This is a set of architectural, mechanical, electrical and plumbing design drawings for replacing vacuum pumps at the John D. Dingell VA Medical Center in Detroit, Michigan (Project #553-22-201). The drawings detail the phased replacement of nine medical vacuum pumps located in three lower level mechanical rooms (LL215, LL528, and LL658).
The drawings include specifications for temporary vacuum pump systems to maintain operations during construction, detailed demolition and new work plans, equipment schedules, and installation details. Key equipment includes three triplex vacuum pump systems: VP-1,2,3 (5.4 HP each), VP-4,5,6 (7.5 HP each), and VP-7,8,9 (10 HP each), all operating on 480V/3-phase power. The work requires coordination of mechanical, electrical and plumbing systems, with specific requirements for pipe labeling, testing, and electrical connections. The drawings show existing concrete pads will be reused for the new equipment installation. Details are provided for conduit installations, equipment connections, and system controls including integration with the facility's master alarm panels.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Responses - 553-22-201.docx | DOCX document | |
| 36C25025B0016 0002.docx | DOCX document | |
| 36C25025B0016 0001.docx | DOCX document | |
| Bid Schedule 553-22-201 Replace Vacuum Pumps.pdf | ||
| S04 - Pre Bid Site Visit Attendance Log - 553-22-201.doc.pdf | ||
| S02 RFI Form - 553-22-201.pdf | ||
| S02 Wage Determination - MI20250101 02 21 2025 - 553-22-201.pdf | ||
| S02 Final Specifications - 553-22-201.pdf | ||
| S02 EMR Certification Form - 553-22-201.pdf | ||
| 36C25025B0016_1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROGRESS PRINT
NOT FOR CONSTRUCTION
PROGRESS PRINT
NOT FOR CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
MECHANICAL ELECTRICAL PLUMBING
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
NOT FOR CONSTRUCTION
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
B
IM
/0
R e p la c e
F ir e
P u m p
C o n tr o lle r D e s ig n /0
R e p la c e
F ir e
P u m p C o n tr o lle r
R
E
.r v t
/1
/2
:2
:1
P
M
8/17/2022 12:23:12 PM8/17/2022 12:23:12 PM
G-000
COVER SHEET VAMC Detroit Replace Vacuum Pump
DETROIT, MICHIGAN
553-22-201
05/25/2023 MJD MJD
REPLACE VACUUM PUMPS
PROJECT #: 553-22-201
SHEET LIST
SHEET NUMBER SHEET NAME
G-000 VA COVER SHEET
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
EP101 ELECTRICAL 1ST FLR PLAN & BASEMENT PLAN - BOILER RM
PROJECT LOCATION
© Google Maps
Revisions Date www.abovegroupinc.com COA/CA Lic. No. 31120
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
937.461.0260 F
RDC / JOHN POE ARCHITECTS
ABOVE GROUP
ENGINEERING
70 BIRCH ALLEY, SUITE 240
BEAVERCREEK, OHIO 45440
G-000
100% BID DOCUMENTS
ST
A
T E O F F L O R
ID
A
RE
G
IS
T E R E D A R C H
IT
EC
T
ROGE
R A R E P
ST
IEN
A R
STAMP
MEDICAL CENTER DIRECTOR
VA APPROVAL
DATE
DATEASSOCIATE MEDICAL CENTER DIRECTOR
DATECHIEF, FACILITY MANAGEMENT SERVICES
DATEASSISTANT CHIEF, FMS
DATESAFETY AND OCCUPATIONAL HEALTH MANAGER
DATEENERGY MANAGER
B ru sh S t
E Hancock St
Joh n R
S t
W oo d w ard A ve
C a s s A ve
E Canfield St
S t A n to in e
Mack Ave
In terstate 7
E W arre n Ave
Department of Veteran Affairs Medical Campus
N
VICINITY MAP
102 101
Brush St
John R St
E C a n fie ld S t
E H a n c o c k S t
Building Key:
100 MAIN HOPSITAL
101 SOUTH PARKING GARAGE
- SOUTH GENERATING STATION
102 NORTH PARKING GARAGE
103 ENERGY CENTER
G-000 P-001
PD101
PG101
P-501 P-601 E-001 E-002
EP101
EP102
EP103
EP104
E-501 E-601
COVER SHEET
PLUMBING NOTES, LEGENDS, & SYMBOLS
LOWER LEVEL PLAN - MED GAS - DEMO
LOWER LEVEL PLAN - MED GAS - NEW WORK
PLUMBING SCHEDULES & DETAILS
PLUMBING ISOMETRICS
ELECTRICAL LEGENDS & SYMBOLS
ELECTRICAL GENERAL NOTES
LOWER LEVEL PLANS - LL658 - ELEC. EQUIPMENT- NEW & DEMO
LOWER LEVEL PLANS - LL528 - ELEC. EQUIPMENT - NEW & DEMO
LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - DEMO
LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - NEW
ELECTRICAL DETAILS
ELECTRICAL DIAGRAMS
DRAWING INDEX
1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS INDICATED IN DETAILS AND/OR RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING
AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE
ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT
REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR
OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL
GOVERN.
2. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH DIVISION
22 SPECIFICATION SECTION. "IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT".
3. LABEL VALVES ABOVE CEILINGS AND IN CONCEALED SPACES AT CEILING TILE WITH METAL CEILING TACKS INDICATING VALVE # AND TYPE OF WATER. (i.e.; BLUE= COLD WATER, LETTERING CW
VLV1-001).
4. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS FOR DETAILS AND UL
ASSEMBLY NUMBERS.
5. COORDINATE CEILING PIPING AND ELEVATIONS IN SHOP DRAWINGS WITH ALL OTHER TRADES (I.E.
HVAC, FIRE PROTECTION, ELECTRICAL, TELECOMM, STRUCTURAL, ETC.) PRIOR TO ANY INSTALLATION
TO ENSURE PROPER CLEARANCES AND PENETRATIONS.
6. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED UNLESS
NOTED OTHERWISE.
7. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER INSTALLATION
INSTRUCTIONS.
8. ALL AUTOMATIC CONTROL, PROTECTIVE OR SIGNAL DEVICES REQUIRED FOR THE OPERATION SPECIFIED, SHALL BE PROVIDED WITH ANY CONTROL WIRING AND INSTALLED PER MANUFACTURERS
REQUIREMENTS.
9. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.
10. PROVIDE TEMPORARY PUMP SYSTEM AND PIPING FOR EACH PHASE OF CONSTRUCTION TO MINIMIZE
SYSTEM DOWNTIME AND REMAIN OPERATIONAL. CONTRACTOR SHALL COORDINATE ANY REQUIRED
SHUT-DOWNS WITH COR PRIOR TO START OF DEMOLITION. REFER TO SHEET PD101 FOR ADDITIONAL
REQUIREMENTS.
PLUMBING ABBREVIATIONSPLUMBING SYMBOL LEGEND
SYMBOL DESCRIPTION
NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT
MEDICAL VACUUM EXHAUST PIPINGMVE
110° HOT WATER PIPINGHW
HOT WATER RETURN PIPINGHWR
STO STORM OVERFLOW (SECONDARY)
ST STORM (PRIMARY)
SANITARY DRAINAGE PIPING (UNDERGROUND)S U/G
SANITARY DRAINAGE PIPING (ABOVE SLAB)SAN
V VENT PIPING
GATE VALVE
PRESSURE GAUGE
CHECK VALVE
BALL VALVE
CIRCULATING PUMP
PIPE END CAP
PIPE TURNING DOWN
PIPE TURNING UP
PIPE TURNING DOWN (TEE)
MEDICAL VACUUM PIPING
CLEANOUTS
CW COLD WATER PIPING
CD CONDENSATE PIPING
CIRCUIT SETTER VALVE
OR
PDI-"A" WATER HAMMER ARRESTER & SIZE
THERMOSTATIC MIXING VALVE
HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT
FLOW ARROW
P-TRAP
ROLL DOWN
PIPING TEE
ST U/G STORM PIPING (UNDERGROUND)
MV
PRESSURE REGULATING VALVE
BUTTERFLY VALVE
A
B
SIM
A
SECTION SYMBOL:
A = IDENTIFYING LETTER
B = SHEET WHERE SECTION IS SHOWN
SIM =
(ONLY NOTED IF IT APPLIES)
PLUMBING RISER DESIGNATION:
A = RISER IDENTIFYING SYSTEM TYPE
1 =
REVISION CLOUD AND
REVISION NUMBER
SHEET NOTE CALLOUT
A TITLE SYMBOL ON SHEET WHERE SHOWN
A = IDENTIFYING NUMBER/LETTER
RISER IDENTIFYING SYSTEM NUMBER
SIMILAR
ABBR. DESCRIPTION ABBR. DESCRIPTION
PLUMBING GENERAL NOTES
WATER HAMMER ARRESTOR
SYMBOL
1/2"
PIPE SIZE PDI STANDARD FIXTURE UNIT CAP.
3/4"
1"
1-1/4"
A
B
C
D
1 TO 11
12 TO 32
33 TO 60
61 TO 113
DEMOLISH TO POINT INDICATED
CONNECT TO EXISTING
DEMOLISHED PIPING
EXISTING PIPING
NEW PIPING
AS ABOVE SLAB
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AP ACCESS PANEL
ASTM AMERICAN STANDARDS TESTING MATERIALS
AWWA AMERICAN WATER WORKS ASSOCIATION
BFP BACKFLOW PREVENTER
BS BELOW SLAB
BF BELOW FLOOR
BG BELOW GRADE
CA COMPRESSED AIR
CD CONDENSATE
CO CLEANOUT
CONN CONNECTION
CONT CONTINUOUS
CP CIRCULATING PUMP
CW COLD WATER
DF DRINKING FOUNTAIN
DFU DRAINAGE FIXTURE UNITS
DIA DIAMETER
DN DOWN
DWG DRAWING
DW DOMESTIC WATER
ECO EXTERIOR CLEANOUT
ELEV ELEVATION
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EX EXISTING
ºF DEGREES FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FIN FINISH
FL FLOOR
FPS FEET PER SECOND
FT FEET
FU FIXTURE UNITS
G NATURAL GAS
GAL GALLON(S)
GPM GALLONS PER MINUTE
GR GREASE WASTE
HB HOSE BIBB
HP HORSEPOWER
HR HOUR
HW HOT WATER
HWR HOT WATER RETURN
HZ HERTZ
IE INVERT ELEVATION
ID INTERNAL DIAMETER
IN INCHES
IPS INTERNATIONAL PIPE STANDARD
IRR IRRIGATION WATER
KW KILOWATT
LAV LAVATORY
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
MNTG MOUNTING
MS MOP SINK
MV MEDICAL VACUUM
MVE MEDICAL VACUUM EXHAUST
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NSF NATIONAL SANITATION FOUNDATION
NTS NOT TO SCALE
OD OUTSIDE DIAMETER
ORWL OVERFLOW RAIN WATER LEADER
PDI PLUMBING DRAINAGE INSTITUTE
PH PHASE
PPP PRECISION PLUMBING PRODUCTS
PSI POUNDS PER SQUARE INCH
RD ROOF DRAIN
RPM REVOLUTIONS PER MINUTE
RWL RAIN WATER LEADER
RX REMOVE EXISTING
S SANITARY
SAN SANITARY
SH SHOWER
SK SINK
SL SODA LINE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
ST STORM
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TET THERMAL EXPANSION TANK
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U/G UNDERGROUND
UNO UNLESS NOTED OTHERWISE
UR URINAL
V VENT
VA DEPARTMENT OF VETERANS AFFAIRS
VTR VENT THROUGH ROOF
VIV VALVE IN VERTICAL
VLV VALVE
VOL VOLUME
W WATTS
W/ WITH
WC WATER CLOSET
WCO WALL CLEANOUT
WHA WATER HAMMER ARRESTOR
WHY WALL HYDRANT
WFU WATER SUPPLY FIXTURE UNITS
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
A. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2020 EDITION
B. NATIONAL ELECTRICAL CODE (NEC) 2020 EDITION
C. HEALTH CARE FACILITIES CODE (NFPA 99) 2021 EDITION
D. LIFE SAFETY CODE (NFPA 101) 2021 EDITION
2. VA PLUMBING DESIGN MANUAL 2021 EDITION
3. VA SEISMIC DESIGN REQUIREMENTS 2019 EDITION
4. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
5. AMERICANS WITH DISABILITIES ACT (ADA)
6. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
7. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER
SYMBOL DESCRIPTION
CONTROL VALVE
BUTTERFLY VALVE
CALIBRATING BALANCING VALVE
BALL VALVE
STRAINER
UNION
THERMOMETER
PSI REG.
FLOW SWITCH
CHECK VALVE
THREE-WAY CONTROL VALVE
FLEX CONNECTION
RELIEF VALVE
VALVE ON RISER
TEST PLUG
GLOBE VALVE
PSI REG.
