S02_RFP Attachment_SPEC 01 74 19_ Construction Waste Management.docx

DOCX document 26 KB Posted

Attached to
5998--FY23: STATION (PROJ: 673-21-162) DB Replace Nurse Call System
Solicitation number
36C24823R0035
Issued by

About this file

This specification section outlines requirements for construction waste management on a federal construction project. Contractors must develop and implement a waste management plan to divert at least 50% of construction and demolition debris from landfills through waste reduction, reuse, recycling, and salvage. The plan must include procedures for waste stream separation and storage on site; transportation of materials to reuse, recycling, and disposal facilities; record keeping of waste diversion activities; and reporting of waste diversion outcomes. Materials recommended for diversion include soil, concrete, wood, green waste, metals, gypsum board, cardboard, and plastics. Contractors will be responsible for legal disposal of waste not suitable for diversion and will retain financial benefits from salvage and recycling.

The related federal contract opportunity is a solicitation to replace the nurse call system at the James A. Haley Veterans Medical Center in Tampa, Florida. The project number is 673-21-162 and the point of contact is listed. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration VISN 8.

View the file

Other files

File Type Posted
S05_Phase Two_RFI Tracking Log 673_21_162_Nurse Call System_Part 2 Final.docx DOCX document
36C24823R0035 0006.docx DOCX document
S05_Phase Two_RFI Tracking Log 673_21_162_Nurse Call System_Final.docx DOCX document
S02_RFP Attachment_R5_BLDG1_3FL_RBF 3NORTH.pdf PDF
S02_RFP Attachment_R5_BLDG1_6FL_RBF 6WEST.pdf PDF
36C24823R0035 0005.docx DOCX document
S02_RFP Attachment_R5_BLDG30_4FL_D NursingHome_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_2FL_RBF CATHLAB.pdf PDF
S02_RFP Attachment_R5_BLDG38_Polytrauma 2FL_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_3rd FL Cardiology GI_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_2nd FL Hemodialysis_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_2FL_RBF PACU_OR.pdf PDF
S02_RFP Attachment_P2 Site Visit_Nurse Call_23Mar2023.pdf PDF
S02_RFP Attachment__R5_BLDG1_6FL_RBF 6SOUTH.pdf PDF
S02_RFP Attachment_R5_BLDG1_4FL_RBF North_South_West.pdf PDF
S02_RFP Attachment_R5_BLDG1_5FL_RBF_5NORTH.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Nurse Call System_Updated.docx DOCX document
S02_RFP Attachment_R5_BLDG38_Polytrauma 1FL_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG38_Polytrauma 3FL_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_5FL_RBF_5WEST.pdf PDF
S02_RFP Attachment_R5_BLDG1_2FL_RBF SICU.pdf PDF
S02_RFP Attachment_Bldg 30_D Floor Power and Nurse Call Riser.pdf PDF
36C24823R0035 0004.docx DOCX document
36C24823R0035 0003.docx DOCX document
P03_JA_OVER_SAT_Nurse Call System_Signed_HCA_Redacted.pdf PDF
S02_RFP Attachment_Bldg 30 _ D floor Power and Nurse Call Riser.pdf PDF
S02_RFP Attachment_Bldg 1 _ 4th floor South_North_West MICU.pdf PDF
36C24823R0035 0002.docx DOCX document
S02_RFP Attachment_Bldg 38 _ 2nd floor Polytrauma Fire Alarm and Nurse Call.pdf PDF
S02_RFP Attachment_Bldg 38 _ Pool Area Power FA and Nurse Call.pdf PDF
S02_RFP Attachment_Bldg 1 _ 5th floor North _ West_.pdf PDF
S02_RFP Attachment_Bldg 68 PTRP APT.pdf PDF
S02_RFP Attachment_Bldg 1 _ 6th floor South_West.pdf PDF
S05_RFI Tracking Log PN 673_21_162 DB Replace Nurse Call System (27 Jan 2023).docx DOCX document
S02_RFP Attachment_Bldg 1 _ 3rd floor South_North Cardiology_GI.pdf PDF
S02_RFP Attachment_Bldg 1 _ 2nd Floor Hemodialysis.pdf PDF
S02_RFP Attachment_Bldg 38 _ 3rd Floor FA and Nurse call.pdf PDF
S02_RFP Attachment_Bldg 1 _ 2nd Floor Post Op _PACU_SICU.pdf PDF
S02_RFP Attachment_SPEC 00 11 21_RFP 673_21_162_Revised 27Jan2023.docx DOCX document
Experience Information Sheet.docx DOCX document
36C24823R0035 0001.docx DOCX document
S02_RFP 36C24823R0035_Final.pdf PDF
S02_RFP Attachment_Tampa site map 673-21-162.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Nurse Call System.docx DOCX document
S02_RFP Attachment_Tampa site map.pdf PDF
S02_RFP Attachment_SPEC 27 11 00_Communications Equipment Room Fittings.docx DOCX document
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_SPEC 27 52 53_Nurse Call and Code Blue Systems_Technical Specifications - 673-21-162.docx DOCX document
S02_RFP Attachment_AHERA Survey.pdf PDF
S02_RFP Attachment_SPEC 27 15 00_Communications Structured Cabling.docx DOCX document
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

