S05_Phase Two_RFI Tracking Log 673_21_162_Nurse Call System_Part 2 Final.docx

DOCX document 33 KB Posted

Attached to
5998--FY23: STATION (PROJ: 673-21-162) DB Replace Nurse Call System
Solicitation number
36C24823R0035
Issued by

About this file

This document contains responses to a Request for Information (RFI) related to Solicitation Number 36C24823R0035 for a design-build project to replace the nurse call system at the James A. Haley Veterans Medical Center in Tampa, Florida. The RFI responses clarify that the contractor will be responsible for providing licensed design professionals to ensure VA technical installation requirements are met, that existing equipment removed must be turned over to the medical center's Electronics Department, and that all security requirements and specifications provided are valid, including background checks for contractor employees. Review meetings will take place after the 65% and 95% design submissions are completed.

View the file

Other files

File Type Posted
36C24823R0035 0006.docx DOCX document
S05_Phase Two_RFI Tracking Log 673_21_162_Nurse Call System_Final.docx DOCX document
S02_RFP Attachment_R5_BLDG1_3FL_RBF 3NORTH.pdf PDF
S02_RFP Attachment_R5_BLDG1_6FL_RBF 6WEST.pdf PDF
36C24823R0035 0005.docx DOCX document
S02_RFP Attachment_R5_BLDG30_4FL_D NursingHome_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_2FL_RBF CATHLAB.pdf PDF
S02_RFP Attachment_R5_BLDG38_Polytrauma 2FL_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_3rd FL Cardiology GI_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_2nd FL Hemodialysis_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_2FL_RBF PACU_OR.pdf PDF
S02_RFP Attachment_P2 Site Visit_Nurse Call_23Mar2023.pdf PDF
S02_RFP Attachment__R5_BLDG1_6FL_RBF 6SOUTH.pdf PDF
S02_RFP Attachment_R5_BLDG1_4FL_RBF North_South_West.pdf PDF
S02_RFP Attachment_R5_BLDG1_5FL_RBF_5NORTH.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Nurse Call System_Updated.docx DOCX document
S02_RFP Attachment_R5_BLDG38_Polytrauma 1FL_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG38_Polytrauma 3FL_RBF.pdf PDF
S02_RFP Attachment_R5_BLDG1_5FL_RBF_5WEST.pdf PDF
S02_RFP Attachment_R5_BLDG1_2FL_RBF SICU.pdf PDF
S02_RFP Attachment_Bldg 30_D Floor Power and Nurse Call Riser.pdf PDF
36C24823R0035 0004.docx DOCX document
36C24823R0035 0003.docx DOCX document
P03_JA_OVER_SAT_Nurse Call System_Signed_HCA_Redacted.pdf PDF
S02_RFP Attachment_Bldg 30 _ D floor Power and Nurse Call Riser.pdf PDF
S02_RFP Attachment_Bldg 1 _ 4th floor South_North_West MICU.pdf PDF
36C24823R0035 0002.docx DOCX document
S02_RFP Attachment_Bldg 38 _ 2nd floor Polytrauma Fire Alarm and Nurse Call.pdf PDF
S02_RFP Attachment_Bldg 38 _ Pool Area Power FA and Nurse Call.pdf PDF
S02_RFP Attachment_Bldg 1 _ 5th floor North _ West_.pdf PDF
S02_RFP Attachment_Bldg 68 PTRP APT.pdf PDF
S02_RFP Attachment_Bldg 1 _ 6th floor South_West.pdf PDF
S05_RFI Tracking Log PN 673_21_162 DB Replace Nurse Call System (27 Jan 2023).docx DOCX document
S02_RFP Attachment_Bldg 1 _ 3rd floor South_North Cardiology_GI.pdf PDF
S02_RFP Attachment_Bldg 1 _ 2nd Floor Hemodialysis.pdf PDF
S02_RFP Attachment_Bldg 38 _ 3rd Floor FA and Nurse call.pdf PDF
S02_RFP Attachment_Bldg 1 _ 2nd Floor Post Op _PACU_SICU.pdf PDF
S02_RFP Attachment_SPEC 00 11 21_RFP 673_21_162_Revised 27Jan2023.docx DOCX document
Experience Information Sheet.docx DOCX document
36C24823R0035 0001.docx DOCX document
S02_RFP 36C24823R0035_Final.pdf PDF
S02_RFP Attachment_Tampa site map 673-21-162.pdf PDF
S02_RFP Attachment_INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION_Nurse Call System.docx DOCX document
S02_RFP Attachment_Tampa site map.pdf PDF
S02_RFP Attachment_SPEC 27 11 00_Communications Equipment Room Fittings.docx DOCX document
S02_RFP Attachment_DB Wage Rate FL20220208 dtd 09.09.22.txt TXT text file
S02_RFP Attachment_SPEC 27 52 53_Nurse Call and Code Blue Systems_Technical Specifications - 673-21-162.docx DOCX document
S02_RFP Attachment_AHERA Survey.pdf PDF
S02_RFP Attachment_SPEC 27 15 00_Communications Structured Cabling.docx DOCX document
S02_RFP Attachment_SPEC 23 05 93_Testing Adjusting and Balancing for HVAC.docx DOCX document
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI)

D/B Replace Nurse Call System Project 673-21-162

RFI NBR
Question/

Response

Company Submitted By
Dated Received
1.
Reference VA TIL Specification 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

Under the Submittals section of this specification, it requires the contractor responsible for the specification to submit delegated design submittals. Delegated design allows an owner, through the drawings and specifications prepared by the architect though the use of the standard VA TIL specification(s), to delegate the design of systems, materials, or equipment to the contractor, and their appropriately licensed design professional that prepares the actual design as a shop drawing. The architect is required to specify the performance and design criteria that the contractor will be required to achieve. The contractor then provides those design services through an “appropriately licensed design professional” who uses its own signature and seal on design documents it produces. Question: Can the VA confirm that the Justification and Approval (J&A) for the authorized Rauland Nurse Call System designer/installer will procure the design services and certifications necessary to satisfactorily complete the work from a licensed design professional in order to meet the requirements of 27 05 11?

TLS
3/20/23

VA Response: It is the responsibility of the design build contractor to provide licensed design professionals to ensure that the project vendor installs within VA TIL requirements and specifications.

2.
What should be done with the existing equipment to be removed. Turn it over to the COTR or dispose of it?
TLS
3/20/23

VA Response: The existing equipment will be turned over to the Electronics Department at JAHVA

3.
The solicitation states “Contractor employees shall have background checks completed.” Can the VA confirm this is required?
TLS
3/20/23

VA Response: All security requirements are valid.

4.
The solicitation Page 18 of 89 states “The initial test schedule shall be submitted to the COR no later than 10 days after award.” Given that the specifications will not be fully developed until the 95% Design phase, should this statement be after the 95% review in lieu of “10 days after award”?
TLS
3/20/23

VA Response: No. The contractor is to provide a schedule.

5
For the purpose of providing the Proposal Schedule what date should we use as the NTP/ Design Only date?
TLS
3/20/23

VA Response: There will be only one NTP date issued and will be the same date as the kick off meeting.

6
Are existing as-builts for the NC going to be provided in Phase II as the files given do not have enough information in order to bid or develop a schedule?
TLS
3/20/23

VA Response: The additional drawings that are provided during phase 2 RFI answers are the most current drawings available.

7
Reference VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) page 69 of 89 of the solicitation. The VAAR states “The specifications attached to this RFP are mandatory. Compliance with additional specifications may be required during the design phase.”

However, the SOW states “The Tampa VA has specifications that have been edited for general use at this facility and are the preferred specification to be used”. Can the VA confirm that all sections provided in the solicitation shall be used in the context provided?

TLS
3/20/23

VA Response: The Tampa General and Safety specifications has been edited to suit the specific needs of the facility. All other specifications have not been altered and are to be reviewed and tailored by the design team to ensure that the design follows VA design requirements for the installation.

8
Can the VA verify if Flexible Galvanized Steel Conduit Conforming to UL 1 is prohibited for new raceways needed in/down walls?
TLS
3/20/23

VA Response: Galvanized Steel Conduit Conforming to UL 1 can be used to provide a raceway in finished walls.

9
Reference DESIGN SCHEDULES page 13 of 89 in the solicitation below.

Can the VA confirm that there are 3 each design packages, IE 65% 95% and Deliver Final Contract Documents 100%. Of which the 65% and 95% will have review meetings?

a. Begin Design Development (Notice to Proceed): NTP

b. First Submission Contract Documents (CD1-65%): NTP + 80 Days

c. First Review Meeting and Return First Submission: NTP + 95 Days

a. Second Submission Contract Documents (CD2-95%): NTP + 120 Days

b. Second Review Meeting and Return Third Submission: NTP + 135 Days

c. Forth Submission (Deliver Final Contract Documents) (CD3- 100%): NTP + 155 Days

TLS
3/20/23

VA Response: Confirmed

10
Will there be another opportunity to submit follow up questions once the phase II RFI’s are responded to?
TLS
3/20/23

VA Response: No.