S02 SOL-Att-08 SEED PROJECT SOW.pdf
PDF 248 KB Posted
- Attached to
- Z1DA--Multiple Award Task Order Contract 695-23-109 Clement J. Zablocki VA Medical Center
- Solicitation number
- 36C25223R0071
About this file
This statement of work is for a construction services contract to complete repairs at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contract involves nine specific repair and replacement tasks, including replacing windows, dock seals, loading dock levels, and exterior siding, as well as slab jacking, sprinkler installation, door replacement, flooring replacement, and waterline and valve work. The work must be completed within 315 calendar days of receiving a notice to proceed in five phases, including preconstruction, review, construction, post-substantial completion, and closeout. The related federal contract opportunity is a multiple award task order contract through the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clement J. Zablocki VA Medical Center
FY24 TJC and Safety Corrections
Project 695‐24‐103
Statement of Work
(MATOC SEED PROJECT)
September 29, 2023
US Department of Veterans Affairs
Clement J. Zablocki VA Medical Center
5000 W. National Ave.
Milwaukee, WI 53295‐0001
STATEMENT OF WORK
Prepared by:
Facility Management Division
STATEMENT OF WORK September 29, 2023 695‐24‐103 Repair FY24 TJC & Safety Corrections
I General Description:
Provide Construction Services for Project# 695‐24‐103, “Repair FY24 TJC and Safety Corrections”.
II Project Scope:
1. General Description: Contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with the specifications and drawings to complete Project# 695‐24‐103, “FY24 TJC and Safety Corrections” at Clement J. Zablocki VA Medical Center, 5000 West National Avenue Milwaukee, WI. Project requirements are provided in the Project Specifications and Construction Documents. The project includes the following tasks:
Task Description
1 Remove and Replace Windows 7AS Dialysis and 7AN Endoscopy
2 Remove and Replace Dock Seal System for PET MRI Trailer
3 Remove and Replace Loading Dock Levelers, Frames and Concrete Repair
4 Paint Exterior Bldgs 49, 50 and Replace Deteriorated Wood
5 Slab Jacking of Various Slabs Bldg 144 Exterior
6 Install Sprinklers Bldg 111, rooms B0253A and B0253B
7 Remove and Replace Bldg 7 Entry Door
8 Remove and Replace Bldg 6, 2B South Flooring
9 Remove and Replace 6” Waterline/Valves and Install 10” Valve on Main Trunk Line Outside Bldg 70 Wing A
2. All work shall be completed within 315 calendar days after receiving Notice to Proceed.
III Project Duration/Phases:
This project shall be completed within 315 calendar days once NTP is issued.
Phase 1: Pre‐construction (kick‐off) Meeting is anticipated to be scheduled on the effective date identified in the Notice to Proceed (NTP).
Phase 2: Pre‐Construction Period duration is NTP + 60 calendar days. Within this period the contractor shall submit pre‐construction submittals provided in specification section 01 00 00.
Pre‐Construction Submittals are required prior to issuing the contract notice to proceed or starting construction. Additional submittal requirements for this contract are found in the technical sections throughout the contract specifications. All submittal submission requirements and the approvals process is per specification 01 33 23.
1. Construction Site Security Plan
2. Construction Phasing Plan
3. Existing Conditions Survey
STATEMENT OF WORK September 29, 2023 695‐24‐103 Repair FY24 TJC & Safety Corrections
4. Contractor’s Impact Statement & Checklist
5. Construction Schedule (Initial)
6. Submittal Register
7. Schedule of Values
8. SF 1413s (Subcontractor List)
9. Surety Bonds & Certificates of Insurance
10. Accident Prevention Plan
11. Activity Hazard Analyses
12. SSHO and CP Memorandum
13. OSHA Certificates and Applicable Training Documents
14. Infection Control Plan
15. Fire Safety Plan
16. Construction Waste Management Plan
17. Sustainable Construction Spreadsheet
Phase 3: VA will Conduct a thirty (30) calendar day review of the documentation in accordance with the project specifications; to be completed no later than NTP + 90 calendar days.
Phase 4: Construction Period – Phase duration is anticipated to be 195 days; to be completed no later than NTP + 285 calendar days. All applicable documentation listed in Phase 2 and any necessary submittals required to mobilize must be approved by the COR prior to commencing work. No demolition or construction shall be started without COR review and approval of those items listed in the Pre‐Construction Period unless authorized in writing by the COR or the CO.
Phase 5: Post‐Substantial Completion Period– Phase duration is anticipated to be 30 days; to be completed no later than NTP + 315 calendar days. The contractor shall provide all required materials within 15 days of completion of Phase 3 (NTP + 300), as the VA owns the last 15 days for closeout activities.
1. Inspection and Approval by the COR and/or the CO.
2. Final Approval and Beneficial Occupancy when applicable.
3. Warranties documents and O&M Manuals.
4. As‐built drawings and record submittals.
5. Staff training when applicable.
6. Waste Reports.
7. Existing Conditions Re‐survey.
8. Release of Claims.
‐‐ End SOW ‐‐