S06_RFI UPDATE 673-21-148 VA Tampa 5South DRAWINGS BidSet REV1 2023 10 27.pdf
PDF 36 MB Posted
- Attached to
- Y1DA--FY23: NRM-Tier 1 (PROJ: 673-21-148) BB - Renovate Bldg 1 - 5 South to Private Patient Rooms
- Solicitation number
- 36C24823R0199
About this file
This file is related to a solicitation for renovations to Building 1 - 5 South at the VA Medical Center in Tampa, Florida to convert it to private patient rooms. The solicitation number is 36C24823R0199 and was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The opportunity type is a solicitation for the project NRM-Tier 1 (PROJ: 673-21-148) BB - Renovate Bldg 1 - 5 South to Private Patient Rooms. The file appears to contain drawings related to the solicitation for renovations that will convert the building to private patient rooms. The response date and award date are not specified in the information provided.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline:
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D Temple, AZ, 85282 480-454-2861 David Combs
KEY PLAN NTS NORTH
BID SET RENOVATE B1 - 5 SOUTH
PRIVATE PATIENT ROOMS
13000 BRUCE B DOWN BLVD, TAMPA, FL 33612
673-21-148
BLDG 1
AESUSAESUSJAN 31, 2023
C U s e rs
\o g o n z \O n e
D ri v e
\D o c u m e n ts \6
-2
-1
V
A T a m p a
S o u th A
R C
H
L m a rc h iU
P G
J
.r v t
/1
/2
:4
:4
A M
GI.001
COVER SHEET
DX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
x x x x
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
DURING CONSTRUCTION:
A. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
B. COMPLETE ALL CRITICAL BARRIERS I.E. SHEET ROCK, PLYWOOD, PLASTIC,
TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
C. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS. PROVIDE NEGATIVE AIR PRESSURE
MONITOR.
D. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
E. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
F. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY A SAFETY OFFICER AND INFECTION CONTROL
COORDINATOR AND THOROUGHLY CLEANED BY THE ENVIRONMENTAL
MANAGEMENT SERVICES.
UPON COMPLETION OF PROJECT:
A. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
B. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
C. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
D. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
E. WET MOP AREA WITH DISINFECTANT.
F. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
Approved: Associate Director
Approved: Chief Facilities Management
Approved: Manager / Engineer
Approved: Director
Approved: Union representative
Approved: Safety Officer
EQ-X
CPT1
W-X
E
EA EACH
E EAST
EWC ELECTRIC WATER COOLER
ELEC ELECTRIC (AL)
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ETR EXISTING TO REMAIN
EXP EXPANSION
EXP BT EXPANSION BOLT
EJ EXPANSION JOINT
EXP EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
F
FWC FABRIC WALL COVERING
FT FEET, FOOT
FGL FIBERGLASS
FIN FINISH
FIN GR FINISH GRADE
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FP FIREPROOF
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDTN FOUNDATION
FRMG FRAMING
FURN FURNACE, FURNITURE
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GL GLASS
GL BLK GLASS BLOCK
GB GRAB BAR
GR GRADE
GRAN GRANITE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GUT GUTTER
GYP BD GYPSUM BOARD
H
HNDRL HANDRAIL
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AIR CONDITIONING
HT HEIGHT
HPT HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HR HOUR
I
IN INCH
INFO INFORMATION
ID INSIDE DIAMETER
INSUL INSULATED,INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KPL KICKPLATE
KIT KITCHEN
KB KNEE BRACE
L
LAB LABORATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LV LAVATORY
LT LIGHT
LD LINEAR DIFFUSER
L CL LINEN CLOSET
LL LIVE LOAD
LLV LONG LEG VERTICAL
LPT LOW POINT
M
MACH MACHINE
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MRB MARBLE BASE
MRF MARBLE FLOOR
MKR BD MARKER BOARD
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MC MEDICINE CABINET
MEMB MEMBRANE
MTL METAL
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
N
NAT FIN NATURAL FINISH
NOM NOMINAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
ORCH ORCHESTRA
ORN ORNAMENTAL
OD OUTSIDE DIAMETER
OH OVERHANG, OVERHEAD
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
O OXYGEN
P
P PAINT
PR PAIR
PNL PANEL
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PERF PERFORATED
PC PIECE
PLAM PLASTIC LAMINATE
PLAS PLASTIC, PLASTER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PCC PRECAST CONCRETE
PREFAB PREFABRICATE
PREFIN PREFINISH
PROD PRODUCTION
Q
QTY QUANTITY
QT QUARRY TILE
A
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
APC ACOUSTICAL PANEL CEILING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
AL ANGLE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
B
BALC BALCONY
BSMT BASEMENT
BM BEAM, BENCHMARK
BR BEDROOM
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BRKT BRACKET
BRK BRICK
B CL BROOM CLOSET
BLDG BUILDING
BLT IN BUILT-IN
BUR BUILT-UP ROOFING
C
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEANOUT, CASED OPENING
CLR CLEAR, COLOR
CLO CLOSET
COL COLUMN
CMPST COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COTR CONTRACTING OFFICER
CJ CONTROL JOINT
COP COPING
CU COPPER
CG CORNER GUARD
CORR CORRIDOR
CNTR COUNTER
CSK COUNTER SUNK
D
DMPF DAMPPROOFING
DL DEAD LOAD
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DR DOOR, DRAIN
DH DOUBLE HUNG
DN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
DUPL DUPLICATE
R
R RADIUS, RISER
RWD REDWOOD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RB RESILIENT BASE
RF RESILIENT FLOORING
RA RETURN AIR
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
S
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHV SHELVING
SIM SIMILAR
S SOUTH
SP FIN SPECIAL FINISH
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FEET
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
S4S SURFACED FOUR SIDES
SUSP SUSPEND
SW SWITCH
SYMM SYMMETRICAL
T
TK BD TACKBOARD
TEL TELEPHONE
TV TELEVISION
TMPD TEMPERED
TEMP TEMPORARY
TER TERRAZZO
THK THICKNESS
TPD TOILET PAPER DISPENSER
T&G TONGUE AND GROOVE
TOS TOP OF SLAB, STEEL
T TREAD
TYP TYPICAL
U
UC UNDERCUT
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
V
VAC VACUUM
VR VAPOR RETARDER
VNR VENEER
VP VENEER PLASTER
VIF VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W
W CAB WALL CABINETS
WC WALL COVERING, WATER CLOSET
WP WATERPROOFING, WEATHER
PROOF, WORKING POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
W WEST
WF WIDE FLANGE
WDW WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
WDP WOOD PANELING
13000 Bruce B Downs Blvd
Department of Veterans Affairs
KEYED NOTE
WALL TYPE
X
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
NORTH
Tampa FL VA Health Care System
APPROVED FOR CONSTRUCTION
Project No: 673-21-148
Tampa, FL, 33612
DESIGN TEAM
ABBREVIATIONS OWNER
CODE REFERENCES
BUILDING CODE:
2020 FBC - INTERNATIONAL BUILDING CODE
2020 FBC - EXISTING BUILDING CODE
2020 FBC - INTERNATIONAL ENERGY CONSERVATION CODE
2020 FFPC - NFPA
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2020 FBC - INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2020 FBC - INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2020 FBC - INTERNATIONAL ELECTRICAL CODE
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
GENERAL NOTES
VICINITY MAP
INFECTION CONTROL MEASURES
ALTERNATES
DESCRIPTIONSYMBOL
RENOVATE B1, 5 SOUTH FOR PRIVATE PATIENT ROOMS - 673-21-148
James A Haley VA Hospital, Tampa, FL Department of Veterans Affairs
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Orlando Gonzales (ogonzales@aesusdesign.com)
480-454-2861
David Combs (dcombs@aesusdesign.com)
480-454-2861
NORTH
PROJECT AREA
PROJECT SITE
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
James A Haley VA Hospital, Tampa, FL
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (0730-1600) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
G. NOT ALL KEYNOTES ARE ON ALL SHEETS.
THIS PROJECT SCOPE SHALL INCLUDE BUT NOT BE LIMITED TO THE RENOVATION OF THE
5TH FLOOR SOUTH WING OF BUILDING ONE AT THE JAMES A. HALEY VA HOSPITAL,
LOCATED AT 13000 BRUCE B. DOWNS BOULEVARD, TAMPA, FLORIDA. THE SCOPE OF
WORK INCLUDES THE COMPLETE DEMOLITION AND REMODEL OF AN INPATIENT WING. A
GENERAL DESCRIPTION OF WORK INCLUDES DEMOLITION OF EXISTING WALLS, FINISHES,
MEP, FP, AND OTHER ITEMS TO SUPPORT NEW WORK ALONG WITH ASBESTOS
ABATEMENT AS DEEMED NECESSARY BY THE ASBESTOS REPORT. NEW WORK INCLUDES
NEW WALLS, INTERIOR FINISHES, MILLWORK, DOORS, FRAMES, HARDWARE,
MECHANICAL, ELECTRICAL, PLUMBING, STRUCTURAL, ACCESS CONTROL, AND OTHER
SYSTEMS.
