This solicitation is for upgrade plumbing work at the Clement J. Zablocki VA Medical Center in Milwaukee, WI. The project involves removing cross connected and dead leg domestic water lines in Building 123, installing recirculation lines and balance valves, adding thermostatic mixing valves to fixtures, and providing water quality monitoring stations. In Building 111, the work includes improved recirculation lines and risers with balance valves, removing underutilized fixtures and dead legs, and adding thermostatic mixing valves. Asbestos abatement and limited architectural patching is required in both buildings. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 6 7 8 9 10 10' 11 12 13 13'
LL
KK
HH
JJ
WH
1 1/2" DCW
1 1/2" DHW
1/2" DHWR
1/2" IW
1/2" DHWR
1" DCW
3/4" DHW
1/2" DHWR
3/4" DCW
PROGRAM
MANAGER
C2C04
HALLWAY
C2C05
HALLWAY
2550EC
ELECTRICAL
CLOSET
TIMEKEEPER
VASCULAR
PHYSICIAN
ADMINISTRATIVE
ASSISTANT
OPHTHAMOLOGY
PHYSICIAN
ENT
PHYSICIAN
OFFICE
NEUROLOGY
PHYSICIAN
GENERAL
PHYSICIANS
TOILET
ORTHOPEDIC
PHYSICIANS
UROLOGY
PHYSICIANS
COPY ROOM/
STORAGE ROOM
RECEPTION
MER
3/4" DCW DN
5 6 7 8 9 10 10' 11 12 13 13'
LL
KK
HH
JJ
P-102C2
P-102C1
1/2" DHWR
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:3
:0
A
M
P-102C4
SECOND FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - C4
91 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
C4
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
SECOND FLOOR DOMESTIC WATER PIPING PLAN - AREA C4 0 2 4 8
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
nstoltz 3-5-2020
2 3 4 5 6 7 8 9 10 10' 11 12 1313' 14 15 16 17 19 20 21 22 2323a 24 25 26 27 28 29
LL
KK
A
C
D
E
H
J
K L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
BB
CC
FF
GG
HH
JJ
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:4
A
M
P-103
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN
92 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
Scale: 1/16" = 1'-0"
THIRD FLOOR DOMESTIC WATER DEMOLITION PLUMBING PLAN 0 8 16 32
DL
DEAD LEG TAG
AP
AP
DCW
DHW
DHWR
IW
IWR
FL
ABANDON
KEYNOTE
VALVE TAG
RISER TAG (UP & DOWN)
DRINKING FOUNTAIN
SINK - MOP
SINK - WALL HUNG
TOILET
URINAL
SHOWER
BATHTUB
WALL HYDRANT/HOSE BIBB
EMERGENCY EYEWASH
EMERGENCY SHOWER
DIALYSIS BOX
RECIRCULATION PUMP
WATER HAMMER ARRESTOR
ACCESS PANEL - CEILING
ACCESS PANEL - WALL
WASHING MACHINE
EXISTING DOMESTIC COLD WATER SUPPLY
EXISTING DOMESTIC HOT WATER SUPPLY
EXISTING DOMESTIC HOT WATER RETURN
EXISTING DOMESTIC CHILLED WATER SUPPLY
EXISTING DOMESTIC CHILLED WATER RETURN
EXISTING FIRE SUPPRESSION PIPING
PIPING TO BE DEMOLISHED - TAGGED WITH SYSTEM
ABANDONED PIPING
PIPE UP
PIPE DOWN
PIPE UP AND DOWN
PIPE TEE UP
PIPE TEE DOWN
PIPE CAPPED
PIPE CONTINUATION
FLOW ARROW
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
BACKFLOW PREVENTER
CIRCUIT SETTER
WATER HAMMER ARRESTOR
WYE STRAINER
MIXING VALVE
SOLENOID VALVE
INLINE PUMP
LEGEND & SYMBOLS
PLUMBING LINE TYPES
GENERAL PLUMBING SYMBOLS
PLUMBING VALVE SYMBOLS
OVERALL KEYNOTES
MATCHLINE
PRESSURE REDUCING VALVE
LIMITS OF DEMOLITION
CONNECT TO EXISTING
DCW
DHW
DHWR
NEW DOMESTIC COLD WATER SUPPLY
NEW DOMESTIC HOT WATER SUPPLY
NEW DOMESTIC HOT WATER RETURN
RISER TAG (DOWN)###
RISER TAG (UP)###
KEY PLAN
SCALE: NO SCALE
A1 A2 A3
A4 A5 A6
B1
B2
B3 B4
C1 C3
C6C5C4
C2
N
TRUE
NORTH
1 2 3 4 5 8 9
A
B
C
D
E
DL
3-002
DL
3-001
3/4" DHW
3/4" DCW
P-103A4
P-103A5
P-103A2
NEW 1" DHWR UP
& DN
2" DCW
1" DHW
NEW 1" DHWR
UP & DN
OFFICE
OFFICE
OFFICE
OFFICE
C3A12
CORRIDOR
C3A11
CORRIDOR
C3A09
CORRIDOR
OFFICE
3139B
GROUP ROOM 2B
3139A
GROUP ROOM 2A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
OFFICE
STR 3-4
STAIRWELL
3A01
FAC
VP 3-30
VP
VP 3-31
VP
HAC
3126BEC
FC
NEW 1" DHWR UP & DN
3/4" DCW
& DHW UP
1" DCW & 3/4" DHW UP
3/4" DHWR DN
3/4" DHWR UP & DN
3/4" DHWR UP & DN
1/2" DHWR UP & DN
24 24
24 24
1 2 3 4 5 8 9
A
B
C
D
E
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:5
A
M
P-103A1
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - A1
93 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
A1
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA A1
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM BOARD.
FINISH AND PATCH TO MATCH EXISTING
WALL FINISH. INSTALL CERAMIC FLOOR TILE
TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
24 REMOVE GYPSUM BOARD OR PLASTER
WALLS TO FRAMING, CERAMIC TILE, ACT
CEILING TILE AND GRID, AND FLOORING AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
11 12 13' 14 15 16
C
D
E
DL
3-004
DL
3-003
DL
3-005
DL
3-006
DL
3-007
DL
3-008
DL
3-009
4 4
DL
3-028
DL
3-029
DL
3-030
1/2" DCW
1/2" DHW
3/4" DHWR
1/2" DCW
1/2" DHW
3/4" DHWR
3/4" DCW
3/4"
DHWR UP
& DN
1/2" DHW UP
1" DHWR
P-103A5
P-103A6
P-103A3
3/4" DHWR
1 1/4" DCW
1" DHWR DN
3/4" DCW
3/4" DHW
3232A
3204A
OFFICE
OFFICE
3104A
MENS
TOILET
C3A08
CORRIDOR
C3A07
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TOILET
TC
ELEC
3103 STAFF LOUNGE
VP 3-33
VP
3A05
FAC
TOILET
NEW 1" DHWR
UP & DN
1 1/4" DCW
1/2" DHW 1/2" DHW
1-1/4" DCW & 3/4" DHW UP
1/2" DCW
1/2" DHW
1/2" DHWR DN
1/2" DCW
3/4" DHWR UP & DN
3/4" DHWR DN
22 22
3/4" DHWR
3/4" DHWR DN
C3A13 CORRIDOR
22 422
11 12 13' 14 15 16
C
D
E
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:1
A
M
P-103A2
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - A2
94 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
A2
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA A2
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
22 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL AND CEILING FRAMING. FEATHER
EXISTING GYPSUM BOARD OR PLASTER
FINISH INTO NEW GYPSUM BOARD. FINISH
AND PAINT TO MATCH ADJACENT EXISTING
WALL AND CEILING. INSTALL CERAMIC
FLOOR TILE TO MATCH EXISTING.
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM BOARD.
FINISH AND PATCH TO MATCH EXISTING
WALL FINISH. INSTALL CERAMIC FLOOR TILE
TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
22 REMOVE GYPSUM BOARD OR PLASTER
WALLS AND CEILING, FLOORING, AND
CERAMIC TILE AS REQUIRED TO PERFORM
PLUBMING WORK IN SPACE.
24 REMOVE GYPSUM BOARD OR PLASTER
WALLS TO FRAMING, CERAMIC TILE, ACT
CEILING TILE AND GRID, AND FLOORING AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
16 17 19 20 21 22 23 24 25
B
C
D
E
DL
3-010 4
1/2" DHWR
1/2" DHWR
1" DHWR
P-103A6
P-103A2
OFFICE
C3A06
CORRIDOR
3247B
GROUP ROOM 3B
3247A
GROUP
ROOM 3A
0FFICE
OFFICE
0FFICE
OFFICE
OFFICE
OFFICE
OFFICE
3227A
OFFICE
ANTE ROOM
VP 3-36
VP
VP 3-37
VP
3A06
FAC
3228B
FC
STORAGE
OFFICE
C3A04
HALLWAY
C3A03
HALLWAY
HAC
STR 3-5
STAIRWELL
GROUP
ROOM 5232
NEW 1" DHWR DN
3/4" DCW
& DHW UP
OFFICE C3A05
HALLWAY
1/2" DHWR UP & DN
NEW 1" DHWR UP
1/2"
DHWR UP
& DN
3/4" DCW & DHW UP
1/2" DHWR DN
21 21
24 24
1/2" DHWR DN
16 17 19 20 21 22 23 24 25
A
B
C
D
E
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:3
A
M
P-103A3
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - A3
95 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
A3
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA A3
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM
BOARD. FINISH AND PATCH TO MATCH
EXISTING WALL FINISH. INSTALL CERAMIC
FLOOR TILE TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
24 REMOVE GYPSUM BOARD OR PLASTER WALLS
TO FRAMING, CERAMIC TILE, ACT CEILING TILE
AND GRID, AND FLOORING AS REQUIRED TO
PERFORM PLUMBING WORK IN SPACE.
SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
1 2 3 4 5 8
H
J
K
L
M
DL
3-011
1/2" DHWR
1/2" DCW
DL
3-034
3/4" DHW
P-103A5
P-103A1
P-103B1
C3A14
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
3126AEC
EC
EC
3126BEC
FC
3/4" DHW UP
OFFICE 3118
OFFICE
C3A12
CORRIDOR
21 21
1/2" DHWR DN
1/2" DHWR DN
1/2" DHWR
1/2" DHWR DN
1/2" DHWR
1/2" DHWR DN
1/2" DHWR DN
1 2 3 4 5 8
H
J
K
L
M
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:4
A
M
P-103A4
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - A4
96 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
A4
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA A4
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID
FOR REINSTALLATION AFTER COMPLETION
OF PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
9 11 12 13' 14 15
E
H
J
K
L
M
DL
3-030
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DCW
1/2" DHW
1" DCW
3/4" DHWR
3/4" DCW
3/4" DHW
3/4" DCW
3/4" DHWR
P-103A2
P-103A1
P-103B1
P-103A6
1 1/4" DCW
1" DHWR DN
3/4" DCW
3/4" DHW
2" DCW
1" DHW
NEW 3/4" DHWR DN
3232A
3204A
OFFICE
OFFICE
3104A
MENS
TOILET
C3A13
CORRIDOR
C3A08
CORRIDOR
C3A07
CORRIDOR
TOILET
TC
ELEC
3103 STAFF LOUNGE
WOMENS TOILET
3A03A
WC STORAGE
OFFICE
OFFICE
WORK AREA
RECEPTION
WAITING
ELEV 3-A-8
ELEVATOR
ELEV 3-A-7
ELEVATOR
VP 3-33
VP
LN-3
LINEN CHUTE
VP 3-29
VP
3A05
FAC
OFFICE
TOILET
C3A01
HALLWAY
OFFICE
OFFICE
WAITING
C3A15
CORRIDOR
OFFICE
C3B12
HALLWAY
RECEPTIONIST
1 1/4" DCW
1/2" DHW 1/2" DHW
3/4" DCW
& DHW UP
1/2" DHWR UP & DN
1/2" DHWR DN
1/2" DCW
22 22
3/4" DHWR
1/2" DHWR DN 212
3/4" DHWR DN
C3A13 CORRIDOR
22 422
9 11 12 13' 14 15
E
H
J
K
L
M
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:0
A
M
P-103A5
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - A5
97 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
A5
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA A5
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
22 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL AND CEILING FRAMING. FEATHER
EXISTING GYPSUM BOARD OR PLASTER
FINISH INTO NEW GYPSUM BOARD. FINISH
AND PAINT TO MATCH ADJACENT EXISTING
WALL AND CEILING. INSTALL CERAMIC
FLOOR TILE TO MATCH EXISTING.
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM BOARD.
FINISH AND PATCH TO MATCH EXISTING
WALL FINISH. INSTALL CERAMIC FLOOR TILE
TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
22 REMOVE GYPSUM BOARD OR PLASTER
WALLS AND CEILING, FLOORING, AND
CERAMIC TILE AS REQUIRED TO PERFORM
PLUBMING WORK IN SPACE.
24 REMOVE GYPSUM BOARD OR PLASTER
WALLS TO FRAMING, CERAMIC TILE, ACT
CEILING TILE AND GRID, AND FLOORING AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
J
K
L
DL
3-012
1/2" DHW
1/2" DCW
3/4" DCW
3/4" DHW
1/2" DHW
1/2" DCW
3/4" DCW
3/4" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1 1/4" DCW UP
P-103A5
P-103A3
P-103A2
3/4" DCW & 3/4" DHW UP
1/2" DHWR DN
EXAM
SUPPLY
OFFICE
3227A
OFFICE
ANTE ROOM
EXAM
OFFICE
3228B
FC
3218EC
EC
TC
STORAGE
3228AEC
EC
3206A
OFFICE
C3A05
HALLWAY
C3A03
HALLWAY
C3A02
HALLWAY
TOILET
3215A
TOILET
C3A01
HALLWAY
OFFICE
3217A
OFFICE 3219
OFFICE
BREAK
3219A
OFFICE3215
OFFICE
OFFICE
RECEPTIONIST
216 219
1-1/2" DCW &
1" DHW UP
URINAL ROUGH-IN
1/2"
DHWR UP
& DN
1/2" DHWR DN 1/2" DHWR DN217 219
1/2" DHWR
DN
1/2" DCW
1/2" DHW
1/2" DHWR
DN
1/2" DHWR
DN
16 17 19 20 21 22 23 24 25
H
J
K
L
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:1
A
M
P-103A6
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - A6
98 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
A6
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA A6
22 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL AND CEILING FRAMING. FEATHER
EXISTING GYPSUM BOARD OR PLASTER
FINISH INTO NEW GYPSUM BOARD. FINISH
AND PAINT TO MATCH ADJACENT EXISTING
WALL AND CEILING. INSTALL CERAMIC
FLOOR TILE TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK
TO PLUMBING MAIN AND CAP WITHIN
TWO PIPE DIAMETERS OF MAIN.
22 REMOVE GYPSUM BOARD OR PLASTER
WALLS AND CEILING, FLOORING, AND
CERAMIC TILE AS REQUIRED TO
PERFORM PLUBMING WORK IN SPACE.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
M
N
O
P
Q
R
S
DL
3-013
DL
3-014
3/4" DCW
3/4" DHW
8" DCW
UP & DN
4" DCW & 6" DCW
UP & DN
4" DHW &
1-1/2" IW
UP & DN
3/4" DCW
3/4" DHW
P-103A6
P-103A5
P-103B2
3/4" DHWR
NEW 1" DHWR
UP & DN
NEW 1"
DHWR UP &
DN
3/4" DCW
3/4" DHW
3/4" IW 3/4" DCW
ELEV 3-B-9
ELEVATOR
ELEV 3-B-12
ELEVATOR
ELEV 3-A-6
ELEVATOR
ELEV 3-A-5
ELEVATOR
C3B01
CORRIDOR
STR-3-1
STAIRWELL
VP 3-27
VP
VP 3-25
VP
VP 3-29
VP
3409EC
EC
EC
3321A
FAC
OFFICE
TOILET
TOILET
HAC
C3B13
HALLWAY
OFFICE
OFFICE
C3B12
HALLWAY
C3B11
HALLWAY
OFFICE
OFFICE
C3B09
HALLWAY
C3B02
ELEVATOR LOBBY
OFFICE
OFFICE
OFFICE
C3B10
HALLWAY
OFFICE
STORAGE
COMPUTER ROOM
4" DCW & 1" DHW UP
1" DHWR DN
3/4" DCW & DHW UP
3/4" DHWR DN
3320E
OFFICE
3320F
OFFICE
BALANCE
TO 0.5 GPM
24 24
24 24
22 22
9 11 12 13' 14 15
M
N
O
P
Q
R
S
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:3
A
M
P-103B1
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - B1
99 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
B1
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA B1
1 BALANCE FLOW RATE AS INDICATED ON
PLAN.
22 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL AND CEILING FRAMING. FEATHER
EXISTING GYPSUM BOARD OR PLASTER
FINISH INTO NEW GYPSUM BOARD. FINISH
AND PAINT TO MATCH ADJACENT EXISTING
WALL AND CEILING. INSTALL CERAMIC
FLOOR TILE TO MATCH EXISTING.
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM BOARD.
FINISH AND PATCH TO MATCH EXISTING
WALL FINISH. INSTALL CERAMIC FLOOR TILE
TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
6 DEMOLISH ABANDONED AND CUT PIPES.
22 REMOVE GYPSUM BOARD OR PLASTER
WALLS AND CEILING, FLOORING, AND
CERAMIC TILE AS REQUIRED TO PERFORM
PLUBMING WORK IN SPACE.
24 REMOVE GYPSUM BOARD OR PLASTER
WALLS TO FRAMING, CERAMIC TILE, ACT
CEILING TILE AND GRID, AND FLOORING AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
T
U
V
W
X
Y
Z
AA
DL
3-017
DL
3-018
DL
3-019
DL
3-020
DL
3-015
DL
3-016
1/2" IW
3/4" IW
1" DHW
1/2" DCW
3/4" DCW
1/2" IW
3/4" DCW
3/4" DHW
P-103B3
P-103B1
P-103C2
P-103C1
3/4" IW
3/4" IW
3/4" DCW
3/4" DCW
1" DHW
1 1/4" DCW
1/2" DCW
1/2" DHW
1 1/4" DCW
1" DHW
1/2" DCW DN
TO CHILLER
1/2" DCW
1 1/4" DCW
SOCIAL
WORKERS
ACUTE MH
STAFF
3320B
OFFICE
3320A
OFFICE
OFFICE
3325A
IRM
IRM
C3B10
CORRIDOR
HAC
OFFICE
OFFICE
FA PANEL
VP 3-23
VP
VP 3-25
VP
TC
3409EC
EC
STORAGE
STORAGE
OFFICE
3410A
OFFICE
C3B03
CORRIDOR
3320F
OFFICE
3320E
OFFICE
3320C
OFFICE
EQUIPMENT
CLINICAL NUTRITION COORDINATOR
1 1/4" DCW & 1" DHW UP
1/2" DHWR DN
WAITING
3321 COMPUTER ROOM
21 21
21 21
24 24
9 11 12 13' 14 15
T
U
V
W
X
Y
Z
AA
3/4" DHWR
UP & DN
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:5
A
M
P-103B2
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - B2
100 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
B2
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA B2
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM BOARD.
