S02_RFP Attachment_Experience Information Sheet.docx

DOCX document 22 KB Posted

Attached to
Y1DA--FY23: NRM-Tier 1 (PROJ: 673-21-148) BB - Renovate Bldg 1 - 5 South to Private Patient Rooms
Solicitation number
36C24823R0199
Issued by

About this file

This document contains an experience information sheet template for contractors to provide details on relevant past project experience. The template requests information on three past projects including contractor details, contract numbers and award dates, work performed as prime contractor or subcontractor, percentage of work performed, description of scope of work and responsibilities, performance period including start and completion dates, difficulties encountered and resolutions, unforeseen conditions and resolutions, completion status and reasons for incomplete work, and original and final contract prices with explanations for differences.

The related federal contract opportunity is solicitation number 36C24823R0199 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 for the renovation of building 1-5 at a VA medical center to convert to private patient rooms. Offerors would need to provide details on three relevant past projects using the experience information sheet template to demonstrate qualification for this renovation contract opportunity.

View the file

Other files

File Type Posted
36C24823R0199 0007.docx DOCX document
S06_673 21 148_VA Tampa_5South_DRAWINGS_BidSet_REV1_20231106.pdf PDF
S06_673 21 148_VA Tampa_5South_SPECS_BidSet_REV1_20231106.pdf PDF
36C24823R0199 0006.docx DOCX document
S06_RFI UPDATE List-Description of Bid-Proposal Items and any associated alternate deductive_110723.docx DOCX document
S06_673-21-148_VA Tampa_5South_SPECS_BidSet_REV1_20231106.pdf PDF
S06_673-21-148_VA Tampa_5South_DRAWINGS_BidSet_REV1_20231106.pdf PDF
36C24823R0199 0005.docx DOCX document
S05_RFI 36C24823R0199 BB Renovate 5 South Private Patient Rooms UPDATED 11 3.xlsx XLSX spreadsheet
S06_RFI UPDATE CCTV Riser Diagram_110723.pdf PDF
S06_RFI UPDATE CCTV Riser Diagram.pdf PDF
S06_RFI UPDATE ACM Survey Report - JAHVA Building 1 FOR REF ONLY.pdf PDF
P01_673-21-148 BB SOW REV.docx DOCX document
S06_RFI UPDATE 22 00 97 5th Floor Asbestos and Lead Survey Report REV 1 2023 10 05.pdf PDF
S05_RFI_36C24823R0199_BB Renovate 5 South Private Patient Rooms UPDATED 10.27.xlsx XLSX spreadsheet
S06_RFI UPDATE 673-21-148 VA Tampa 5South DRAWINGS BidSet REV1 2023 10 27.pdf PDF
36C24823R0199 0004.docx DOCX document
S06_RFI UPDATE List-Description of Bid-Proposal Items and any associated alternate deductive.docx DOCX document
S06_RFI UPDATE 673-21-148 VA Tampa 5South SPECS BidSet REV1 2023 10 30.pdf PDF
36C24823R0199 0003.docx DOCX document
RFI Spreadsheet.xlsx XLSX spreadsheet
36C24823R0199 0002.docx DOCX document
S04_673_21_148 Construction Site Visit Attendance.pdf PDF
36C24823R0199 0001.docx DOCX document
S02_RFP Attachment_Price Matrix.xlsx XLSX spreadsheet
S02_RFP Attachment_VA LOS_JAN 2023_DEVIATION.pdf PDF
S02_RFP Attachment_WD FL20230208_13Jan2023.pdf PDF
S02_RFP Attachment_Instructions to Offerors.docx DOCX document
S02_RFP Attachment_RFI Spreadsheet.xlsx XLSX spreadsheet
S02_RFP Attachment_Past Performance Questionnaire.pdf PDF
36C24823R0199_2.docx DOCX document
S02_RFP Attachment_5S Site Map.pdf PDF
S02_RFP Attachment_673_21_148_VA Tampa_5South_SPECS_BidSet_REVISED.pdf PDF
S02_RFP Attachment_673_21_148_VA Tampa_5South_DRAWINGS_BidSet_REV.pdf PDF
S02_RFP Attachment_EMR.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXPERIENCE INFORMATION SHEET

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of THREE (3) projects, more than 3 will not be evaluated; less than 3 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)

e. Percent (%) of project work performed by your company

f. if you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project: Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution

j. Describe unforeseen conditions and how each were resolved

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:

original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences:

File details come from the government source that posted it. Updated .