S02_RFP Attachment_Price Matrix.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Y1DA--FY23: NRM-Tier 1 (PROJ: 673-21-148) BB - Renovate Bldg 1 - 5 South to Private Patient Rooms
Solicitation number
36C24823R0199
Issued by

About this file

This document contains a price matrix template for a federal construction contract opportunity with the Department of Veterans Affairs. The price matrix includes line items for various construction divisions such as general requirements, concrete, masonry, and HVAC. Offerors are to provide their labor costs, material costs, and total costs for each line item. Additionally, the price matrix includes fields for overhead percentage, profit percentage, bond percentage, and total price.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Veterans Health Administration to renovate building 1-5 at a VA medical center to convert it to private patient rooms. The solicitation number is 36C24823R0199 and the project number is 673-21-148. Offerors are to use the price matrix template to submit their pricing proposals for the construction renovation work.

View the file

Other files

File Type Posted
36C24823R0199 0007.docx DOCX document
S06_673 21 148_VA Tampa_5South_DRAWINGS_BidSet_REV1_20231106.pdf PDF
S06_673 21 148_VA Tampa_5South_SPECS_BidSet_REV1_20231106.pdf PDF
36C24823R0199 0006.docx DOCX document
S06_RFI UPDATE List-Description of Bid-Proposal Items and any associated alternate deductive_110723.docx DOCX document
S06_673-21-148_VA Tampa_5South_SPECS_BidSet_REV1_20231106.pdf PDF
S06_673-21-148_VA Tampa_5South_DRAWINGS_BidSet_REV1_20231106.pdf PDF
36C24823R0199 0005.docx DOCX document
S05_RFI 36C24823R0199 BB Renovate 5 South Private Patient Rooms UPDATED 11 3.xlsx XLSX spreadsheet
S06_RFI UPDATE CCTV Riser Diagram_110723.pdf PDF
S06_RFI UPDATE CCTV Riser Diagram.pdf PDF
S06_RFI UPDATE ACM Survey Report - JAHVA Building 1 FOR REF ONLY.pdf PDF
P01_673-21-148 BB SOW REV.docx DOCX document
S06_RFI UPDATE 22 00 97 5th Floor Asbestos and Lead Survey Report REV 1 2023 10 05.pdf PDF
S05_RFI_36C24823R0199_BB Renovate 5 South Private Patient Rooms UPDATED 10.27.xlsx XLSX spreadsheet
S06_RFI UPDATE 673-21-148 VA Tampa 5South DRAWINGS BidSet REV1 2023 10 27.pdf PDF
36C24823R0199 0004.docx DOCX document
S06_RFI UPDATE List-Description of Bid-Proposal Items and any associated alternate deductive.docx DOCX document
S06_RFI UPDATE 673-21-148 VA Tampa 5South SPECS BidSet REV1 2023 10 30.pdf PDF
36C24823R0199 0003.docx DOCX document
RFI Spreadsheet.xlsx XLSX spreadsheet
36C24823R0199 0002.docx DOCX document
S04_673_21_148 Construction Site Visit Attendance.pdf PDF
36C24823R0199 0001.docx DOCX document
S02_RFP Attachment_VA LOS_JAN 2023_DEVIATION.pdf PDF
S02_RFP Attachment_WD FL20230208_13Jan2023.pdf PDF
S02_RFP Attachment_Instructions to Offerors.docx DOCX document
S02_RFP Attachment_RFI Spreadsheet.xlsx XLSX spreadsheet
S02_RFP Attachment_Past Performance Questionnaire.pdf PDF
36C24823R0199_2.docx DOCX document
S02_RFP Attachment_5S Site Map.pdf PDF
S02_RFP Attachment_673_21_148_VA Tampa_5South_SPECS_BidSet_REVISED.pdf PDF
S02_RFP Attachment_673_21_148_VA Tampa_5South_DRAWINGS_BidSet_REV.pdf PDF
S02_RFP Attachment_Experience Information Sheet.docx DOCX document
S02_RFP Attachment_EMR.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Base Offer Cost Breakdown

Project Number:Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror CityStateZip
ItemDescriptionLabor CostMaterial CostTotal Cost
Division 1General Requirements$-$-$-
Division 1Design Requirements
Division 2Existing Conditions---
Division 3Concrete---
Division 4Masonry---
Division 5Metals---
Division 6Wood and Plastic---
Division 7Thermal & Moisture Protect---
Division 8Doors and Windows---
Division 9Finishes---
Division 10Specialties---
Division 11Equipment---
Division 12Furnishings---
Division 13Special Construction---
Division 14Conveying Equipment---
Division 21Fire Suppression---
Division 22Plumbing---
Division 23HVAC---
Division 26Electrical---
Division 27Communications---
Division 28Electronic Safety & Security---
Division 31Earthwork---
Division 32Exterior Improvements---
Division 33Utilities---
Division 34Transportation Subtotal---
Division Subtotals :$-$-$-
Overhead %0.00%-
Profit %0.00%-
Bond %0.00%-
Overhead/Profit Subtotals :$-

Total Price $- $- $-

File details come from the government source that posted it. Updated .