FINISH AND PATCH TO MATCH EXISTING
WALL FINISH. INSTALL CERAMIC FLOOR TILE
TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
24 REMOVE GYPSUM BOARD OR PLASTER
WALLS TO FRAMING, CERAMIC TILE, ACT
CEILING TILE AND GRID, AND FLOORING AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
16 17 19 20 21 22 23
Q
R
S
T
U
DL
3-021
1/2" DCW
1/2" DHW
1/2" DCW
1/2" DHW
3/4" DCW
3/4" DHW
3/4" DCW
3/4" DHW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
1/2" ABANDONED
1/2" DCW
1/2" DHW
1" DCW
1" DHW
1" DHWR
3/4" DHWR
P-103B2
P-103B1
P-103B4
BALANCE
TO 0.75 GPM
3/4" DCW
3/4" DHW
3/4" DCW
3/4" DHW
3/4" DHWR
3/4" DHWR
1/2" ABANDONED
NEW 1"
DHWR UP &
DN
OFFICE
OFFICE
ELEV 3-B-11
ELEVATOR
ELEV 3-B-10
ELEVATOR
OFFICE
C3B04
CORRIDOR
C3B05
ELEVATOR LOBBY
OFFICE
OFFICE
OFFICE
OFFICE
C3B06
HALLWAY
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STORAGE
1" DCW & DHW UP
3/4" RISERS NOT VISIBLE
ON FOURTH FLOOR
1" IW
24 24
24 242121
24 24
24 24
24 24
16 17 19 20 21 22 23
Q
R
S
T
U
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:0
A
M
P-103B3
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - B3
101 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
B3
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA B3
1 BALANCE FLOW RATE AS INDICATED ON
PLAN.
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM BOARD.
FINISH AND PATCH TO MATCH EXISTING
WALL FINISH. INSTALL CERAMIC FLOOR TILE
TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
11 DEMOLISH ABANDONED DROPS BACK TO
LIMITS OF DEMOLITION.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK
IN SPACE. SALVAGE ACT CEILING AND GRID
FOR REINSTALLATION AFTER COMPLETION
OF PLUMBING WORK.
24 REMOVE GYPSUM BOARD OR PLASTER
WALLS TO FRAMING, CERAMIC TILE, ACT
CEILING TILE AND GRID, AND FLOORING AS
REQUIRED TO PERFORM PLUMBING WORK
IN SPACE. SALVAGE ACT CEILING AND GRID
FOR REINSTALLATION AFTER COMPLETION
OF PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
24 25 26 27 28 29
R
S
T
U
WH HIGH ON
EXTERIOR WALL
DL
3-022
DL
3-023
1" IW
P-103B3
3/4" DCW UP
TO 5TH FLR.
3/4" DHWR
1/2" DCW
1/2" DHW
STR 3-6
STAIRWELL
3B08
FAC
OFFICE
OFFICE
HAC
STORAGE
RECREATION HALL
FOOD PREP AREA
24 25 26 27 28 29
Q
R
S
T
U
1/2" DCW
1/2" DHW
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:2
A
M
P-103B4
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - B4
102 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
B4
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA B4
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
Y
Z
AA
CC
FF
3524A
3" DCW
2" DHW
1" DHWR
1 1/2" DCW
1" DHW
3/4" DHWR
2" DCW
1 1/2" DHW
3/4" DHWR
3/4" DHW
1 1/2" DCW
3/4" DHWR
3/4" DHWR
3/4" DHWR
1" DCW
1/2" DHW
3/4" DHWR
3/4" DHW
1 1/2" DCW
3/4" DHW
1 1/2" DCW
1 1/2" DCW
3/4" DHW
3/4" DHW
1 1/2" DCW
3/4" DHW
3/4" DCW
P-103C5
P-103C2
P-103C4
2" DCW
1 1/2" DHW
3/4" DHWR
1 1/2" DCW
1" DHW
3/4" DHWR
3517EC
3522H
HAMPER
OFFICE
3511A
DAY/RM DINING
C3C04
CORRIDOR
C3C03A
CORRIDOR
C3C03
CORRIDOR
3522A
TOILET
3504 WAITING
3520H
HAMPER
3522 PATIENT RM
3520 PATIENT RM
3520A
TOILET
3518B
TOILET
3518A TOILET
PATIENT RM
LAUNDRY CART
3515B
TOILET
PATIENT
RM
3515A
TOILET
3511B
DAY/RM DINING
C3C05
CORRIDOR
C3C02
CORRIDOR
SOILED UTILITY
CLEAN UTILITY
EQUIP
CONSULT
CONSULT
C3C01
CORRIDOR
REPORT
NURSE
STATION
3509A
MEDS 3644C
TOILET
PIPE CONTINUATIONS
COULD NOT BE VERIFIED
1 2 3 4 5 8 9
Y
Z
AA
CC
FF
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:4
A
M
P-103C1
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - C1
103 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
C1
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA C1
22 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL AND CEILING FRAMING. FEATHER
EXISTING GYPSUM BOARD OR PLASTER
FINISH INTO NEW GYPSUM BOARD. FINISH
AND PAINT TO MATCH ADJACENT EXISTING
WALL AND CEILING. INSTALL CERAMIC
FLOOR TILE TO MATCH EXISTING.
0 2 4 8
8 DEMOLISH EXISTING DHWR CONNECTION TO
DCW.
22 REMOVE GYPSUM BOARD OR PLASTER
WALLS AND CEILING, FLOORING, AND
CERAMIC TILE AS REQUIRED TO PERFORM
PLUBMING WORK IN SPACE.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
11 12 13' 14 15
Z
AA
CC
FF
DL
3-024
3/4" DHWR
1" DCW
1/2" DHW
1/2" DHW
1/2" DHWR
3/4" DCW
3/4" DHW
3/4" DHWR
1" DHW
1 1/2" DCW
1/2" DHWR
3/4" DCW
1/2" DHW
3/4" DHWR
3/4" DCW
3/4" DHW
1 1/4" DCW
1/2" DHW
1/2" DHW
3/4" DCW
1/2" DHW
1/2" DCW
1/2" DHW
1/2" DCW
3/4" DCW
3/4" DHW
1/2" DHWR
1/2" DHWR
P-103C1
P-103C3
P-103B2
EC
3650A
C3B10
CORRIDOR
3504 WAITING
HAC
INTAKE
VEST
IV
TREATMENT
3644C
TOILET
3644P
PASSAGE
STORAGE
STORAGE
EC
3644A
LOCKERS
STAFF
LOUNGE
RECEPTION 3609
WORK
MEDS
LAUNDRY
COMPUTER ROOM
3644B
TOILET
CONSULT
WAITING
FA PANEL
3600 VESTIBULE
3608 INTAKE
SOILED
UTILITY
C3C14
CORRIDOR
C3C07
CORRIDOR
REPORT
21 21
11 12 13' 14 15
Y
Z
AA
CC
FF
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:5
A
M
P-103C2
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - C2
104 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
C2
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA C2
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
Z
AA
CC
FF
DL
3-031
DL
3-032
3/4" DHWR
1 1/4" DHW
2 1/2" DCW
1/2" DHWR
3/4" DCW
1/2" DHW
3/4" DHWR
1/2" DHWR
3/4" DCW
3/4" DHWR
1" DHW
1 1/2" DCW
2" DCW
1 1/2" DHW
3/4" DHWR
1" DCW
1" DCW
1" DHW
1" DHW
1" DCW
1/2" DHW
1" DCW
2" DCW
3/4" DHWR
1 1/2" DHW
P-103C2
1/2" DHWR
1/2" DHWR
3617A
EC
WORK
CHART/CONTROL
MEDS
CLEAN
UTILITY
PATIENT RM
3615A
TOILET
3616A
TOILET
PATIENT RM
PATIENT
RM
C3C11
CORRIDOR
C3C13
CORRIDOR
C3C10
CORRIDOR
DINING
STORAGE
STORAGE
HAC
C3C12
CORRIDOR
3622FC FIBER
3624EC
EC
3618A
TOILET
PATIENT
RM
3619A
TOILET
3620A
TOILET
PATIENT RM
PATIENT RM
TOILET
2 1/2" DCW,
1 1/4" DHW &
3/4" DHWR UP
16 17 19 20 21 22 23 24 25
Y
Z
AA
CC
FF
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:1
A
M
P-103C3
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - C3
105 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
C3
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA C3 0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
KK
HH
JJ
3524A
DL
3-025
1/2" IW
1" DHW
3/4" DHWR
1 1/2" DCW
1 1/2" DCW
1" DHW
3/4" DHWR
1/2" DHWR
3/4" ABANDONED
1 1/2" DCW
3/4" DHW
3/4" DHW
1 1/2" DCW
3/4" DHWR
1 1/2" DHW
2" DCW1 1/2" DCW
1" DHW
3/4" DHWR
3530S
STORAGE
3538H
HAMPER
C3C05
CORRIDOR
C3C05A
CORRIDOR
VEST3536
NOURISH 3538A
TOILET
3538B
RESTRAINT
3538C
SECLUSION
QUIET
3534A
TOILET
PATIENT RM
3534A
TOILET
3532A
TOILET
PATIENT RM
3532A
TOILET
3530A
TOILET
PATIENT RM
3528A
TOILET
BARIATRIC
RM
3524A
TOILET
PATIENT RM
3524B
TOILET
C3C04
CORRIDOR
21 21
1 2 3 4 5 8 9
KK
HH
JJ
TERMINATION COULD NOT BE
FIELD VERIFIED, ASSUME PIPE
CAPPED IN CHASE. P.C. TO
CONFIRM BEFORE DEMOLISHING.
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:3
A
M
P-103C4
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - C4
106 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
C4
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA C4
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID FOR
REINSTALLATION AFTER COMPLETION OF
PLUMBING WORK.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
HH
DL
3-027
DL
3-026
1/2" DHW
1 1/2" DCW
1" DHW
3/4" DHWR
2" DCW
1/2" ABANDONED
1/2" DHW
2" DCW
1 1/2" DHW
3/4" DHWR
1" DCW
1/2" DHW
1 1/4" DCW
1 1/2" DCW
3/4" DHW
2" DCW
1 1/2" DHW
3/4" DHWR
P-103C2
P-103C1
P-103C4
C3C07
CORRIDOR
SECLUSION ANTE RM
TOILET
SECLUSION
RESTRAINT
TUB/SHOWER
3649A
TOILET
PATIENT RM
LAUNDRY
3540B
TOILET
PATIENT RM
STORAGE
3540A
TOILET
2222 21 21
9 11 12 13' 14 15
HH
TERMINATION COULD NOT BE
FIELD VERIFIED, ASSUME PIPE
CAPPED IN WALL. P.C. TO
CONFIRM BEFORE DEMOLISHING.