Structural Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Orlando Gonzales (ogonzales@aesusdesign.com)
480-454-2861
ALTERNATE #1: VA TO INSTALL AND SUPPLY METAL LOCKERS IN PLACE
OF CONTRACTOR
ALTERNATE #2: PUBLIC TOILET AND STAFF TOILET TO USE EPOXY PAINT
AND EPOXY FLOOR IN PLACE OF TILE
ALTERNATE #3: NO WALL PROTECTION IN CORRIDORS, ONLY CRASH RAIL
AND HANDRAILS
ALTERNATE #4: OWNER FURNISHED CONTRACTOR INSTALLED
PREFABRICATED HEADWALLS
ALTERNATE #5: OWNER FURNISHED CONTRACTOR INSTALLED PATIENT
LIFTS
ALTERNATE #6: NURSE STATION DESKS NO LONGER BUILT IN, TO BE
MADE FURNITURE AND REMOVE GYP BD SOFFITS WITH DOWNLIGHTS
ABOVE NURSE STATIONS
DESCRIPTION OF EXISTING BUILDING: BUILDING 1
TYPE OF CONSTRUCTION: 1, FULLY SPRINKLERED (NFPA 220)
OCCUPANCY: HEALTHCARE (NFPA 101)
FIRE RESISTANCE RATING: (TABLE 601 IBC)
-PRIMARY STRUCTURAL FRAME: 3 HRS
-PRIMARY STRUCTURAL FRAE, SUPPORTING ROOF: 2 HRS
NON-BEARING WALLS AND PARTITIONS - EXTERIOR: 0 HR
NON-BEARING WALLS AND PARTITIONS INTERIOR: 0 HR
FLOOR CONSTRUCTION + SECONDARY STRUCTURAL MEMBERS: 2 HRS
ROOF CONSTRUCTION + SECONDARY STRUCTURAL MEMBERS 1.5HRS
STAIR ENCLOSURE: 2 HR FIRE
ROOF SUBSTRATE: LIGHTWEIGHT CONCRETE
TRAVEL DISTANCE: 200FT MAX
COMMON PATH OF EGRESS TRAVEL: 100FT (NFPA 101)
NOTE: IN ADDITION TO THE FOLLOWING INFECTION CONTROL MEASURES OF ICRA
CLASS & PERMIT LEVEL IV, THE CONTRACTOR SHALL REVIEW THE VA SAFETY-QUALITY
CONTROL-INFECTION CONTROL DOCUMENTS, SPECIFICATIONS, PCRA
DOCUMENTS, AND HPM 138-24.
Revisions: Date:
STAMP
OR
LA
NDO ER I K GONZALES
PRO F E S S I O NA L E NG I NEE
R
BASE BID ALL WORK: Work includes general construction to renovate 5 South to private patient rooms, as shown in scope of work, drawings and specifications.
Deduct Alternate 1: Owner-furnished, contractor installed patient lifts
Deduct Alternate 2: Public Toilet and Staff Toilet to use Epoxy Paint and Epoxy Floor in Place of Tile
Deduct Alternate 3: VA to supply and install metal lockers in place of contractor
Deduct Alternate 4: Owner-furnished, contractor installed prefabricated headwalls
Deduct Alternate 5: Owner-furnished and installed TVs
Deduct Alternate 6: No wall protection in corridors, only crash rail and handrails
REV 1 - Bidder RFIs 10-4-2023
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline:
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D Temple, AZ, 85282 480-454-2861 David Combs
BID SET RENOVATE B1 - 5 SOUTH
PRIVATE PATIENT ROOMS
13000 BRUCE B DOWN BLVD, TAMPA, FL 33612
673-21-148
BLDG 1
AESUSAESUSJAN 31, 2023
C U s e rs
\o g o n z \O n e
D ri v e
\D o c u m e n ts \6
-2
-1
V
A T a m p a
S o u th A
R C
H
L m a rc h iU
P G
J
.r v t
/4 /2
:3
:1
P
M
GI.002
SHEET INDEX
ISSUED SHEETS
Sheet No. Sheet Name 30
SU
BM
ITT
AL
SU
BM
ITT
AL
SU
BM
ITT
AL
0%
SU
BM
ITT
AL
Bid Se t
GENERAL INFORMATION
GI.001 COVER SHEET ■ ■ ■ ■ ■
GI.002 SHEET INDEX ■ ■ ■ ■ ■
GI.100 OVERALL FLOOR PLAN - SCOPE OF WORK ■ ■ ■ ■ ■
ARCHITECTURAL
AD1.0 DEMOLITION PLAN ■ ■ ■ ■ ■
AD1.1 DEMOLITION CEILING PLAN ■ ■ ■ ■ ■
AD1.2 DEMOLITION LEVEL 04 CEILING PLAN ■ ■ ■ ■ ■
AD1.3 ICRA DETAIL ■
ALS1.0 ARCHITECTURAL LIFE SAFETY PLAN ■ ■ ■ ■ ■
AE1.0 LEVEL 05 FLOOR PLAN ■ ■ ■ ■
AE1.01 ROOF PLAN AND DETAILS ■ ■
AC1.0 REFLECTED CEILING PLAN ■ ■ ■ ■ ■
AC3.0 CEILING DETAILS ■ ■ ■
AE2.01 ENLARGED PLANS ■ ■ ■ ■
AE2.02 ENLARGED PLANS ■ ■ ■ ■
AE2.03 ENLARGED PLANS ■ ■ ■ ■
AE3.00 PARTITION TYPES ■ ■ ■ ■
AE3.02 PARTITION HEAD DETAILS ■ ■ ■ ■
AE3.05 GYP BD DETAILS ■ ■ ■ ■
AE3.23 TOILET LAYOUTS AND MOUNTING HEIGHTS ■ ■ ■ ■
AE3.26 SHOWER AND TUB DETAILS ■ ■ ■ ■
AE3.31 DOOR, SAFETY GLAZING AND LOUVER INFORMATION ■ ■ ■ ■
AE3.32 HEAD, JAMB & SILL DETAILS ■ ■ ■ ■
AE3.41 FINISH SCHEDULE AND DETAILS ■ ■ ■ ■
AE3.50 CABINET DETAILS ■ ■ ■ ■
AE4.01 INTERIOR FINISH PLAN ■ ■ ■ ■
AE9.50 FIRE RATED ASSEMBLIES - U419, BW-S-0001, BW-S-0023 ■ ■ ■
AE9.51 FIRE RATED ASSEMBLIES - HW-D-0538, HW-D-0539 ■ ■ ■
AE9.52 FIRE RATED ASSEMBLIES - HW-D-0388, HW-D-0218 ■ ■ ■
AE9.53 FIRE RATED ASSEMBLIES - HW-D-0259, HW-D-0634 ■ ■ ■
AE9.54 FIRE RATED ASSEMBLIES - HW-D-0639 ■ ■ ■
AE9.55 FIRE RATED ASSEMBLIES - W-L-1222, W-L-5073, W-L-8081, C-AJ-3214,
C-AJ-3260, C-AJ-3285 ■ ■ ■
AS3.00 SIGNAGE DETAILS ■ ■ ■ ■
Q.201 EQUIPMENT PLAN - FOR REFERENCE ONLY ■ ■ ■
Q.202 EQUIPMENT SCHEDULE ■ ■
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES ■ ■ ■
S-002 G.S.N. / ABBREVIATIONS / INSPECTION SCHEDULES ■ ■ ■
S-102 LEVEL 5 FLOOR FRAMING PLAN - NEW MECHANICAL ROOM LAYOUT ■ ■ ■
S-103 LEVEL 6 FLOOR FRAMING - PATIENT LIFT SUPPORT LAYOUT PLAN ■ ■ ■
S-501 STRUCTURAL DETAILS ■ ■ ■
S-502 STRUCTURAL DETAILS ■
MECHANICAL
M.001 MECHANICAL GENERAL INFORMATION ■ ■ ■ ■ ■
MD.205 MECHANICAL LEVEL 05 DEMOLITION PLAN ■ ■ ■ ■ ■
M.205 MECHANICAL LEVEL 05 PLAN ■ ■ ■ ■ ■
M.208 MECHANICAL ROOF PLAN ■ ■ ■ ■ ■
M.501 MECHANICAL DETAILS ■ ■ ■ ■ ■
M.502 MECHANICAL DETAILS ■ ■ ■ ■ ■
M.601 MECHANICAL SCHEDULES ■ ■ ■ ■ ■
M.801 MECHANICAL CONTROL DIAGRAMS ■ ■ ■
PLUMBING
P.001 PLUMBING GENERAL INFORMATION ■ ■ ■ ■ ■
P.204 PLUMBING LEVEL 04 PLAN ■ ■ ■ ■
P.205 PLUMBING LEVEL 05 PLAN ■ ■ ■ ■ ■
PD.204 PLUMBING LEVEL 04 DEMOLITION PLAN ■ ■ ■ ■
PD.205 PLUMBING LEVEL 05 DEMOLITION PLAN ■ ■ ■ ■ ■
P.305 PLUMBING LEVEL 05 PLAN-MEDICAL GAS ■ ■ ■ ■ ■
P.501 PLUMBING DETAILS ■ ■ ■ ■ ■
FIRE
F.205 FIRE LEVEL 05 PLAN-SPRINKLER ■ ■ ■ ■ ■
ELECTRICAL
E.000 SYMBOLS AND ABBREVIATIONS ■ ■ ■ ■ ■
ED.101 ELECTRICAL DEMO PLAN - LEVEL 5 - SOUTH WING ■ ■ ■ ■ ■
ED.601 ELECTRICAL ONE-LINE DIAGRAM (DEMO) ■ ■ ■ ■
EP.101 ELECTRICAL POWER PLAN - LEVEL 5 - SOUTH WING ■ ■ ■ ■ ■
EP.102 ELECTRICAL MECHANICAL POWER PLAN - LEVEL 5 - SOUTH WING ■ ■ ■ ■
EP.103 ELECTRICAL MECHANICAL POWER PLAN - PENTHOUSE ■ ■ ■ ■
EP.401 ELECTRICAL DETAILS ■ ■ ■
EP.402 ELECTRICAL DETAILS ■ ■ ■
EP.403 TYPICAL MOUNTING HEIGHT DETAILS ■ ■ ■
EP.501 ELECTRICAL MECHANICAL SCHEDULES ■ ■ ■ ■
EP.601 ELECTRICAL ONE-LINE DIAGRAM ■ ■ ■ ■ ■
EP.701 ELECTRICAL PANEL SCHEDULES ■ ■ ■
EP.702 ELECTRICAL PANEL SCHEDULES ■ ■ ■
EY.101 LOW VOLTAGE FLOOR PLAN - LEVEL 5 - SOUTH WING ■ ■ ■ ■
EY.102 SECURITY AND ACCESS CONTROLS - LEVEL 5 - SOUTH WING ■ ■ ■ ■
EY.103 NURSE CALL - LEVEL 5 - SOUTH WING ■ ■ ■ ■
EY.411 SYSTEMS DETAILS (IT) ■ ■ ■ ■
EY.412 SYSTEMS DETAILS (OUTLETS) ■ ■ ■ ■
EY.413 SYSTEMS DETAILS (WAP) ■ ■ ■ ■
EY.414 SYSTEMS DETAILS (ROUTING) ■ ■ ■ ■
EY.431 SYSTEMS DETAILS (NURSE CALL) ■ ■ ■
EY.432 SYSTEMS DETAILS (NURSE CALL) ■ ■ ■
EL.101 ELECTRICAL LIGHTING PLAN - LEVEL 5 - SOUTH WING ■ ■ ■ ■
EL.102 LIGHTING CIRCUITING PLANS ■ ■ ■
EL.103 PHOTOMETRIC (NORMAL) - LEVEL 1 ■ ■ ■
EL.104 PHOTOMETRIC (LIFE SAFTEY) - LEVEL 1 ■ ■ ■
EL.400 LIGHTING DETAILS ■ ■ ■
EL.501 LIGHTING SCHEDULES ■ ■ ■ ■
FA.001 FIRE ALARM LEGEND, ABBREVIATIONS AND RISER ■ ■ ■ ■
FA.101 FIRE ALARM - LEVEL 5 - SOUTH WING ■ ■ ■ ■
FA.401 FIRE ALARM DETAILS ■ ■ ■
HAZARDOUS MATERIALS
ASB-1 GENERAL NOTES FOR ASBESTOS ABATEMENT ■ ■ ■
ASB-2 GYPSUM WALL BOARD SYSTEMS ■ ■ ■
ASB-3 GOLD MASTIC ON DUCTWORK ■ ■ ■
ASB-4 FLOOR COVERINGS AND MISC. MATERIALS ■ ■ ■
L-1 GENERAL NOTES FOR LEAD ABATEMENT ■ ■ ■
L-2 MISC. LEAD CONTAINING MATERIAL ■ ■ ■
ROOM SCHEDULE
Number Name Area
5A-501 MECHANICAL ROOM 442 ft² 5A-502 CLEAN SUPPLY & EQUIPMENT 262 ft² 5A-503 INTERDISCIPLINARY TEAM ROOM 513 ft² 5A-504 SOILED 100 ft² 5A-505 DESK 10 ft² 5A-506 NOURISHMENT 111 ft² 5A-507 PATIENT ROOM 277 ft² 5A-507A PATIENT TOILET 63 ft² 5A-508 CART ALCOVE 33 ft² 5A-509 PATIENT ROOM 279 ft² 5A-509A PATIENT TOILET 62 ft² 5A-510 MEDS 129 ft² 5A-511 PATIENT ROOM 264 ft² 5A-511A PATIENT TOILET 63 ft² 5A-512 EXISTING ELECTRICAL ROOM 244 ft² 5A-513 DESK 11 ft² 5A-514 NURSE STATION 136 ft² 5A-515 PATIENT ROOM 264 ft² 5A-515A PATIENT TOILET 63 ft² 5A-516 WOW ALCOVE 16 ft² 5A-517 BARIATRIC PATIENT ROOM 273 ft² 5A-517A PATIENT TOILET 73 ft² 5A-518 PATIENT ROOM 226 ft² 5A-518A PATIENT TOILET 68 ft² 5A-520 HAC 41 ft² 5A-521 LINEN 49 ft² 5A-522 BARIATRIC ISOLATION ROOM 277 ft² 5A-522A PATIENT TOILET 68 ft² 5A-523 ANTE ROOM 126 ft² 5A-524 PATIENT ROOM 253 ft² 5A-524A PATIENT TOILET 63 ft² 5A-525 ISOLATION ROOM 218 ft² 5A-525A PATIENT TOILET 68 ft² 5A-526 DESK 12 ft² 5A-527 IT CLOSET 126 ft² 5A-528 PATIENT ROOM 253 ft² 5A-528A PATIENT TOILET 63 ft² 5A-529 EXISTING STAIR 164 ft² 5A-530 PATIENT ROOM 264 ft² 5A-530A PATIENT TOILET 62 ft² 5A-531 SIGNAL 33 ft² 5A-532 PATIENT ROOM 242 ft² 5A-532A PATIENT TOILET 63 ft² 5A-533 SHAFT 61 ft² 5A-534 DESK 12 ft² 5A-535 ALCOVE 31 ft² 5A-536 PATIENT ROOM 265 ft² 5A-536A PATIENT TOILET 62 ft² 5A-537 STAFF TOILET 65 ft² 5A-538 STORAGE 195 ft² 5A-539 NURSE STATION 126 ft² 5A-540 PUBLIC TOILET 60 ft² 5A-541 NM OFFICE 99 ft² 5A-542 BREAK / LOCKER ROOM 262 ft² 5A-543 CONSULT 90 ft² C5-20 CORRIDOR 1012 ft² C5-30 CORRIDOR 203 ft² C5-40 CORRIDOR 201 ft² C5-50 CORRIDOR 726 ft²
9895 ft²
Revisions: Date:
REV 1 - BIDDER RFIs 10-4-2023
10.05.23
P.205 PLUMBING LEVEL 05 PLAN
PD.204 PLUMBING LEVEL 04 DEMOLITION PLAN ■ ■ ■ ■
PD.205 PLUMBING LEVEL 05 DEMOLITION PLAN ■ ■ ■ ■ ■
P.204 PLUMBING LEVEL 04 PLAN ■ ■ ■ ■
P.205 PLUMBING LEVEL 05 PLAN ■ ■ ■ ■ ■
UP
DN
5 6 7 8
N
M
L
K
J
H
9 10 11 12 13 14 15 16 17
C
C.2
D
E
F
G
LIMITS OF WORK
LIMITS OF WORK
PATIENT ROOM
5A-536
ISOLATION ROOM
5A-525
MECHANICAL ROOM
5A-501
INTERDISCIPLINARY TEAM
ROOM
5A-503
EXISTING STAIR
5A-529
EXISTING ELECTRICAL ROOM
5A-512
PUBLIC TOILET
5A-540
HAC
5A-520
LINEN
5A-521
PATIENT ROOM
5A-518
BARIATRIC PATIENT ROOM
5A-517
PATIENT ROOM
5A-515
PATIENT ROOM
5A-511
PATIENT ROOM
5A-509
PATIENT ROOM
5A-507
PATIENT ROOM
5A-524
PATIENT ROOM
5A-528
PATIENT ROOM
5A-530
PATIENT ROOM
5A-532
STORAGE
5A-538
IT CLOSET
5A-527
NOURISHMENT
5A-506
MEDS
5A-510
SOILED
5A-504
CLEAN SUPPLY &
EQUIPMENT
5A-502
SIGNAL
5A-531
C A
R T
A L
C O
V E
A
-5
EXISTING SOILED
A1-1293
EXISTING CLEAN
A1-1294
PATIENT TOILET
5A-536A
PATIENT TOILET
5A-532A
PATIENT TOILET
5A-530A
PATIENT TOILET
5A-528A
PATIENT TOILET
5A-524A
PATIENT TOILET
5A-522A
PATIENT TOILET
5A-525A
PATIENT TOILET
5A-518A
PATIENT TOILET
5A-517A
PATIENT TOILET
5A-515A
PATIENT TOILET
5A-511A
PATIENT TOILET
5A-509A
PATIENT TOILET
5A-507A
BARIATRIC ISOLATION ROOM
5A-522
ANTE ROOM
5A-523
NURSE STATION
5A-539
NM OFFICE
5A-541
SHAFT
5A-533
CORRIDOR
C5-50
CORRIDOR
C5-30
CORRIDOR
C5-20
CORRIDOR
C5-40
NURSE STATION
5A-514
WOW ALCOVE
5A-516
ALCOVE
5A-535
DESK
5A-513
DESK
5A-505
DESK
5A-526
DESK
5A-534
STAFF TOILET
5A-537
CONSULT
5A-543
BREAK / LOCKER ROOM
5A-542
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline:
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D Temple, AZ, 85282 480-454-2861 David Combs
KEY PLAN NTS NORTH
BID SET RENOVATE B1 - 5 SOUTH
PRIVATE PATIENT ROOMS
13000 BRUCE B DOWN BLVD, TAMPA, FL 33612
673-21-148
BLDG 1
AESUSAESUSJAN 31, 2023
C U s e rs
\o g o n z \O n e
D ri v e
\D o c u m e n ts \6
-2
-1
V
A T a m p a
S o u th A
R C
H
L m a rc h iU
P G
J
.r v t
/1
/2
:4
:4
A M
GI.100
OVERALL FLOOR PLAN - SCOPE
OF WORK
1/16" = 1'-0"1 LEVEL 05 - OVERALL FLOOR PLAN - SOUTH WING
FOR REFERENCE ONLY
Revisions: Date:
STAMP
OR
LA
NDO ER I K GONZALES
PRO F E S S I O NA L E NG I NEE
R
5 6 7 8
H
9 10 11 12 13
C
C.2
D
E
F
G
44444
4 4 4
2 2
2 2 2 2
2 2
2 2
7 7
7 7
ICRA BARRIER
EXISTING
ELECTRICAL
ROOM TO
REMAIN
ICRA BARRIER
ICRA TUNNEL AND VESTIBULE
16 16 16 16 16 16
16 16 16 16 16 16
16 16 16 16
17 17 17 17 17 17 17 17
17 17 17 17 17 17
1717171717
ICRA VESTIBULE REFER
TO DETAILS ON AD1.3
ICRA DOOR
ICRA DOOR
DEMOLITION SYMBOL LEGEND
GENERAL DEMOLITION NOTES
KEYED DEMOLITION NOTES
ITEMS SHOWN DASHED TO BE DEMOLISHED
HATCH INDICATES AREA TO BE COVERED BY KEYED
NOTES LOCATED WITHIN
01 02
A. CONTRACTOR TO REFER TO HAZARDOUS MATERIALS REPORT. ASBESTOS IN AREA.
PRIOR TO ANY DEMOLITION, REFER TO ASBESTOS REMOVAL SPECIFICATION
B. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON THE DRAWINGS:
COORDINATE DEMOLITION WITH ARCHITECTURAL DRAWINGS AND REQUIREMENTS
SHOWN ON ALL MECHANICAL PLUMBING AND ELECTRICAL, AND STRUCTURAL
DRAWINGS
C. EXISTING CONDITIONS SHOWN ARE FROM AVAILBLE RECORD DRAWINGS AND VISUAL
FIELD SURVEYS. THE CONTRACTOR SHALL VERIFY ACTUAL EXISTING CONDITIONS
AND NOTIFY THE OWNER OF ANY DISCREPENCIES.
D. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH ADJACENT BUILDING
AREAS
E. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH MAY BE CRITICAL TO
THE ONGOING OPERATIONS OF THE HOSPITAL. ATTENTION SHALL BE BROUGHT TO
THE COR PRIOR TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO SPECIFICATIONS
FOR MAJOR AND MINOR SHUTDOWN PROCEDURES.
F. PROTECT EXISTING MATERIALS AND EQUIPMENT WHICH ARE NOT TO BE
DEMOLISHED. CONTRACTOR TO PROTECT FROM DAMAGE ALL EXISTING FLOORS,
WALLS, CEILINGS, ETC. CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS, ETC. IF AREAS NEED
TO BE REPAIRED, FINISHES ARE TO MATCH EXISTING.
G. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK. ALSO MAINTAIN
REQUIRED EGRESS AROUND TEMPORARY PARTITIONS.
H. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS AND ABOVE CEILINGS.
I. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF ANY SCHEDULED
DEMO WORK IN THE AREA TO ALLOW THE OWNER TO REMOVE PERSONAL
BELONGINGS AND DESIGNATE ALL MEDICAL EQUIPMENT, FURNITURE, AND OTHER
ITEMS TO BE SALVAGED AND STORED BY THE CONTRACTOR. ALL ITEMS NOT
DESIGNATED AS "SALVAGED" BY THE OWNER AFTER THIS TIME SHALL BE DISPOSED
OF BY THE CONTRACTOR. REFER TO SPECIFICATION FOR NOTIFICATION
REQUIREMENTS.
J. OWNER SHALL REMOVE ALL EQUIPMENT AND WALL-MOUNTED FURNITURE, AND ALL
WALL MOUNTED SINGAGE AND ARTWORK TO BE SALVAGED PRIOR TO
COMMENCEMENT OF DEMOLITION.
K. SCOPE OF WORK TO BE REMOVED IS SHOWN WITH DASHED LINES. COORDINATE
EXTENT OF DEMOLITION OF EXISTING ITEMS TO BE PARTIALLY DEMOLISHED WITH
THE FLOOR PLAN AND REFLECTED CEILING PLAN.
L. REMOVE AND SALVAGE ANY DOORS, DOOR CLOSERS, AND MAGNETS, PNEUMATIC
DAMPER OPERATORS, AND HEATING COIL ACTUATORS AND VALVES. SALVAGED
ITEMS ARE TO BE STORED BY CONTRACTOR IF THEY ARE TO BE RE-USED IN
PROJECT. REPORT ANY OTHER ITEMS TO OWNER FOR HANDLING.
M. CONTRACTOR SHALL REMOVE EXISTING INSULATION OR PIPE JACKETING WHERE IT
DOES NOT COMPLY WITH FIRE STOPPING REQUIREMENTS AT PIPING PENETRATIONS
AND OTHER CONDITIONS WHERE FIRE STOPPING IS REQUIRED. REFER TO, AND
COMPLY WITH, I.B.C. SECTION 712.
N. REMOVE ANY REMAINING CASEWORK AND EQUIPMENT NOT INDICATED ON PLANS IN
SPACES, REQUIRING DEMOLITION IN ITS ENTIRETY.
O. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-SITE WHICH ARE NOT
SCHEDULED TO REMAIN, BE RELOCATED, OR BECOME THE PROPERTY OF THE
OWNER.
P. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE INSTALLATION OF
CONSTRUCTION TUNNEL AND BARRICADES. RELOCATE CONSTRUCTION
BARRICADES AS NECESSARY FOR CONSTRUCTION WORK AND/OR AS DIRECTED BY
VA AT NO ADDITIONAL COST TO VA.
Q. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS TO VA FOR REVIEW
AND APPROVAL PRIOR TO THE INSTALLATION.
R. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED AREAS AS REQUIRED
AND/OR AS DIRECTED BY VA AT NO ADDITIONAL COST TO VA.
S. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS PER THE IBC AND VA
GUIDELINES. ALL EGRESS PATHS SHALL REMAIN CLEAR AT ALL TIMES.
T. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL MAINTAIN FIRE RATING
CONTINUITY OF THE SURROUNDING WALLS. FIRE-RATING OF CONSTRUCTION
ACCESS DOORS SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES. PAINT
ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE TO THE PUBLIC.
U. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL COLUMNS AND CHASES
PRIOR TO DEMOLITION
V. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT COMPLETION OF EACH PHASE
AND EACH PROJECT'S CONSTRUCTION WORK, U.O.N.
W. DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING WITH STRUCTURAL
REQUIREMENTS.
ICRA BARRIER . REFER TO AD1.3 FOR DETAILS
ICRA VESITBULE. REFER TO AD1.3 FOR DETAILED REQUIREMENTS
A. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH COR.
B. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING ELECTRICAL, AND FIRE PROTECTION.
C. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY COR.
D. ALL HOSPITAL ACCESS POINTS, AND ALL BUILDING EXITS, MUST
REMAIN ACCESSIBLE, CLEAR AND UNOBSTRUCTED THROUGHOUT
ALL PHASES OF DEMOLITION AND CONSTRUCTION. SHORT-TERM
CLOSURE MAY BE ACCEPTABLE AS COORDINATED WITH COR.
E. THE CONTRACTOR SHALL COORDINATE ALL ROOF TOP WORK AND
ROOF REPAIRS WITH THE COR.
A. THE CONTRACTOR SHALL USE THE FOLLOWING AS A GUIDE FOR ALL
ICRA BARRIERS. TEMPORARY INFECTION CONTROL BARRIERS
SHALL BE CONSTRUCTED AS FOLLOWS DEPENDING UPON LENGTH
OF NEED:
- 1 WEEK MAXIMUM - FLAME-RETARDANT PLASTIC PER NFPA 701 -
TEST METHOD 2
- GREATER THAN 1 WEEK - SEE NOTE B AND C.
B. TEMPORARY CONSTRUCTION BARRIERS SHALL BE 3 5/8" METAL
STUDS @ 16" O.C. WITH 5/8" TYPE "X" GYP. BD. EACH SIDE. BARRIERS
ARE TO EXTEND TO THE BOTTOM OF EXISTING CEILINGS. PROVIDE
NON-DAMAGING SEAL AT INTERSECTION WITH CEILING. PROVIDE
PLASTIC SHEET BARRIER SEAL BETWEEN TOP OF WALL AND
STRUCTURE ABOVE. TAPE ALL SEAMS AND PENETRATION
OPENINGS TO PREVENT CONTAMINATION FROM PASSING OVER THE
TOP OR UNDERNEATH THE WALL FROM CONSTRUCTION AREAS.
BARRIERS ARE REQUIRED TO BE 1 HOUR FIRE RATED WITH
APPROVED UL LISTING.
C. TEMPORARY CONSTRUCTION BARRIERS SHALL BE EITHER TYPE I
OR TYPE II. TYPE I BARRIERS SHALL BE ANCHORED TO THE
FLOORING SURFACE (WHICH IS INTENDED TO BE REPLACED) WITH
POWER ACTUATED FASTENERS. TYPE II BARRIERS SHALL BE
ANCHORED TO THE FLOORING SURFACE (WHICH IS INTENDED TO
REMAIN) BY TAPING BOTTOM STUD TRACK TO FLOOR SURFACE OR
BY OTHER METHODS WHICH WILL NOT HARM FLOOR SURFACE.
BARRIERS ARE REQUIRED TO BE 1 HOUR FIRE RATED WITH
APPROVED UL LISTING.
D. TEMPORARY PARTITIONS SHALL NOT CONSTRICT WALKWAYS TO
LESS THAN 42" CLEAR. ANY EXITS CHANGED OR BLOCKED SIGNAGE
NEEDS TO BE POSTED FOR THE MODIFICATIONS.
E. PROVIDE TEMPORARY RATED DOOR AND FRAME IN CONSTRUCTION
BARRIER AT ENTRY POINTS TO THE CONSTRUCTION AREAS.
DOORS ARE TO REMAIN LOCKED AT ALL TIMES. CONSTRUCTION
CORES WILL BE PROVIDED BY THE VA.
GENERAL PHASING NOTES
TEMPORARY CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline:
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D Temple, AZ, 85282 480-454-2861 David Combs
KEY PLAN NTS NORTH
BID SET RENOVATE B1 - 5 SOUTH
PRIVATE PATIENT ROOMS
13000 BRUCE B DOWN BLVD, TAMPA, FL 33612
673-21-148
BLDG 1
AESUSAESUSJAN 31, 2023
C U s e rs
\o g o n z \O n e
D ri v e
\D o c u m e n ts \6
-2
-1
V
A T a m p a
S o u th A
R C
H
L m a rc h iU
P G
J
.r v t
/4 /2
:2
:3
P
M
AD1.0
DEMOLITION PLAN
1/8" = 1'-0"1 LEVEL 05 - DEMOLITION PLAN
PLAN KEYNOTES
2 DEMOLISH EXISTING DOOR, FRAME & HARDWARE, TYPICAL.
4 DEMOLISH EXISTING WALLS AND ASSOCIATED COMPONENTS, TYPICAL.
5 DEMOLISH EXISTING PLUMBING FIXTURES. REFER TO PLUMBING DRAWINGS,
TYPICAL.
6 DEMOLISH EXISTING MILLWORK.
7 REMOVE ALL FURNITURE AND EQUIPMENT AND REPORT TO OWNER. TO BE
DETERMINED IF EXISTING FURNITURE AND EQUIPMENT IS TO BE SALVAGED OR
DEMOLISHED BY CONTRACTOR.
9 EXISTING SHAFT TO REMAIN.
10 EXISTING WALL TO REMAIN.
12 EXISTING DOOR TO REMAIN.
13 EXISTING STAIRS TO REMAIN.
16 DEMOLISH EXISTING WINDOW & FRAME, TYPICAL.
17 DEMOLISH EXISTING 2 1/2" FURRING WALL ALONG EXTERIOR WALL, TYPICAL.
31 GYPSUM BOARD TO BE DEMOLISHED FOR ACM REMOVAL INSIDE WALL CAVITY PER
HAZARD MATERIAL REPORT.
Revisions: Date:
REV 1 - BIDDER RFIs 10-4-2023
10.05.23
FSD
FS
D
FSD FSD
FS
D
FS
D
DEMOLITION SYMBOL LEGEND
GENERAL DEMOLITION NOTES
KEYED DEMOLITION NOTES
ITEMS SHOWN DASHED TO BE DEMOLISHED
HATCH INDICATES AREA TO BE COVERED BY KEYED
NOTES LOCATED WITHIN
01 02
A. CONTRACTOR TO REFER TO HAZARDOUS MATERIALS REPORT. ASBESTOS IN AREA.
PRIOR TO ANY DEMOLITION, REFER TO ASBESTOS REMOVAL SPECIFICATION
B. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON THE DRAWINGS:
COORDINATE DEMOLITION WITH ARCHITECTURAL DRAWINGS AND REQUIREMENTS
SHOWN ON ALL MECHANICAL PLUMBING AND ELECTRICAL, AND STRUCTURAL
DRAWINGS
C. EXISTING CONDITIONS SHOWN ARE FROM AVAILBLE RECORD DRAWINGS AND VISUAL
FIELD SURVEYS. THE CONTRACTOR SHALL VERIFY ACTUAL EXISTING CONDITIONS
AND NOTIFY THE OWNER OF ANY DISCREPENCIES.
D. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH ADJACENT BUILDING
AREAS
E. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH MAY BE CRITICAL TO
THE ONGOING OPERATIONS OF THE HOSPITAL. ATTENTION SHALL BE BROUGHT TO
THE COR PRIOR TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO SPECIFICATIONS
FOR MAJOR AND MINOR SHUTDOWN PROCEDURES.
F. PROTECT EXISTING MATERIALS AND EQUIPMENT WHICH ARE NOT TO BE
DEMOLISHED. CONTRACTOR TO PROTECT FROM DAMAGE ALL EXISTING FLOORS,
WALLS, CEILINGS, ETC. CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS, ETC. IF AREAS NEED
TO BE REPAIRED, FINISHES ARE TO MATCH EXISTING.
G. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK. ALSO MAINTAIN
REQUIRED EGRESS AROUND TEMPORARY PARTITIONS.
H. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS AND ABOVE CEILINGS.
I. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF ANY SCHEDULED
DEMO WORK IN THE AREA TO ALLOW THE OWNER TO REMOVE PERSONAL
BELONGINGS AND DESIGNATE ALL MEDICAL EQUIPMENT, FURNITURE, AND OTHER
ITEMS TO BE SALVAGED AND STORED BY THE CONTRACTOR. ALL ITEMS NOT
DESIGNATED AS "SALVAGED" BY THE OWNER AFTER THIS TIME SHALL BE DISPOSED
OF BY THE CONTRACTOR. REFER TO SPECIFICATION FOR NOTIFICATION
REQUIREMENTS.
J. OWNER SHALL REMOVE ALL EQUIPMENT AND WALL-MOUNTED FURNITURE, AND ALL
WALL MOUNTED SINGAGE AND ARTWORK TO BE SALVAGED PRIOR TO
COMMENCEMENT OF DEMOLITION.
K. SCOPE OF WORK TO BE REMOVED IS SHOWN WITH DASHED LINES. COORDINATE
EXTENT OF DEMOLITION OF EXISTING ITEMS TO BE PARTIALLY DEMOLISHED WITH
THE FLOOR PLAN AND REFLECTED CEILING PLAN.
L. REMOVE AND SALVAGE ANY DOORS, DOOR CLOSERS, AND MAGNETS, PNEUMATIC
DAMPER OPERATORS, AND HEATING COIL ACTUATORS AND VALVES. SALVAGED
ITEMS ARE TO BE STORED BY CONTRACTOR IF THEY ARE TO BE RE-USED IN
PROJECT. REPORT ANY OTHER ITEMS TO OWNER FOR HANDLING.
M. CONTRACTOR SHALL REMOVE EXISTING INSULATION OR PIPE JACKETING WHERE IT
DOES NOT COMPLY WITH FIRE STOPPING REQUIREMENTS AT PIPING PENETRATIONS
AND OTHER CONDITIONS WHERE FIRE STOPPING IS REQUIRED. REFER TO, AND
COMPLY WITH, I.B.C. SECTION 712.
N. REMOVE ANY REMAINING CASEWORK AND EQUIPMENT NOT INDICATED ON PLANS IN
SPACES, REQUIRING DEMOLITION IN ITS ENTIRETY.
O. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-SITE WHICH ARE NOT
SCHEDULED TO REMAIN, BE RELOCATED, OR BECOME THE PROPERTY OF THE
OWNER.
P. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE INSTALLATION OF
CONSTRUCTION TUNNEL AND BARRICADES. RELOCATE CONSTRUCTION
BARRICADES AS NECESSARY FOR CONSTRUCTION WORK AND/OR AS DIRECTED BY
VA AT NO ADDITIONAL COST TO VA.
Q. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS TO VA FOR REVIEW
AND APPROVAL PRIOR TO THE INSTALLATION.
R. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED AREAS AS REQUIRED
AND/OR AS DIRECTED BY VA AT NO ADDITIONAL COST TO VA.
S. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS PER THE IBC AND VA
GUIDELINES. ALL EGRESS PATHS SHALL REMAIN CLEAR AT ALL TIMES.
T. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL MAINTAIN FIRE RATING
CONTINUITY OF THE SURROUNDING WALLS. FIRE-RATING OF CONSTRUCTION
ACCESS DOORS SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES. PAINT
ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE TO THE PUBLIC.
U. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL COLUMNS AND CHASES
PRIOR TO DEMOLITION
V. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT COMPLETION OF EACH PHASE
AND EACH PROJECT'S CONSTRUCTION WORK, U.O.N.
W. DO NOT PENETRATE THE FLOOR SLAB WITHOUT COORDINATING WITH STRUCTURAL
REQUIREMENTS.
ICRA BARRIER . REFER TO AD1.3 FOR DETAILS
ICRA VESITBULE. REFER TO AD1.3 FOR DETAILED REQUIREMENTS
5 6 7 8
H
9 10 11 12 13
C
C.2
D
E
F
G
ICRA BARRIER
ICRA BARRIER
existing to remain
3 333
3 3
14 15
5 6 7 8 9 10 11
C
D
E
F
G
ICRA TUNNEL
131211109
H
5 6 7 8
G
F
E
O
C.2
C
D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline:
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D Temple, AZ, 85282 480-454-2861 David Combs
KEY PLAN NTS NORTH
BID SET RENOVATE B1 - 5 SOUTH
PRIVATE PATIENT ROOMS
13000 BRUCE B DOWN BLVD, TAMPA, FL 33612
673-21-148
BLDG 1
AESUSAESUSJAN 31, 2023
C U s e rs
\o g o n z \O n e
D ri v e
\D o c u m e n ts \6
-2
-1
V
A T a m p a
S o u th A
R C
H
L m a rc h iU
P G
J
.r v t
/4 /2
:2
:3
P
M
AD1.1
DEMOLITION CEILING PLAN
PLAN KEYNOTES
3 DEMOLISH EXISTING CEILING AND ASSOCIATED COMPONENTS,
TYPICAL.CONTRACTOR TO SALVAGE AND STORE WAPSFOR REUSE.
14 EXISTING CEILING TO REMAIN.
15 EXISTING CEILING MOUNTED FIXTURES TO REMAIN.
26 EXISTING ELEVATOR AND SHAFT TO REMAIN.
27 EXISTING SHAFT TO REMAIN.
28 EXISTING ELECTRICAL ROOM TO REMAIN. REFER TO ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
29 EXISTING STAIRS TO REMAIN.
30 CONFIRM WITH VA, THE EXTENTION OF DEMOLITION WITHIN THE SIGNAL CLOSET.
1/8" = 1'-0"1 LEVEL 05 - RCP DEMOLITION
Revisions: Date:
REV 1 - BIDDER RFIs 10-4-2023
BCS
SN
SOUTH
DUCT
SHAFT
CENTRAL DUCT SHAFTS
MECH.
CHASE
BOILER
STACK
SERVICE
LOBBY
DUCT
SHAFT
21"x21" STAINLESS
STEEL "B" LABEL
INTAKE DOOR WITH
ELECTRIC DOOR INTERLOCK
UP
DN
tub
C O R R
ID
O R
C O R R
ID
O
RS
T A
IR
C O R R
ID
O R
C O R R
ID
O R
BREAK ROOM 2 BED ROOM
CORRIDOR
RESTROOM
RESTROOM
SOCIAL WORK
OFFICE
SUPPLY
TELEMETRYWAITING
ASSIST. CHIEF
NURSE ACUTE CARE
ELEVATOR LOBBY
OFFICE
RESTROOM
CORRIDOR
RESTROOM
1 BED ROOM1 BED ROOM1 BED ROOMCHIEF ACUTE
CARE NURSING
SOILED
UTILITY
RESTROOMRESTROOMRESTROOMRESTROOMRESTROOM
ICE MACHINE
H.A.C.
ELECTRICAL DRUG STORAGE
NURSE STATION
MENS SHOWER
WOMENS SHOWER
PYXIS SOCIAL
WORKER
CORRIDOR
BREAK ROOM DECEDANT
AFFAIRS
FIRE
CORRIDOR
ELEVATOR LOBBY
RESTROOM
RESTROOM
RESTROOM
RESTROOM
1 BED ROOM
RESTROOM
RESTROOM RESTROOM RESTROOM
ELECTRICAL
1 BED ROOM
RESTROOM
1 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM1 BED ROOM1 BED ROOM
2 BED ROOM
CLEAN
NURSE MANAGER
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
2 BED ROOM
ACUTE CARE
MED SURG
CASE WORKER
PHYSICIAN
OFFICE
SURGICAL
CARE
NUTRITIONAL
SUPPORT
FIRE
SIGNAL
TELEPHONE
RESTROOM COFFEE NOOK
WAITINGFIRE
CLEAN UTILITY
DIETETIC CLOSET
ELECTRICAL
ELEVATOR LOBBY
EQUIPMENT
STORAGE
BLOOD GAS
CONSULTING ROOM
CLEAN SUPPLY
DECEDANT
AFFAIRS
C
C 1S
C
C
4A-440
C4-05-1
4A-437
4A-438
4A-440a
4A-439 4A-441
4A-442b4A-442a
4A-469
4A-435
4A-402
4A-468a
C4-07-1
4A-466a
4A-4664A-4674A-4684A-4704A-401
4A-401a4A-404a4A-406a4A-4114A-413a
4A-415
4A-416
4A-414 4A-408a
4A-408
4A-421
4A-421a 4A-430 4A-432
C4-03-1
4A-407 4A-402b
4A-402a C4-01-1
4A-436
4A-419a
4A-420a
4A-422a
4A-423a
4A-424
4A-424a
4A-426a 4A-427 4A-428a
4A-426b
4A-425
4A-418a
4A-418
4A-417
4A-417a
4A-4034A-4044A-405
4A-406
4A-410b
4A-410
4A-413
4A-419
4A-420
4A-422
4A-423
4A-426 4A-428
4A-431
4A-434
4A-434a
4A-425c 4A-425d
4A-425e
4B-424 4B-423b
4B-4234B-421
4B-425
4B-422
4B-402
4B-401
4B-423a
4A-429
4A-433
S F
S F
S F
S F
S F
S F
284 SF
590 SF
46 SF
34 SF
96 SF
120 SF
140 SF
200 SF98 SF
85 SF
373 SF
80 SF
17 SF
873 SF
17 SF
164 SF164 SF164 SF164 SF164 SF
17 SF17 SF17 SF28 SF16 SF
26 SF
42 SF
251 SF 31 SF
405 SF
110 SF
88 SF
129 SF 90 SF
588 SF
259 SF 111 SF
3 SF
908 SF
255 SF
17 SF
16 SF
16 SF
17 SF
158 SF
13 SF
16 SF 31 SF 17 SF
60 SF
178 SF
14 SF
160 SF
121 SF
27 SF
164 SF164 SF164 SF
260 SF
77 SF
180 SF
393 SF
397 SF
395 SF
395 SF
397 SF
393 SF
260 SF
275 SF
91 SF
94 SF
3 SF
15 SF
13 SF
44 SF 46 SF
192 SF3 SF
332 SF
135 SF
311 SF
233 SF
265 SF
94 SF
closer
56x48
56x48
48x30
48x30
ADO
ADOADO
ADO ADO
DEMOLITION SYMBOL LEGEND
GENERAL DEMOLITION NOTES
KEYED DEMOLITION NOTES
ITEMS SHOWN DASHED TO BE
DEMOLISHED
HATCH INDICATES AREA TO BE COVERED
BY KEYED NOTES LOCATED WITHIN
01 02
A. CONTRACTOR TO REFER TO HAZARDOUS MATERIALS REPORT.
ASBESTOS IN AREA. PRIOR TO ANY DEMOLITION, REFER TO
ASBESTOS REMOVAL SPECIFICATION
B. EXISTING CONSTRUCTION TO BE REMOVED IS INDICATED ON
THE DRAWINGS: COORDINATE DEMOLITION WITH
ARCHITECTURAL DRAWINGS AND REQUIREMENTS SHOWN ON
ALL MECHANICAL PLUMBING AND ELECTRICAL, AND
STRUCTURAL DRAWINGS
C. EXISTING CONDITIONS SHOWN ARE FROM AVAILBLE RECORD
DRAWINGS AND VISUAL FIELD SURVEYS. THE CONTRACTOR
SHALL VERIFY ACTUAL EXISTING CONDITIONS AND NOTIFY THE
OWNER OF ANY DISCREPENCIES.
D. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH
ADJACENT BUILDING AREAS
E. AREA OF WORK CONTAINS BUILDING INFRASTRUCTURE WHICH
MAY BE CRITICAL TO THE ONGOING OPERATIONS OF THE
HOSPITAL. ATTENTION SHALL BE BROUGHT TO THE COR PRIOR
TO ANY DEMOLITION OR SHUT-DOWNS. REFER TO
SPECIFICATIONS FOR MAJOR AND MINOR SHUTDOWN
PROCEDURES.
F. PROTECT EXISTING MATERIALS AND EQUIPMENT WHICH ARE
NOT TO BE DEMOLISHED. CONTRACTOR TO PROTECT FROM
DAMAGE ALL EXISTING FLOORS, WALLS, CEILINGS, ETC.
CONTRACTOR IS RESPONSIBLE FOR REPAIR AND
REPLACEMENT OF ALL DAMAGED FLOORING, WALLS, CEILINGS,
ETC. IF AREAS NEED TO BE REPAIRED, FINISHES ARE TO
MATCH EXISTING.
G. MAINTAIN PROTECTED EGRESS AND ACCESS TO THE WORK.
ALSO MAINTAIN REQUIRED EGRESS AROUND TEMPORARY
PARTITIONS.
H. REMOVE ANY UNUSED OR ABANDONED MATERIALS IN WALLS
AND ABOVE CEILINGS.
I. THE CONTRACTOR SHALL NOTIFY THE OWNER IN ADVANCE OF
ANY SCHEDULED DEMO WORK IN THE AREA TO ALLOW THE
OWNER TO REMOVE PERSONAL BELONGINGS AND DESIGNATE
ALL MEDICAL EQUIPMENT, FURNITURE, AND OTHER ITEMS TO
BE SALVAGED AND STORED BY THE CONTRACTOR. ALL ITEMS
NOT DESIGNATED AS "SALVAGED" BY THE OWNER AFTER THIS
TIME SHALL BE DISPOSED OF BY THE CONTRACTOR. REFER TO
SPECIFICATION FOR NOTIFICATION REQUIREMENTS.
J. OWNER SHALL REMOVE ALL EQUIPMENT AND WALL-MOUNTED
FURNITURE, AND ALL WALL MOUNTED SINGAGE AND ARTWORK
TO BE SALVAGED PRIOR TO COMMENCEMENT OF DEMOLITION.
K. SCOPE OF WORK TO BE REMOVED IS SHOWN WITH DASHED
LINES. COORDINATE EXTENT OF DEMOLITION OF EXISTING
ITEMS TO BE PARTIALLY DEMOLISHED WITH THE FLOOR PLAN
AND REFLECTED CEILING PLAN.
L. REMOVE AND SALVAGE ANY DOORS, DOOR CLOSERS, AND
MAGNETS, PNEUMATIC DAMPER OPERATORS, AND HEATING
COIL ACTUATORS AND VALVES. SALVAGED ITEMS ARE TO BE
STORED BY CONTRACTOR IF THEY ARE TO BE RE-USED IN
PROJECT. REPORT ANY OTHER ITEMS TO OWNER FOR
HANDLING.
M. CONTRACTOR SHALL REMOVE EXISTING INSULATION OR PIPE
JACKETING WHERE IT DOES NOT COMPLY WITH FIRE
STOPPING REQUIREMENTS AT PIPING PENETRATIONS AND
OTHER CONDITIONS WHERE FIRE STOPPING IS REQUIRED.
REFER TO, AND COMPLY WITH, I.B.C. SECTION 712.
N. REMOVE ANY REMAINING CASEWORK AND EQUIPMENT NOT
INDICATED ON PLANS IN SPACES, REQUIRING DEMOLITION IN
ITS ENTIRETY.
O. REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS OFF-
SITE WHICH ARE NOT SCHEDULED TO REMAIN, BE RELOCATED,
OR BECOME THE PROPERTY OF THE OWNER.
P. DO NOT PROCEED WITH DEMOLITION WORK BEFORE THE
INSTALLATION OF CONSTRUCTION TUNNEL AND BARRICADES.
RELOCATE CONSTRUCTION BARRICADES AS NECESSARY FOR
CONSTRUCTION WORK AND/OR AS DIRECTED BY VA AT NO
ADDITIONAL COST TO VA.
Q. CONTRACTOR TO SUBMIT BARRICADE LOCATIONS DRAWINGS
TO VA FOR REVIEW AND APPROVAL PRIOR TO THE
INSTALLATION.
R. PROVIDE CONSTRUCTION BARRICADE IN ALL OCCUPIED AREAS
AS REQUIRED AND/OR AS DIRECTED BY VA AT NO ADDITIONAL
COST TO VA.
S. PROVIDE TEMPORARY EXIT SIGNS AND ILLUMINATION LEVELS
PER THE IBC AND VA GUIDELINES. ALL EGRESS PATHS SHALL
REMAIN CLEAR AT ALL TIMES.
T. ALL CONSTRUCTION BARRICADES FIRE-RATING SHALL
MAINTAIN FIRE RATING CONTINUITY OF THE SURROUNDING
WALLS. FIRE-RATING OF CONSTRUCTION ACCESS DOORS
SHALL BE APPROPRIATE FOR THE FIRE-RATED WALL TYPES.
PAINT ALL TUNNELS AND BARRICADES ON THE SIDE VISIBLE TO
THE PUBLIC.
U. CONTRACTOR TO VERIFY EXISTING CONDITIONS AT ALL
COLUMNS AND CHASES PRIOR TO DEMOLITION
V. REMOVE CONSTRUCTION TUNNEL AND BARRICADE AT
COMPLETION OF EACH PHASE AND EACH PROJECT'S
CONSTRUCTION WORK, U.O.N.
W. DO NOT PENETRATE THE FLOOR SLAB WITHOUT
COORDINATING WITH STRUCTURAL REQUIREMENTS.
5 6 7 8
H
9 10 11 12 13
C
C.2
D
E
F
G
5 6 7 8 9 10 11
C
D
E
F
G
131211109
H
5 6 7 8
G
F
E
O
C.2
C
D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline:
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D Temple, AZ, 85282 480-454-2861 David Combs
KEY PLAN NTS NORTH
BID SET RENOVATE B1 - 5 SOUTH
PRIVATE PATIENT ROOMS
13000 BRUCE B DOWN BLVD, TAMPA, FL 33612
673-21-148
BLDG 1
AESUSAESUSJAN 31, 2023
C U s e rs
\o g o n z \O n e
D ri v e
\D o c u m e n ts \6
-2
-1
V
A T a m p a
S o u th A
R C
H
L m a rc h iU
P G
J
.r v t
/1
/2
:4
:0
A M
AD1.2
DEMOLITION LEVEL 04 CEILING
PLAN
PLAN KEYNOTES
18 REMOVE EXISTING CEILING AS REQUIRED FOR NEW PLUMBING WORK. FIELD
VERIFY CEILING TYPE. PATCH AND REPAIR TO MATCH EXISTING, AS REQUIRED.
1/8" = 1'-0"1 LEVEL 04 - RCP DEMOLITION
Revisions: Date:
STAMP
OR
LA
NDO ER I K GONZALES
OUTSIDE OF
BUILDING EXISTING DECK- V.I.F.
FIRE RATED
PLYWOOD (REFER
TO ELEVATION)
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS WITH FIRE RATED PLASTIC
SHEETINGAND SECURE WITH DUCT TAPE.
NEW WALL
PARTITION. REFER
TO INFECTION
CONTROL PLAN
FOR PARTITION
TYPE.
EXISTING FIRE SPRINKLER
MONTHLY
CHANGED HEPA
FILTER
SUPPLY DUCTS TO BE COVERED
WITH FIRE RATED PLASTIC
SHEETING AND SECURE WITH
DUCT TAPE TO KEEP DUST OUT.
SYSTEM
*MODIFICATION OF SPRINKLER
SYSTEM AS OUTLINED IN THE
SCOPE OF WORK CAN COMMENCE
UPON INSPECTION AND APPROVAL
OF CONSTRUCTION BARRIERS BY
VA
FUSIBLE 1-HR FIRE DAMPER
HEPA NEGATIVE AIR
UNIT
TYPE
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE-FILTER TAPE ALL SERVICES TO
PROTECT AGAINST
CONTAMINATION
A
O
V
TYPE B
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
PROTECTED
OR COVERED WITH ROSEN PAPER/FIRE
RATED PLYWOOD.
PLASTIC WINDOW
(ON ALL SIDES)
HEPA NEGATIVE AIR UNIT
HEATED
DETECTOR
CUT-OFF
A
EXHAUST DUCTS
(COVER THE GRATES
AND THE DIFFUSERS)
E
EXISTING WALL
A
FLEX
DUCT HEPA NEGATIVE AIR UNIT
ZIPPER SIDE ENTRY
EXISTING AIR PLENUM
FLEX DUCT
NEW WALL OVER
EXISTING WALL.
VIF EXISTING WALL.
REFER TO
INFECTION
CONTROL PLAN
FOR WALL
PARTITION TYPE.
MOBILE CONTAINMENT
CART WITH CANVAS/
1-1/4" SQAURE STEEL
TUBULAR FRAME
SWIVEL CASTERS
ABC TYPE FIRE EXTINGUISHER
ON PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE THAN
ONE OR WALL MOUNTED). NEED
INSPECTION TAG AND MONTHLY
INSPECTION). (INITIALS/DATED).
THIS IS A
TYPE B
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY), IF NOT VERIFY ALL OPENING SUCH
AS DOORS ARE CLOSED AND/OR CHANGE OUT
NEGATIVE AIR PRE-FILTER. (TYPICAL REGULATOR
INSTALLATION).
ELEVATION
HARD
BARRIER TEMP. ANTE ROOM
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
(REFER TO
ELEV. DETAIL)
POST ICRA, ILSM,FIRE
INSPECTION SHEETS
VISIBLE
TO PUBLIC
ICRA, ILSM
FIRE WATCH
MISC. FORMS
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
BLUE CORE
LOCKSET
(LOCKED AT
ALL TIMES)
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN
CLEANLINESS).
BOTTOM OF METAL DECK
EXISTING FLOOR/ROOF DECK
QUICK SET FIRE STOP QUICK SET FIRE STOP
4 7/8" BOTTOM OF METAL DECK
EXISTING FLOOR/ROOF DECK
PAPER
CADDY
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
INDICATOR
(REFER TO
PLAN &
ELEVATION)
CONST. SUPERVISOR
NAME AND CELL
PHONE
CHILLER PLANT AFTER HOURS
CALL (VA PROVIDED #)
IN-HOUSE PHONE (VA #) FIRE EMERGENCY DIAL
RESTRICTED AREA
AREA UNDER
CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!!
-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY-
2' X 4' SUSPENDED
ACOUSTICAL CEILING AS
SCHEDULED ON FLOOR
PLAN.
2' X 4' SUSPENDED
ACOUSTICAL CEILING AS
SCHEDULED ON FLOOR
PLAN.
3 5/8" INSULATED WALL WITH
16 GA. METAL STUDS AT 16"
O.C. WITH 2 LAYERS 5/8"
GYPSUM BOARD ONE SIDE
(CONSTRUCTION SIDE) WALL
TO EXTEND TO ROOF METAL
DECKING
3 5/8" INSULATED WALL WITH 16 GA.
METAL STUDS AT 16" O.C. WITH 5/8"
GYPSUM BOARD EACH SIDE. WALL
TO EXTEND TO ROOF METAL
DECKING
3 5/8" 16 GA. METAL STUDS AT 16"
O.C. WITH 5/8" GYPSUM BOARD
EACH SIDE.
EXISTING FINISH CEILING TO
REMAIN
4 7/8"
TYPE A UL DESIGN NO. 419
NOTE: ALL TEMPORARY CONSTRUCTION BARRIERS TO BE 1 -HOUR RATED.
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE B
4 7/8"
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE C UL DESIGN NO. 497
EXISTING WALL TO REMAIN
W A
L L H
E
IG
H T
V A
R
IE
S
C E
IL
IN
G H
E
IG
H T
F
IE
L D
V E
R
IF
Y
F L E
X D
U C
T
F
IE
L D
V E
R
IF
Y W
A L L H
E
IG
H T
V A
R
IE
S
C E
IL
IN
G H
E
IG
H T
W A
L L H
E
IG
H T
V A
R
IE
S
F
IE
L D
V E
R
IF
Y
C E
IL
IN
G H
E
IG
H T
T O
R E
M A
IN
E X
IS
T
IN
G
W A
L L T
O R
E M
A
IN
V .I .F
A P
P R
O X
A .F
.F
A D
J U
S T
A B
L E
H E
IG
H
T
A D
J U
S T
A B
L E
H E
IG
H
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10 engineering discipline:
AESUS DESIGN GROUP
1050 E. Southern Ave., Suite D Temple, AZ, 85282 480-454-2861 David Combs
KEY PLAN NTS NORTH
BID SET RENOVATE B1 - 5 SOUTH
PRIVATE PATIENT ROOMS
13000 BRUCE B DOWN BLVD, TAMPA, FL 33612
673-21-148
BLDG 1
AESUSAESUSJAN 31, 2023
C U s e rs
\o g o n z \O n e
D ri v e
\D o c u m e n ts \6
-2
-1
V
A T a m p a
S o u th A
R C
H
L m a rc h iU
P G
J
.r v t
/4 /2
:2
:3
P
M
AD1.3
ICRA DETAIL
Revisions: Date:
REV 1 - BIDDER RFIs 10-4-2023
TYPICAL IDEAL CONSTRUCTION LAYOUT
NTS 3
ANTE ROOM ELEVATION
NTS
CROSS SECTION 'A-A'
NTS 4
MOBILE CONTAINMENT CART (CONST. BARRIER TYPES)
NTS
WALL CONSTRUCTION TYPES (DETAILS)
NTS
Revisions: Date:
REV 1 - BIDDER RFIs 10-4-2023
STAMP
OR
LA
NDO ER I K GONZALES
AO
AO
AO
A O
A O
A O
A O
A O
A O
A O
A
OAO
AO
AO
AO
A O
A O
A O
A O
A O
A O
A O
A O
A O
A O
AO
A. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE. LARGER SCALE
DRAWINGS SHALL HAVE PRECEDENCE OVER SMALLER SCALE
DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY
DISCREPENCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT
PORTION OF THE WORK.
B. ALL DIMENSIONS ARE TAKEN FROM EXISTING FACE OF WALLS
C. PRIOR TO START OF ANY WORK, THE CONTRACTOR IS REQUIRED
TO VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING
CONDITIONS MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE
DRAWINGS. THE CONTRACTOR SHALL VERIFY EXISTING
CONDITIONS, DIMENSIONS, AND MATERIALS IN THE FIELD AND
GENERATE A LIST OF DISCREPANCIES IN WRITING AND REPORT
TO THE OWNER. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
D. THE CONTRACTOR SHALL COORDINATE EQUIPMENT AND
MATERIAL TRAFFIC AND STORAGE WITH THE OWNER.
E. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION
PHASING SHALL BE APPROVED BY THE OWNER.
F. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL,
PLUMBING, ELECTRICAL, AND FIRE PROTECTION.
G. REFER AND ADHERE TO THE INFECTION PREVENTION MEASURE
REQUIREMENTS IN SPECIFICATION SECTION 01 35 26 17.
H. EXTEND BOTH SIDES OF GYPSUM BOARD AT PARTITIONS TO
UNDERSIDE OF STRUCTURE IN AREAS WITHOUT CEILING AND
SEAL AIR TIGHT, TYPICAL, U.O.N.
I. PROVIDE HIGH IMPACT GYPSUM WALLBOARD UP TO 4'-0" A.F.F. AT
THE FOLLOWING LOCATIONS:
CORRIDORS, EQUIPMENT STORAGE ROOMS, AND STORAGE
ALCOVES
J. PROVIDE INSULATION FOR ALL INTERIOR SOUND RATED
PARTITIONS, U.O.N. EXTEND INSULATION AND GYPSUM BOARD ON
BOTH SIDES TO UNDERSIDE OF STRUCTURE. NOTCH PARTITION
TIGHTLY AROUND FRAMING AND OTHER CEILING OBSTRUCTIONS,
AND SEAL AIR TIGHT, TYPICAL, U.O.N.
K. PROVIDE CONTINUOUS FIRE RATED CONSTRUCTION AROUND ALL
RECESSED FIXTURES AND ACCESSORIES LOCATED IN FIRE RATED
PARTITIONS
L. PROVIDE AND COORDINATE BACKING PLATES FOR ALL
EQUIPMENT, ACCESSORIES, CASEWORK, ETC.
M. WHERE FLOOR FINISHES CHANGE BETWEEN TWO ROOMS,
TRANSITION SHALL OCCUR AT CENTER OF DOOR, U.O.N.
N. ADJUST FURRING SPACE AS NECESSARY TO CLEAR ANY PIPES OR
CONDUITS WITHIN THE FURRED SPACE. PROVIDE 1/2-INCH
MINIMUM CLEARANCE BETWEEN PIPES/CONDUITS AND THE BACK
OF GYPSUM BOARD, U.O.N.
O. PROVIDE ADDITIONAL FULL HEIGHT 16 GA. STEEL STUDS FROM
FLOOR TO STRUCTURE ABOVE AT EACH ADJUSTABLE SHELF
STANDARD LOCATION.
P. PROVIDE TWO ROWS OF CONTINUOUS BACKING PLATES ALONG
ALL PARTITIONS INSIDE STORAGE ROOMS, U.O.N. VERIFY
MOUNTING HEIGHT OF THE BACKING PLATES WITH OWNER, U.O.N.
Q. WHERE (N) WORK IS INSTALLED IN (E) PARTITIONS, REPLACE (E)
STUDS AS NECESSARY FOR PROPER SUPPORT OF GYP BD.
ASSEMBLY AND WALL MOUNTED EQUIPMENT, EITHER RECESSED
OR SURFACE MOUNTED.
R. PATCH ALL AREAS OF FIREPROOFING WHERE REMOVED FOR
INSTALLATION OF NEW WORK.
S. REMOVE (E) GYP. BD. AS NECESSARY TO INSTALL ALL DUCT,
PIPING, CONDUIT AND ACCESSORIES. REINSTALL GYP. BD. FINISH
TO MATCH EXIST. CONDITIONS AND TO VA'S ACCEPTANCE.
T. REPLACE CORRIDOR CEILING AND FLOORING FINISHES AND PAINT
AFTER REMOVAL OF CONSTRUCTION BARRICADES.
U. PROVIDE…