S02 SSJ - 523A5-24-010 - Expansion Joint Corrections.pdf

PDF 250 KB Posted

Attached to
Z1DZ--523A5-24-010 Expansion Joint Corrections
Solicitation number
36C24124B0053
Issued by

About this file

This document is a Single Source Justification (SSJ) for Simplified Acquisition Procedures (SAP) under the Simplified Acquisition Threshold (SAT) for project 36C24124B0053 - Z1DZ--523A5-24-010 Expansion Joint Corrections at the VA Medical Center in Brockton, MA.

The justification states that the required Johnsonite/Tarkett resilient base and Nurazzo Tile are part of an existing wayfinding program at the facility, and the new work must match the existing installations. Therefore, only these manufacturers' products are acceptable, and no substitutions are allowed. The estimated cost for the project is $2,500. No further market research was conducted since the specified products were previously obtained through full and open competition. The Contracting Officer has certified the justification in accordance with FAR 13.106-1(b).

View the file

Other files

File Type Posted
36C24124B0053 0005.docx DOCX document
Tile Quantities.pdf PDF
523A5-24-010 Bid Opening Conference Line 11-26-24.pdf PDF
36C24124B0053 0004.docx DOCX document
Work Narrative_R1 - 523A5-24-010 - Expansion Joint Corrections.pdf PDF
523A5-24-010 RFIs v4 FINAL POSTED.pdf PDF
36C24124B0053 0003.docx DOCX document
36C24124B0053 0002.docx DOCX document
Amendment 2 RFI.pdf PDF
General Decision Number MA20240012 11-1-24.pdf PDF
36C24124B0053 0001.docx DOCX document
523A5-24-010 Site Visit Sign In Sheet.pdf PDF
523A5-24-010 RFI Responses from COR 11-5-24.pdf PDF
S02 523A5-24-010 01 32 16 15 Project Schedule_Final 1218.pdf PDF
S02 523A5-24-010 PCRA Determination - 523A5-24-010 - Expansion Joint Correction.pdf PDF
S02 523A5-24-010 SECTION 01 35 26 - SAFETY REQUIREMENTS.pdf PDF
S02 523A5-24-010 SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT.pdf PDF
36C24124B0053.docx DOCX document
S02 523A5-24-010 ICRA Determination - 523A5-24-010 - Expansion Joint Correction.pdf PDF
S02 SOW - 523A5-24-010 - Expansion Joint Corrections.pdf PDF
S02 DWG - 523A5-24-010 - Expansion Joint Corrections.pdf PDF
S02 WD 20240012 9-20-2024.pdf PDF
S02 Work Narrative - 523A5-24-010 - Expansion Joint Corrections.pdf PDF
S02 523A5-24-010 SECTION 01 00 00 GENERAL REQUIREMENTS.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Single Source Justification for SAP under the SAT

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards IAW FAR 13.106-1 For

Over Micro-Purchase Threshold but Not Exceeding the SAT ($250K)

Acquisition Plan Action ID:_ 36C241-24-AP-4069

1. Contracting Activity: Department of Veterans Affairs, VISN 01, 523A5 Brockton Medical Center

2. Brief Description of Supplies/ Services required and the intended use/Estimated Amount:

Installation of tiles, resilient base, and grout in the corridor at the specified locations. The following are the required manufacturers: 1. Resilient Base: Johnsonite/Tarkett; and 2. Tile: Nurazzo Tile.

Estimated Costs: $2,500

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

Johnsonite/Tarkett is the specified resilient base as part of an overall wayfinding program being implemented at VA Brockton. It is the currently installed resilient base in the tunnel system, and the new work must match the existing work. Therefore, only this manufacturer’s products are acceptable, no substitutions.

Nurazzo Tile is the specified tile as part of an overall wayfinding program at VA Brockton. These tiles are resilient tiles designed to stand up to the rigors of a hospital setting. It is the currently installed tile in the tunnel system, and the new work must match the existing work. Therefore, only this manufacturer’s products are acceptable, no substitutions.

4. Description of market research conducted and results or statement why it was not conducted:

Market Research was not conducted in association with this request. The reason is that the products and services to be sole sourced were previously obtained through full and open competition procedures and are now integral parts of existing facility systems.

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

Heather Libiszewski-Gallien Contracting Officer

2024-08-14T09:57:29-0400
HEATHER LIBISZEWSKI-GALLIEN

File details come from the government source that posted it. Updated .