This is a set of architectural, mechanical, electrical and plumbing design drawings for replacing vacuum pumps at the John D. Dingell VA Medical Center in Detroit, Michigan (Project #553-22-201). The drawings detail the phased replacement of nine medical vacuum pumps located in three lower level mechanical rooms (LL215, LL528, and LL658).

The drawings include specifications for temporary vacuum pump systems to maintain operations during construction, detailed demolition and new work plans, equipment schedules, and installation details. Key equipment includes three triplex vacuum pump systems: VP-1,2,3 (5.4 HP each), VP-4,5,6 (7.5 HP each), and VP-7,8,9 (10 HP each), all operating on 480V/3-phase power. The work requires coordination of mechanical, electrical and plumbing systems, with specific requirements for pipe labeling, testing, and electrical connections. The drawings show existing concrete pads will be reused for the new equipment installation. Details are provided for conduit installations, equipment connections, and system controls including integration with the facility's master alarm panels.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Replace Vacuum Pumps 553-22-201 - 0002, newest first.
File Type Posted
RFI Responses - 553-22-201.docx DOCX document
36C25025B0016 0002.docx DOCX document
36C25025B0016 0001.docx DOCX document
Bid Schedule 553-22-201 Replace Vacuum Pumps.pdf PDF
S04 - Pre Bid Site Visit Attendance Log - 553-22-201.doc.pdf PDF
S02 RFI Form - 553-22-201.pdf PDF
S02 Wage Determination - MI20250101 02 21 2025 - 553-22-201.pdf PDF
S02 Final Specifications - 553-22-201.pdf PDF
S02 EMR Certification Form - 553-22-201.pdf PDF
36C25025B0016_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROGRESS PRINT

NOT FOR CONSTRUCTION

PROGRESS PRINT

NOT FOR CONSTRUCTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED

Department of Veterans Affairs Medical Center

ABOVE GROUP, INC.

MECHANICAL ELECTRICAL PLUMBING

305 EAST DRIVE, SUITE H

MELBOURNE, FL 32904

321.345.9026 P

NOT FOR CONSTRUCTION

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

B

IM

/0

R e p la c e

F ir e

P u m p

C o n tr o lle r D e s ig n /0

R e p la c e

F ir e

P u m p C o n tr o lle r

R

E

.r v t

/1

/2

:2

:1

P

M

8/17/2022 12:23:12 PM8/17/2022 12:23:12 PM

G-000

COVER SHEET VAMC Detroit Replace Vacuum Pump

DETROIT, MICHIGAN

553-22-201

05/25/2023 MJD MJD

REPLACE VACUUM PUMPS

PROJECT #: 553-22-201

SHEET LIST

SHEET NUMBER SHEET NAME

G-000 VA COVER SHEET

E-001 ELECTRICAL LEGENDS & SYMBOLS

E-002 ELECTRICAL GENERAL NOTES

EP101 ELECTRICAL 1ST FLR PLAN & BASEMENT PLAN - BOILER RM

PROJECT LOCATION

© Google Maps

Revisions Date www.abovegroupinc.com COA/CA Lic. No. 31120

305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

ARCHITECTURE PLANNING INTERIOR DESIGN

524 FERNWOOD AVENUE

ALTAMONTE SPRINGS, FLORIDA 32701

407.830.6522 P

937.461.0260 F

RDC / JOHN POE ARCHITECTS

ABOVE GROUP

ENGINEERING

70 BIRCH ALLEY, SUITE 240

BEAVERCREEK, OHIO 45440

G-000

100% BID DOCUMENTS

ST

A

T E O F F L O R

ID

A

RE

G

IS

T E R E D A R C H

IT

EC

T

ROGE

R A R E P

ST

IEN

A R

STAMP

MEDICAL CENTER DIRECTOR

VA APPROVAL

DATE

DATEASSOCIATE MEDICAL CENTER DIRECTOR

DATECHIEF, FACILITY MANAGEMENT SERVICES

DATEASSISTANT CHIEF, FMS

DATESAFETY AND OCCUPATIONAL HEALTH MANAGER

DATEENERGY MANAGER

B ru sh S t

E Hancock St

Joh n R

S t

W oo d w ard A ve

C a s s A ve

E Canfield St

S t A n to in e

Mack Ave

In terstate 7

E W arre n Ave

Department of Veteran Affairs Medical Campus

N

VICINITY MAP

102 101

Brush St

John R St

E C a n fie ld S t

E H a n c o c k S t

Building Key:

100 MAIN HOPSITAL

101 SOUTH PARKING GARAGE

- SOUTH GENERATING STATION

102 NORTH PARKING GARAGE

103 ENERGY CENTER

G-000 P-001

PD101

PG101

P-501 P-601 E-001 E-002

EP101

EP102

EP103

EP104

E-501 E-601

COVER SHEET

PLUMBING NOTES, LEGENDS, & SYMBOLS

LOWER LEVEL PLAN - MED GAS - DEMO

LOWER LEVEL PLAN - MED GAS - NEW WORK

PLUMBING SCHEDULES & DETAILS

PLUMBING ISOMETRICS

ELECTRICAL LEGENDS & SYMBOLS

ELECTRICAL GENERAL NOTES

LOWER LEVEL PLANS - LL658 - ELEC. EQUIPMENT- NEW & DEMO

LOWER LEVEL PLANS - LL528 - ELEC. EQUIPMENT - NEW & DEMO

LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - DEMO

LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - NEW

ELECTRICAL DETAILS

ELECTRICAL DIAGRAMS

DRAWING INDEX

1. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS INDICATED IN DETAILS AND/OR RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING

AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE

ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT

REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR

OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL

GOVERN.

2. PROVIDE PIPE MARKER FOR ALL PIPING ABOVE THE CEILING SPACES IN ACCORDANCE WITH DIVISION

22 SPECIFICATION SECTION. "IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT".

3. LABEL VALVES ABOVE CEILINGS AND IN CONCEALED SPACES AT CEILING TILE WITH METAL CEILING TACKS INDICATING VALVE # AND TYPE OF WATER. (i.e.; BLUE= COLD WATER, LETTERING CW

VLV1-001).

4. FIRE CAULK AND SLEEVE PENETRATIONS THROUGH FIRE RATED ASSEMBLIES. REFER TO LIFE SAFETY PLANS FOR RATED ASSEMBLY LOCATIONS. REFER TO ARCHITECTURAL SHEETS FOR DETAILS AND UL

ASSEMBLY NUMBERS.

5. COORDINATE CEILING PIPING AND ELEVATIONS IN SHOP DRAWINGS WITH ALL OTHER TRADES (I.E.

HVAC, FIRE PROTECTION, ELECTRICAL, TELECOMM, STRUCTURAL, ETC.) PRIOR TO ANY INSTALLATION

TO ENSURE PROPER CLEARANCES AND PENETRATIONS.

6. VALVES AND FITTINGS SHALL BE THE SAME SIZE AS THE PIPING WHERE THEY ARE LOCATED UNLESS

NOTED OTHERWISE.

7. PROVIDE ALL NECESSARY SUPPORTING DEVICES FOR FIXTURES PER MANUFACTURER INSTALLATION

INSTRUCTIONS.

8. ALL AUTOMATIC CONTROL, PROTECTIVE OR SIGNAL DEVICES REQUIRED FOR THE OPERATION SPECIFIED, SHALL BE PROVIDED WITH ANY CONTROL WIRING AND INSTALLED PER MANUFACTURERS

REQUIREMENTS.

9. SHOP DRAWING SUBMITTALS SHALL BE FULLY COORDINATED PRIOR TO SUBMITTAL.

10. PROVIDE TEMPORARY PUMP SYSTEM AND PIPING FOR EACH PHASE OF CONSTRUCTION TO MINIMIZE

SYSTEM DOWNTIME AND REMAIN OPERATIONAL. CONTRACTOR SHALL COORDINATE ANY REQUIRED

SHUT-DOWNS WITH COR PRIOR TO START OF DEMOLITION. REFER TO SHEET PD101 FOR ADDITIONAL

REQUIREMENTS.

PLUMBING ABBREVIATIONSPLUMBING SYMBOL LEGEND

SYMBOL DESCRIPTION

NOTE: SOME SYMBOLS SHOWN ON THIS LEGEND MAY NOT PERTAIN TO THIS PROJECT

MEDICAL VACUUM EXHAUST PIPINGMVE

110° HOT WATER PIPINGHW

HOT WATER RETURN PIPINGHWR

STO STORM OVERFLOW (SECONDARY)

ST STORM (PRIMARY)

SANITARY DRAINAGE PIPING (UNDERGROUND)S U/G

SANITARY DRAINAGE PIPING (ABOVE SLAB)SAN

V VENT PIPING

GATE VALVE

PRESSURE GAUGE

CHECK VALVE

BALL VALVE

CIRCULATING PUMP

PIPE END CAP

PIPE TURNING DOWN

PIPE TURNING UP

PIPE TURNING DOWN (TEE)

MEDICAL VACUUM PIPING

CLEANOUTS

CW COLD WATER PIPING

CD CONDENSATE PIPING

CIRCUIT SETTER VALVE

OR

PDI-"A" WATER HAMMER ARRESTER & SIZE

THERMOSTATIC MIXING VALVE

HB-1 OR WHY-1 HOSE BIBB / WALL HYDRANT

FLOW ARROW

P-TRAP

ROLL DOWN

PIPING TEE

ST U/G STORM PIPING (UNDERGROUND)

MV

PRESSURE REGULATING VALVE

BUTTERFLY VALVE

A

B

SIM

A

SECTION SYMBOL:

A = IDENTIFYING LETTER

B = SHEET WHERE SECTION IS SHOWN

SIM =

(ONLY NOTED IF IT APPLIES)

PLUMBING RISER DESIGNATION:

A = RISER IDENTIFYING SYSTEM TYPE

1 =

REVISION CLOUD AND

REVISION NUMBER

SHEET NOTE CALLOUT

A TITLE SYMBOL ON SHEET WHERE SHOWN

A = IDENTIFYING NUMBER/LETTER

RISER IDENTIFYING SYSTEM NUMBER

SIMILAR

ABBR. DESCRIPTION ABBR. DESCRIPTION

PLUMBING GENERAL NOTES

WATER HAMMER ARRESTOR

SYMBOL

1/2"

PIPE SIZE PDI STANDARD FIXTURE UNIT CAP.

3/4"

1"

1-1/4"

A

B

C

D

1 TO 11

12 TO 32

33 TO 60

61 TO 113

DEMOLISH TO POINT INDICATED

CONNECT TO EXISTING

DEMOLISHED PIPING

EXISTING PIPING

NEW PIPING

AS ABOVE SLAB

ADA AMERICANS WITH DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AP ACCESS PANEL

ASTM AMERICAN STANDARDS TESTING MATERIALS

AWWA AMERICAN WATER WORKS ASSOCIATION

BFP BACKFLOW PREVENTER

BS BELOW SLAB

BF BELOW FLOOR

BG BELOW GRADE

CA COMPRESSED AIR

CD CONDENSATE

CO CLEANOUT

CONN CONNECTION

CONT CONTINUOUS

CP CIRCULATING PUMP

CW COLD WATER

DF DRINKING FOUNTAIN

DFU DRAINAGE FIXTURE UNITS

DIA DIAMETER

DN DOWN

DWG DRAWING

DW DOMESTIC WATER

ECO EXTERIOR CLEANOUT

ELEV ELEVATION

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EX EXISTING

ºF DEGREES FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FIN FINISH

FL FLOOR

FPS FEET PER SECOND

FT FEET

FU FIXTURE UNITS

G NATURAL GAS

GAL GALLON(S)

GPM GALLONS PER MINUTE

GR GREASE WASTE

HB HOSE BIBB

HP HORSEPOWER

HR HOUR

HW HOT WATER

HWR HOT WATER RETURN

HZ HERTZ

IE INVERT ELEVATION

ID INTERNAL DIAMETER

IN INCHES

IPS INTERNATIONAL PIPE STANDARD

IRR IRRIGATION WATER

KW KILOWATT

LAV LAVATORY

LF LINEAR FEET

MAX MAXIMUM

MIN MINIMUM

MNTG MOUNTING

MS MOP SINK

MV MEDICAL VACUUM

MVE MEDICAL VACUUM EXHAUST

NA NOT APPLICABLE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NSF NATIONAL SANITATION FOUNDATION

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

ORWL OVERFLOW RAIN WATER LEADER

PDI PLUMBING DRAINAGE INSTITUTE

PH PHASE

PPP PRECISION PLUMBING PRODUCTS

PSI POUNDS PER SQUARE INCH

RD ROOF DRAIN

RPM REVOLUTIONS PER MINUTE

RWL RAIN WATER LEADER

RX REMOVE EXISTING

S SANITARY

SAN SANITARY

SH SHOWER

SK SINK

SL SODA LINE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

ST STORM

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TET THERMAL EXPANSION TANK

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U/G UNDERGROUND

UNO UNLESS NOTED OTHERWISE

UR URINAL

V VENT

VA DEPARTMENT OF VETERANS AFFAIRS

VTR VENT THROUGH ROOF

VIV VALVE IN VERTICAL

VLV VALVE

VOL VOLUME

W WATTS

W/ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WHA WATER HAMMER ARRESTOR

WHY WALL HYDRANT

WFU WATER SUPPLY FIXTURE UNITS

APPLICABLE CODES

1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):

A. COMPRESSED GASES AND CRYOGENIC FLUIDS CODE, NFPA 55 2020 EDITION

B. NATIONAL ELECTRICAL CODE (NEC) 2020 EDITION

C. HEALTH CARE FACILITIES CODE (NFPA 99) 2021 EDITION

D. LIFE SAFETY CODE (NFPA 101) 2021 EDITION

2. VA PLUMBING DESIGN MANUAL 2021 EDITION

3. VA SEISMIC DESIGN REQUIREMENTS 2019 EDITION

4. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

5. AMERICANS WITH DISABILITIES ACT (ADA)

6. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)

7. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER

SYMBOL DESCRIPTION

CONTROL VALVE

BUTTERFLY VALVE

CALIBRATING BALANCING VALVE

BALL VALVE

STRAINER

UNION

THERMOMETER

PSI REG.

FLOW SWITCH

CHECK VALVE

THREE-WAY CONTROL VALVE

FLEX CONNECTION

RELIEF VALVE

VALVE ON RISER

TEST PLUG

GLOBE VALVE

PSI REG.

FLOW SWITCH

PRESSURE SWITCH

AUTOMATIC AIR VENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:4

:5

P

M

P-001

PLUMBING NOTES, LEGENDS, &

SYMBOLS

VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 KDB WRH

100% BID DOCUMENTS

SHEET LIST

SHEET NUMBER SHEET NAME

P-001 PLUMBING NOTES, LEGENDS, & SYMBOLS

PD101 LOWER LEVEL PLAN - MED GAS - DEMO

PG101 LOWER LEVEL PLAN - MED GAS - NEW WORK

P-501 PLUMBING SCHEDULES & DETAILS

P-601 PLUMBING ISOMETRICS

Revisions Date

LL215

19 18

P.4

Q

R

RX

VP-1,2,3

EX 3" MVEX 3" MVE

1 TEMP

VP

RX 3" MVE

RX 3" MV

RX 3" MVE (TYP)

EX-FD EX

CP-1

A

B

C

D

D.8

LL528

EX 4" MV

EX 6" MVE

EX

TANK

EX

AHU

RX

VP-7,8,9

1 TEMP

VP

RX 6" MVE

RX 4" MV

RX 4" MVE RX 2" MVE

EX-FD

LL658

1414.3 13.8 13.4

13 12.9 12.5

A

B

C

D

D.8

RX

VP-4,5,6EX 5" MVE

EX 3" MV

EX

AHU

TEMP

VP

RX 5" MVE

RX 3" MV

EX-FD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/1

/2

:5

:5

P

M

PD101

LOWER LEVEL PLAN - MED GAS -

DEMO

VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 KDB WRH

100% BID DOCUMENTS

CODED NOTES:

PROPOSED LOCATION FOR TEMPORARY VACUUM PUMP. THE TEMPORARY SYSTEM SHALL BE

CONNECTED TO THE EXISTING HEADER, AS SHOWN ON PG101, TO ALLOW FOR THE REMOVAL OF THE EXISTING VACUUM PUMP SYSTEM SERVING THIS AREA. THE TEMPORARY VACUUM PUMP SYSTEM SHALL BE DISCONNECTED AND RELOCATED TO THE NEXT PHASE UPON COMPLETION OF NEW VACUUM PUMP INSTALLATION. A SINGLE TEMPORARY VACUUM PUMP SYSTEM SHALL BE UTILIZED FOR THE DURATION OF THE PROJECT. REFER TO SHEET PG101 FOR TEMPORARY PIPING ROUTES. REFER TO TEMP VACUUM

PUMP SYSTEM SCHEDULE FOR A BASIS OF DESIGN.

CONCRETE PAD EXISTING TO REMAIN.

MANUFACTURER'S RECOMMENDED CLEARANCE.

N 0 2' 4' 8' 12'

1/4" = 1'-0"

1/4" = 1'-0"3

LOWER LEVEL PLAN - LL215 - MED GAS - DEMO - PHASE 3

1/4" = 1'-0"2

LOWER LEVEL PLAN - LL528 - MED GAS - DEMO - PHASE 2

1/4" = 1'-0"1

LOWER LEVEL PLAN - LL658 - MED GAS - DEMO - PHASE 1

KEY PLAN

LL528 LL658

LL215

DRAWING NOTES:

1. THE PROJECT SHALL BE COMPLETED IN 3 PHASES: PHASE 1 SHALL BE TO REPLACE THE EXISTING MEDICAL VACUUM PUMP SYSTEM IN LL658, PHASE 2 SHALL BE TO REPLACE THE EXISTING MEDICAL VACUUM PUMP SYSTEM IN LL528, AND PHASE 3 SHALL BE TO REPLACE THE EXISTING MEDICAL VACUUM PUMP SYSTEM IN LL215. THE EXISTING VACUUM PUMP SHALL BE DISCONNECTED, AND THE

TEMPORARY PIPING CONNECTED FOR OPERATION. THE TEMPORARY SYSTEM SHALL BE

DISCONNECTED UPON COMPLETION OF THE NEW MEDICAL VACUUM SYSTEM INSTALLATION AND

RELOCATED FOR THE NEXT PHASE. THE EXISTING HOUSEKEEPING PADS AND MEDICAL VACUUM

HEADERS ARE ANTICIPATED TO BE UTILIZED FOR THE NEW MEDICAL VACUUM SYSTEMS. REFER TO SPECIFICATION 22 05 11 COMMON WORK RESULTS FOR PLUMBING PARAGRAPH, TEMPORARY PIPING

AND EQUIPMENT.

2. EXISTING VACUUM SYSTEM SHALL BE DISMANTLED AND REMOVED IN MULTIPLE SECTIONS CAPABLE OF BEING SAFELY REMOVED THROUGH A 36" WIDE DOOR OPENING. IF DOOR REMOVAL IS REQUIRED, COORDINATE REMOVAL WITH COR.

LL215

19 18

P.4

Q

R

VP-1,2,3

3" MVE

3" MVE

EX 3" MVEX 3" MVE

1 TEMP

VP

3" MVE

3" MV

EX

CP-1

EX-FD

3/4" CD

3/4" CD

A

B

C

D

D.8

LL528

EX 4" MV

EX 6" MVE

VP-7,8,9

3" MVE

6" MVE

EX

TANK

EX

AHU

1 TEMP

VP

4" MV 3/4" CD

EX-FD

3/4" CD

6" MVE

4" MV

LL658

1414.3 13.8 13.4 13 12.9 12.5

A

B

C

D

D.8

VP-4,5,6

EX 5" MVE

EX 3" MV

EX

AHU

1 TEMP

VP

5" MVE

9 3" MV

EX-FD

3/4" CD

3" MV

3/4" CD

3" MV

5" MVE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:4

:3

P

M

PG101

LOWER LEVEL PLAN - MED GAS -

NEW WORK

VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 KDB WRH

100% BID DOCUMENTS

CODED NOTES:

PROPOSED LOCATION FOR TEMPORARY VACUUM PUMP TO ALLOW FOR THE REPLACEMENT OF THE

VACUUM PUMP SYSTEM SERVING THIS AREA. THE TEMPORARY VACUUM PUMP SYSTEM SHALL BE

DISCONNECTED AND RELOCATED TO THE NEXT PHASE UPON COMPLETION OF NEW VACUUM PUMP

INSTALLATION. A SINGLE TRIPLEX TEMPORARY VACUUM PUMP SYSTEM SHALL BE UTILIZED FOR THE DURATION OF THE PROJECT. REFER TO TEMP VACUUM PUMP SYSTEM SCHEDULE FOR BASIS OF DESIGN.

LOCATE NEW VACUUM PUMP ON EXISTING CONCRETE PAD.

EXISTING CONCRETE PAD.

MANUFACTURER'S RECOMMENDED CLEARANCE.

AFTER CONSTRUCTION IS COMPLETE. REMOVE TEMPORARY PIPING AND CAP VALVE FOR FUTURE

TEMPORARY SYSTEM SERVICES.

PROVIDE VALVE AND FLEXIBLE CONNECTION FOR EQUIPMENT CONNECTION. REFER TO DETAIL 1 / P-501

FOR MORE INFORMATION.

TEMPORARY PIPING ROUTED TO EXISTING MEDICAL VACUUM PIPING.

TEMPORARY PIPING ROUTED TO EXISTING MEDICAL VACUUM EXHAUST PIPING.

CONNECT NEW SINGLE TRIPLEX VACUUM PUMP SYSTEM TO EXISTING HEADER.

TEMPORARY DRAIN PIPING ROUTED TO NEAREST FLOOR DRAIN.

N 0 2' 4' 8' 12'

1/4" = 1'-0"

1/4" = 1'-0"1

LOWER LEVEL PLAN - LL215 - MED GAS - NEW WORK - PHASE 3

1/4" = 1'-0"2

LOWER LEVEL PLAN - LL528 - MED GAS - NEW WORK - PHASE 2

1/4" = 1'-0"3

LOWER LEVEL PLAN - LL658 - MED GAS - NEW WORK - PHASE 1

KEY PLAN

LL528 LL658

LL215

DRAWING NOTES:

1. VACUUM SYSTEM SHALL BE SHIPPED IN MULTIPLE SKIDS CAPABLE OF BEING DELIVERED THROUGH A 36" WIDE DOOR OPENING. UNITS SHALL BE RECEIVED AT THE LOADING DOCK AND DELIVERED TO THE

MECHANICAL ROOMS THROUGH 36" WIDE DOORS. IF DOOR REMOVAL IS REQUIRED, COORDINATE

INSTALLATION WITH COR. VACUUM SYSTEM SHALL BE ASSEMBLED IN MECHANICAL ROOM FOR

OPERATION BY INSTALLING CONTRACTOR.

2. CONTRACTOR SHALL FIELD VERIFY EXISTING EXHAUST PIPE LENGTH FOR EACH SYSTEM DOES NOT

EXCEED MANUFACTURER'S RECOMMENDATIONS. IF MAXIMUM PIPE LENGTH IS EXCEEDED,

CONTRACTOR SHALL REPLACE PIPING AND SIZE PER MANUFACTURER'S RECOMMENDATIONS.

EXHAUST TERMINATION SHALL BE 25 FT. MIN. FROM OUTSIDE AIR OPENINGS, TURNED DOWN, AND

SCREENED PER NFPA 99 5.1.3.7.7.

DETAIL NOTES:

MEDICAL VACUUM

FLOW DIRECTION LABEL. PROVIDE 360

DEGREE WRAP OVERLAPPING BOTH ENDS OF

THE PIPE FUNCTION LABEL AND MATCHING

THE FLOW DIRECTION OF THE PIPE

CONTENTS.

PIPE FUNCTION LABEL

A.

B.

C.

D.

E.

F.

PROVIDE A PIPE LABEL FOR EACH PIPE FUNCTION.

PROVIDE AT LEAST ONE LABEL ON EACH PIPE FOR EVERY ROOM THE

PIPE PASSES THROUGH.

PROVIDE LABELS IN LARGE SPACES ON MAXIMUM 20' CENTERS FOR

EVERY PIPE UNLESS OTHERWISE NOTED IN THE SPECIFICATIONS.

LABELS TO BE LOCATED IN AN EASILY VISIBLE LOCATION AS THEY

WOULD NORMALLY BE SEEN. IE. ON THE BOTTOM HALF OF PIPES

IN THE AIR AND ON THE TOP HALF OR SIDES OF PIPES MOUNTED LOW.

LABELS SHALL BE, COLOR CODED, PRE-PRINTED, SELF ADHESIVE VINYL.

SEE SPECIFICATION FOR OTHER REQUIREMENTS AND LIST OF PIPE FUNCTIONS.

INSTALL FACTORY

EXHAUST SILENCER LOW VACUUM

SWITCH

VACUUM GAUGE RANGE: 0-30"HG

SHUT-OFF VALVE (TYP.)

INLET FROM FACILITY

FLEX CONNECTION

(TYPICAL)

VACUUM PUMP (TYP.)

DRIP LEG ON EXHAUST OF PUMP

EXISTING RAISED HOUSEKEEPING PAD

STEEL CHANNEL

FRAME

CONTRACTOR SHALL SECURE FRAME TO

EXISTING CONCRETE PAD. NO INERTIA

PAD OR VIBRATION PADS ARE REQUIRED

FOR BASIS OF DESIGN VACUUM SYSTEM.

EXISTING DRAIN

3/4" TANK DRAIN LINE. PROVIDE PIPING SUPPORTS

TO MAINTAIN 1/4" / FT MIN. SLOPE TO FLOOR DRAIN.

TANK DRAIN VALVE

LOCAL CONTROL PANEL WITH AUTOMATIC PUMP

CHANGEOVER

ASME

RECEIVER TANK

CHECK VALVE

(TYP.)

EXISTING MASTER ALARM PANEL LOCATED

IN THE BOILER PLANT CONTROL ROOM.

EXISTING MASTER ALARM PANEL LOCATED

AT 24 HOUR MONITORED LOCATION.

CONTRACTOR

MANUFACTURER

WIRE ALARMS FROM THE LOCAL ALARM PANEL TO THE

EXISTING MASTER ALARM PANELS. REPLACE ALL

DAMAGED WIRING BACK TO THE MASTER ALARM PANEL.

FINISHED FLOOR

VACUUM SWITCH

BELOW NORMAL

LAG PUMP

RUNNING

PUMP 1,2,3 HIGH

TEMP

CONTRACTOR MANUFACTURER

1'-0"

PIPE HANGER

(SEE SPECS.)

GALVANIZED

SHEETMETAL PIPE

SADDLE W/FLARED ENDS

INSULATED PIPE

PIPE HANGER

(SEE SPECS.)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:4

:1

P

M

P-501

PLUMBING SCHEDULES & DETAILS VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 KDB WRH

100% BID DOCUMENTS

N.T.S.

PIPING IDENTIFICATION LABEL DETAIL

N.T.S.

TRIPLEX CLAW ROTARY MEDICAL VACUUM PUMP DETAIL

N.T.S.

INSULATED PIPE HANGER

MEDICAL VACUUM PUMP SCHEDULE

MARK

BASIS OF DESIGN

MANUFACTURER

BASIS OF

DESIGN MODEL TYPE MOTOR QTY. / HP SYSTEM

RECEIVER

CAPACITY (GAL)

SCFM @19 Hg

PUMP / SYSTEM

SYSTEM

(BTU/HR) INLET SIZE (IN)

DISCHARGE SIZE

(IN)

NOISE LEVEL

(DB)

UNIT WEIGHT

(LBS)

ELECTRICAL

V/PH/HZ SYSTEM FLA MCA MOCP

VP-1,2,3 BEACON MEDAES VHS05T-120V-T TRIPLEX 3 / 5.4 MEDICAL VACUUM 120 38 / 76 21,989 2 2 82 2,520 460/3/60 20.1 26.2 32.3

VP-4,5,6 BEACON MEDAES VHS07T-200V-T TRIPLEX 3 / 7.5 MEDICAL VACUUM 200 65 / 130 30,133 3 3 82 3,466 460/3/60 30.6 37.3 46.8

VP-7,8,9 BEACON MEDAES VHS10T-200V-T TRIPLEX 3 / 10 MEDICAL VACUUM 200 87 / 174 40,720 4 3 90 4,366 460/3/60 36.6 47.0 59.5

NOTES:

1. MEDICAL VACUUM PUMP AND ALL ASSOCIATED COMPONENTS SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.

2. MEDICAL VACUUM PUMP SHALL BE PLACED ON EXISTING 4" RAISED CONCRETE PAD.

3. ROUTE TANK DISCHARGE TO NEAREST FLOOR DRAIN.

4. WIRE LAG PUMP RUNNING AND HIGH TEMP LOCAL ALARMS BACK TO THE EXISTING MASTER ALARM PANELS. REPLACE ANY DAMAGED WIRING BACK TO THE MASTER ALARM PANEL.

