This amendment to a federal solicitation provides updated specifications, drawings, and responses to requests for information for construction services. The Department of Veterans Affairs is seeking proposals to renovate and upgrade facilities at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. Key updates include revisions to specification sections on infection control and inspections, the addition of an asbestos specification, and adjustments to multiple drawings providing additional details. The wage determination was also replaced with a new version dated January 19, 2024. The proposal due date remains February 21, 2024 at 1:00pm Central Time.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 695-24-1-6985-0008 (Seed) 695-23-109 Department of Veterans Affairs
GLAC (69D)
115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 Department of Veterans Affairs
GLAC-MILWAUKEE (69D)
Great Lakes Acquisition Center - HC 115 South 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders
36C25223R0071 12-26-2023
X X X
X The purpose of this Amendment is the following:
1. Provide VA responses to Contractor Requests for Information/Clarifications.
2. Provide updates/revisions to Specifications and Drawings
3. Provide updates to the Wage Determination.
See the Continuation page for further details.
There is no change to the proposal due date/time on February 21, 2024 at 1:00pm (CST).
All documents and information within this amendment supersede previous versions.
Continue to monitor SAM.gov for any and all changes to this solicitation.
Anne Vossler Contracting Officer Continuation Page of Block 14, Standard Form 30 Solicitation: 36C25223R0071 Amendment: 0004
The purpose of this amendment is the following:
1. Provide VA responses to Contractor Requests for Information/Clarifications.
2. Provide updates/revisions to the Specifications.
a. Specification Section 01 01 10 SN incorporated new Infection Control Risk Assessment changes.
b. Specification Section 01 32 16.15 List of VA required inspections added as an appendix to this section.
c. Specification Section 02 82 13.19 added.
3. Provide updates/revisions to the Drawings.
a. Drawing G-001 (Reissued)
· General notes 1 and 6 removed.
· Infection control matrix updated
b. Drawing 1-001 (Reissued):
| - | Scale added for reference. |
| - | (2) windows changed to spandrel glass in patient bathrooms Drawing 1-002 |
c. Drawing 1-002 (Reissued):
· Updated details for “backer rod”
d. Drawing 2-001 (Reissued):
· Scale added for reference.
e. Drawing 3-001 (Reissued):
· Scale added for reference.
· Detail 2 added
f. Drawing 5-001 (Reissued):
| - | Scale added for reference. |
| - | (3) Mudjacking areas descoped |
| - | Estimated square footage for areas added to details. |
g. Drawing 6-001 (Reissued):
· Scale added for reference.
h. Drawing 8-001 (Reissued):
· General notes 1. Updated to reflect flooring adhesive was positive for asbestos containing material.
· Detail notes 5. Updated “Furniture in place will need to be removed and discarded by contractor prior to carpet removal / floor installation.
· Detail 4 added to show current furniture layout. Pictures A and B add for visual reference of furniture to be removed.
i. Drawing 9-001
· Scale removed.
· Details 2,3 and 4 added.
j. Drawing 9-002
· Detail 2. “Crusher run” replaced with soil for curb backfill.
4. Provide update to the Wage Determination, dated 01/19/2024.
Attachments:
See attached document: S06 - 36C25223R0071 0004_RFI Responses.
See attached document: S06 - 36C25223R0071 0004_SEED PROJECT Specifications.
See attached document: S06 - 36C25223R0071 0004_SEED PROJECT Drawings.
See attached document: S06 - 36C25223R0071 0004_SEED PROJECT Wage Det 01_19_24.
----NOTHING ELSE FOLLOWS----
S06 – 36C25223R0071 0004 Page 4 of 4