This document is an Infection Prevention and Control Construction/Renovation/Maintenance Permit for project 523A5-24-010 to replace expansion joints and repair damaged tile in the tunnel system at the VA Medical Center in Brockton, MA. The project goals are to correct deficient expansion joints, repair damaged tile at the expansion joints, and complete tile work at the building entrances. The project is categorized as Level II infection control precautions, requiring measures such as active dust control, sealed containment, HEPA filtration, and negative pressure to prevent dust and debris from spreading. The overall patient risk is low. The solicitation for this project, Solicitation Number 36C24124B0053, is an invitation for bid issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA-ICRA-2023-1.0
Infection Prevention and Control Construction/Renovation/Maintenance Permit
This page must be posted at the entrance to the project area for Level III and Level IV activities.
Unique permit number:
Location of construction/renovation/maintenance
523A5-24-010 – Replace Expansion Joint – Throughout Brockton Tunnel System - The goals of this project are to correct deficient expansion joints in the tunnel area, repair damaged tile at the expansion joints, and complete tile work at the Building entrances.
Project manager Steven Riley Project start date - Contact phone number 774-826-2391 Completion date - Contractor TBD Permit expiration date -
Activity Category (A, B, C, or D) B Overall Patient Risk Category
(Low, Medium, High, or Highest) Low Level of Infection Prevention and Control Precautions (I, II, III, or IV) II
Level of Precautions
Control measures to be in place for the duration of the activity (Check the box for the activity’s Level of Precautions to indicate the Control Measures)
Level I
1. Perform work activity in a manner that does not create dust.
2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.
3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.
Level II
All control measures in Level I and the following:
1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).
2. Ensure worker clothing is clean and free of visible dust before leaving the work area.
3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.
4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system
5. Seal doors, to prevent dust migration.
6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.
7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.
Level III
All control measures in Levels I and II and the following:
1. Ensure availability of equipment for cleaning hands.
2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.
3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.
4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.
6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.
Level IV
All control measures in Levels I, II and III and the following:
1. Barriers must be hard barriers unless temporary to install final barrier.
2. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.
3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.
4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.
Additional requirements: When completing work that creates dust, utilize tools that have a HEPA vacuum attachment to prevent dust. Contractor to install containment to contain all dust, and odors produced because of the work occurring to complete the Project Scope. This may require negative pressure if the barrier is unable to contain dust and/or odors due to Contractors means and methods.
Project Manager signature Date STEVEN M RILEY 3353810 Digitally signed by STEVEN M RILEY 3353810
Date: 2023.09.08 11:18:06 -04'00'
VHA-ICRA-2023-1.0
Infection Preventionist signature Date Alice F. Skolnik 367514