HARD CEILING
NO ACCESS
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:4
A
M
P-103C5
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - C5
107 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
C5
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA C5
21 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100.
22 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL AND CEILING FRAMING. FEATHER
EXISTING GYPSUM BOARD OR PLASTER
FINISH INTO NEW GYPSUM BOARD. FINISH
AND PAINT TO MATCH ADJACENT EXISTING
WALL AND CEILING. INSTALL CERAMIC
FLOOR TILE TO MATCH EXISTING.
0 2 4 8
4 DEMOLISH EXISTING DEAD LEGS BACK TO
PLUMBING MAIN AND CAP WITHIN TWO PIPE
DIAMETERS OF MAIN.
21 REMOVE ACT CEILING TILES AND GRID AS
REQUIRED TO PERFORM PLUMBING WORK IN
SPACE. SALVAGE ACT CEILING AND GRID
FOR REINSTALLATION AFTER COMPLETION
OF PLUMBING WORK.
22 REMOVE GYPSUM BOARD OR PLASTER
WALLS AND CEILING, FLOORING, AND
CERAMIC TILE AS REQUIRED TO PERFORM
PLUBMING WORK IN SPACE.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
KK
HH
JJ
1 1/2" DHW
3/4" DHWR
1/2" DHW
3/4" DCW
2" DCW
1 1/2" DHW
1" DCW
2" DCW
1 1/2" DHW3/4" DHWR
2" DHWR
1 1/2" DHW
2" DCW
2" DCW
1 1/2" DHW
1/2" DHW
3/4" DCW
3630A
COMPUTER
ROOM
C3C10
CORRIDOR
3627A
TOILET
PATIENT
RM
HAC
FAC
STAIR
STR-3-2
SUNROOM
DAYROOM
C3C08
CORRIDOR
C3C09
CORRIDOR
MEITATION/ PATIENT ED
PATIENT
3636A
TOILET
3635A
TOILET
PATIENT
3633A
TOILET
PATIENT
TOILET
3638A
TOILET
PATIENT
16 17 19 20 21 22 23 24 25
KK
HH
JJ
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:0
A
M
P-103C6
THIRD FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - C6
108 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
C6
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
THIRD FLOOR EXISTING DOMESTIC WATER PIPING PLAN - AREA C6 0 2 4 8
A. CONTRACTOR SHALL BE RESPONSIBLE FOR
DISPOSAL OF ALL MATERIALS AND
FIXTURES REMOVED UNLESS NOTED
OTHERWISE.
B. CONTRACTOR SHALL BE AWARE THAT
ASBESTOS IS PRESENT IN AREAS OF
DEMOLITION AND SHALL BE ABATED PER
SPECIFICATION SECTION 02 82 13.13. SEE
ASBESTOS REPORT ATTACHED TO THE
SPECIFICATION SECTION.
C. CONTRACTOR SHALL PROTECT ADJACENT
WORK FROM DAMAGE DURING
DEMOLITION. RESTORE ANY DAMAGED
AREAS TO ORIGINAL CONDITION.
D. IF PLUMBING WORK DOES NOT AFFECT ALL
WALLS, ONLY REMOVE WALL AND FINISH
WHERE PLUMBING WORK IS BEING
PERFORMED.
