Amendment 03 - Sheet P-110A6.pdf

PDF 469 KB Posted

Attached to
Z1DA--Upgrade Plumbing for Legionella Prevention Project 695-19-114
Solicitation number
36C25220B0020
Issued by

About this file

This document contains a federal contract solicitation and related construction documents. The solicitation is for Project 695-19-114 to upgrade plumbing systems for Legionella prevention at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves removing cross-connected domestic water lines and dead legs to mains in Building 123, installing new recirculation lines and balance valves, adding thermostatic mixing valves to fixtures, and providing water quality monitoring stations. In Building 111, the work includes installing improved recirculation lines and risers with balance valves, removing underutilized fixtures and dead legs, and adding thermostatic mixing valves to fixtures. Asbestos abatement and limited architectural patching will be required in both buildings. The construction documents provide additional details on the domestic water plumbing plan for the tenth floor Area A6 of the project scope.

View the file

Other files

File Type Posted
36C25220B0020 0004.pdf PDF
S06 - WQMS Specification.pdf PDF
S02 - Davis Bacon WD.pdf PDF
Amendment 03 - Asbestos Survey Report.pdf PDF
36C25220B0020 0003.pdf PDF
S02 - JNA for Tile Sealant.pdf PDF
36C25220B0020 0002.pdf PDF
S04 - Site-Visit Roster.pdf PDF
36C25220B0020 0001.pdf PDF
S02 - Drawings 91-120.pdf PDF
S02 - JNA for FireStop Material.pdf PDF
S02 - Drawings 201-247.pdf PDF
S02 - Specifications.pdf PDF
S02 - Drawings 31-60.pdf PDF
S02 - Drawings 61-90.pdf PDF
S02 - Drawings 161-200.pdf PDF
S02 - Drawings 11-30.pdf PDF
S02 - Davis Bacon WD.pdf PDF
36C25220B0020_1.pdf PDF
S02 - Drawings 121-160.pdf PDF
36C25220B0020_1.docx DOCX document
S02 - Drawings 6-10.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16 17 19 20 21 22 23 24 25

H

J

K

L

P-110A5

P-110A3

P-110A2

5 5

10207A

TOILET

10207

ON-CALL

10209

ON-CALL

10215

OFFICE

10215A

TOILET

10217

OFFICE

10219A

TOILET

10219

OFFICE 10221

OFFICE

10223

OFFICE

10224

TOILET

10227

GROUP ROOM10228

10226EC

ELECTRICAL

CLOSET

10213

SOILED

UTILITY

C10A01

CORRIDOR

C10A02

CORRIDOR

C10A05

CORRIDOR

10220EC

ELECTRICAL

CLOSET

3/4" DCW & DHW DN

10210

NURSES

STATION

C10A02A

CORRIDOR

10211 WAITING ROOM

1-1/4" DCW &

3/4" DHW DN

1" DCW DN

3/4" DCW & DHW DN

3/4" DCW & DHW DN

2491" DCW DN

16 17 19 20 21 22 23 24 25

H

J

K

L

Engineers Architects

## DEMO KEY NOTES:

# NEW WORK KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:1

:1

P

M

P-110A6

TENTH FLOOR DOMESTIC WATER

PLUMBING PLAN AREA - A6

205 247NAS, PA

UPGRADE PLUMBING FOR

LEGIONELLA PREVENTION

CLEMENT J. ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295 3/18/2020

100% CONSTRUCTION DOCUMENTS

695-19-11419-122

WX

KEY PLAN

SCALE: NO SCALE

A6

N

TRUE

NORTH

Scale: 1/4" = 1'-0"

TENTH FLOOR DOMESTIC WATER PIPING PLAN - AREA A6

22 INSTALL GYPSUM BOARD ON EXISTING

STUD WALL AND CEILING FRAMING.

FEATHER EXISTING GYPSUM BOARD OR

PLASTER FINISH INTO NEW GYPSUM BOARD.

FINISH AND PAINT TO MATCH ADJACENT

EXISTING WALL AND CEILING. INSTALL

CERAMIC FLOOR TILE TO MATCH EXISTING.

0 2 4 8

5 DEMOLISH UNDERUTILIZED FIXTURE.

REMOVE ALL ASSOCIATED DOMESTIC WATER

PIPING BACK TO MAIN. REMOVE ALL

ASSOCIATED SANITARY BACK TO MAIN AND

VENT PIPING BACK TO HEADER.

22 REMOVE GYPSUM BOARD OR PLASTER

WALLS AND CEILING, FLOORING, AND

CERAMIC TILE AS REQUIRED TO PERFORM

PLUBMING WORK IN SPACE.

A. CONTRACTOR SHALL BE RESPONSIBLE FOR

DISPOSAL OF ALL MATERIALS AND

FIXTURES REMOVED UNLESS NOTED

OTHERWISE.

B. CONTRACTOR SHALL BE AWARE THAT

ASBESTOS IS PRESENT IN AREAS OF

DEMOLITION AND SHALL BE ABATED PER

SPECIFICATION SECTION 02 82 13.13. SEE

ASBESTOS REPORT ATTACHED TO THE

SPECIFICATION SECTION.

C. CONTRACTOR SHALL PROTECT ADJACENT

WORK FROM DAMAGE DURING

DEMOLITION. RESTORE ANY DAMAGED

AREAS TO ORIGINAL CONDITION.

D. IF PLUMBING WORK DOES NOT AFFECT ALL

WALLS, ONLY REMOVE WALL AND FINISH

WHERE PLUMBING WORK IS BEING

PERFORMED.

3 ADDENDUM 3 6/12/2020

DocuSign Envelope ID: 485AD756-E526-4AF3-9973-D7D97793FC82

6/17/2020

Sheets
P-110A6 - TENTH FLOOR DOMESTIC WATER PLUMBING PLAN AREA - A6
2020-06-17T07:00:33-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .