S02_RFP Attachment Past Performance Questionaire.doc

DOC document 101 KB Posted

Attached to
Y1JZ--FY25: NRM (PROJ: 673-21-144) BB Install Main Water Well and Tower
Solicitation number
36C24825R0069
Issued by

About this file

The document is a Past Performance Questionnaire for a Department of Veterans Affairs contract (Solicitation Number 36C24825R0069) for the project "BB Install Main Water Well and Tower" with project number 673-21-144. The questionnaire is designed to collect detailed performance feedback from previous references, allowing potential contractors to demonstrate their past performance capabilities through a comprehensive 24-point evaluation covering areas such as project management, personnel quality, problem-solving, scheduling, responsiveness, and overall contract execution.

The questionnaire uses a 1-5 rating scale to assess contractor performance across multiple dimensions, including technical and administrative abilities, quality control, problem identification and resolution, schedule adherence, and cooperation with government personnel. References are asked to provide narrative explanations for low ratings, confirm whether they would award another contract to the contractor, and indicate if the contractor is rated in the Contractor Performance Assessment Reporting System (CPARS). The form is to be completed and submitted directly to the Contracting Specialist Cynda Rosa at Cynda.rosa@va.gov, with the expectation that contractors will proactively seek and submit performance evaluations as part of their bid preparation.

View the file

Other files

File Type Posted
S02_Attachment_Lead paint 1 page.pdf PDF
S02_Attachment__Final RFI Spreadsheet with answers 5-27-2025 11 pages.pdf PDF
S02_Attachment_Water Usage Study 224 pages.pdf PDF
S02_Attachment_Wage Determination 5-23-2025 Hillsborough 7 pages.pdf PDF
S02_Attachment_Tank Exterior Paint 23 pages.pdf PDF
S02_Attachment_Proposed laydown area for the Water Tank project 1 page.pdf PDF
36C24825R0069 0001.docx DOCX document
S02_Attachment_Lead Paint Inspection Report 2023-24 37 pages.pdf PDF
S02_Attachment_Universal Waste-HazMat Inspection Report 2024 21 pages.pdf PDF
S02_Attachment_Tank Inspection Report 31 pages.pdf PDF
S02_Attachment_Tank paint interior 29 pages.pdf PDF
S02_Attachment_Site visit Attendance sheet 2 pages.pdf PDF
S02_Attachment_Advanced Utility Metering System 29 pages.pdf PDF
S02_Attachment_Tampa VAMC Geotech Final Report 39 pages.pdf PDF
S02_RFP Attachment Safety or Environmental Violations and Experience Modification Rating Information.docx DOCX document
S02_RFP Attachment Specifications-Vol2 312 pages.pdf PDF
S02_RFP Attachment Specifications-Vol1 234 pages.pdf PDF
S02_RFP Attachment Davis Bacon Wage Determination Hillsborough County 3-14-25.pdf PDF
S02_RFP Attachment Drawings pages 1-43 compressed.pdf PDF
S02_RFP Attachment SOW rev 1.pdf PDF
S02_RFP Attachment NARA.pdf PDF
S02_36C24825R0069_1 FINAL...pdf PDF
S02_RFP Attachment LOS.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

PN: 673-21-144, BB Install Main Water Well and Tower C24825R0069

INSTRUCTIONS TO CONTRACTOR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit no later than the solicitation date/time according to the instructions, below.

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named below is submitting an offer for a United States Department of Veterans Affairs contract requirement, and has sent this form to you, in your role as a past performance reference contact. Please complete this form in full (all areas shaded in light yellow). Once completed, please send the form directly to the Contracting Specialist via email at Cynda.rosa@va.gov GENERAL INFORMATION [Completed by Contractor]

Contractor Company Name

Street Address

Contractor Point of Contact Name

City

Point of Contact Phone Number

State

Reference Project Title

Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number

Contract Dollar Value

Description of Work

Role of Contractor on This Project (check appropriate box)
☐ Prime Contractor ☐ Sub-contractor ☐ Key Personnel

RESPONDENT INFORMATION [Completed by Reference Contact]

Company Name

Street Address

POC Name

City

Phone Number

State

Fax Number

Zip Code

Email

PERFORMANCE INFORMATION: Choose the number on the scale of 1 to 5 that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF 1 OR 2 in the Remarks section, below (text box will expand to whatever extent is necessary).

1
2
3
4
5
UNSATISFACTORY
MARGINAL
SATISFACTORY
VERY GOOD
EXCEPTIONAL
Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner.
The Contractor …
1
2
3
4
5
1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
☐
☐
☐
☐
☐
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
☐
☐
☐
☐
☐
3.
Delegated authority to project managers and supervisors commensurate with contract requirements.
☐
☐
☐
☐
☐
4.
Home office participated in solving significant local problems.
☐
☐
☐
☐
☐
5.
Followed approved quality control plan.
☐
☐
☐
☐
☐
6.
Provided effective quality control and/or inspection procedures to meet contract requirements.
☐
☐
☐
☐
☐
7.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
☐
☐
☐
☐
☐
8.
Provided timely resolution of contract discrepancies
☐
☐
☐
☐
☐
9.
Identified problems as they occurred.
☐
☐
☐
☐
☐
10.
Suggested alternative approaches to problems.
☐
☐
☐
☐
☐
11.
Displayed initiative to solve problems.
☐
☐
☐
☐
☐
12.
Developed realistic progress schedules.
☐
☐
☐
☐
☐
13.
Met established project schedules.
☐
☐
☐
☐
☐
14.
Provided timely resolution of warranty defects.
☐
☐
☐
☐
☐
15.
Was responsive to contract changes.
☐
☐
☐
☐
☐
16.
Provided adequate project supervision.
☐
☐
☐
☐
☐
17.
Obtained consent of surety for increases in bonding as work-in-progress increased.
☐
☐
☐
☐
☐
18.
Paid subcontractors/suppliers in a timely manner.
☐
☐
☐
☐
☐
19.
Provided accurate and complete line item cost proposals including all aspects of work required for each task.
☐
☐
☐
☐
☐
20.
Cooperated with Government personnel after award.
☐
☐
☐
☐
☐
21.
How would you rate the contractor's overall performance?
☐
☐
☐
☐
☐
22.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
☐

YES

NO

23
Would you award another contract to this contractor? If not, please explain in “remarks.”
☐

YES

NO

24
To the best of your knowledge, is the contractor rated in CPARS?
☐

YES

NO

REMARKS (Please use as much space as is needed – the box will expand as you type).

Name of Person Completing Form

Signature

FOR OFFICAL USE ONLY 7 of 18

File details come from the government source that posted it. Updated .