2 3 4 5 6 7 8 9 10 10' 11 12 1313' 14 15 16 17 19 20 21 22 2323a 24 25 26 27 28 29
LL
KK
A
C
D
E
H
J
K L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
BB
CC
FF
GG
HH
JJ
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:3
A
M
P-104
FOURTH FLOOR DOMESTIC WATER
PLUMBING PLAN
109 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
Scale: 1/16" = 1'-0"
FOURTH FLOOR DOMESTIC WATER DEMOLITION PLUMBING PLAN 0 8 16 32
DL
DEAD LEG TAG
AP
AP
DCW
DHW
DHWR
IW
IWR
FL
ABANDON
KEYNOTE
VALVE TAG
RISER TAG (UP & DOWN)
DRINKING FOUNTAIN
SINK - MOP
SINK - WALL HUNG
TOILET
URINAL
SHOWER
BATHTUB
WALL HYDRANT/HOSE BIBB
EMERGENCY EYEWASH
EMERGENCY SHOWER
DIALYSIS BOX
RECIRCULATION PUMP
WATER HAMMER ARRESTOR
ACCESS PANEL - CEILING
ACCESS PANEL - WALL
WASHING MACHINE
EXISTING DOMESTIC COLD WATER SUPPLY
EXISTING DOMESTIC HOT WATER SUPPLY
EXISTING DOMESTIC HOT WATER RETURN
EXISTING DOMESTIC CHILLED WATER SUPPLY
EXISTING DOMESTIC CHILLED WATER RETURN
EXISTING FIRE SUPPRESSION PIPING
PIPING TO BE DEMOLISHED - TAGGED WITH SYSTEM
ABANDONED PIPING
PIPE UP
PIPE DOWN
PIPE UP AND DOWN
PIPE TEE UP
PIPE TEE DOWN
PIPE CAPPED
PIPE CONTINUATION
FLOW ARROW
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
BACKFLOW PREVENTER
CIRCUIT SETTER
WATER HAMMER ARRESTOR
WYE STRAINER
MIXING VALVE
SOLENOID VALVE
INLINE PUMP
LEGEND & SYMBOLS
PLUMBING LINE TYPES
GENERAL PLUMBING SYMBOLS
PLUMBING VALVE SYMBOLS
OVERALL KEYNOTES
MATCHLINE
PRESSURE REDUCING VALVE
LIMITS OF DEMOLITION
CONNECT TO EXISTING
DCW
DHW
DHWR
NEW DOMESTIC COLD WATER SUPPLY
NEW DOMESTIC HOT WATER SUPPLY
NEW DOMESTIC HOT WATER RETURN
RISER TAG (DOWN)###
RISER TAG (UP)###
KEY PLAN
SCALE: NO SCALE
A1 A2 A3
A4 A5 A6
B1
B2
B3 B4
C1 C3
C6C5C4
C2
N
TRUE
NORTH
B
C
D
E
1 1/4" DCW
3/4" DHW
1-1/2" DCW &
3/4" DHW UP
3/4" DHWR DN
3/4" DHWR
P-104A2
P-104A5
P-104A4
NEW 1" DHWR
UP & DN
NEW 1"
DHWR UP &
DWN
BALANCE
TO 0.5 GPM
1/2" DCW
1 1/4" DCW
1/2" DHW
FIBER
4111A
4110A
STORAGE
C4A10A
CORRIDOR
OFFICE
C4A10
CORRIDOR
HAC
OFFICE
4134A
STORAGE
STORAGE 4138
TOILET
PANTRY
OFFICE
OFFICE
OFFICE
A0433
CORRIDOR
OFFICE
CONFERENCE
STORAGE
4152A
BATH /
SHOWER
TOILET
C4A08
CORRIDOR
VERT 4-30
VERT 4-31
STR 4-4
STAIRWELL
OFFICE
4146A
OFFICE
OFFICE
3/4" DHW & DCW UP
1/2" DHWR DN
STORAGE
C4A09
CORRIDOR
CLASSROOM
NEW 1"
DHWR UP &
DN
1" DCW & 3/4" DHW
UP & DN
1" DCW & DHW UP
3/4" DCW & DHW DN
3/4" DHWR UP &
DN
1-1/4" DCW &
3/4" DHW UP
3/4" DHWR DN
24 24
22 22
24 24
22 22
24 24
24 24
22 22
22 22
1 2 3 4 5 8 9
A
B
C
D
E
Engineers Architects
## DEMO KEY NOTES:
# NEW WORK KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
NOT FOR
CONSTRUCTIO
N
NOT FOR
CONSTRUCTIO
N
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/4
/2
:4
:5
A
M
P-104A1
FOURTH FLOOR DOMESTIC WATER
PLUMBING PLAN AREA - A1
110 247NAS, PA
UPGRADE PLUMBING FOR
LEGIONELLA PREVENTION
CLEMENT J. ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295 2/24/2020
100% CONSTRUCTION DOCUMENTS
695-19-11419-122
WX
KEY PLAN
SCALE: NO SCALE
A1
N
TRUE
NORTH
Scale: 1/4" = 1'-0"
FOURTH FLOOR DOMESTIC WATER PIPING PLAN - AREA A1
1 BALANCE FLOW RATE AS INDICATED ON PLAN.
22 INSTALL GYPSUM BOARD ON EXISTING STUD
WALL AND CEILING FRAMING. FEATHER
EXISTING GYPSUM BOARD OR PLASTER
FINISH INTO NEW GYPSUM BOARD. FINISH
AND PAINT TO MATCH ADJACENT EXISTING
WALL AND CEILING. INSTALL CERAMIC FLOOR
TILE TO MATCH EXISTING.
24 REINSTALL ACT TILES AND GRID PER
SPECIFICATION SECTION 095100. INSTALL
GYPSUM BOARD ON EXISTING STUD WALL.
FEATHER EXISTING GYPSUM BOARD OR
PLASTER FINISH INTO NEW GYPSUM BOARD.
FINISH AND PATCH TO MATCH EXISTING WALL
FINISH. INSTALL CERAMIC FLOOR TILE TO
MATCH EXISTING.
0 2 4 8
5 DEMOLISH UNDERUTILIZED FIXTURE.
REMOVE ALL…