S05_Phase Two_RFI Tracking Log 673_21_162_Nurse Call System_Part 2 Final.docx
DOCX document 33 KB Posted
- Solicitation number
- 36C24823R0035
About this file
This document contains responses to a Request for Information (RFI) related to Solicitation Number 36C24823R0035 for a design-build project to replace the nurse call system at the James A. Haley Veterans Medical Center in Tampa, Florida. The RFI responses clarify that the contractor will be responsible for providing licensed design professionals to ensure VA technical installation requirements are met, that existing equipment removed must be turned over to the medical center's Electronics Department, and that all security requirements and specifications provided are valid, including background checks for contractor employees. Review meetings will take place after the 65% and 95% design submissions are completed.
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI)
D/B Replace Nurse Call System Project 673-21-162
| RFI NBR |
| Question/ |
Response
| Company Submitted By |
| Dated Received |
| 1. |
| Reference VA TIL Specification 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS |
Under the Submittals section of this specification, it requires the contractor responsible for the specification to submit delegated design submittals. Delegated design allows an owner, through the drawings and specifications prepared by the architect though the use of the standard VA TIL specification(s), to delegate the design of systems, materials, or equipment to the contractor, and their appropriately licensed design professional that prepares the actual design as a shop drawing. The architect is required to specify the performance and design criteria that the contractor will be required to achieve. The contractor then provides those design services through an “appropriately licensed design professional” who uses its own signature and seal on design documents it produces. Question: Can the VA confirm that the Justification and Approval (J&A) for the authorized Rauland Nurse Call System designer/installer will procure the design services and certifications necessary to satisfactorily complete the work from a licensed design professional in order to meet the requirements of 27 05 11?
| TLS |
| 3/20/23 |
VA Response: It is the responsibility of the design build contractor to provide licensed design professionals to ensure that the project vendor installs within VA TIL requirements and specifications.
| 2. |
| What should be done with the existing equipment to be removed. Turn it over to the COTR or dispose of it? |
| TLS |
| 3/20/23 |
VA Response: The existing equipment will be turned over to the Electronics Department at JAHVA
| 3. |
| The solicitation states “Contractor employees shall have background checks completed.” Can the VA confirm this is required? |
| TLS |
| 3/20/23 |
VA Response: All security requirements are valid.
| 4. |
| The solicitation Page 18 of 89 states “The initial test schedule shall be submitted to the COR no later than 10 days after award.” Given that the specifications will not be fully developed until the 95% Design phase, should this statement be after the 95% review in lieu of “10 days after award”? |
| TLS |
| 3/20/23 |
VA Response: No. The contractor is to provide a schedule.
| 5 |
| For the purpose of providing the Proposal Schedule what date should we use as the NTP/ Design Only date? |
| TLS |
| 3/20/23 |
VA Response: There will be only one NTP date issued and will be the same date as the kick off meeting.
| 6 |
| Are existing as-builts for the NC going to be provided in Phase II as the files given do not have enough information in order to bid or develop a schedule? |
| TLS |
| 3/20/23 |
VA Response: The additional drawings that are provided during phase 2 RFI answers are the most current drawings available.
| 7 |
| Reference VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) page 69 of 89 of the solicitation. The VAAR states “The specifications attached to this RFP are mandatory. Compliance with additional specifications may be required during the design phase.” |
However, the SOW states “The Tampa VA has specifications that have been edited for general use at this facility and are the preferred specification to be used”. Can the VA confirm that all sections provided in the solicitation shall be used in the context provided?
| TLS |
| 3/20/23 |
VA Response: The Tampa General and Safety specifications has been edited to suit the specific needs of the facility. All other specifications have not been altered and are to be reviewed and tailored by the design team to ensure that the design follows VA design requirements for the installation.
| 8 |
| Can the VA verify if Flexible Galvanized Steel Conduit Conforming to UL 1 is prohibited for new raceways needed in/down walls? |
| TLS |
| 3/20/23 |
VA Response: Galvanized Steel Conduit Conforming to UL 1 can be used to provide a raceway in finished walls.
| 9 |
| Reference DESIGN SCHEDULES page 13 of 89 in the solicitation below. |
Can the VA confirm that there are 3 each design packages, IE 65% 95% and Deliver Final Contract Documents 100%. Of which the 65% and 95% will have review meetings?
a. Begin Design Development (Notice to Proceed): NTP
b. First Submission Contract Documents (CD1-65%): NTP + 80 Days
c. First Review Meeting and Return First Submission: NTP + 95 Days
a. Second Submission Contract Documents (CD2-95%): NTP + 120 Days
b. Second Review Meeting and Return Third Submission: NTP + 135 Days
c. Forth Submission (Deliver Final Contract Documents) (CD3- 100%): NTP + 155 Days
| TLS |
| 3/20/23 |
VA Response: Confirmed
| 10 |
| Will there be another opportunity to submit follow up questions once the phase II RFI’s are responded to? |
| TLS |
| 3/20/23 |
VA Response: No.