04-01-22

SECTION 01 74 19

CONSTRUCTION WASTE MANAGEMENT

GENERAL

DESCRIPTION

This section specifies the requirements for the management of non-hazardous building construction and demolition waste.

Waste disposal in landfills shall be minimized to the greatest extent possible. Of the inevitable waste that is generated, as much of the waste material as economically feasible shall be salvaged, recycled or reused.

Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators, and facilitate their salvage and recycle not limited to the following:

Waste Management Plan development and implementation.

Techniques to minimize waste generation.

Sorting and separating of waste materials.

Salvage of existing materials and items for reuse or resale.

Recycling of materials that cannot be reused or sold.

At a minimum the following waste categories shall be diverted from landfills:

Soil.

Inerts (eg, concrete, masonry and asphalt).

Clean dimensional wood and palette wood.

Green waste (biodegradable landscaping materials).

Engineered wood products (plywood, particle board and I-joists, etc).

Metal products (eg, steel, wire, beverage containers, copper, etc).

Sheathings Cardboard, paper and packaging.

Bitumen roofing materials.

Plastics (eg, ABS, PVC).

Carpet and/or pad.

Gypsum board.

Insulation.

Paint.

Fluorescent lamps.

RELATED WORK

Section 02 41 00, DEMOLITION.

Section 01 00 00, GENERAL REQUIREMENTS.

//C. Lead Paint: Section 02 83 33.13, LEAD BASED PAINT REMOVAL AND DISPOSAL.// //D. Division 1 Sustainability specifications//

QUALITY ASSURANCE

Contractor shall practice efficient waste management when sizing, cutting and installing building products. Processes shall be employed to ensure the generation of as little waste as possible. Construction /Demolition waste includes products of the following:

Excess or unusable construction materials.

Packaging used for construction products.

Poor planning and/or layout.

Construction error.

Over ordering.

Weather damage.

Contamination.

Mishandling.

Breakage.

Establish and maintain the management of non-hazardous building construction and demolition waste set forth herein. Conduct a site assessment to estimate the types of materials that will be generated by demolition and construction.

Contractor shall develop and implement procedures to recycle construction and demolition waste to a minimum of //50// // // percent.

Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling. Any revenues or savings obtained from salvage or recycling shall accrue to the contractor.

Contractor shall provide all demolition, removal and legal disposal of materials. Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by local, state, federal regulations.

Contractor shall assign a specific area to facilitate separation of materials for reuse, salvage, recycling, and return. Such areas are to be kept neat and clean and clearly marked in order to avoid contamination or mixing of materials.

Contractor shall provide on-site instructions and supervision of separation, handling, salvaging, recycling, reuse and return methods to be used by all parties during waste generating stages.

Record on daily reports any problems in complying with laws, regulations and ordinances with corrective action taken.

TERMINOLOGY

Class III Landfill: A landfill that accepts non-hazardous resources such as household, commercial and industrial waste resulting from construction, remodeling, repair and demolition operations.

Clean: Untreated and unpainted; uncontaminated with adhesives, oils, solvents, mastics and like products.

Construction and Demolition Waste: Includes all non-hazardous resources resulting from construction, remodeling, alterations, repair and demolition operations.

Dismantle: The process of parting out a building in such a way as to preserve the usefulness of its materials and components.

Disposal: Acceptance of solid wastes at a legally operating facility for the purpose of land filling (includes Class III landfills and inert fills).

Inert Backfill Site: A location, other than inert fill or other disposal facility, to which inert materials are taken for the purpose of filling an excavation, shoring or other soil engineering operation.

Inert Fill: A facility that can legally accept inert waste, such as asphalt and concrete exclusively for the purpose of disposal.

Inert Solids/Inert Waste: Non-liquid solid resources including, but not limited to, soil and concrete that does not contain hazardous waste or soluble pollutants at concentrations in excess of water-quality objectives established by a regional water board, and does not contain significant quantities of decomposable solid resources.

Mixed Debris: Loads that include commingled recyclable and non-recyclable materials generated at the construction site.

Mixed Debris Recycling Facility: A solid resource processing facility that accepts loads of mixed construction and demolition debris for the purpose of recovering re-usable and recyclable materials and disposing non-recyclable materials.

Permitted Waste Hauler: A company that holds a valid permit to collect and transport solid wastes from individuals or businesses for the purpose of recycling or disposal.

Recycling: The process of sorting, cleansing, treating, and reconstituting materials for the purpose of using the altered form in the manufacture of a new product. Recycling does not include burning, incinerating or thermally destroying solid waste.

On-site Recycling – Materials that are sorted and processed on site for use in an altered state in the work, i.e. concrete crushed for use as a sub-base in paving.

Off-site Recycling – Materials hauled to a location and used in an altered form in the manufacture of new products.

Recycling Facility: An operation that can legally accept materials for the purpose of processing the materials into an altered form for the manufacture of new products. Depending on the types of materials accepted and operating procedures, a recycling facility may or may not be required to have a solid waste facilities permit or be regulated by the local enforcement agency.

Reuse: Materials that are recovered for use in the same form, on-site or off-site.

Return: To give back reusable items or unused products to vendors for credit.

Salvage: To remove waste materials from the site for resale or re-use by a third party.

Source-Separated Materials: Materials that are sorted by type at the site for the purpose of reuse and recycling.

Solid Waste: Materials that have been designated as non-recyclable and are discarded for the purposes of disposal.

Transfer Station: A facility that can legally accept solid waste for the purpose of temporarily storing the materials for re-loading onto other trucks and transporting them to a landfill for disposal, or recovering some materials for re-use or recycling.

SUBMITTALS

In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES, furnish the following:

Prepare and submit to the //COR// //Resident Engineer// a written demolition debris management plan. The plan shall include, but not be limited to, the following information:

Procedures to be used for debris management.

Techniques to be used to minimize waste generation.

Analysis of the estimated job site waste to be generated:

List of each material and quantity to be salvaged, reused, recycled.

List of each material and quantity proposed to be taken to a landfill.

Detailed description of the Means/Methods to be used for material handling.

On site: Material separation, storage, protection where applicable.

Off site: Transportation means and destination. Include list of materials.

Description of materials to be site-separated and self-hauled to designated facilities.

Description of mixed materials to be collected by designated waste haulers and removed from the site.

The names and locations of mixed debris reuse and recycling facilities or sites.

The names and locations of trash disposal landfill facilities or sites.

Documentation that the facilities or sites are approved to receive the materials.

Designated Manager responsible for instructing personnel, supervising, documenting and administer over meetings relevant to the Waste Management Plan.

Monthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling.

Target waste diversion rate by material and an overall diversion rate.

Final report documenting the results of implementation of the preconstruction waste management plan.

APPLICABLE PUBLICATIONS

Publications listed below form a part of this specification to the extent referenced. Publications are referenced by the basic designation only. In the event that criteria requirements conflict, the most stringent requirements shall be met.

U.S. Green Building Council (USGBC): LEED Green Building Rating System for New Construction

1. Green Building Initiative (GBI): Green Globes for New Construction 2019

RECORDS

Maintain records to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration. Records shall be kept in accordance with the //LEED Reference Guide and LEED Template// // Green Globes for New Construction 2019 Technical Reference Manual.//

PRODUCTS

MATERIALS

List of each material and quantity to be salvaged, recycled, reused.

List of each material and quantity proposed to be taken to a landfill.

Material tracking data: Receiving parties, dates removed, transportation costs, weight tickets, tipping fees, manifests, invoices, net total costs or savings.

EXECUTION

COLLECTION

Provide all necessary containers, bins and storage areas to facilitate effective waste management.

Clearly identify containers, bins and storage areas so that recyclable materials are separated from trash and can be transported to respective recycling facility for processing.

Hazardous wastes shall be separated, stored, disposed of according to local, state, federal regulations.

DISPOSAL

Contractor shall be responsible for transporting and disposing of materials that cannot be delivered to a source-separated or mixed materials recycling facility to a transfer station or disposal facility that can accept the materials in accordance with state and federal regulations.

Construction or demolition materials with no practical reuse or that cannot be salvaged or recycled shall be disposed of at a landfill or incinerator.

REPORT

With each application for progress payment, submit a summary of construction and demolition debris diversion and disposal including beginning and ending dates of period covered.

Quantify all materials diverted from landfill disposal through salvage or recycling during the period with the receiving parties, dates removed, transportation costs, weight tickets, manifests, invoices. Include the net total costs or savings for each salvaged or recycled material.

Quantify all materials disposed of during the period with the receiving parties, dates removed, transportation costs, weight tickets, tipping fees, manifests, invoices. Include the net total costs for each disposal.

- - - E N D - - - 01 74 19 - 2