5. VACUUM SYSTEM SHALL BE SHIPPED IN MULTIPLE SKIDS CAPABLE OF BEING DELIVERED THROUGH A 36" WIDE DOOR OPENING. UNITS SHALL BE RECEIVED AT THE LOADING DOCK AND DELIVERED TO THE MECHANICAL

ROOMS THROUGH 36" WIDE DOORS. IF DOOR REMOVAL IS REQUIRED, COORDINATE INSTALLATION WITH COR. VACUUM SYSTEM SHALL BE ASSEMBLED IN MECHANICAL ROOM FOR OPERATION BY INSTALLING CONTRACTOR.

TEMPORARY MEDICAL VACUUM PUMP SCHEDULE

MARK

BASIS OF DESIGN

MANUFACTURER

BASIS OF DESIGN

MODEL TYPE MOTOR QTY. / HP SYSTEM

RECEIVER

CAPACITY (GAL.)

SCFM @19 Hg

PUMP / SYSTEM

SYSTEM

(BTU/HR)

INLET SIZE

(IN)

DISCHARGE SIZE

(IN)

NOISE LEVEL

(DB)

UNIT WEIGHT

(LBS)

ELECTRICAL

V/PH/HZ SYSTEM FLA MCA MOCP

TEMP-VP BEACON MEDAES VLS10D-200V-D DUPLEX 2 / 10 MEDICAL VACUUM 200 77 / 77 20,360 2 2 81 2,711 460/3/60 27 32.5 45.5

NOTES:

1. TEMPORARY MEDICAL VACUUM PUMP TO BE RENTED AND USED DURING CONSTRUCTION. AFTER ALL CONSTRUCTION PHASES ARE COMPLETED, MEDICAL VACUUM PUMP SHALL BE RETURNED.

2. MEDICAL VACUUM PUMP AND ALL ASSOCIATED COMPONENTS SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.

3. ROUTE TANK DISCHARGE TO NEAREST FLOOR DRAIN.

4. WIRE LOCAL ALARMS BACK TO MASTER ALARM PANELS LOCATED.

5. VACUUM SYSTEM SHALL BE SHIPPED IN MULTIPLE SKIDS CAPABLE OF BEING DELIVERED THROUGH A 36" WIDE DOOR OPENING. UNITS SHALL BE RECEIVED AT THE LOADING DOCK AND DELIVERED TO THE MECHANICAL

ROOMS THROUGH 36" WIDE DOORS. IF DOOR REMOVAL IS REQUIRED, COORDINATE INSTALLATION WITH COR. VACUUM SYSTEM SHALL BE ASSEMBLED IN MECHANICAL ROOM FOR OPERATION BY INSTALLING CONTRACTOR.

3" MV

3" MV

VP-4,5,6

EXISTING CONCRETE PAD

EX 5" MVE

3" MV

TEMP

VP

EX 3" MV

5" MVE

5" MVE

EX-FD

3/4" CD

3/4" CD

4" MV

TEMP

VP

VP-7,8,9

3" MVE

6" MVE

4" MV

EX 4" MV

EX 6" MVE

EXISTING CONCRETE PAD

EXISTING CONCRETE PAD

3" MVE

EX-FD

3/4" CD

3/4" CD

6" MVE

6" MVE

EX 3" MV

EX 3" MVE

3" MV

3" MVE

TEMP

VP

VP-1,2,3

EXISTING CONCRETE PAD

3" MVE

EX-FD

3/4" CD

3/4" CD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:4

:2

P

M

P-601

PLUMBING ISOMETRICS VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 KDB WRH

100% BID DOCUMENTS

N.T.S.

ROOM LL658 VP-4,5,6 ISOMETRIC

1N.T.S.

ROOM LL528 VP-7,8,9 ISOMETRIC

2N.T.S.

ROOM LL215 VP-1,2,3 ISOMETRIC

1PH SINGLE-PHASE

3PH THREE-PHASE

4W FOUR-WIRE

A/E ARCHITECT/ENGINEER

AF AMPERE FRAME OR AMP FUSE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMP AMPERE

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BLDG BUILDING

C CONDUIT

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CKT CIRCUIT

CLG CEILING

COAX COAX CABLE

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUE

COORD COORDINATE

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CU COPPER

DB DECIBEL OR DIRECT BURIAL

DC DIRECT CURRENT

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DISC DISCONNECT

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DS DISCONNECT SWITCH

DWG DRAWING

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

ETR, EX EXISTING TO REMAIN

ELECTRICAL ABBREVIATIONS

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FLA FULL LOAD AMPS

FP FIRE PROTECTION

FT FEET OR FOOT

GND GROUND

G OR GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LRA LOCKED ROTOR AMPS

LTG LIGHTING

LV LOW VOLTAGE

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MLO MAIN LUGS ONLY

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT-AMPERE

MW MEGAWATT MICROWAVE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEUT OR N NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PA PUBLIC ADDRESS

PCB POLYCHLORINATED BIPHENYL

PH PHASE

PNL PANEL

POD POWER OPERATED DAMPER

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

REQD REQUIRED

SCC SHORT CIRCUIT CAPACITY

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION

AWG AMERICAN WIRE GAUGE

KCMIL ONE-THOUSAND CIRCULAR MILS

NA NOT APPLICABLE

HD HEAT DETECTOR

NEW (HEAVY, SOLID LINE)

EXISTING TO REMAIN (LIGHT, SOLID LINE)

EXISTING TO BE REMOVED (HEAVY, DASHED LINE)

JUNCTION BOX

RECEPTACLE, DUPLEX

ELECTRICAL SYMBOLS - POWER/LIGHTING PLANS

J

SYMBOL DESCRIPTION

SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL, OVER 250 VOLTS

SWITCHBOARD/ SWITCHGEAR/ DISTRIBUTION PANEL - UNDER 250 VOLTS

WALL MOUNTED JUNCTION BOXJ

RECEPTACLE, DOUBLE DUPLEX (QUADRAPLEX)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:3

:3

A

M

E-001

ELECTRICAL LEGENDS & SYMBOLS VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 JFR KEM

100% BID DOCUMENTS

SHEET LIST

SHEET NUMBER SHEET NAME

E-001 ELECTRICAL LEGENDS & SYMBOLS

E-002 ELECTRICAL GENERAL NOTES

EP101 LOWER LEVEL PLANS - LL658 - ELEC. EQUIPMENT- NEW & DEMO

EP102 LOWER LEVEL PLANS - LL528 - ELEC. EQUIPMENT - NEW & DEMO

EP103 LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - DEMO

EP104 LOWER LEVEL PLAN - LL215 - ELECTRICAL EQUIPMENT - NEW

E-501 ELECTRICAL DETAILS

E-601 ELECTRICAL DIAGRAMS

ELECTRICAL GENERAL NOTES

WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS, WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED

APPLICABLE CODES

1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):

a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2023

b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2022

c. LIFE SAFETY CODE, NFPA 101 – YEAR

d. EMERGENCY AND STANDBY POWER SYSTEMS, NFPA 110 – 2021

e. HEALTH CARE FACILITIES CODE, NFPA 99

2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):

a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2

3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)

4. FACILITY GUIDELINES INSTITUTE (FGI):

a. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT FACILITIES

5. FEDERAL COMMUNICATION COMMISSION (FCC)

6. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

7. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)

8. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

9. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)

10. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)

11. ILLUMINATION ENGINEERING SOCIETY (IES)

12. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)

13. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)

14. INTERNATIONAL CODE COUNCIL (ICC):

a. INTERNATIONAL BUILDING CODE (IBC)

15. UNIFORM BUILDING CODE (UBC)

16. COMBINED ANSI/ASHRAE/IES STANDARD 90.1 – “ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL

BUILDINGS”

17. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)

18. AMERICANS WITH DISABILITIES ACT (ADA)

19. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.

20. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE

a. AUTHORITIES HAVING JURISDICTION (AHJs).

21. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.

1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT

ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.

2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND

ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.

3. INCLUDE ALL COSTS FOR SURFACE RESTORATION, REPAIR OF FINISHES, ETC. THAT IS REQUIRED IN ORDER TO

MEET THE PROJECT REQUIREMENTS.

4. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH STATUTES REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN CERTIFICATION OF

ACCEPTED DISPOSAL.

5. ALL POWER CIRCUITS REQUIRE 2% OR LESS VOLTAGE DROP FOR FEEDERS, AND 3% OR LESS VOLTAGE DROP FOR

BRANCH CIRCUITS.

6. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS ARE NOT ALLOWED

UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.

7. VERIFY AND COORDINATE LOCATIONS OF ANY MISCELLANEOUS EQUIPMENT REQUIRING ELECTRICAL CONNECTIONS WITH APPROVED SHOP DRAWINGS, OWNER-PROVIDED CUT SHEETS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL

REQUIRED.

8. VERIFY AND COORDINATE LOCATIONS AND EXACT ELECTRICAL REQUIREMENTS FOR ALL EQUIPMENT PRIOR TO SUBMITTAL OF SHOP DRAWINGS OF ELECTRICAL EQUIPMENT. PROVIDE ALL NECESSARY RACEWAYS, CONDUCTORS, BOXES, EQUIPMENT, ACCESSORIES, ASSOCIATED DISCONNECT SWITCHES, CIRCUIT BREAKERS, CONTROL TRANSFORMERS, FIRE ALARM SHUTDOWN, ETC. REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM.

COORDINATE WITH APPROPRIATE TRADE'S APPROVED SHOP DRAWINGS, MANUFACTURER'S INSTRUCTIONS, AND EQUIPMENT NAMEPLATE INFORMATION, PRIOR TO ROUGH IN, AND PROVIDE ALL NECESSARY ELECTRICAL

REQUIRED, UNLESS OTHERWISE NOTED.

9. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT OF WORK. AVOID INTERFERENCES WITH

THE PROGRESS OF OTHER DIVISIONS/TRADES.

10. LOCATIONS OF VFD'S, DISCONNECTS, MOTOR STARTERS, ETC. FOR HVAC EQUIPMENT ARE DIAGRAMMATIC ON THE PLAN DRAWINGS. EXACT LOCATIONS ARE TO BE COORDINATED WITH CONTRACTOR'S COORDINATION DRAWINGS PRIOR TO ROUGHING IN TO ENSURE PROPER NEC CLEARANCES AND APPROPRIATE MOUNTING SURFACE.

11. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS

INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA.

12. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS AND DETAILS.

COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.

13. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.

14. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR

PHASING.

15. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN WRITING BY THE OWNER AND SCHEDULED IN

ADVANCE.

16. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.

CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO

PROCEEDING WITH REPAIRS.

17. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL

APPURTENANCES IN ACCORDANCE WITH NEC.

18. PROVIDE ALL TEMPORARY NORMAL LIGHTING, EMERGENCY LIGHTING AND EXIT SIGNAGE REQUIRED DURING THE

PROJECT CONSTRUCTION PHASE.

19. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L.

LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED

WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY.

20. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, TO THE

SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.

21. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS. WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO

REQUEST COMPENSATION FROM THE CONTRACTOR FOR SAID SERVICES.

22. MAINTAIN A CURRENT AND ACCURATE SET OF PROJECT RECORD DOCUMENTS (AS-BUILTS) AT THE SITE THROUGHOUT THE DURATION OF THE PROJECT. RECORD DRAWINGS SHALL BE UPDATED EACH DAY TO REFLECT THE ACTUAL LOCATIONS, SIZES, ROUTING, ETC. OF EACH PORTION OF THE ELECTRICAL SYSTEM AFFECTED BY THIS WORK. A FINAL SET OF RECORD DOCUMENTS SHALL BE ISSUED TO THE A/E FOR REVIEW AND THEN SUBMITTED TO THE OWNER WITHIN 30 DAYS AFTER THE DATE OF FINAL ACCEPTANCE. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION INCLUDING SINGLE LINE DIAGRAM, POWER RISER DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM, SITE PLANS AND ALL

ELECTRICAL FLOOR PLANS, DETAILS, PANEL SCHEDULES, ETC.

23. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL ELECTRICAL REQUIREMENTS FOR THE TEMPORARY PUMP SYSTEMS AND MUST PROVIDE ALL ELECTRICAL CONNECTIONS AND MATERIALS FOR A COMPLETE AND WORKING SYSTEM.

24. WHERE SUBMITTED EQUIPMENT REQUIRES REVISION TO OVERCURRENT PROTECTION, CONDUIT OR WIRING, MAKE

CHANGES IN ACCORDANCE WITH APPLICABLE CODES.

ELECTRICAL DEMOLITION NOTES

1. THE FACILITY WILL REMAIN OCCUPIED DURING RENOVATIONS.

2. EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE DEMOLISHED; EQUIPMENT SHOWN IN LIGHT SOLID LINE TYPE

ARE EXISTING TO REMAIN, UNLESS OTHERWISE NOTED.

3. EXISTING EQUIPMENT SHOWN ARE BASED ON FIELD SURVEYS AND RECORD DRAWINGS PROVIDED BY THE OWNER, AND IS

NOT NECESSARILY ALL INCLUSIVE IN EVERY AREA AS FAR AS EXISTING ELECTRICAL EQUIPMENT. EXISTING CIRCUITING SHOWN IS BASED ON RECORD DRAWINGS AND THE SURVEYED PANEL DIRECTORIES, WHERE THEY WERE AVAILABLE. THE ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE CONDITIONS SHOWN ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING EQUIPMENT, WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK.

FIELD CONDITIONS SHALL GOVERN.

4. PRIOR TO DEMOLITION, FIELD VERIFY CONDUIT AND WIRING WHICH SERVES AREAS OUTSIDE THE SCOPE OF WORK AND

PASSES THROUGH THE AREA OF WORK. MAINTAIN CONTINUITY OF SYSTEMS.

5. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED. OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE NOT BEING USED IN THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION. PROPERLY AND LEGALLY DISPOSE OF ALL EQUIPMENT AND MATERIALS BEING REMOVED.

6. WHERE EXISTING EQUIPMENT ARE INDICATED TO BE DEMOLISHED, REMOVE ASSOCIATED CONDUIT AND WIRING BACK TO

SOURCE PANEL.

7. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE PHASING WITH CONSTRUCTION MANAGER AND OWNER PRIOR TO DEMOLITION WHICH MAY RESULT IN INTERRUPTION OF POWER.

8. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENT OF AREA REQUIRING DEMOLITION AND ADDITIONAL INFORMATION ON ELECTRICAL DEMOLITION WITHIN THAT AREA. DISCONNECT ELECTRICAL SERVICE TO ALL EQUIPMENT BEING REMOVED. DEMOLITION SHALL BE PHASED AS REQUIRED BY DIVISION 1, OR DIRECTED BY THE OWNER.

9. REMOVE ALL CONDUIT LEFT EXPOSED BY REMOVAL OF WALLS AND CEILINGS IN REMODELED OR RENOVATED AREA. CAP BOTH ENDS OF REMAINING CONDUIT IN WALL OR FLOOR WHERE CUT. REMOVE ALL ASSOCIATED SUPPORTS. REMOVE WIRING

BACK TO SOURCE OF VOLTAGE.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR.

11. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND OBTAIN

CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.

12. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS DIAGRAMMATIC IN NATURE. FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL ITEMS SCHEDULED TO BE DEMOLISHED AND PERFORM THE

WORK AS INTENDED AND DEPICTED ON THE DRAWINGS.

13. UPDATE ALL EXISTING ELECTRICAL EQUIPMENT NAMEPLATES AND DIRECTORIES AS NECESSARY TO REFLECT FINAL AS-BUILT

CONDITIONS AT THE END OF CONSTRUCTION.

14. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED AREA. NOTIFY OWNER WHEN

ITEMS ARE READY TO BE REMOVED.

15. COORDINATE ANY ALTERATION AND CHANGES TO THE ELECTRICAL SERVICE WITH THE LOCAL UTILITY COMPANY AND THE

OWNER PRIOR TO COMMENCEMENT OF WORK.

16. SCHEDULE ALL POWER INTERRUPTION WITH OWNER FOR EXACT DATE, TIME AND DURATION. PROVIDE A MINIMUM OF 72 HOURS NOTICE PRIOR TO DISCONNECTING ANY POWER TO ANY PORTION OF THE BUILDING, AND MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO COMMENCEMENT OF

WORK.

17. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT AREA. IT IS INTENDED TO PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE A/E. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED ELECTRICAL DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT.

18. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC. ANY EXISTING CONDUIT IS INSTALLED BELOW THE HEIGHT OF THE NEW CEILING SHALL BE RELOCATED TO ABOVE THE NEW CEILING HEIGHT.

19. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO THE END OF CONSTRUCTION.

20. UPDATE PANELBOARD DIRECTORIES WHICH ARE MODIFIED BY THIS PROJECT.

21. REPAIR DISTURBED AREAS TO MATCH EXISTING CONDITIONS

D1.

D2.

D3.

D4.

D5.

D6.

D7.

D8.

D9.

D10.

D11.

D12.

D13.

D14.

D15.

D16.

D17.

D18.

D19.

D20.

D21.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:3

:3

A

M

E-002

ELECTRICAL GENERAL NOTES VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 JFR KEM

100% BID DOCUMENTS

STEEL STEM PENDANT

SINGLE-BOLT, TWO PIECE

CONDUIT/CHANNEL

STRAPS

CONDUIT

UNISTRUT

910mm (3'-0") MAX.

FRONT ELEVATIONSIDE ELEVATION SIDE ELEVATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:3

:3

A

M

E-501

ELECTRICAL DETAILS VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 JFR KEM

100% BID DOCUMENTS

N.T.S.

MCC EQL1

1N.T.S.

MCC EQL3

3N.T.S.

PP-EQL6

CODED NOTES:

DRAWING NOTES:

1. REFER TO EQUIPMENT SCHEDULES SHEET E-601 FOR ELECTRICAL CONNECTION INFORMATION

REPLACE EXISTING FEEDER BUCKET WITH NEW TO SERVE VACUUM PUMP. REFER TO EQUIPMENT

SCHEDULE SHEET E-601 FOR CIRCUIT BREAKER AMPERE RATING.

2 REPLACE EXISTING BUCKET SPACE WITH NEW FEEDER BUCKET TO SERVE TEMPORARY VACUUM PUMP.

REFER TO EQUIPMENT SCHEDULE SHEET E-601 FOR CIRCUIT BREAKER AMPERE RATING.

12" = 1'-0"2

CONDUIT HANGER DETAIL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/2

/2

:3

:3

A

M

E-601

ELECTRICAL DIAGRAMS VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 JFR KEM

100% BID DOCUMENTS

EQUIPMENT SCHEDULE

EQUIPMENT NAME IDENTIFICATION HP FLA MCA

VOLT / PH / LOAD

(VA) MOCP

CB

AMPS PANEL CKT # FEEDER SIZE CONDUIT

MOTOR

STARTING DISC MEANS COMMENTS

TEMPORARY VACUUM

PUMP

TEMP VP (LL215) (3) 10 36.6 480 V/3-25429 VA 70A 70A PP-EQL6 13 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL

TEMPORARY VACUUM

PUMP

TEMP VP (LL658) (3) 10 36.6 480 V/3-25429 VA 70A 70A MCC-EQL3 13 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL

TEMPORARY VACUUM

PUMP

TEMP VP (LL528) (3) 10 36.6 480 V/3-25429 VA 70A 70A MCC-EQL1 9 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL

VACUUM PUMP VP-1,2,3 (3) 5.4 20.1 480 V/3-16703 VA 30A 30A PP-EQL6 12 (3) #10 #10 GND 3/4 INTEGRAL INTEGRAL

VACUUM PUMP VP-4,5,6 (3) 7.5 30.6 480 V/3-25429 VA 70A 70A MCC-EQL3 7 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL

VACUUM PUMP VP-7,8,9 (3) 10 36.6 480 V/3-30415 VA 70A 70A MCC-EQL1 1 (3) #8, #10 GND 3/4 INTEGRAL INTEGRAL

1. PROVIDE NEW CIRCUIT BREAKER

BRANCH CIRCUIT NOTES:

Total Est. Demand... 127 A

Total Conn. Current: 108 A

Total Est. Demand: 105766 VA

Total Conn. Load: 89698 VA

Motor 50857 VA 112.50% 57214 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

108 A

89698 VA

14 EX. SPACE 1 -- --

13 TEMP VACUUM PUMP (NOTE 1) 3 70 A 25.4 kVA

12 EX. EF-3 ON ROOF 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE

11 EX. EF-1 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE

10 EX. EF-2 ON ROOM 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE

9 EX. SPARE 3 20 A 0.0 kVA

8 EX. CP-3 3 25 A 12.6 kVA

7 MED VACUUM/VP-4,5,6 3 70 A 25.4 kVA

6 EX. SPARE 3 20 A 0.0 kVA

5 EX. AH 1042 MECH ROOM 1863 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE

4 EX. P-45 3 20 A 4.0 kVA

3 EX. P-44 3 20 A 4.0 kVA

2 EX. P-43 3 20 A 9.1 kVA

1 EX. P-42 3 20 A 9.1 kVA

CKT Circuit Description # of

Poles Trip Rating Load Remarks

PANEL INFORMATION: MANUFACTURED BY SIEMENS

GENERAL NOTES:

Enclosure: NEMA 1 Neutral Rating: 100.00%

Mounting: FLOOR Wires: 3 Mains Rating: 600 A

Supply From: Phases: 3 Mains Type: MLO

Location: Space LL658 Volts: 480 Delta A.I.C. Rating: 22000

EX. MOTOR CONTROL CTR: MCC-EQL3

1. REPLACE EXISTING CIRCUIT BREAKER WITH NEW.

2. PROVIDE NEW CIRCUIT BREAKER.

BRANCH CIRCUIT NOTES:

Total Est. Demand... 224 A

Total Conn. Current: 185 A

Total Est. Demand: 186255 VA

Total Conn. Load: 154090 VA

Motor 55844 VA 113.62% 63447 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

185 A

154090 VA

14 EX. VP-10,11 3 70 A 23.1 kVA

13 EX. Spare 3 20 A 0.0 kVA

12 EX. Spare 3 20 A 0.0 kVA

11 EX. Spare 3 20 A 0.0 kVA

10 EX. Spare 3 20 A 0.0 kVA

9 TEMP VACUUM PUMP (NOTE 2) 3 50 A 25.4 kVA

8 EX. DENTAL AC 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE

7 EX. PUMP STATION NO. 1 3 60 A 64.4 kVA

6 EX. SPARE 3 20 A 0.0 kVA

5 EX. SPARE 3 20 A 0.0 kVA

4 EX. SPARE 3 20 A 0.0 kVA

3 EX. REF COMPRESSOR 3 60 A 2.8 kVA

2 EX. CP-1 3 15 A 7.9 kVA

1 VP-7,8,9 (NOTE 1) 3 70 A 30.4 kVA

CKT Circuit Description # of

Poles Trip Rating Load Remarks

PANEL INFORMATION: MANUFACTURED BY SIEMENS

GENERAL NOTES:

Enclosure: NEMA 1 Neutral Rating: 100.00%

Mounting: FLOOR Wires: 3 Mains Rating: 600 A

Supply From: Phases: 3 Mains Type: MLO

Location: Space LL528 Volts: 480 Delta A.I.C. Rating: 50000

EX. MOTOR CONTROL CTR: MCC-EQL1

1. REPLACE EXISTING CIRCUIT BREAKER WITH NEW.

2. PROVIDE NEW CIRCUIT BREAKER.

BRANCH CIRCUIT NOTES:

Total Est. Demand... 401 A

Total Conn. Current: 325 A

Total Est. Demand: 333357 VA

Total Conn. Load: 270026 VA

Motor 42132 VA 115.09% 48489 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

325 A

270026 VA

14 EX. SPACE 3 -- --

13 TEMP VACUUM PUMP (NOTE 2) 3 70 A 25.4 kVA

12 VP-1,2,3 (NOTE 1) 3 70 A 16.7 kVA

11 EX. SPARE 3 100 A 0.0 kVA

10 EX. SPARE 3 100 A 0.0 kVA

9 EX. SPARE 3 40 A 0.0 kVA

8 EX. UPS STANDBY 3 175 A 123.8 kVA

7 EX. SPARE 3 125 A 0.0 kVA

6 EX. AHU-0065 3 50 A 22.3 kVA

5 EX. PUMP STA. NO. 2 3 100 A 11.9 kVA

4 EX. SPARE 3 20 A 0.0 kVA

3 COMPRESSOR COLD RM. LL272 3 20 A 6.3 kVA

2 EX. ELEV NO. 7 3 125 A 63.6 kVA

1 EX. CIRCUIT 3 20 A 0.0 kVA LOAD INFORMATION UNAVAILABLE

CKT Circuit Description # of

Poles Trip Rating Load Remarks

PANEL INFORMATION: MANUFACTURED BY SEIMENS, TYPE S4

GENERAL NOTES:

Enclosure: NEMA 1 Neutral Rating: 100.00%

Mounting: WALL Wires: 3 Mains Rating: 600 A

Supply From: Phases: 3 Mains Type: MLO

Location: Volts: 480 Delta A.I.C. Rating: 22000

EX. DISTRIBUTION PANEL: PP-EQL6

J

J

LL658

15 1414.6 14.3 13.8 13.4 13 12.9 12.5 12

A

B

C

D

D.8

RX

VP-4,5,6

MCC-EQL3

EX

D1

D2

EX

AHU

TEMP

VP

LL658

15 1414.6 14.3 13.8 13.4 13 12.9 12.5 12

A

B

C

D

D.8

VP-4,5,6

MCC-EQL3

EX

EX

AHU

TEMP

VP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /M ic h ig a n

D e tr o it V

A /0

V A

M C

D e t.

R e p l.

V a c .P u m p

R

E P

.r v t

/1

/2

:5

:5

P

M

EP101

LOWER LEVEL PLANS - LL658 -

ELEC. EQUIPMENT- NEW & DEMO

VAMC Detroit Replace Vacuum Pump

DETROIT VA

553-22-201

5/26/2023 JFR KEM

100% BID DOCUMENTS

CODED NOTES-DEMO WORK:

DRAWING NOTES:

1. REFER TO EQUIPMENT SCHEDULES SHEET E-601 FOR ELECTRICAL CONNECTION INFORMATION.

2. REFER TO SHEET E-501 FOR PICTURES OF MOTOR CONTROL CENTER.

PRIOR TO REMOVAL OF VACUUM PUMP 4,5,6, ROUTE CONDUIT AND WIRE FROM

TEMPORARY VACUUM PUMP TO AVAILABLE SPARE BREAKER IN EXISTING MCC-EQL3.

REFER TO PANEL SCHEDULES FOR LOCATION.

DE ENERGIZE, DISCONNECT AND REMOVE WIRE BACK TO CLOSEST UPSTREAM JUNCTION

BOX. EXISTING CONDUIT AND WIRING SHALL BE REUSED FOR NEW WORK.

D1

N 0 4' 8' 16' 24'

1/8" = 1'-0"

1/8" = 1'-0"2

LOWER LEVEL PLAN - LL658 - ELECTRICAL EQUIPMENT - DEMO - PHASE 1

KEY PLAN

LL528 LL658

LL215

1/8" = 1'-0"1

LOWER LEVEL PLAN - LL658 - ELECTRICAL EQUIPMENT - NEW - PHASE 1

CODED NOTES-NEW WORK:

D2

PRIOR TO REMOVAL OF TEMPORARY VACUUM, REROUTE AND RECONNECT EXISTING CIRCUIT TO

NEW VACUUM PUMP TO MATCH EXISTING.

AFTER INSTALLATION OF NEW VACUUM PUMP, DE ENERGIZE, DISCONNECT AND REMOVE WIRE AND

CONDUIT FOR TEMP VACUUM PUMP BACK TO SOURCE PANEL.

J

E

232425

22.222.722.923.523.824.424.6

C

D

B

A

D.8

A

B

C

D

D.8

Room

LL528

RX

VP-7,8,9

EX. EX.

MCC-EQL1 EX. MCC-L1

D2

D1

EX

AHU

TEMP

VP

E

232425

22.222.722.923.523.824.424.6

C

D

B

A

D.8

A

B

C

D

D.8

Room

LL528

EX. EX.

MCC-EQL1 EX. MCC-L1

TEMP

VP

EX

AHU

VP-7,8,9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Off…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .