RFI Responses - 553-22-201.docx
DOCX document 16 KB Posted
- Attached to
- Z1DA--Replace Vacuum Pumps 553-22-201 - 0002 Federal contract opportunity
- Solicitation number
- 36C25025B0016
About this file
The document is a Request for Information (RFI) response related to a VA medical vacuum pump replacement project at the John D. Dingell Veterans Administration Medical Center in Detroit, Michigan. The RFI addresses three key areas: electrical circuit requirements for temporary and new pumps, security clearance and badging procedures, and shutdown protocols for installation work.
The associated federal contract opportunity is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB), with a project scope to replace nine existing medical vacuum pumps. The project is valued between $500,000 and $1,000,000, with a 90-calendar day performance period from Notice to Proceed. The Government intends to award a Firm Fixed Price Contract within 120 days of bid opening. Contractors must be registered in the Vendor Information Pages (VIP) database and System for Award Management (SAM), with all solicitation information available exclusively on beta.sam.gov. The North American Industry Classification Code is 236220 for Commercial and Institutional Building Construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25025B0016 0002.docx | DOCX document | |
| Bid Schedule 553-22-201 Replace Vacuum Pumps.pdf | ||
| S04 - Pre Bid Site Visit Attendance Log - 553-22-201.doc.pdf | ||
| 36C25025B0016 0001.docx | DOCX document | |
| S02 FInal Drawings - 553-22-201.pdf | ||
| S02 EMR Certification Form - 553-22-201.pdf | ||
| 36C25025B0016_1.docx | DOCX document | |
| S02 RFI Form - 553-22-201.pdf | ||
| S02 Wage Determination - MI20250101 02 21 2025 - 553-22-201.pdf | ||
| S02 Final Specifications - 553-22-201.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Responses:
1. In Room LL215, the existing and new pump utilize a 30A circuit but the temporary requires 70A. This will be accounted for, however, the other two (2) are listed as existing 70A circuits as are the temp units. Can you confirm whether or not we have to provide a breaker/new circuit for the temp units or can we utilize the existing circuit power where applicable.
Answer: Per the construction documents, provide new breakers for each temporary pump and each new ump to be installed.
Given the phasing of this project, the temporary pumps and the new pumps to be installed must be on separate circuits. Circuit breakers must be coordinated with the pumps to be utilized and thus must be coordinated with he pumps submitted during the submittal process.
2. What should be included to account for security clearance in the restricted area? Will the VA require badging prior to starting work or will we require someone from the hospital staff to chaperone us in the restricted area? Will there be a daily required check-in with the VA police?
Answer: All Contractor require badging.
3.
A. Is there a shutdown procedure in place for the VA hospital when installing the breakers for the temporary units?
Answer: Yes
B. What is the shutdown procedure if required?
Answer: Two Weeks
C. Are after hours or weekends required to do this work?
Answer: After Hours or weekends