FLOW SWITCH
PRESSURE SWITCH
AUTOMATIC AIR VENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:4
:5
P
M
P-001
PLUMBING NOTES, LEGENDS, &
SYMBOLS
VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 KDB WRH
100% BID DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS
PD101 LOWER LEVEL PLAN - MED GAS - DEMO
PG101 LOWER LEVEL PLAN - MED GAS - NEW WORK
P-501 PLUMBING SCHEDULES & DETAILS
P-601 PLUMBING ISOMETRICS
Revisions Date
LL215
19 18
P.4
Q
R
RX
VP-1,2,3
EX 3" MVEX 3" MVE
1 TEMP
VP
RX 3" MVE
RX 3" MV
RX 3" MVE (TYP)
EX-FD EX
CP-1
A
B
C
D
D.8
LL528
EX 4" MV
EX 6" MVE
EX
TANK
EX
AHU
RX
VP-7,8,9
1 TEMP
VP
RX 6" MVE
RX 4" MV
RX 4" MVE RX 2" MVE
EX-FD
LL658
1414.3 13.8 13.4
13 12.9 12.5
A
B
C
D
D.8
RX
VP-4,5,6EX 5" MVE
EX 3" MV
EX
AHU
TEMP
VP
RX 5" MVE
RX 3" MV
EX-FD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/1
/2
:5
:5
P
M
PD101
LOWER LEVEL PLAN - MED GAS -
DEMO
VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 KDB WRH
100% BID DOCUMENTS
CODED NOTES:
PROPOSED LOCATION FOR TEMPORARY VACUUM PUMP. THE TEMPORARY SYSTEM SHALL BE
CONNECTED TO THE EXISTING HEADER, AS SHOWN ON PG101, TO ALLOW FOR THE REMOVAL OF THE EXISTING VACUUM PUMP SYSTEM SERVING THIS AREA. THE TEMPORARY VACUUM PUMP SYSTEM SHALL BE DISCONNECTED AND RELOCATED TO THE NEXT PHASE UPON COMPLETION OF NEW VACUUM PUMP INSTALLATION. A SINGLE TEMPORARY VACUUM PUMP SYSTEM SHALL BE UTILIZED FOR THE DURATION OF THE PROJECT. REFER TO SHEET PG101 FOR TEMPORARY PIPING ROUTES. REFER TO TEMP VACUUM
PUMP SYSTEM SCHEDULE FOR A BASIS OF DESIGN.
CONCRETE PAD EXISTING TO REMAIN.
MANUFACTURER'S RECOMMENDED CLEARANCE.
N 0 2' 4' 8' 12'
1/4" = 1'-0"
1/4" = 1'-0"3
LOWER LEVEL PLAN - LL215 - MED GAS - DEMO - PHASE 3
1/4" = 1'-0"2
LOWER LEVEL PLAN - LL528 - MED GAS - DEMO - PHASE 2
1/4" = 1'-0"1
LOWER LEVEL PLAN - LL658 - MED GAS - DEMO - PHASE 1
KEY PLAN
LL528 LL658
LL215
DRAWING NOTES:
1. THE PROJECT SHALL BE COMPLETED IN 3 PHASES: PHASE 1 SHALL BE TO REPLACE THE EXISTING MEDICAL VACUUM PUMP SYSTEM IN LL658, PHASE 2 SHALL BE TO REPLACE THE EXISTING MEDICAL VACUUM PUMP SYSTEM IN LL528, AND PHASE 3 SHALL BE TO REPLACE THE EXISTING MEDICAL VACUUM PUMP SYSTEM IN LL215. THE EXISTING VACUUM PUMP SHALL BE DISCONNECTED, AND THE
TEMPORARY PIPING CONNECTED FOR OPERATION. THE TEMPORARY SYSTEM SHALL BE
DISCONNECTED UPON COMPLETION OF THE NEW MEDICAL VACUUM SYSTEM INSTALLATION AND
RELOCATED FOR THE NEXT PHASE. THE EXISTING HOUSEKEEPING PADS AND MEDICAL VACUUM
HEADERS ARE ANTICIPATED TO BE UTILIZED FOR THE NEW MEDICAL VACUUM SYSTEMS. REFER TO SPECIFICATION 22 05 11 COMMON WORK RESULTS FOR PLUMBING PARAGRAPH, TEMPORARY PIPING
AND EQUIPMENT.
2. EXISTING VACUUM SYSTEM SHALL BE DISMANTLED AND REMOVED IN MULTIPLE SECTIONS CAPABLE OF BEING SAFELY REMOVED THROUGH A 36" WIDE DOOR OPENING. IF DOOR REMOVAL IS REQUIRED, COORDINATE REMOVAL WITH COR.
LL215
19 18
P.4
Q
R
VP-1,2,3
3" MVE
3" MVE
EX 3" MVEX 3" MVE
1 TEMP
VP
3" MVE
3" MV
EX
CP-1
EX-FD
3/4" CD
3/4" CD
A
B
C
D
D.8
LL528
EX 4" MV
EX 6" MVE
VP-7,8,9
3" MVE
6" MVE
EX
TANK
EX
AHU
1 TEMP
VP
4" MV 3/4" CD
EX-FD
3/4" CD
6" MVE
4" MV
LL658
1414.3 13.8 13.4 13 12.9 12.5
A
B
C
D
D.8
VP-4,5,6
EX 5" MVE
EX 3" MV
EX
AHU
1 TEMP
VP
5" MVE
9 3" MV
EX-FD
3/4" CD
3" MV
3/4" CD
3" MV
5" MVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:4
:3
P
M
PG101
LOWER LEVEL PLAN - MED GAS -
NEW WORK
VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 KDB WRH
100% BID DOCUMENTS
CODED NOTES:
PROPOSED LOCATION FOR TEMPORARY VACUUM PUMP TO ALLOW FOR THE REPLACEMENT OF THE
VACUUM PUMP SYSTEM SERVING THIS AREA. THE TEMPORARY VACUUM PUMP SYSTEM SHALL BE
DISCONNECTED AND RELOCATED TO THE NEXT PHASE UPON COMPLETION OF NEW VACUUM PUMP
INSTALLATION. A SINGLE TRIPLEX TEMPORARY VACUUM PUMP SYSTEM SHALL BE UTILIZED FOR THE DURATION OF THE PROJECT. REFER TO TEMP VACUUM PUMP SYSTEM SCHEDULE FOR BASIS OF DESIGN.
LOCATE NEW VACUUM PUMP ON EXISTING CONCRETE PAD.
EXISTING CONCRETE PAD.
MANUFACTURER'S RECOMMENDED CLEARANCE.
AFTER CONSTRUCTION IS COMPLETE. REMOVE TEMPORARY PIPING AND CAP VALVE FOR FUTURE
TEMPORARY SYSTEM SERVICES.
PROVIDE VALVE AND FLEXIBLE CONNECTION FOR EQUIPMENT CONNECTION. REFER TO DETAIL 1 / P-501
FOR MORE INFORMATION.
TEMPORARY PIPING ROUTED TO EXISTING MEDICAL VACUUM PIPING.
TEMPORARY PIPING ROUTED TO EXISTING MEDICAL VACUUM EXHAUST PIPING.
CONNECT NEW SINGLE TRIPLEX VACUUM PUMP SYSTEM TO EXISTING HEADER.
TEMPORARY DRAIN PIPING ROUTED TO NEAREST FLOOR DRAIN.
N 0 2' 4' 8' 12'
1/4" = 1'-0"
1/4" = 1'-0"1
LOWER LEVEL PLAN - LL215 - MED GAS - NEW WORK - PHASE 3
1/4" = 1'-0"2
LOWER LEVEL PLAN - LL528 - MED GAS - NEW WORK - PHASE 2
1/4" = 1'-0"3
LOWER LEVEL PLAN - LL658 - MED GAS - NEW WORK - PHASE 1
KEY PLAN
LL528 LL658
LL215
DRAWING NOTES:
1. VACUUM SYSTEM SHALL BE SHIPPED IN MULTIPLE SKIDS CAPABLE OF BEING DELIVERED THROUGH A 36" WIDE DOOR OPENING. UNITS SHALL BE RECEIVED AT THE LOADING DOCK AND DELIVERED TO THE
MECHANICAL ROOMS THROUGH 36" WIDE DOORS. IF DOOR REMOVAL IS REQUIRED, COORDINATE
INSTALLATION WITH COR. VACUUM SYSTEM SHALL BE ASSEMBLED IN MECHANICAL ROOM FOR
OPERATION BY INSTALLING CONTRACTOR.
2. CONTRACTOR SHALL FIELD VERIFY EXISTING EXHAUST PIPE LENGTH FOR EACH SYSTEM DOES NOT
EXCEED MANUFACTURER'S RECOMMENDATIONS. IF MAXIMUM PIPE LENGTH IS EXCEEDED,
CONTRACTOR SHALL REPLACE PIPING AND SIZE PER MANUFACTURER'S RECOMMENDATIONS.
EXHAUST TERMINATION SHALL BE 25 FT. MIN. FROM OUTSIDE AIR OPENINGS, TURNED DOWN, AND
SCREENED PER NFPA 99 5.1.3.7.7.
DETAIL NOTES:
MEDICAL VACUUM
FLOW DIRECTION LABEL. PROVIDE 360
DEGREE WRAP OVERLAPPING BOTH ENDS OF
THE PIPE FUNCTION LABEL AND MATCHING
THE FLOW DIRECTION OF THE PIPE
CONTENTS.
PIPE FUNCTION LABEL
A.
B.
C.
D.
E.
F.
PROVIDE A PIPE LABEL FOR EACH PIPE FUNCTION.
PROVIDE AT LEAST ONE LABEL ON EACH PIPE FOR EVERY ROOM THE
PIPE PASSES THROUGH.
PROVIDE LABELS IN LARGE SPACES ON MAXIMUM 20' CENTERS FOR
EVERY PIPE UNLESS OTHERWISE NOTED IN THE SPECIFICATIONS.
LABELS TO BE LOCATED IN AN EASILY VISIBLE LOCATION AS THEY
WOULD NORMALLY BE SEEN. IE. ON THE BOTTOM HALF OF PIPES
IN THE AIR AND ON THE TOP HALF OR SIDES OF PIPES MOUNTED LOW.
LABELS SHALL BE, COLOR CODED, PRE-PRINTED, SELF ADHESIVE VINYL.
SEE SPECIFICATION FOR OTHER REQUIREMENTS AND LIST OF PIPE FUNCTIONS.
INSTALL FACTORY
EXHAUST SILENCER LOW VACUUM
SWITCH
VACUUM GAUGE RANGE: 0-30"HG
SHUT-OFF VALVE (TYP.)
INLET FROM FACILITY
FLEX CONNECTION
(TYPICAL)
VACUUM PUMP (TYP.)
DRIP LEG ON EXHAUST OF PUMP
EXISTING RAISED HOUSEKEEPING PAD
STEEL CHANNEL
FRAME
CONTRACTOR SHALL SECURE FRAME TO
EXISTING CONCRETE PAD. NO INERTIA
PAD OR VIBRATION PADS ARE REQUIRED
FOR BASIS OF DESIGN VACUUM SYSTEM.
EXISTING DRAIN
3/4" TANK DRAIN LINE. PROVIDE PIPING SUPPORTS
TO MAINTAIN 1/4" / FT MIN. SLOPE TO FLOOR DRAIN.
TANK DRAIN VALVE
LOCAL CONTROL PANEL WITH AUTOMATIC PUMP
CHANGEOVER
ASME
RECEIVER TANK
CHECK VALVE
(TYP.)
EXISTING MASTER ALARM PANEL LOCATED
IN THE BOILER PLANT CONTROL ROOM.
EXISTING MASTER ALARM PANEL LOCATED
AT 24 HOUR MONITORED LOCATION.
CONTRACTOR
MANUFACTURER
WIRE ALARMS FROM THE LOCAL ALARM PANEL TO THE
EXISTING MASTER ALARM PANELS. REPLACE ALL
DAMAGED WIRING BACK TO THE MASTER ALARM PANEL.
FINISHED FLOOR
VACUUM SWITCH
BELOW NORMAL
LAG PUMP
RUNNING
PUMP 1,2,3 HIGH
TEMP
CONTRACTOR MANUFACTURER
1'-0"
PIPE HANGER
(SEE SPECS.)
GALVANIZED
SHEETMETAL PIPE
SADDLE W/FLARED ENDS
INSULATED PIPE
PIPE HANGER
(SEE SPECS.)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:4
:1
P
M
P-501
PLUMBING SCHEDULES & DETAILS VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 KDB WRH
100% BID DOCUMENTS
N.T.S.
PIPING IDENTIFICATION LABEL DETAIL
N.T.S.
TRIPLEX CLAW ROTARY MEDICAL VACUUM PUMP DETAIL
N.T.S.
INSULATED PIPE HANGER
MEDICAL VACUUM PUMP SCHEDULE
MARK
BASIS OF DESIGN
MANUFACTURER
BASIS OF
DESIGN MODEL TYPE MOTOR QTY. / HP SYSTEM
RECEIVER
CAPACITY (GAL)
SCFM @19 Hg
PUMP / SYSTEM
SYSTEM
(BTU/HR) INLET SIZE (IN)
DISCHARGE SIZE
(IN)
NOISE LEVEL
(DB)
UNIT WEIGHT
(LBS)
ELECTRICAL
V/PH/HZ SYSTEM FLA MCA MOCP
VP-1,2,3 BEACON MEDAES VHS05T-120V-T TRIPLEX 3 / 5.4 MEDICAL VACUUM 120 38 / 76 21,989 2 2 82 2,520 460/3/60 20.1 26.2 32.3
VP-4,5,6 BEACON MEDAES VHS07T-200V-T TRIPLEX 3 / 7.5 MEDICAL VACUUM 200 65 / 130 30,133 3 3 82 3,466 460/3/60 30.6 37.3 46.8
VP-7,8,9 BEACON MEDAES VHS10T-200V-T TRIPLEX 3 / 10 MEDICAL VACUUM 200 87 / 174 40,720 4 3 90 4,366 460/3/60 36.6 47.0 59.5
NOTES:
1. MEDICAL VACUUM PUMP AND ALL ASSOCIATED COMPONENTS SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.
2. MEDICAL VACUUM PUMP SHALL BE PLACED ON EXISTING 4" RAISED CONCRETE PAD.
3. ROUTE TANK DISCHARGE TO NEAREST FLOOR DRAIN.
4. WIRE LAG PUMP RUNNING AND HIGH TEMP LOCAL ALARMS BACK TO THE EXISTING MASTER ALARM PANELS. REPLACE ANY DAMAGED WIRING BACK TO THE MASTER ALARM PANEL.
5. VACUUM SYSTEM SHALL BE SHIPPED IN MULTIPLE SKIDS CAPABLE OF BEING DELIVERED THROUGH A 36" WIDE DOOR OPENING. UNITS SHALL BE RECEIVED AT THE LOADING DOCK AND DELIVERED TO THE MECHANICAL
ROOMS THROUGH 36" WIDE DOORS. IF DOOR REMOVAL IS REQUIRED, COORDINATE INSTALLATION WITH COR. VACUUM SYSTEM SHALL BE ASSEMBLED IN MECHANICAL ROOM FOR OPERATION BY INSTALLING CONTRACTOR.
TEMPORARY MEDICAL VACUUM PUMP SCHEDULE
MARK
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN
MODEL TYPE MOTOR QTY. / HP SYSTEM
RECEIVER
CAPACITY (GAL.)
SCFM @19 Hg
PUMP / SYSTEM
SYSTEM
(BTU/HR)
INLET SIZE
(IN)
DISCHARGE SIZE
(IN)
NOISE LEVEL
(DB)
UNIT WEIGHT
(LBS)
ELECTRICAL
V/PH/HZ SYSTEM FLA MCA MOCP
TEMP-VP BEACON MEDAES VLS10D-200V-D DUPLEX 2 / 10 MEDICAL VACUUM 200 77 / 77 20,360 2 2 81 2,711 460/3/60 27 32.5 45.5
NOTES:
1. TEMPORARY MEDICAL VACUUM PUMP TO BE RENTED AND USED DURING CONSTRUCTION. AFTER ALL CONSTRUCTION PHASES ARE COMPLETED, MEDICAL VACUUM PUMP SHALL BE RETURNED.
2. MEDICAL VACUUM PUMP AND ALL ASSOCIATED COMPONENTS SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.
3. ROUTE TANK DISCHARGE TO NEAREST FLOOR DRAIN.
4. WIRE LOCAL ALARMS BACK TO MASTER ALARM PANELS LOCATED.
5. VACUUM SYSTEM SHALL BE SHIPPED IN MULTIPLE SKIDS CAPABLE OF BEING DELIVERED THROUGH A 36" WIDE DOOR OPENING. UNITS SHALL BE RECEIVED AT THE LOADING DOCK AND DELIVERED TO THE MECHANICAL
ROOMS THROUGH 36" WIDE DOORS. IF DOOR REMOVAL IS REQUIRED, COORDINATE INSTALLATION WITH COR. VACUUM SYSTEM SHALL BE ASSEMBLED IN MECHANICAL ROOM FOR OPERATION BY INSTALLING CONTRACTOR.
3" MV
3" MV
VP-4,5,6
EXISTING CONCRETE PAD
EX 5" MVE
3" MV
TEMP
VP
EX 3" MV
5" MVE
5" MVE
EX-FD
3/4" CD
3/4" CD
4" MV
TEMP
VP
VP-7,8,9
3" MVE
6" MVE
4" MV
EX 4" MV
EX 6" MVE
EXISTING CONCRETE PAD
EXISTING CONCRETE PAD
3" MVE
EX-FD
3/4" CD
3/4" CD
6" MVE
6" MVE
EX 3" MV
EX 3" MVE
3" MV
3" MVE
TEMP
VP
VP-1,2,3
EXISTING CONCRETE PAD
3" MVE
EX-FD
3/4" CD
3/4" CD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:4
:2
P
M
P-601
PLUMBING ISOMETRICS VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 KDB WRH
100% BID DOCUMENTS
N.T.S.
ROOM LL658 VP-4,5,6 ISOMETRIC
1N.T.S.
ROOM LL528 VP-7,8,9 ISOMETRIC
2N.T.S.
ROOM LL215 VP-1,2,3 ISOMETRIC
1PH SINGLE-PHASE
3PH THREE-PHASE
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AF AMPERE FRAME OR AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMP AMPERE
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BLDG BUILDING
C CONDUIT
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CKT CIRCUIT
CLG CEILING
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
COORD COORDINATE
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DISC DISCONNECT
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DS DISCONNECT SWITCH
DWG DRAWING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
ETR, EX EXISTING TO REMAIN
ELECTRICAL ABBREVIATIONS
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPS
FP FIRE PROTECTION
FT FEET OR FOOT
GND GROUND
G OR GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LRA LOCKED ROTOR AMPS
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PA PUBLIC ADDRESS
PCB POLYCHLORINATED BIPHENYL
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
AWG AMERICAN WIRE GAUGE
KCMIL ONE-THOUSAND CIRCULAR MILS
NA NOT APPLICABLE
HD HEAT DETECTOR
NEW (HEAVY, SOLID LINE)
EXISTING TO REMAIN (LIGHT, SOLID LINE)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
JUNCTION BOX
RECEPTACLE, DUPLEX
ELECTRICAL SYMBOLS - POWER/LIGHTING PLANS
J
SYMBOL DESCRIPTION
SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL, OVER 250 VOLTS
SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL - UNDER 250 VOLTS
WALL MOUNTED JUNCTION BOXJ
RECEPTACLE, DOUBLE DUPLEX (QUADRAPLEX)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:3
:3
A
M
E-001
ELECTRICAL LEGENDS & SYMBOLS VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 JFR KEM
100% BID DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
E-001 ELECTRICAL LEGENDS & SYMBOLS
E-002 ELECTRICAL GENERAL NOTES
EP101 LOWER LEVEL PLANS - LL658 - ELEC. EQUIPMENT- NEW & DEMO
EP102 LOWER LEVEL PLANS - LL528 - ELEC. EQUIPMENT - NEW & DEMO
EP103 LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - DEMO
EP104 LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - NEW
E-501 ELECTRICAL DETAILS
E-601 ELECTRICAL DIAGRAMS
ELECTRICAL GENERAL NOTES
WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2023
b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2022
c. LIFE SAFETY CODE, NFPA 101 – YEAR
d. EMERGENCY AND STANDBY POWER SYSTEMS, NFPA 110 – 2021
e. HEALTH CARE FACILITIES CODE, NFPA 99
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2
3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
4. FACILITY GUIDELINES INSTITUTE (FGI):
a. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT FACILITIES
5. FEDERAL COMMUNICATION COMMISSION (FCC)
6. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
7. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
8. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
9. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
10. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
11. ILLUMINATION ENGINEERING SOCIETY (IES)
12. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)
13. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)
14. INTERNATIONAL CODE COUNCIL (ICC):
a. INTERNATIONAL BUILDING CODE (IBC)
15. UNIFORM BUILDING CODE (UBC)
16. COMBINED ANSI/ASHRAE/IES STANDARD 90.1 – “ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL
BUILDINGS”
17. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)
18. AMERICANS WITH DISABILITIES ACT (ADA)
19. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.
20. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE
a. AUTHORITIES HAVING JURISDICTION (AHJs).
21. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.
1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT
ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.
2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND
ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
3. INCLUDE ALL COSTS FOR SURFACE RESTORATION, REPAIR OF FINISHES, ETC. THAT IS REQUIRED IN ORDER TO
MEET THE PROJECT REQUIREMENTS.
4. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH STATUTES REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN CERTIFICATION OF
ACCEPTED DISPOSAL.
5. ALL POWER CIRCUITS REQUIRE 2% OR LESS VOLTAGE DROP FOR FEEDERS, AND 3% OR LESS VOLTAGE DROP FOR
BRANCH CIRCUITS.
6. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS ARE NOT ALLOWED
UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.
7. VERIFY AND COORDINATE LOCATIONS OF ANY MISCELLANEOUS EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS WITH APPROVED SHOP DRAWINGS, OWNER-PROVIDED CUT SHEETS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL
REQUIRED.
8. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL EQUIPMENT PRIOR TO SUBMITTAL OF SHOP DRAWINGS OF ELECTRICAL EQUIPMENT. PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS, BOXES, EQUIPMENT, ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS, CONTROL TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM.
COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL
REQUIRED, UNLESS OTHERWISE NOTED.
9. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT OF WORK. AVOID INTERFERENCES WITH
THE PROGRESS OF OTHER DIVISIONS/TRADES.
10. LOCATIONS OF VFD'S, DISCONNECTS, MOTOR STARTERS, ETC. FOR HVAC EQUIPMENT ARE DIAGRAMMATIC ON THE PLAN DRAWINGS. EXACT LOCATIONS ARE TO BE COORDINATED WITH CONTRACTOR'S COORDINATION DRAWINGS PRIOR TO ROUGHING IN TO ENSURE PROPER NEC CLEARANCES AND APPROPRIATE MOUNTING SURFACE.
11. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS
INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA.
12. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS AND DETAILS.
COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.
13. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
14. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR
PHASING.
15. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN WRITING BY THE OWNER AND SCHEDULED IN
ADVANCE.
16. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO
PROCEEDING WITH REPAIRS.
17. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL
APPURTENANCES IN ACCORDANCE WITH NEC.
18. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNAGE REQUIRED DURING THE
PROJECT CONSTRUCTION PHASE.
19. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L.
LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED
WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY.
20. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, TO THE
SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.
21. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS. WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO
REQUEST COMPENSATION FROM THE CONTRACTOR FOR SAID SERVICES.
22. MAINTAIN A CURRENT AND ACCURATE SET OF PROJECT RECORD DOCUMENTS (AS-BUILTS) AT THE SITE THROUGHOUT THE DURATION OF THE PROJECT. RECORD DRAWINGS SHALL BE UPDATED EACH DAY TO REFLECT THE ACTUAL LOCATIONS, SIZES, ROUTING, ETC. OF EACH PORTION OF THE ELECTRICAL SYSTEM AFFECTED BY THIS WORK. A FINAL SET OF RECORD DOCUMENTS SHALL BE ISSUED TO THE A/E FOR REVIEW AND THEN SUBMITTED TO THE OWNER WITHIN 30 DAYS AFTER THE DATE OF FINAL ACCEPTANCE. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION INCLUDING SINGLE LINE DIAGRAM, POWER RISER DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM, SITE PLANS AND ALL
ELECTRICAL FLOOR PLANS, DETAILS, PANEL SCHEDULES, ETC.
23. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL ELECTRICAL REQUIREMENTS FOR THE TEMPORARY PUMP SYSTEMS AND MUST PROVIDE ALL ELECTRICAL CONNECTIONS AND MATERIALS FOR A COMPLETE AND WORKING SYSTEM.
24. WHERE SUBMITTED EQUIPMENT REQUIRES REVISION TO OVERCURRENT PROTECTION, CONDUIT OR WIRING, MAKE
CHANGES IN ACCORDANCE WITH APPLICABLE CODES.
ELECTRICAL DEMOLITION NOTES
1. THE FACILITY WILL REMAIN OCCUPIED DURING RENOVATIONS.
2. EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE DEMOLISHED; EQUIPMENT SHOWN IN LIGHT SOLID LINE TYPE
ARE EXISTING TO REMAIN, UNLESS OTHERWISE NOTED.
3. EXISTING EQUIPMENT SHOWN ARE BASED ON FIELD SURVEYS AND RECORD DRAWINGS PROVIDED BY THE OWNER, AND IS
NOT NECESSARILY ALL INCLUSIVE IN EVERY AREA AS FAR AS EXISTING ELECTRICAL EQUIPMENT. EXISTING CIRCUITING SHOWN IS BASED ON RECORD DRAWINGS AND THE SURVEYED PANEL DIRECTORIES, WHERE THEY WERE AVAILABLE. THE ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE CONDITIONS SHOWN ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING EQUIPMENT, WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK.
FIELD CONDITIONS SHALL GOVERN.
4. PRIOR TO DEMOLITION, FIELD VERIFY CONDUIT AND WIRING WHICH SERVES AREAS OUTSIDE THE SCOPE OF WORK AND
PASSES THROUGH THE AREA OF WORK. MAINTAIN CONTINUITY OF SYSTEMS.
5. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED. OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE NOT BEING USED IN THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION. PROPERLY AND LEGALLY DISPOSE OF ALL EQUIPMENT AND MATERIALS BEING REMOVED.
6. WHERE EXISTING EQUIPMENT ARE INDICATED TO BE DEMOLISHED, REMOVE ASSOCIATED CONDUIT AND WIRING BACK TO
SOURCE PANEL.
7. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE PHASING WITH CONSTRUCTION MANAGER AND OWNER PRIOR TO DEMOLITION WHICH MAY RESULT IN INTERRUPTION OF POWER.
8. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENT OF AREA REQUIRING DEMOLITION AND ADDITIONAL INFORMATION ON ELECTRICAL DEMOLITION WITHIN THAT AREA. DISCONNECT ELECTRICAL SERVICE TO ALL EQUIPMENT BEING REMOVED. DEMOLITION SHALL BE PHASED AS REQUIRED BY DIVISION 1, OR DIRECTED BY THE OWNER.
9. REMOVE ALL CONDUIT LEFT EXPOSED BY REMOVAL OF WALLS AND CEILINGS IN REMODELED OR RENOVATED AREA. CAP BOTH ENDS OF REMAINING CONDUIT IN WALL OR FLOOR WHERE CUT. REMOVE ALL ASSOCIATED SUPPORTS. REMOVE WIRING
BACK TO SOURCE OF VOLTAGE.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR.
11. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND OBTAIN
CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.
12. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS DIAGRAMMATIC IN NATURE. FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL ITEMS SCHEDULED TO BE DEMOLISHED AND PERFORM THE
WORK AS INTENDED AND DEPICTED ON THE DRAWINGS.
13. UPDATE ALL EXISTING ELECTRICAL EQUIPMENT NAMEPLATES AND DIRECTORIES AS NECESSARY TO REFLECT FINAL AS-BUILT
CONDITIONS AT THE END OF CONSTRUCTION.
14. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED AREA. NOTIFY OWNER WHEN
ITEMS ARE READY TO BE REMOVED.
15. COORDINATE ANY ALTERATION AND CHANGES TO THE ELECTRICAL SERVICE WITH THE LOCAL UTILITY COMPANY AND THE
OWNER PRIOR TO COMMENCEMENT OF WORK.
16. SCHEDULE ALL POWER INTERRUPTION WITH OWNER FOR EXACT DATE, TIME AND DURATION. PROVIDE A MINIMUM OF 72 HOURS NOTICE PRIOR TO DISCONNECTING ANY POWER TO ANY PORTION OF THE BUILDING, AND MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO COMMENCEMENT OF
WORK.
17. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT AREA. IT IS INTENDED TO PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE A/E. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED ELECTRICAL DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT.
18. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC. ANY EXISTING CONDUIT IS INSTALLED BELOW THE HEIGHT OF THE NEW CEILING SHALL BE RELOCATED TO ABOVE THE NEW CEILING HEIGHT.
19. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO THE END OF CONSTRUCTION.
20. UPDATE PANELBOARD DIRECTORIES WHICH ARE MODIFIED BY THIS PROJECT.
21. REPAIR DISTURBED AREAS TO MATCH EXISTING CONDITIONS
D1.
D2.
D3.
D4.
D5.
D6.
D7.
D8.
D9.
D10.
D11.
D12.
D13.
D14.
D15.
D16.
D17.
D18.
D19.
D20.
D21.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:3
:3
A
M
E-002
ELECTRICAL GENERAL NOTES VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 JFR KEM
100% BID DOCUMENTS
STEEL STEM PENDANT
SINGLE-BOLT, TWO PIECE
CONDUIT/CHANNEL
STRAPS
CONDUIT
UNISTRUT
910mm (3'-0") MAX.
FRONT ELEVATIONSIDE ELEVATION SIDE ELEVATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:3
:3
A
M
E-501
ELECTRICAL DETAILS VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 JFR KEM
100% BID DOCUMENTS
N.T.S.
MCC EQL1
1N.T.S.
MCC EQL3
3N.T.S.
PP-EQL6
CODED NOTES:
DRAWING NOTES:
1. REFER TO EQUIPMENT SCHEDULES SHEET E-601 FOR ELECTRICAL CONNECTION INFORMATION
REPLACE EXISTING FEEDER BUCKET WITH NEW TO SERVE VACUUM PUMP. REFER TO EQUIPMENT
SCHEDULE SHEET E-601 FOR CIRCUIT BREAKER AMPERE RATING.
2 REPLACE EXISTING BUCKET SPACE WITH NEW FEEDER BUCKET TO SERVE TEMPORARY VACUUM PUMP.
REFER TO EQUIPMENT SCHEDULE SHEET E-601 FOR CIRCUIT BREAKER AMPERE RATING.
12" = 1'-0"2
CONDUIT HANGER DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/2
/2
:3
:3
A
M
E-601
ELECTRICAL DIAGRAMS VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 JFR KEM
100% BID DOCUMENTS
EQUIPMENT SCHEDULE
EQUIPMENT NAME IDENTIFICATION HP FLA MCA
VOLT / PH / LOAD
(VA) MOCP
CB
AMPS PANEL CKT # FEEDER SIZE CONDUIT
MOTOR
STARTING DISC MEANS COMMENTS
TEMPORARY VACUUM
PUMP
TEMP VP (LL215) (3) 10 36.6 480 V/3-25429 VA 70A 70A PP-EQL6 13 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL
TEMPORARY VACUUM
PUMP
TEMP VP (LL658) (3) 10 36.6 480 V/3-25429 VA 70A 70A MCC-EQL3 13 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL
TEMPORARY VACUUM
PUMP
TEMP VP (LL528) (3) 10 36.6 480 V/3-25429 VA 70A 70A MCC-EQL1 9 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL
VACUUM PUMP VP-1,2,3 (3) 5.4 20.1 480 V/3-16703 VA 30A 30A PP-EQL6 12 (3) #10 #10 GND 3/4 INTEGRAL INTEGRAL
VACUUM PUMP VP-4,5,6 (3) 7.5 30.6 480 V/3-25429 VA 70A 70A MCC-EQL3 7 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL
VACUUM PUMP VP-7,8,9 (3) 10 36.6 480 V/3-30415 VA 70A 70A MCC-EQL1 1 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL
1. PROVIDE NEW CIRCUIT BREAKER
BRANCH CIRCUIT NOTES:
Total Est. Demand... 127 A
Total Conn. Current: 108 A
Total Est. Demand: 105766 VA
Total Conn. Load: 89698 VA
Motor 50857 VA 112.50% 57214 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
108 A
89698 VA
14 EX. SPACE 1 -- --
13 TEMP VACUUM PUMP (NOTE 1) 3 70 A 25.4 kVA
12 EX. EF-3 ON ROOF 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE
11 EX. EF-1 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE
10 EX. EF-2 ON ROOM 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE
9 EX. SPARE 3 20 A 0.0 kVA
8 EX. CP-3 3 25 A 12.6 kVA
7 MED VACUUM/VP-4,5,6 3 70 A 25.4 kVA
6 EX. SPARE 3 20 A 0.0 kVA
5 EX. AH 1042 MECH ROOM 1863 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE
4 EX. P-45 3 20 A 4.0 kVA
3 EX. P-44 3 20 A 4.0 kVA
2 EX. P-43 3 20 A 9.1 kVA
1 EX. P-42 3 20 A 9.1 kVA
CKT Circuit Description # of
Poles Trip Rating Load Remarks
PANEL INFORMATION: MANUFACTURED BY SIEMENS
GENERAL NOTES:
Enclosure: NEMA 1 Neutral Rating: 100.00%
Mounting: FLOOR Wires: 3 Mains Rating: 600 A
Supply From: Phases: 3 Mains Type: MLO
Location: Space LL658 Volts: 480 Delta A.I.C. Rating: 22000
EX. MOTOR CONTROL CTR: MCC-EQL3
1. REPLACE EXISTING CIRCUIT BREAKER WITH NEW.
2. PROVIDE NEW CIRCUIT BREAKER.
BRANCH CIRCUIT NOTES:
Total Est. Demand... 224 A
Total Conn. Current: 185 A
Total Est. Demand: 186255 VA
Total Conn. Load: 154090 VA
Motor 55844 VA 113.62% 63447 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
185 A
154090 VA
14 EX. VP-10,11 3 70 A 23.1 kVA
13 EX. Spare 3 20 A 0.0 kVA
12 EX. Spare 3 20 A 0.0 kVA
11 EX. Spare 3 20 A 0.0 kVA
10 EX. Spare 3 20 A 0.0 kVA
9 TEMP VACUUM PUMP (NOTE 2) 3 50 A 25.4 kVA
8 EX. DENTAL AC 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE
7 EX. PUMP STATION NO. 1 3 60 A 64.4 kVA
6 EX. SPARE 3 20 A 0.0 kVA
5 EX. SPARE 3 20 A 0.0 kVA
4 EX. SPARE 3 20 A 0.0 kVA
3 EX. REF COMPRESSOR 3 60 A 2.8 kVA
2 EX. CP-1 3 15 A 7.9 kVA
1 VP-7,8,9 (NOTE 1) 3 70 A 30.4 kVA
CKT Circuit Description # of
Poles Trip Rating Load Remarks
PANEL INFORMATION: MANUFACTURED BY SIEMENS
GENERAL NOTES:
Enclosure: NEMA 1 Neutral Rating: 100.00%
Mounting: FLOOR Wires: 3 Mains Rating: 600 A
Supply From: Phases: 3 Mains Type: MLO
Location: Space LL528 Volts: 480 Delta A.I.C. Rating: 50000
EX. MOTOR CONTROL CTR: MCC-EQL1
1. REPLACE EXISTING CIRCUIT BREAKER WITH NEW.
2. PROVIDE NEW CIRCUIT BREAKER.
BRANCH CIRCUIT NOTES:
Total Est. Demand... 401 A
Total Conn. Current: 325 A
Total Est. Demand: 333357 VA
Total Conn. Load: 270026 VA
Motor 42132 VA 115.09% 48489 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
325 A
270026 VA
14 EX. SPACE 3 -- --
13 TEMP VACUUM PUMP (NOTE 2) 3 70 A 25.4 kVA
12 VP-1,2,3 (NOTE 1) 3 70 A 16.7 kVA
11 EX. SPARE 3 100 A 0.0 kVA
10 EX. SPARE 3 100 A 0.0 kVA
9 EX. SPARE 3 40 A 0.0 kVA
8 EX. UPS STANDBY 3 175 A 123.8 kVA
7 EX. SPARE 3 125 A 0.0 kVA
6 EX. AHU-0065 3 50 A 22.3 kVA
5 EX. PUMP STA. NO. 2 3 100 A 11.9 kVA
4 EX. SPARE 3 20 A 0.0 kVA
3 COMPRESSOR COLD RM. LL272 3 20 A 6.3 kVA
2 EX. ELEV NO. 7 3 125 A 63.6 kVA
1 EX. CIRCUIT 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE
CKT Circuit Description # of
Poles Trip Rating Load Remarks
PANEL INFORMATION: MANUFACTURED BY SEIMENS, TYPE S4
GENERAL NOTES:
Enclosure: NEMA 1 Neutral Rating: 100.00%
Mounting: WALL Wires: 3 Mains Rating: 600 A
Supply From: Phases: 3 Mains Type: MLO
Location: Volts: 480 Delta A.I.C. Rating: 22000
EX. DISTRIBUTION PANEL: PP-EQL6
J
J
LL658
15 1414.6 14.3 13.8 13.4 13 12.9 12.5 12
A
B
C
D
D.8
RX
VP-4,5,6
MCC-EQL3
EX
D1
D2
EX
AHU
TEMP
VP
LL658
15 1414.6 14.3 13.8 13.4 13 12.9 12.5 12
A
B
C
D
D.8
VP-4,5,6
MCC-EQL3
EX
EX
AHU
TEMP
VP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /M ic h ig a n
D e tr o it V
A /0
V A
M C
D e t.
R e p l.
V a c .P u m p
R
E P
.r v t
/1
/2
:5
:5
P
M
EP101
LOWER LEVEL PLANS - LL658 -
ELEC. EQUIPMENT- NEW & DEMO
VAMC Detroit Replace Vacuum Pump
DETROIT VA
553-22-201
5/26/2023 JFR KEM
100% BID DOCUMENTS
CODED NOTES-DEMO WORK:
DRAWING NOTES:
1. REFER TO EQUIPMENT SCHEDULES SHEET E-601 FOR ELECTRICAL CONNECTION INFORMATION.
2. REFER TO SHEET E-501 FOR PICTURES OF MOTOR CONTROL CENTER.
PRIOR TO REMOVAL OF VACUUM PUMP 4,5,6, ROUTE CONDUIT AND WIRE FROM
TEMPORARY VACUUM PUMP TO AVAILABLE SPARE BREAKER IN EXISTING MCC-EQL3.
REFER TO PANEL SCHEDULES FOR LOCATION.
DE ENERGIZE, DISCONNECT AND REMOVE WIRE BACK TO CLOSEST UPSTREAM JUNCTION
BOX. EXISTING CONDUIT AND WIRING SHALL BE REUSED FOR NEW WORK.
D1
N 0 4' 8' 16' 24'
1/8" = 1'-0"
1/8" = 1'-0"2
LOWER LEVEL PLAN - LL658 - ELECTRICAL EQUIPMENT - DEMO - PHASE 1
KEY PLAN
LL528 LL658
LL215
1/8" = 1'-0"1
LOWER LEVEL PLAN - LL658 - ELECTRICAL EQUIPMENT - NEW - PHASE 1
CODED NOTES-NEW WORK:
D2
PRIOR TO REMOVAL OF TEMPORARY VACUUM, REROUTE AND RECONNECT EXISTING CIRCUIT TO
NEW VACUUM PUMP TO MATCH EXISTING.
AFTER INSTALLATION OF NEW VACUUM PUMP, DE ENERGIZE, DISCONNECT AND REMOVE WIRE AND
CONDUIT FOR TEMP VACUUM PUMP BACK TO SOURCE PANEL.
J
E
232425
22.222.722.923.523.824.424.6
C
D
B
A
D.8
A
B
C
D
D.8
Room
LL528
RX
VP-7,8,9
EX. EX.
MCC-EQL1 EX. MCC-L1
D2
D1
EX
AHU
TEMP
VP
E
232425
22.222.722.923.523.824.424.6
C
D
B
A
D.8
A
B
C
D
D.8
Room
LL528
EX. EX.
MCC-EQL1 EX. MCC-L1
TEMP
VP
EX
AHU
VP-7,8,9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Off…