This solicitation seeks proposals for a construction project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. Project 695-19-114 aims to upgrade plumbing systems to prevent Legionella by removing cross-connected and dead-leg domestic water lines, installing recirculation lines with balance valves, adding thermostatic mixing valves to fixtures, and establishing water quality monitoring stations. The project encompasses work in Building 123 and Building 111, including asbestos abatement and architectural patching. Offerors should propose to provide project management, labor, materials, equipment, and supervision to complete the required construction documents, drawings, and specifications. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
Department of Veterans Affairs Clement J. Zablocki VAMC
Upgrade Plumbing for Legionella Prevention VA Project No. 695-19-114
100% Construction Documents March 18, 2020
Prepared by:
Apogee Consulting Group, PA
1151 Kildaire Farm Road Cary, NC 27511
DocuSign Envelope ID: FBB66F22-B270-4ECB-95DE-0B63C07FBB0F
3/18/20203/18/2020
DocuSign Envelope ID: FBB66F22-B270-4ECB-95DE-0B63C07FBB0F
Milwaukee VAMC 695-19-114 Upgrade Plumbing for Legionella Prevention 100% Construction Documents Milwaukee, WI 53295 March 18, 2020
Lian Wu. Xia, PE Mechanical Engineer
Theodore John Mowen, RA Registered Architect
DocuSign Envelope ID: FBB66F22-B270-4ECB-95DE-0B63C07FBB0F
3/18/2020 3/18/2020
Milwaukee VAMC 10-19
Milwaukee, WI 53295 March 18, 2020
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 12-18 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 Reference Standards 09-19 01 45 00 Quality Control 03-19 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 13.13 Glovebag Asbestos Abatement 09-15
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 16 63 Cementitious Sheathing 02-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 29 00 Gypsum Board 06-18 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-16
Milwaukee VAMC 10-19
Milwaukee, WI 53295 March 18, 2020
00 01 10 - 2
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 09-15
Milwaukee, WI 53295 March 18, 2020
DRAWING LIST
No. Description Dwg of Dwg
COVER
GI001 PROJECT COVER 1 247
GI002 PROJECT SHEET LIST 2 247
INFECTION
CONTROL
IC-1 BUILDING 111 BASEMENT 3 247
IC-2 BUILDING 111 FIRST FLOOR 4 247
IC-3 BUILDING 111 SECOND FLOOR 5 247
IC-4 BUILDING 111 THIRD FLOOR 6 247
IC-5 BUILDING 111 FOURTH FLOOR 7 247
IC-6 BUILDING 111 FIFTH FLOOR 8 247
IC-7 BUILDING 111 SIXTH FLOOR 9 247
IC-8 BUILDING 111 SEVENTH FLOOR 10 247
IC-9 BUILDING 111 EIGHTH FLOOR 11 247
IC-10 BUILDING 111 NINTH FLOOR 12 247
IC-11 BUILDING 111 TENTH FLOOR 13 247
IC-12 BUILDING 123 14 247
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 15 247
P-1-1 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN 16 247
P-1-1A1 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
A1
17 247
P-1-1A2 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
A2
18 247
P-1-1A3 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
A3
19 247
P-1-1A4 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
A4
20 247
P-1-1A5 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
A5
21 247
P-1-1A6 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
A6
22 247
P-1-1A7 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
A7
23 247
P-1-1B1 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
B1
24 247
P-1-1B2 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
B2
25 247
P-1-1B3 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
B3
26 247
P-1-1B4 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
B4
27 247
P-1-1C1 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
C1
28 247
Milwaukee, WI 53295 March 18, 2020
P-1-1C2 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
C2
29 247
P-1-1C3 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
C3
30 247
P-1-1C4 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
C4
31 247
P-1-1C5 SUB-BASEMENT DOMESTIC WATER PLUMBING PLAN AREA -
C5
32 247
P-100 BASEMENT DOMESTIC WATER PLUMBING PLAN 33 247
P-100A1 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - A1 34 247
P-100A2 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - A2 35 247
P-100A3 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - A3 36 247
P-100A4 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - A4 37 247
P-100A5 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - A5 38 247
P-100A6 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - A6 39 247
P-100B1 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - B1 40 247
P-100B2 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - B2 41 247
P-100B3 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - B3 42 247
P-100B4 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - B4 43 247
P-100B5 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - B5 44 247
P-100B6 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - B6 45 247
P-100C1 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C1 46 247
P-100C2 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C2 47 247
P-100C3 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C3 48 247
P-100C4 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C4 49 247
P-100C5 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C5 50 247
P-100C6 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C6 51 247
P-100C7 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C7 52 247
P-100C8 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C8 53 247
P-100C9 BASEMENT DOMESTIC WATER PLUMBING PLAN AREA - C9 54 247
P-101 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN 55 247
P-101A1 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
56 247
P-101A2 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
57 247
P-101A3 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
58 247
P-101A4 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
59 247
P-101A5 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
60 247
P-101A6 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
61 247
P-101B1 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
62 247
P-101B2 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
63 247
Milwaukee, WI 53295 March 18, 2020
P-101B3 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B3
64 247
P-101B4 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B4
65 247
P-101B5 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B5
66 247
P-101C1 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
67 247
P-101C2 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
68 247
P-101C3 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
69 247
P-101C4 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
70 247
P-101C5 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
71 247
P-101C6 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
72 247
P-101C7 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C7
73 247
P-101C8 FIRST FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C8
74 247
P-102 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN 75 247
P-102A1 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
76 247
P-102A2 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
77 247
P-102A3 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
78 247
P-102A4 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
79 247
P-102A5 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
80 247
P-102A6 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
81 247
P-102B1 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
82 247
P-102B2 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
83 247
P-102B3 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B3
84 247
P-102B4 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B4
85 247
P-102B5 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B5
86 247
P-102B6 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B6
87 247
P-102C1 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
88 247
P-102C2 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
89 247
P-102C3 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
90 247
Milwaukee, WI 53295 March 18, 2020
P-102C4 SECOND FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
91 247
P-103 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN 92 247
P-103A1 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
93 247
P-103A2 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
94 247
P-103A3 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
95 247
P-103A4 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
96 247
P-103A5 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
97 247
P-103A6 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
98 247
P-103B1 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
99 247
P-103B2 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
100 247
P-103B3 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B3
101 247
P-103B4 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B4
102 247
P-103C1 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
103 247
P-103C2 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
104 247
P-103C3 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
105 247
P-103C4 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
106 247
P-103C5 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
107 247
P-103C6 THIRD FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
108 247
P-104 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN 109 247
P-104A1 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
110 247
P-104A2 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
111 247
P-104A3 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
112 247
P-104A4 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
113 247
P-104A5 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
114 247
P-104A6 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
115 247
P-104B1 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
116 247
P-104B2 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
117 247
P-104B3 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B3
118 247
Milwaukee, WI 53295 March 18, 2020
P-104B4 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B4
119 247
P-104C1 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
120 247
P-104C2 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
121 247
P-104C3 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
122 247
P-104C4 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
123 247
P-104C5 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
124 247
P-104C6 FOURTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
125 247
P-105 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN 126 247
P-105A1 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
127 247
P-105A2 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
128 247
P-105A3 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
129 247
P-105A4 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
130 247
P-105A5 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
131 247
P-105A6 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
132 247
P-105B1 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
133 247
P-105B2 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
134 247
P-105B3 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B3
135 247
P-105B4 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B4
136 247
P-105C1 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
137 247
P-105C2 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
138 247
P-105C3 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
139 247
P-105C4 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
140 247
P-105C5 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
141 247
P-105C6 FIFTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
142 247
P-106 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA 143 247
P-106A1 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
144 247
P-106A2 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
145 247
P-106A3 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
146 247
Milwaukee, WI 53295 March 18, 2020
P-106A4 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
147 247
P-106A5 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
148 247
P-106A6 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
149 247
P-106B1 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
150 247
P-106B2 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
151 247
P-106B3 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B3
152 247
P-106C1 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
153 247
P-106C2 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
154 247
P-106C3 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
155 247
P-106C4 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
156 247
P-106C5 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
157 247
P-106C6 SIXTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
158 247
P-107 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN 159 247
P-107A1 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- A1
160 247
P-107A2 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- A2
161 247
P-107A3 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- A3
162 247
P-107A4 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- A4
163 247
P-107A5 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- A5
164 247
P-107A6 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- A6
165 247
P-107B1 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- B1
166 247
P-107B2 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- B2
167 247
P-107B3 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- B3
168 247
P-107C1 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- C1
169 247
P-107C2 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- C2
170 247
P-107C3 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- C3
171 247
P-107C4 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- C4
172 247
P-107C5 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- C5
173 247
Milwaukee, WI 53295 March 18, 2020
P-107C6 SEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA
- C6
174 247
P-108 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN 175 247
P-108B1 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
176 247
P-108B2 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
177 247
P-108C1 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
178 247
P-108C2 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
179 247
P-108C3 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
180 247
P-108C4 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
181 247
P-108C5 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
182 247
P-108C6 EIGHTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
183 247
P-109 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN 184 247
P-109A1 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
185 247
P-109A2 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
186 247
P-109A3 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
187 247
P-109A4 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
188 247
P-109A5 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
189 247
P-109A6 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
190 247
P-109B1 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
191 247
P-109B2 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
192 247
P-109C1 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
193 247
P-109C2 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
194 247
P-109C3 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
195 247
P-109C4 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
196 247
P-109C5 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
197 247
P-109C6 NINTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
198 247
P-110 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN 199 247
P-110A1 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A1
200 247
P-110A2 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A2
201 247
Milwaukee, WI 53295 March 18, 2020
P-110A3 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A3
202 247
P-110A4 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A4
203 247
P-110A5 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A5
204 247
P-110A6 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
A6
205 247
P-110B1 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B1
206 247
P-110B2 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
B2
207 247
P-110C1 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C1
208 247
P-110C2 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C2
209 247
P-110C3 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C3
210 247
P-110C4 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C4
211 247
P-110C5 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C5
212 247
P-110C6 TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA -
C6
213 247
P-111 ELEVENTH FLOOR DOMESTIC WATER PLUMBING PLAN 214 247
P-112 TWELFTH FLOOR DOMESTIC WATER PLUMBING PLAN 215 247
P-113 THIRTEENTH FLOOR DOMESTIC WATER PLUMBING PLAN 216 247
P-123 DOMESTIC WATER PLUMBING PLAN 217 247
P-123A1 DOMESTIC WATER PLUMBING PLAN AREA - A1 218 247
P-123A2 DOMESTIC WATER PLUMBING PLAN AREA - A2 219 247
P-123A3 DOMESTIC WATER PLUMBING PLAN AREA - A3 220 247
P-123A4 DOMESTIC WATER PLUMBING PLAN AREA - A4 221 247
P-123B1 DOMESTIC WATER PLUMBING PLAN AREA - B1 222 247
P-123B2 DOMESTIC WATER PLUMBING PLAN AREA - B2 223 247
P-123B3 DOMESTIC WATER PLUMBING PLAN AREA - B3 224 247
P-123B4 DOMESTIC WATER PLUMBING PLAN AREA - B4 225 247
P-123C1 DOMESTIC WATER PLUMBING PLAN AREA - C1 226 247
P-123C2 DOMESTIC WATER PLUMBING PLAN AREA - C2 227 247
P-123C3 DOMESTIC WATER PLUMBING PLAN AREA - C3 228 247
P-123C4 DOMESTIC WATER PLUMBING PLAN AREA - C4 229 247
P-123D1 DOMESTIC WATER PLUMBING PLAN AREA - D1 230 247
P-123D2 DOMESTIC WATER PLUMBING PLAN AREA - D2 231 247
P-123D3 DOMESTIC WATER PLUMBING PLAN AREA - D3 232 247
P-123D4 DOMESTIC WATER PLUMBING PLAN AREA - D4 233 247
P-123E1 DOMESTIC WATER PLUMBING PLAN AREA - E1 234 247
P-123E2 DOMESTIC WATER PLUMBING PLAN AREA - E2 235 247
P-123E3 DOMESTIC WATER PLUMBING PLAN AREA - E3 236 247
P-123E4 DOMESTIC WATER PLUMBING PLAN AREA - E4 237 247
P-501 PLUMBING RISER SCHEMATIC - EXISTING 238 247
P-502 PLUMBING RISER SCHEMATIC - NEW WORK 239 247
P-503 PLUMBING DETAILS - NEW WORK 240 247
P-601 PLUMBING RISER SCHEDULE 241 247
P-602 PLUMBING SCHEDULES - NEW WORK 242 247
P-603 PLUMBING DEADLEG SCHEDULE 243 247
P-604 PLUMBING FIXTURE SCHEDULE - EXISTING 244 247
P-605 PLUMBING FIXTURE SCHEDULE - EXISTING 245 247
P-606 PLUMBING FIXTURE SCHEDULE - EXISTING 246 247
P-607 PLUMBING CONTROLS 247 247
---END---
Milwaukee VAMC 12-18 i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S) – SEE BID SCHEDULE
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA – NOT USED
1.12 PROFESSIONAL SURVEYING SERVICES – NOT USED
1.13 LAYOUT OF WORK – NOT USED
1.14 AS-BUILT DRAWINGS
1.15 WARRANTY MANAGEMENT – NOT USED
1.16 USE OF ROADWAYS
1.17 Contractor'S FIELD OFFICE – NOT USED
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.19 TEMPORARY USE OF EXISTING ELEVATORS
1.20 TEMPORARY USE OF NEW ELEVATORS – NOT USED
1.21 TEMPORARY TOILETS
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
1.23 NEW TELEPHONE EQUIPMENT – NOT USED
1.24 TESTS
1.25 INSTRUCTIONS
1.26 GOVERNMENT-FURNISHED PROPERTY – NOT USED
1.27 RELOCATED ITEMS
1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT – NOT USED. 18
1.29 CONSTRUCTION SIGN – NOT USED
1.30 SAFETY SIGN – NOT USED
1.31 PHOTOGRAPHIC DOCUMENTATION
1.32 FINAL ELEVATION Digital Images – NOT USED
1.33 HISTORIC PRESERVATION
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. See attached Scope of Work
B. Visits to the site by Bidders may be made only as described in the solicitation in accordance with FAR 52.236-27 Site Visit
(Construction).
C. Offices of Apogee Consulting Group, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than two weeks unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Refer to Section 01 01 10-SN SPECIAL NOTES for fingerprint, badging, construction door access and parking requirements.
1.3 STATEMENT OF BID ITEM(S) – SEE BID SCHEDULE
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and specifications (contract documents) may be obtained from the Beta.Sam.Gov website where the solicitation is posted. Hard copies will be the responsibility and expense of the contractor(s).
01 00 00 -2
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. A Special Agreement SAC form is required for every contract employee. See the SPECIAL NOTES specification for an example of this SAC form. This needs to be supplied to the COR for every contract employee on the jobsite. Even if the contractor has an active badge, a SAC form is needed for the COR’s records.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
B. Document Control:
1. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
2. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
3. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
4. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
C. Motor Vehicle Restrictions
1. Permits shall be issued for General Contractor and its employees for parking in designated areas only. See the SPECIAL NOTES
Specification.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
01 00 00 -3
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
C. Working space and space available for storing materials shall be as determined by the COR.
D. Workers are subject to rules of Medical Center applicable to their conduct.
E. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
F. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and
Milwaukee, WI 53295 March 18, 2020
01 00 00 -4 coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR three weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to
COR and Contractor, as follows:
Phase I: Building 123 and Building 111 low zone domestic hot and cold plumbing systems (sub-basement through 2nd floor, all wings)
Phase II: Building 111 high zone domestic hot and cold plumbing systems (3rd floor through 11th floor, all wings) and C-wing doghouse hot water system (C-wing 3rd floor through 11th floor).
G. Building 111 and 123 will be occupied during performance of work; but immediate areas of alterations will be vacated.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of
Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of
Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
Milwaukee, WI 53295 March 18, 2020
01 00 00 -5
H. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
I. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 21 days in advance of proposed interruption.
Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
Milwaukee, WI 53295 March 18, 2020
01 00 00 -6
4. Major interruptions of any system must be requested, in writing, at least 28 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
J. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
K. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
L. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both to the Contracting Officer. This report shall list by rooms and spaces:
Milwaukee, WI 53295 March 18, 2020
01 00 00 -7
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.
Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR
52.243-4 and VAAR 852.243-70).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
Milwaukee, WI 53295 March 18, 2020
01 00 00 -8
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the
Milwaukee, WI 53295 March 18, 2020
01 00 00 -9 careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the
COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
01 00 00 -10
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR
52.236-2).
1.11 PHYSICAL DATA – NOT USED
1.12 PROFESSIONAL SURVEYING SERVICES – NOT USED
1.13 LAYOUT OF WORK – NOT USED
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
E. Contractors shall update (as work is completed) the VA electrical, medical gas, domestic plumbing and mechanical piping master schematic books. These books are located in the FM office.
F. MEP Coordination Drawings:
1. Prepare and provide coordination drawings showing the location of openings through slabs, the pipe sleeves/anchors and hanger inserts, as well as the location and elevation of utility lines, including, but not limited to, conveyor systems, pneumatic tubes, ducts, all existing utilities, and conduits and pipes 2 inches and larger in diameter. Drawings required for all areas being remodeled or new and
01 00 00 -11 ancillary areas required by such utility runs. Ancillary area drawings to include equal space on each side of main runs from main source to final location. These drawings, including plans, elevations, and sections as appropriate shall clearly show the manner in which the utilities fit into the available space and how they relate to each other and to existing building elements and controls for maintenance operations. Drawings shall be of appropriate scale to satisfy the previously stated purposes, but not smaller than 3/8-inch scale.
2. Drawings must be composite (with distinctive colors for the various trades) including but not limited to HVAC equipment, HVAC ductwork, mechanical piping, plumbing, fire protection, electrical, medical gases, telecommunications, etc. The submitted drawings for a given area of the project shall show the work of all trades which will be involved in that particular area. A complete composite drawing set or complete sets of separate reproducible drawings and AutoCAD files shall be received by the Government not less than 20 days prior to the scheduled start of the work in the area illustrated by the drawings, for the purpose of showing the contractor's planned method of installation.
3. The objectives of such drawings are to promote carefully planned work sequence and proper trade coordination, in order to assure the expeditious solutions of problems and the installation of lines and equipment as contemplated by the contract documents while avoiding or minimizing additional costs to the contractor and to the Government.
In the event the contractor, in coordinating the various installations and in planning the method of installation, finds a conflict in location or elevation of any of the utilities with themselves, with structural items or with other construction items, the contractor shall bring this conflict to the attention of the contracting officer immediately. In doing so, the contractor shall explain the proposed method of solving the problem or shall request instructions as to how to proceed if adjustments beyond those of usual trades coordination are necessary.
4. Contractor to include initial and two revisions as part of original contract. Utilities installation work will not proceed in any area prior to the submission and completion of the Government review of
01 00 00 -12 the coordinated drawings for that area, nor in any area in which conflicts are disclosed by the coordination drawings until the conflicts have been corrected to the satisfaction of the contracting officer. It is the responsibility of the contractor to submit the required drawings in a timely manner consistent with the requirements to complete the work covered by this contract within the prescribed contract time.
1.15 WARRANTY MANAGEMENT – NOT USED
1.16 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
1.17 Contractor'S FIELD OFFICE – NOT USED
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the
COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.
Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014
Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical
01 00 00 -13 equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned.
Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.19 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevators for handling building materials and
Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the COR for use of elevators.
The COR will ascertain that elevators are in proper condition.
Contractor may use B-bank elevators in Building 111 for special nonrecurring time intervals when permission is granted. Personnel for operating elevators will not be provided by the Department of
Veterans Affairs.
2. Contractor covers and provides maximum protection of following elevator components:
01 00 00 -14
a. Entrance jambs, heads soffits and threshold plates.
b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
c. Finish flooring.
3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractors expense.
1.20 TEMPORARY USE OF NEW ELEVATORS – NOT USED
1.21 TEMPORARY TOILETS
A. Contractor may have for use of Contractor's workers; such toilet accommodations as may be assigned to Contractor by Medical Center.
Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workers. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the
Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.
C. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and
01 00 00 -15 damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:
1. Obtain heat by connecting to Medical Center heating distribution system.
a. Steam is available at no cost to Contractor.
D. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system. Electricity is available at no cost to the
Contractor.
E. Water (for Construction and Testing): Furnish temporary water service.
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the
Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.
1.23 NEW TELEPHONE EQUIPMENT – NOT USED
1.24 TESTS
A. Pre-test…