S02_Attachment_Site visit Attendance sheet 2 pages.pdf

PDF 62 KB Posted

Attached to
Y1JZ--FY25: NRM (PROJ: 673-21-144) BB Install Main Water Well and Tower
Solicitation number
36C24825R0069
Issued by

About this file

The document is a two-page Site Visit Attendance Sheet for a VA hospital water infrastructure project. The attendance sheet is for a site visit on 4/29/2025 at 10:00 hrs, related to Contract 36C24825R0069 for the "673-21-144 Water Usage Study, Install Main Water Well and Tower" project at JAH VA Hospital - 201-42. The sheet contains 16 total attendees from various organizations including Panacca Construction, VSpergy Group, CBSI, Kee Solutions, Junit Group, Blue-Cord, BLDC, Landmark Structures, Lee, and TMM Sub.

Key contract contacts are Cynda Rosa (CO) and Marco Lopez (COR), both with VA email addresses. The attendees represent multiple companies likely participating in or interested in the water infrastructure project, with representatives signing in with their names, organizations, and contact information. The VA Health Care logo and "Defining EXCELLENCE in the 21st Century" tagline are prominently displayed, indicating this is an official VA project site visit documentation.

View the file

Other files

File Type Posted
S02_Attachment_Lead paint 1 page.pdf PDF
S02_Attachment__Final RFI Spreadsheet with answers 5-27-2025 11 pages.pdf PDF
S02_Attachment_Water Usage Study 224 pages.pdf PDF
S02_Attachment_Wage Determination 5-23-2025 Hillsborough 7 pages.pdf PDF
S02_Attachment_Tank Exterior Paint 23 pages.pdf PDF
S02_Attachment_Proposed laydown area for the Water Tank project 1 page.pdf PDF
36C24825R0069 0001.docx DOCX document
S02_Attachment_Lead Paint Inspection Report 2023-24 37 pages.pdf PDF
S02_Attachment_Universal Waste-HazMat Inspection Report 2024 21 pages.pdf PDF
S02_Attachment_Tank Inspection Report 31 pages.pdf PDF
S02_Attachment_Tank paint interior 29 pages.pdf PDF
S02_Attachment_Advanced Utility Metering System 29 pages.pdf PDF
S02_Attachment_Tampa VAMC Geotech Final Report 39 pages.pdf PDF
S02_RFP Attachment Past Performance Questionaire.doc DOC document
S02_RFP Attachment Safety or Environmental Violations and Experience Modification Rating Information.docx DOCX document
S02_RFP Attachment Specifications-Vol2 312 pages.pdf PDF
S02_RFP Attachment Specifications-Vol1 234 pages.pdf PDF
S02_RFP Attachment Davis Bacon Wage Determination Hillsborough County 3-14-25.pdf PDF
S02_RFP Attachment Drawings pages 1-43 compressed.pdf PDF
S02_RFP Attachment SOW rev 1.pdf PDF
S02_RFP Attachment NARA.pdf PDF
S02_36C24825R0069_1 FINAL...pdf PDF
S02_RFP Attachment LOS.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .