) |
| 1 |
| 9 |
| OR – Ortho |
| Steinmann Plain Pin Set |
| 1 |
| 60 |
| OR - Ortho |
| Synthes LCP Lg Fragment Inst Locking |
| 1 |
| 57 |
| OR - Ortho |
| Knee P/S Tibial Insert Trial Tray |
| 2 |
| 24 |
| OR - Arthroscopic |
| Stryker 4mm 70 Deg Arthroscope Set |
| 2 |
| 2 |
| OR - Ortho |
| Shukla Maxi Large Screw Extraction |
| 2 |
| 38 |
| OR - Power |
| Stryker Reciprocating Saw Set |
| 3 |
| 1 |
| Dental |
| McGarvey Extras |
| 2 |
| 3 |
| OR - Ortho |
| Osteotomes |
| 2 |
| 4 |
| OR - Ortho |
| Bone Biopsy Instruments |
| 1 |
| 6 |
| OR - Ortho |
| Cannulated Screw Set Extras |
| 1 |
| 13 |
| OR - General |
| Dallo Miles |
| 1 |
| 7 |
| OR - Ortho |
| Hand Osteotomes |
| 1 |
| 5 |
| OR - General |
| Injector Capsule Tension Ring |
| 1 |
| 1 |
| OR - General |
| Liston Amputation Knife |
| 1 |
| 1 |
| OR - General |
| Neuro Osteotomes |
| 1 |
| 11 |
| OR - Ortho |
| Screw Removal Set |
| 1 |
| 55 |
| OR - Ortho |
| Steinmann Threaded Pin Set |
| 1 |
| 60 |
| OR - Ortho |
| Synthes D.C.P Plates |
| 1 |
| 44 |
| OR - Ortho |
| Synthes LC-DCP DCP Basic Inst Set Lg Frag |
| 1 |
| 56 |
| OR - Ortho |
| Synthes Mini Fragment Self Tapping |
| 1 |
| 258 |
| OR - General |
| Amputation Pack |
| 3 |
| 5 |
| Dental |
| Straight-Post red |
| 8 |
| 5 |
| OR - General |
| Hemorrhoid Bander Set |
| 2 |
| 6 |
| OR - General |
| Henley Blades 1 1/2” (4 blades) |
| 2 |
| 4 |
| OR - Laparoscopic |
| Stryker 10mm 0 & 30 degree Lap Lens Set |
| 2 |
| 4 |
| OR - Arthroscopic |
| Stryker 2.7mm 30 degree Arthroscope |
| 2 |
| 2 |
| Dental |
| Standard Dental Endo |
| 3 |
| 28 |
| Dental |
| BlisSonic Scaling Tips |
| 12 |
| 3 |
| OR - Vascular |
| Aortic Set |
| 2 |
| 23 |
| OR- Eye |
| Crawford Lacrimal Intubation Set |
| 1 |
| 2 |
| Dental |
| Dr. Monson Rubber Dam Clamps |
| 1 |
| 11 |
| OR - Ortho |
| Craig Bone Biopsy Set |
| 1 |
| 8 |
| OR - General |
| Curette Neuro Short |
| 1 |
| 8 |
| OR - Ortho |
| Ortho 6.5mm Cannulated Screw Set |
| 1 |
| 137 |
| OR - Retractors |
| St Marks 7 and 9” Retractors Fiberoptic |
| 1 |
| 3 |
| OR – Ortho |
| Stryker Core Saber/PI Drive 2 Plus Drill |
| 1 |
| 6 |
| OR - Ortho |
| Synthes LCP Large Fragment Plates |
| 1 |
| 34 |
| OR - Ortho |
| Synthes LCP Large Fragment Screw Set |
| 1 |
| 543 |
| OR - General |
| Table Top Plate Bender |
| 1 |
| 1 |
| OR - General |
| Trocar Irrigating Canula |
| 1 |
| 4 |
| OR - Eye |
| Cataract Extras |
| 3 |
| 10 |
| OR - General |
| Biomet CTR Angled Heiss Set |
| 2 |
| 2 |
| OR - Cardiothoracic |
| Chest Set |
| 2 |
| 38 |
| OR - Cardiothoracic |
| Finochietto Pediatric Rib Spreader |
| 2 |
| 1 |
| OR - General |
| Gallbladder Set |
| 2 |
| 12 |
| OR - Emergency |
| Tracheostomy Set |
| 2 |
| 45 |
| Dental |
| Red ParaPost XP Kit |
| 1 |
| Dental |
| Yellow ParaPost XP Kit |
| 1 |
| OR - Ortho |
| Plantar Fasciotomy |
| 1 |
| 6 |
| OR - Eye |
| Eye Enucleation Set |
| 1 |
| 11 |
| OR - General |
| Medline Crossroads Cotton Trials 5-6, 7-8 |
| 1 |
| 2 |
| OR - Power |
| Stryker Corded High Torque Drill |
| 1 |
| 6 |
| OR - General |
| Thyroid Pan |
| 1 |
| 27 |
| OR - General |
| Unfolder Handpiece |
| 1 |
| 1 |
| Dental |
| Dental Endo Files 30mm |
| 5 |
| 7 |
| Dental |
| Dental Gates Glidden Kit |
| 2 |
| OR-GU |
| TUR Set |
| 8 |
| 29 |
| OR-Ortho |
| Affiniti Humeral Bottom Tray (Tornier) |
| 2 |
| 31 |
| OR-Ortho |
| Affiniti Humeral Middle Tray (Tornier) |
| 2 |
| 18 |
| OR-Ortho |
| Affiniti Humeral Top Tray (Tornier) |
| 2 |
| 21 |
| OR -Ortho |
| Allen shoulder Holder New |
| 1 |
| 3 |
| OR-Ortho |
| Allen Shoulder Holder Old |
| 1 |
| 2 |
| OR-Eye |
| Amo Ophthalmic Emerald Unfolder Delivery System |
| 1 |
| 1 |
| OR-Ortho |
| Arthrex MIS Handpiece Set New |
| 2 |
| 3 |
| OR-Ortho |
| Arthrex MIS Instrument Set New |
| 2 |
| 4 |
| OR-Vascular |
| AV Fistula Set |
| 3 |
| 5 |
| OR-Vascular |
| AV Sheath Tunneler |
| 1 |
| 20 |
| OR-Ortho |
| Bone Spikes |
| 1 |
| 5 |
| OR-Ortho |
| Cannulated Screw Set Extras |
| 1 |
| 12 |
| Or-Retractor |
| Charnley Amstutz Extras |
| 1 |
| 3 |
| OR-Retractor |
| Charnley Retractor Set |
| 2 |
| 14 |
| OR-GU |
| Circumcision Tray |
| 2 |
| 10 |
| OR-Emergency |
| Cooley Sternotomy Spreader Adult Set |
| 1 |
| 3 |
| OR-Ortho |
| Cutting blocks Langs Favorite |
| 1 |
| 4 |
| OR-Ortho |
| DeMayo Knee Positioner Base Case |
| 3 |
| 1 |
| OR-Ortho |
| Dr. Olswing’s Knee Extras |
| 1 |
| 9 |
| OR-vascular |
| Garrett Dilators x9 |
| 2 |
| 9 |
| OR-Ortho |
| Hemi-Arthroplasty Set |
| 2 |
| 40 |
| OR-Retractor |
| Henley Smooth Blades |
| 1 |
| 3 |
| OR-Vascular |
| Kelly Wick Tunnler |
| 1 |
| 14 |
| OR-Ortho |
| Knee ACF Cut Blocks & Ream Fem Trials |
| 2 |
| 18 |
| OR-Ortho |
| Knee ACF Femoral Instrument Tray |
| 2 |
| 22 |
| OR-Ortho |
| Knee CR Tibial Insert Trial Tray |
| 2 |
| 44 |
| OR-Ortho |
| Knee Femoral Miscellaneous |
| 2 |
| 16 |
| OR-Ortho |
| Knee Holder |
| 2 |
| 1 |
| OR-Ortho |
| Knee P/S Ream Through Femoral Tray |
| 2 |
| 13 |
| OR-Ortho |
| Knee P/S Tibial Insert Trial Tray |
| 2 |
| 24 |
| OR-Ortho |
| Knee Tibial Instrument Tray |
| 2 |
| 30 |
| OR-Ortho |
| Knee Tibial Miscellaneous Tray |
| 2 |
| 15 |
| OR-GU |
| Lens Cysto 70 degrees |
| 4 |
| 1 |
| OR - Vascular |
| Mediastinoscopy |
| 1 |
| 20 |
| OR-Vascular |
| Mediastinoscopy Extras |
| 1 |
| 9 |
| OR-GU |
| Olympus 110 Deg Cysto Lens |
| 1 |
| 1 |
| OR-GU |
| Olympus Gyrus Set |
| 4 |
| 4 |
| OR-GU |
| Olympus Long Resectoscope Set |
| 1 |
| 7 |
| OR-GU |
| Olympus Urethrotome Blade & Knife |
| 1 |
| 2 |
| OR-GU |
| Olympus Urethrotome Set |
| 1 |
| 7 |
| OR-Ortho |
| Ortho 6.5mm Cannulated Screw Set |
| 1 |
| 138 |
| OR-Power |
| Oscillating Saw Stryker |
| 1 |
| 1 |
| OR - Retractors |
| O’Sullivan O’Connor retractor w/4 Blades |
| 1 |
| 5 |
| OR-GU |
| Penile Dilators |
| 1 |
| 7 |
| OR-GU |
| Penile Prothesis BackUp Set |
| 1 |
| 27 |
| OR-GU |
| Penile Prosthesis |
| 1 |
| 27 |
| OR-Vascular |
| Probe, Pencil, Doppler, 8MHZ (Koven) |
| 1 |
| 1 |
| OR-GU |
| Prostatectomy |
| 1 |
| 30 |
| OR-Vascular |
| PV Sheath Tunneler |
| 1 |
| 8 |
| OR-Ortho |
| R3 Hip Main Inst Tray |
| 2 |
| 21 |
| OR-Ortho |
| R3 Reamer Dome Tray |
| 2 |
| 27 |
| OR-Ortho |
| R3 Trial Shell Tray |
| 2 |
| 21 |
| OR-GU |
| Rigid Ureteroscope MR-6LA |
| 4 |
| 3 |
| OR-Ortho |
| S&N Small Joint Shaver |
| 1 |
| 1 |
| OR-Ortho |
| Shoulder Mini-Open Retractor |
| 1 |
| 7 |
| OR-Ortho |
| Shoulder Set |
| 2 |
| 19 |
| OR-Ortho |
| Small Joint Arthroplasty System |
| 1 |
| 18 |
| OR-GU |
| Sounds Lefort Urethral (10Fr-30Fr) |
| 1 |
| 11 |
| OR-GU |
| Sounds Van Buren Urethral |
| 2 |
| 8 |
| OR-Ortho |
| Steinmann Threaded Pin Set |
| 1 |
| 60 |
| OR-Power |
| Stryker Core Saber/PI Drive 2 Plus Drill |
| 1 |
| 6 |
| OR -Ortho |
| Synergy Broach Tray Hip |
| 2 |
| 34 |
| OR-Ortho |
| Synergy Femoral Reamer Tray (Hip) |
| 2 |
| 13 |
| OR-Ortho |
| Synthes LCP Lg Fragment Inst Locking |
| 1 |
| 57 |
| OR-Ortho |
| Synthes LCP Sm. Frag Inst & Implant Set 1A |
| 1 |
| 63 |
| OR-Ortho |
| Synthes LCP Sm Frag Inst & Implant Set 1 |
| 1 |
| 612 |
| OR-Ortho |
| Tornier Affiniti Glenoid Instrument Set |
| 1 |
| 39 |
| OR-Ortho |
| Total Shoulder Retractor |
| 2 |
| 9 |
| OR-Ortho |
| Total Shoulder Extras |
| 2 |
| 6 |
| OR-Ortho |
| Unipolar Trial |
| 1 |
| 26 |
| OR-Vascular/GU |
| Yasergil Appliers |
| 3 |
| 2 |
| OR-Retractor |
| Parsonnet Epicardial Retractor |
| 1 |
| 2 |
| OR-Retractor |
| Retractor Balfour Pedi Abdominal 1 ½” |
| 1 |
| 2 |
| OR-Gyn |
| Abdominal Hysterectomy Set |
| 1 |
| 32 |
| OR-Gyn |
| D & C Set |
| 2 |
| 26 |
| OR-Gyn |
| Gyn LEEP Set |
| 2 |
| 5 |
| OR-Gyn |
| Hegar Uterine Dilator Set |
| 1 |
| 11 |
36C26326Q0870
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Deviation OCT 2025)
(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—
(1) Notify the Contracting Officer in writing as soon as possible;
(2) Remedy the delay as quickly as possible; and
(3) Notify the Contracting Officer when the occurrence is over.
(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable;
(D) Contractor point of contact; and
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(5) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if–
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .