S02-FINAL DRAWINGS 1 of 2.pdf
PDF 46 MB Posted
- Attached to
- Y1DA--528A8-16-807 REPAIR PARKING LOTS
- Solicitation number
- 36C24222R0102
About this file
This document provides details for a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The solicitation number is 36C24222R0102 for repair work on parking lots named "Y1DA--528A8-16-807 REPAIR PARKING LOTS." The related file is the final drawing set 1 of 2 to provide the drawings for the parking lot repair project. The opportunity type is a solicitation and the description notes this is an amendment with the first of two drawing sets. The document gives relevant information on the federal agency, project name, solicitation number and indicates the related file is the first of two drawing sets required for the parking lot repair opportunity from the Department of Veterans Affairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02-FINAL DRAWINGS 2 OF 2.pdf | ||
| 36C24222R0102 0002.docx | DOCX document | |
| 36C24222R0102 0001.docx | DOCX document | |
| EXHIBIT A - Past Performance Relevancy Questionnaire.docx | DOCX document | |
| FAR 52.225-2 Buy American Certification.docx | DOCX document | |
| EXHIBIT C - Past Performance Questionnaire.docx | DOCX document | |
| Divisional cost break down template.docx | DOCX document | |
| 36C24222R0102_1.docx | DOCX document | |
| Q and A.docx | DOCX document | |
| VAAR 819 219 77 VA Notice of Limitation on subcontracting.docx | DOCX document | |
| VS11-Boring Report-VA.pdf | ||
| EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx | DOCX document | |
| Wage Determinations 8.5.2022.pdf | ||
| 528A8-16-807_Specifications.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Christopher W. Geary PE# 099085
Albany Stratton VAMC Albany, NY 12208
528A8-16-807
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date: 1/19/2021 Witczak Geary
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Dwg. of
Drawing Title
Approved:
Phase
Project Director
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
DESIGN - REPAIR PARKING LOT
FOR
ALBANY STRATTON VAMC
PROJECT NUMBER: 528A8-16-807
CONTRACT NUMBER: 36C24220C0043
I HEREBY CERTIFY THAT ALL INFORMATION INDICATED ON THIS
DRAWING WAS OBTAINED OR VERIFIED BY ACTUAL MEASUREMENTS IN
THE FIELD, AND THAT EVERY EFFORT HAS BEEN MADE TO FURNISH
COMPLETE AND ACCURATE INFORMATION.
CHRISTOPHER GEARY, P.E. PE #099085
AN AUTHORIZED SIGNATURE BELOW INDICATES THE DEPARTMENT OF
VETERANS AFFAIRS APPROVAL.
AUTHORIZED SIGNATURE DATE
PRINTED NAME TITLE
LOCATION MAP
SCALE: 1" = 1,000'
SOURCE: USGS ALBANY, NY QUADRANGLE MAP
LOCATION MAP
N.T.S.
SOURCE: GOOGLE MAPS
PROJECT
LOCATION
SHEET INDEX
SHEET
NO.
DRAWING
NO. SHEET TITLE
GI001 1 OF 42 TITLE SHEET
GI002 2 OF 42 GENERAL NOTES SHEET
GI003 3 OF 42 SUMMARY OF QUANTITIES
CS101 4 OF 42 EXISTING FEATURES & DEMOLITION PLAN
CS102 5 OF 42 LAYOUT PLAN
CS103 6 OF 42 CONSTRUCTION PLAN
CS104 7 OF 42 GRADING PLAN
CS105 8 OF 42 SPOT GRADE PLAN
CS106 9 OF 42 SPOT GRADE TABLES
CS107 10 OF 42 UTILITY PLAN
CS108 11 OF 42 STORMWATER PROFILE PLAN
CS109 12 OF 42 STORMWATER PROFILE PLAN
CS110 13 OF 42 ROADWAY PROFILES PLAN
CS111 14 OF 42 ROADWAY PROFILES PLAN
CS112 15 OF 42 ADA RAMP DETAIL
CS113 16 OF 42 ADA RAMP DETAIL
CS114 17 OF 42 ADA PARKING DETAIL
CS115 18 OF 42 DRIVEWAY DETAIL PLAN
CS116 19 OF 42 LIGHTING & ELECTRICAL PLAN
CS117 20 OF 42 CONSTRUCTION DETAILS
CS118 21 OF 42 CONSTRUCTION DETAILS
CS119 22 OF 42 CONSTRUCTION DETAILS
CS120 23 OF 42 CONSTRUCTION DETAILS
CS121 24 OF 42 CONSTRUCTION DETAILS
CS122 25 OF 42 CONSTRUCTION DETAILS
CS123 26 OF 42 CONSTRUCTION DETAILS
CS124 27 OF 42 CONSTRUCTION DETAILS
CS125 28 OF 42 CONSTRUCTION DETAILS
CS126 29 OF 42 CONSTRUCTION DETAILS
CS127 30 OF 42 CONSTRUCTION DETAILS
CS128 31 OF 42 OVERALL PHASING PLAN
CS129 32 OF 42 PHASE 1 CONSTRUCTION
CS130 33 OF 42 PHASE 1 FINAL PLAN
CS131 34 OF 42 PHASE 2 CONSTRUCTION
CS132 35 OF 42 PHASE 2 FINAL PLAN
CS133 36 OF 42 PHASE 3 CONSTRUCTION
CS134 37 OF 42 PHASE 3 FINAL PLAN
CS135 38 OF 42 PHASE 4 CONSTRUCTION
CS136 39 OF 42 PHASE 4 FINAL PLAN
CS137 40 OF 42 PHASE 5 CONSTRUCTION
CS138 41 OF 42 PHASE 5 FINAL PLAN
CS139 42 OF 42 EARTHWORK VOLUME PLAN
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text Design - Repair Parking Lot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GI001
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Title Sheet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
528A8-16-807
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date: 1/19/2021 Witczak Geary
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Dwg. of
Drawing Title
Approved:
Phase
Project Director
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
EXISTING CONDITIONS NOTES
1. THE EXISTING FEATURES PLAN INFORMATION SHOWN IN THIS PLAN SET IS BASED ON DRAWINGS PROVIDED BY
THE DEPARTMENT OF VETERAN AFFAIRS. NO BOUNDARY SURVEY WAS PERFORMED. THE FIELD SURVEY WAS PERFORMED BY PATRIOT DESIGN & CONSULTING ON DECEMBER 8, 2018. THE PROPOSED INFORMATION IS AS
ACCURATE AS THE PREPARED SURVEY.
2. IT IS ASSUMED ONLY THOSE ITEMS VISIBLE ON THE GROUND AT THE TIME OF SURVEY WERE LOCATED AND SHOWN ON THIS PLAN. THE VA CONTRACTED A SUBSURFACE UTILITY COMPANY TO LOCATE UNDERGROUND UTILITIES. THE UTILITIES SHOWN HEREON ARE A RESULT OF SURFACE AND SUBSURFACE INVESTIGATION.
CONTRACTORS AND OTHER USERS OF THIS PLAN ARE RESPONSIBLE FOR VERIFICATION AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION WORK AT LOCATIONS SHOWN HEREON. ACELA ARCHITECTS + ENGINEERS, P.C. ASSUMES NO LIABILITY TO DAMAGE TO ANY EXISTING UTILITY DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE THAT MAY OCCUR DURING CONSTRUCTION.
3. THE SURVEY IS BASED ON NEW YORK STATE PLANE COORDINATE SYSTEM.
4. THE CONTRACTOR IS ENCOURAGED TO CONDUCT TEST PITS TO VERIFY EXISTING CONDITIONS. TEST PITS CONDUCTED AT THE CONTRACTORS CONVENIENCE TO VERIFY EXISTING CONDITIONS SHALL BE AT THE
CONTRACTORS EXPENSE AND SHALL BE APPROVED AND COORDINATED WITH THE COR.
DEMOLITION NOTES
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND PROPERTY; TO
MINIMIZE NOISE; TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE TO AND FROM SUCH ADJACENT
AREAS OF STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES, WARNING LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL DURING DEMOLITION
AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED EXCAVATIONS UNTIL
SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER TO KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE CONDITION SUCH
AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL CENTER; ANY DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR). THE CONTRACTOR SHALL COORDINATE THE WORK WITH ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING, AND SUPPORTS AS REQUIRED. THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR INCREASING STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, OR DEMOLITION WORK
PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION OF NEW UTILITY
LINES AND NEW CONSTRUCTION.
8. COMPLETELY DEMOLISH AND REMOVE BUILDINGS AND STRUCTURES, INCLUDING ALL APPURTENANCES
RELATED OR CONNECTED THERETO, AS NOTED BELOW:
A. AS REQUIRED FOR INSTALLATION OF NEW UTILITY SERVICE LINES.
B. TO FULL DEPTH WITHIN AN AREA DEFINED BY HYPOTHETICAL LINES LOCATED 5 FT (1500 MM) OUTSIDE
BUILDING LINES OF NEW STRUCTURES.
9. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS AND SIMILAR MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF BY THE CONTRACTOR DAILY, OFF THE MEDICAL CENTER PROPERTY TO AVOID ACCUMULATION AT THE DEMOLITION SITE. MATERIALS THAT CANNOT
BE REMOVED DAILY SHALL BE STORED IN AREAS SPECIFIED BY THE CONTRACTING OFFICERS
REPRESENTATIVE. CONTRACTOR SHALL NOTIFY ENGINEER AND COR IMMEDIATELY IF MATERIALS UNCOVERED DURING ANY PART OF THE WORK APPEAR TO BE CONTAMINATED. ALL LOCAL, STATE AND FEDERAL LAWS
SHALL PREVAIL IN THE EVENT OF CONTAMINATED MATERIALS.
10. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM PRESENT LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT DRAINAGE. CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL PERMITS, RULES AND/OR
REGULATIONS.
11. AS PART OF THE PROPOSED WORK, ANY DAMAGE TO THE EXISTING CURB SHALL BE CORRECTED BY THE
CONTRACTOR TO THE SATISFACTION OF THE COR.
12. ANY SIDEWALK, ON THESE PLANS, THAT IS SHOWN TO BE REMOVED OR REPLACED SHALL BE REMOVED TO THE
NEAREST EXISTING SIDEWALK JOINT.
13. THE CONTRACTOR SHALL CAREFULLY REMOVE ALL STONE CURBING IN THE PROJECT AREA AS NOTED ON THESE PLANS. THE STONE SHALL BE TURNED OVER TO THE COR. ALL BROKEN UNITS SHALL BE DISPOSED OF
AT THE CONTRACTOR'S EXPENSE.
14. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND MAINTING ALL TREES AND LIGHT POLES SURROUNDING THE PARKING LOT. ANY SUCH FEATURES DAMAGED DURING CONSTRUCTION SHALL BE
REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE.
CONCRETE REPAIR NOTES
1. EXPANSION JOINTS SHALL BE INSTALLED WHENEVER CONCRETE IS PLACED AGAINST ROADWAY PAVEMENT, PARKING LOTS, EXISTING CONCRETE, BUILDINGS, OR STRUCTURES AND PER VA REQUIREMENTS. SPACING OF
ALL SIDEWALK JOINTS SHALL BE PER THE CONCRETE SIDEWALK JOINT SPACING DETAIL.
2. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELED AND BROOMED WITH A FINE BRUSH
IN A TRANSVERSE DIRECTION, UNLESS STATED OTHERWISE ON THE PLANS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGED ASPHALT ADJACENT TO THE AREA OF CONSTRUCTION ASSOCIATED WITH REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK AND/OR STAIRS TO
THE SATISFACTION OF THE COR.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SPREADING TOPSOIL, SEEDING AND STABILIZING ANY DAMAGED OR UNVEGETATED PERVIOUS AREA ADJACENT TO THE AREA OF CONSTRUCTION ASSOCIATED WITH
REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK AND/OR STAIRS.
5. POSITIVE DRAINAGE SHALL BE PROVIDED ALONG ALL SIDEWALKS. SIDEWALK CONSTRUCTION AND REPAIR
SHALL BE COMPLETED IN A MANNER TO PREVENT LOW POINTS AND STANDING WATER.
PAVEMENT RECONSTRUCTION NOTES
1. ALL WASTE, DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND LAWFULLY
DISPOSED OF.
2. SAWCUT PAVEMENT TO A DEPTH OF 2" WHERE MILLING OPERATIONS ABUT BITUMINOUS PAVEMENT TO REMAIN.
SEAL JOINT WITH 12" WIDE ASPHALT SEALANT. REFER TO SAW CUT DETAIL FOR MORE INFORMATION.
3. A RECLAIMED BASE MAY BE UTILIZED, WHERE A PROFESSIONAL GEOTECHNICAL ENGINEER LINCENSED IN NEW YORK RETAINED BY THE CONTRACTOR AND COR APPROVES THE SOIL, IN THE AREAS WHERE EXISTING PAVEMENT IS TO BE RECONSTRUCTED. THE RECLAMATION SHALL MEET THE MINIMUM REQUIREMENTS AND CROSS SECTION OF THE FULL DEPTH CONSTRUCTION. IF THE EXISTING CROSS SECTION DOES NOT PROVIDE ADEQUATE DEPTH OR MATERIAL FOR RECLAMATION, NEW MATERIAL SHALL BE IMPORTED. ANY RECLAIMED
MATERIAL SHALL BE APPROVED PRIOR TO REUSE.
4. POOR IN-SITU SOIL THAT IS DEEMED UNSUITABLE, BY THE THIRD PARTY PROFESSIONAL GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR, FOR USE AS PAVING SUBGRADE SHALL BE OVER-EXCAVATED AND REPLACED WITH HIGHER QUALITY LOAD-BEARING FILL AS DIRECTED BY THE
PROFESSIONAL GEOTECHNICAL ENGINEER.
5. PAVEMENT RECONSTRUCTION AND ASSOCIATED IMPROVEMENTS SHALL BE STAGED TO MINIMIZE DISRUPTION TO THE MEDICAL FACILITY. STAGING AREAS AND EQUIPMENT STORAGE SHALL BE COORDINATED WITH THE
CONTRACTING OFFICERS REPRESENTATIVE (COR).
6. REPAIR DAMAGED CURB AS INDICATED, OR AS NECESSARY IF ADDITIONAL DAMAGE OCCURS DURING
CONSTRUCTION.
7. ALL PAVEMENT MARKINGS AND ROAD SIGNS TO BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE NEW YORK STATE SUPPLEMENT TO THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
8. AFTER THE INSTALLATION OF THE BINDER COURSE WITHIN EACH PHASE, AND NO SOONER THAN 24 HOURS AFTER THE ASPHALT HAS BEEN INSTALLED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING TEMPORARY PAVEMENT MARKINGS, PRIOR TO THE AREA BEING OPENED FOR GENERAL PARKING. THE CONTRACTOR SHALL UTILIZE A PAINT EQUIVALENT TO THAT OF THE PERMANENT PAINT MARKINGS ON THE
BINDER COURSE., UNLESS OTHERWISE AGREED TO BY THE CONTRACTING OFFICER.
9. AFTER THE INSTALLATION OF THE WEARING COURSE, AND NO SOONER THAN 24 HOURS AFTER THE ASPHALT HAS BEEN INSTALLED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY PAVEMENT MARKINGS TO CLEARLY IDENTIFY PARKING STALLS AND DRIVE AISLES. THE TEMPORARY PAVEMENT MARKINGS MAY NEED TO BE SUPPLEMENTED WITH TRAFFIC CONES, BARRELS, SIGNAGE, ETC. THESE TEMPORARY PAVEMENT MARKINGS ARE NOT INTENDED TO BE THE PERMANENT PAVEMENT MARKINGS. ADEQUACY OF THE TEMPORARY PAVEMENT MARKINGS AND APPURTENANCES SHALL BE DETERMINED BY THE COR AND IMPROVED OR MODIFIED AS REQUESTED AT NO COST TO THE GOVERNMENT. PERMANENT PAVEMENT MARKINGS SHALL BE INSTALLED NO LESS THAN 14 DAYS AFTER FINAL WEARING COURSE INSTALLATION, OR GREATER IF RECOMMENDED BY THE MANUFACTURER. PAVEMENT MARKINGS SHALL NOT BE INSTALLED DURING NORMAL BUSINESS HOURS (0700H-1600H, MONDAY THRU FRIDAY, EXCLUSIVE TO HOLIDAYS) UNLESS OTHERWISE
APPROVED BY THE CONTRACTING OFFICER.
UTILITY NOTES
1. KEEP HYDRANTS CLEAR AND ACCESSIBLE AT ALL TIMES. PROHIBIT DEBRIS FROM ACCUMULATING WITHIN A
RADIUS OF 15 FT (4500 MM) OF FIRE HYDRANTS.
2. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE REPRESENTATION ONLY. THE OWNER OR ITS REPRESENTATIVE(S), HAVE NOT INDEPENDENTLY VERIFIED THE INFORMATION AS SHOWN ON THE PLANS. THE UTILITY INFORMATION SHOWN DOES NOT GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES, NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES AND ELEVATIONS OF THE POINTS OF CONNECTION TO THE EXISTING UTILITIES AND SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES AND THE PROPOSED UTILITY
ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS OF WAY.
3. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF STORM INLET BOXES PRIOR TO ORDERING GRADE
ADJUSTMENT RINGS OR TOP UNITS.
4. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE INFORMATION SHALL BE FURNISHED IN WRITING BY THE CONTRACTOR TO THE ENGINEER, CONTRACTING OFFICER, AND CONTRACTING OFFICER'S REPRESENTATIVE FOR THE RESOLUTION OF THE CONFLICT. THE CONTRACTORS FAILURE TO NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE
THE CONFLICT.
5. ANY EXISTING UTILITY, SUCH AS BUT NOT LIMITED TO STRUCTURES, PIPES, VALVES, POLES, AND GUY WIRES, IN CONFLICT WITH ANY IMPROVEMENTS SHALL BE ADJUSTED AS REQUIRED, INCLUDING BOTH HORIZONTAL AND
VERTICAL CONFLICTS.
6. RIM ELEVATIONS FOR DRAINAGE AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC AND TELEPHONE PULL BOXES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE SET/RESET AS FOLLOWS:
A. PAVEMENTS AND CONCRETE SURFACES: FLUSH
B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH
C. LANDSCAPE OR LOAM AND SEED AREAS: ONE INCH ABOVE SURROUNDING AREA AND TAPER EARTH TO THE
RIM ELEVATION.
7. ANY EXISTING UTILITY STRUCTURE, BOX OR POLE IN HORIZONTAL CONFLICT WITH ANY PAVEMENT
RECONSTRUCTION AND/OR WIDENING SHALL BE RELOCATED.
8. IMMEDIATELY PRIOR TO THE END OF CONSTRUCTION OR ACCEPTANCE BY THE COR, THE CONTRACTOR SHALL INSPECT ALL CATCH BASINS AND DRAINAGE MANHOLES WITHIN AND DOWNSTREAM OF THE LIMITS OF WORK.
PIPES AND STRUCTURES SHALL BE CLEANED AND FLUSHED AS NECESSARY.
9. THE CONTRACTOR SHALL WORK WITH THE COR AND VA STAFF TO VERIFY EXISTING CONDITIONS OF ELECTRICAL SYSTEMS BEING SPLICED TO WITH PROPOSED LIGHTING. WIRE SIZES AND BREAKER SIZES SHALL BE VERIFIED PRIOR TO ANY WORK TO ENSURE ACCURACY WITH THE PLAN. THE CONTRACTOR SHALL PROVIDE LARGER WIRE
SIZES WHERE NECESSARY TO SPLICE TO EXISTING CIRCUITS.
10. PROPOSED STORMWATER PIPE LENGTHS ARE SHOWN FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE, WITH EXCEPTION OF PIPES ASSOCIATED WITH STRUCTURE 102. FOR STRUCTURE 102 PIPE
LENGTHS ARE TERMINATED AT THE STRUCTURE WALL.
11. SEAL BETWEEN CONCRETE STRUCTURES WITH BUTYL RUBBER SEALANT MEETING ASTM C-990-91.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING UTILITIES. EXISTING UTILITIES DETERMINED TO BE PREVIOUSLY ABANDONED SHALL BE DISCUSSED WITH THE COR IF THE UTILITY SHALL REMAIN IN PLACE OR BE REMOVED, UNLESS OTHERWISE SHOWN ON THE PLANS. ANY UTILITY UNABLE TO BE PREVIOUSLY VERIFIED, INCLUDING ANY "LOST SIGNAL" UTILITY, SHALL BE FURTHER INVESTIGATED BY THE CONTRACTOR AND DISCUSSED WITH THE COR PRIOR TO ANY UTILITY DISRUPTION AND/OR REMOVAL.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE EXISTING LIGHT POLES AND CALL BOXES DURING DEMOLITION, FOR REUSE. ANY DAMAGE TO THE EXISTING POLES AND CALL BOXES SHALL BE REPLACED
AT THE CONTRACTORS EXPENSE.
14. THE SURVEY WAS UNABLE TO DETERMINE SEVERAL UPSTREAM PIPE END LOCATIONS THAT ENTER EXISTING MANHOLE #2. IF DURING CONSTRUCTION, THE CONTRACTOR DETERMINES THE PIPES ARE NO LONGER IN USE, THE CONTRACTOR SHALL NOTIFY THE COR AND REMOVE THEM. IF THE PIPES ARE IN USE, THE CONTRACTOR
WILL NOTIFY THE COR AND REPLACE THE CLAY PIPES WITH HDPE.
GENERAL NOTES
1. THESE PLANS ARE FOR THE RECONSTRUCTION OF THE EMPLOYEE PARKING LOT AND TO CORRECT STORM
WATER DEFICIENCIES. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH THE VAMC.
2. THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS PREPARED FOR DESIGN- REPAIR PARKING LOT FOR
ALBANY STRATTON VAMC, PREPARED BY ACELA ARCHITECTS + ENGINEERS, P.C.
3. THE CONTRACTOR SHALL NOTIFY "DIG-SAFE" (1-800-962-7962) AT LEAST 72 HOURS PRIOR TO EXCAVATION.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS AROUND THE ENTIRE WORK AREA. THE CONTRACTOR SHALL NOT BEGIN WORK UNTIL THE SITE SAFETY PLAN HAS BEEN APPROVED BY THE VA'S SAFETY OFFICER.
5. UPON AWARD OF CONTRACT, THE CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS, APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS ASSOCIATED WITH THE WORK INDICATED WITHIN THE CONSTRUCTION PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS
AND/OR FIRE HYDRANTS WITHOUT APPROPRIATE PERMITS AND/OR PERMISSIONS.
6. THE CONTRACTOR SHALL BE REQUIRED TO OBTAIN A WATER AND SEWER PERMIT FROM THE CITY OF ALBANY FOR THE WORK ON DRAINAGE STRUCTURE NUMBER 5. THE STRUCTURE IS LOCATED WITHIN A MAINTENANCE
EASEMENT.
7. TRAFFIC SIGNAGE (TEMPORARY AND PERMANENT) SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(MUTCD) FOR ALL LOCAL RIGHTS OF WAY AND BE IN ACCORDANCE WITH TRAFFIC MANAGEMENT PLANS. THE TRAFFIC MANAGEMENT PLANS SHALL BE PART OF THE SITE SAFETY PLANS AND
SHALL BE APPROVED BY THE VA'S SAFETY OFFICER.
8. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTORS OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S
EXPENSE.
9. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF SIX (6) INCHES OF
TOPSOIL. THESE AREAS SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
10. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
OWNER.
11. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO
COST TO OWNER.
12. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES DAILY. NO OPEN
TRENCHES SHALL BE LEFT UNATTENDED OR OUTSIDE OF THE PROTECTED WORK AREA.
13. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE SURVEY. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE
COMMENCING OR PROCEEDING WITH WORK.
14. THE ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. METHODS AND MATERIALS USED IN THE CONSTRUCTION OF IMPROVEMENTS FOR THIS PROJECT SHALL CONFORM TO THE CURRENT CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE NEW
YORK DEPARTMENT OF TRANSPORTATION.
15. MATERIALS WHICH COULD BE A POTENTIAL SOURCE OF STORMWATER POLLUTION, SUCH AS GASOLINE, DIESEL FUEL, HYDRAULIC OIL, ETC., SHALL BE STORED AT THE END OF EACH DAY IN A STORAGE TRAILER OR COVERED LOCATION, OR TAKEN OFF-SITE AND PROPERLY DISPOSED. ALL TYPES OF WASTE GENERATED AT THIS SITE
SHALL BE DISPOSED OF IN A MANNER CONSISTENT WITH APPLICABLE REGULATIONS.
16. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES
SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION TO THE
SATISFACTION OF THE COR.
18. AN APPROVED SET OF PLANS, SPECIFICATIONS AND ALL APPLICABLE PERMITS MUST BE AVAILABLE AT THE
CONSTRUCTION SITE.
19. THE CONTRACTOR AGREES THAT HE/SHE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL AND ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM "THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER." THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING A PROTECTIVE BARRIER
AROUND THE SITE PRIOR TO AND MAINTAINED DURING CONSTRUCTION.
20. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS ISSUED BY ACELA ARCHITECTS + ENGINEERS P.C. ANY DEVIATIONS FROM THESE DOCUMENTS SHALL REQUIRE NOTIFICATION TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF/OR CONSTRUCTION OF ANY CHANGE.
WITHOUT NOTIFICATION TO THE ENGINEER, THE CONTRACTOR WILL BE WORKING AT HIS/HER OWN RISK. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF THE COR AND THE ENGINEER SHALL BE CORRECTED AT
THE CONTRACTORS EXPENSE.
21. ALL CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE COR AT LEAST 72 HOURS PRIOR TO THE
START OF THE CONSTRUCTION ACTIVITY.
22. THE CONTRACTOR SHALL MAINTAIN UPDATED RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. AS BUILT DRAWINGS SHALL BE UPDATED AS CONSTRUCTION PROGRESSES. RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO EXCEPTION ALLOWED**. THE UPDATED ON-SITE DRAWINGS SHALL BE MADE
AVAILABLE TO THE COR AND/OR DESIGN ENGINEER UPON REASONABLE REQUEST.
23. ANY SINKHOLE ENCOUNTERED HAS TO BE REPAIRED PER PLAN APPROVED BY THE COR FROM THE PROFESSIONAL GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR.
EROSION CONTROL NOTES
1. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE CONSTRUCTION & EROSION AND
SEDIMENTATION POLLUTION CONTROL PLAN (ENS) PREPARED FOR THE PROJECT.
2. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE COR AND SHALL
INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS.
3. THE CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES DAILY, REMOVE SEDIMENT ON A WEEKLY BASIS AND WITHIN TWELVE HOURS AFTER EACH STORM EVENT, AND DISPOSE OF SEDIMENT. SEDIMENT SHALL BE REMOVED FROM THE SITE OR PLACED ON THE SITE AS DIRECTED BY
THE COR.
4. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT
SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH SEDIMENTATION
IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.
5. THE CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR A MINIMUM TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO
PREVENT EROSION.
6. THE CONTRACTOR SHALL INSTALL PROTECTIVE MEASURES TO PREVENT DEBRIS AND/OR SEDIMENT FROM ENTERING DRAINAGE CATCH BASINS AND PIPES. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OR PERMANENT GROUND COVER, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF
EROSION CONTROL MEASURES AND REMOVE ANY DEBRIS AND/OR SEDIMENT FROM ALL DRAINAGE
INFRASTRUCTURE.
7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTROL DUST AND TAKE ALL NECESSARY MEASURES TO ENSURE ALL ROADS ARE MAINTAINED IN A DUST FREE CONDITION AT ALL TIMES THROUGHOUT THE DURATION OF THE PROJECT. REPETITIVE TREATMENTS SHOULD BE APPLIED AS
NECESSARY.
8. PERMANENT VEGETATIVE COVER SHALL BE INSTALLED TO ALL DISTURBED AREAS THAT HAVE REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE
CONSTRUCTION ACTIVITY IN ANY GIVEN AREA HAS PERMANENTLY CEASED. THE RECOMMENDED
PERMANENT SEEDING DATES ARE APRIL 1 TO JUNE 15 AND AUGUST 15 TO OCTOBER 1.
9. TEMPORARY VEGETATIVE COVER SHALL BE APPLIED TO ANY DISTURBED AREAS (INCLUDING SOIL STOCKPILE AREAS) THAT HAVE NOT YET REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED, UNLESS THE ACTIVITY IS TO RESUME WITHIN TWENTY-ONE (21) DAYS. THE RECOMMENDED
TEMPORARY SEEDING DATES ARE MARCH 1 TO JUNE 15 AND AUGUST 15 TO OCTOBER 1.
10. AREAS WHICH HAVE BEEN TEMPORARILY OR PERMANENTLY SEEDED SHOULD BE MULCHED IMMEDIATELY FOLLOWING SEEDING IN ADDITION TO AREAS WHICH CANNOT BE SEEDED WITHIN THE RECOMMENDED SEEDING DATES AND ANY SOIL STOCKPILE AREAS. TEMPORARY MULCHING SHOULD BE PERFORMED AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED UNLESS THE ACTIVITY IS TO RESUME WITHIN TWENTY-ONE (21)
DAYS. STRAW OR HAY MULCH, WOOD FIBER MULCH, AND HYDROMULCH ARE RECOMMENDED. THE
MATERIALS USED IN MULCHING SHALL CONFORM TO THE REQUIREMENTS LISTED IN THE NEW YORK
STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENTATION CONTROL.
11. ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAIN EVENTS, TO CHECK FOR EROSION. WHERE EROSION IS OBSERVED, ADDITIONAL MULCH MUST BE APPLIED. IF NETTING IS USED, THE NET SHOULD BE INSPECTED AFTER RAIN EVENTS FOR DISLOCATION OR FAILURE. IF WASHOUTS OR BREAKAGE OCCUR, THE NET MUST BE REINSTALLED AS NECESSARY AFTER REPAIRING DAMAGE TO SLOPE. INSPECTIONS SHOULD TAKE PLACE UNTIL VEGETATIVE COVER IS FIRMLY ESTABLISHED.
VEGETATION IS CONSIDERED TO BE FIRMLY ESTABLISHED AT A MINIMUM HEIGHT OF THREE (3) INCHES.
ANY EXISTING OR PROPOSED CATCH BASINS THAT MAY BE SUBJECT TO SEDIMENTATION PROCESSES SHALL HAVE INLET PROTECTION INSTALLED TO PREVENT SEDIMENT FROM ENTERING THE PROPOSED STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED SITE. THE PROPER INLET PROTECTION DEVICES SHALL BE INSTALLED WHERE STORMWATER CATCH BASINS ARE TO BE
MADE OPERATIONAL BEFORE PERMANENT STABILIZATION OF ANY DISTURBED DRAINAGE AREA.
12. THE CONTRACTOR SHALL RESTORE DISTURBED AREAS AS CLOSELY AS POSSIBLE. AREAS DAMAGED
DURING CONSTRUCTION SHALL BE RESODDED, RESEEDED, OR OTHERWISE RESTORED TO THEIR
ORIGINAL STATE. TREES AND OTHER EXISTING VEGETATION SHALL BE RETAINED WHEREVER FEASIBLE.
13. THE CONTRACTOR SHALL PREVENT DUST, SEDIMENT AND DEBRIS FROM EXITING THE SITE AND SHALL BE
RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF NECESSARY.
14. ALL EXISTING AND PROPOSED CATCH BASINS SHALL RECEIVE INLET PROTECTION. AN APPROPRIATE
INLET PROTECTION OPTION SHALL BE SELECTED BASED ON LOCATION AND TRIBUTARY AREA.
15. PERIMETER CONTROL SHALL BE INSTALLED DOWNSLOPE OF ALL DISTURBANCE. AN APPROPRIATE
OPTION FOR PERIMETER CONTROL SHALL BE SELECTED BASED ON LOCATION AND UPSLOPE
DISTURBANCE. COMPOST FILTER SOCK AND SILT FENCE ARE VIABLE OPTIONS FOR PERIMETER CONTROL.
16. ALL DISTURBED SLOPES OF 3:1 OR STEEPER SHALL RECEIVE EROSION CONTROL MATTING AND BE
IMMEDIATELY STABILIZED.
17. ALL EXISTING AND PROPOSED CATCH BASINS SHALL BE CLEANED OUT BY THE CONTRACTOR AT THE END
OF CONSTRUCTION.
18. A CONCRETE TRUCK WASHOUT IS LOCATED ALONG THE SOUTHEAST PROPERTY LINE OF THE MEDICAL
CAMPUS. THE CONTRACTOR SHALL COORDINATE USE OF THE WASHOUT WITH THE COR AT LEAST
24-HOURS IN ADVANCE TO ALLOW FACILITY PERSONEL TO BLOCK OFF PARKING STALLS TO BE ABLE TO
ACCESS THE WASHOUT LOCATION.
19. EROSION CONTROL FEATURES HAVE BEEN INCORPORATED IN TO THE PHASING PLANS.
ELECTRICAL NOTES
1. LOCATIONS OF UNDERGROUND ELECTRIC ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING LOCATIONS PRIOR TO ANY REMOVAL AND/OR RELOCATION. ANY DISRUPTION TO AN EXISTING ELECTRICAL CIRCUIT SHALL BE APPROVED BY THE COR PRIOR TO DISRUPTION. ANY DISCREPANCY ON THE PLAN REGARDING SUBSURFACE UTILITES SHALL BE REPORTED TO THE COR. IT IS POSSIBLE THAT A SINGLE ELECTRIC LINE , AS SHOWN ON THE PLANS, COULD REPRESENT MULTIPLE LINES, ALSO, THESE LINES MAY BE ACTIVE OR ABANDONED. THE CONTRACTOR
SHALL VERIFY PRIOR TO REMOVAL AND/OR RELOCATION. CONTRACTOR IS RESPONSIBLE FOR
ADJUSTMENTS AS NECESSARY TO MATCH FIELD CONDITIONS.
2. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING ALL EXISTING ELECTRICAL
CONDUCTORS AND CONDUIT FOR PARKING LOT. THIS INCLUDES ALL LIGHT POLES WITHIN AND
SURROUNDING PARKING LOT, DRIVEWAYS AND ADJACENT SIDEWALK.
3. CONTRACTOR SHALL REMOVE ALL ABANDONED LINES. PRIOR TO REMOVAL THE CONTRACTOR SHALL
COORDINATE WITH COR.
4. THE CONTRACTOR IS RESPONSIBLE FOR CAREFULLY REMOVING AND REUSING THE CABLING FOR THE EXISTING GATES. THE CONTRACTOR SHALL REMOVE TO NEAREST HANDHOLE. IF THE HANDHOLE IS BEING REMOVED, THE CONTRACTOR SHALL REMOVE TO NEW HANDHOLE LOCATION AND TIE ACCORDINGLY.
5. THE MINIMUM 90-DEGREE BEND RADIUS FOR CONDUIT IS 6 TIMES THE INTERNAL DIAMETER OF THE CONDUIT. CONDUITS ENTERING A VAULT MUST ENTER THE BODY OF THE VAULT. CONDUITS MUST NEVER ENTER THE TRAFFIC RING.CONDUITS MUST MAINTAIN A 12 INCH SEPARATION FROM OTHER CONDUITS
(ELEC., GAS, ETC.)
6. INSTALL PULL CORDS IN ALL CONDUIT. WHEN PULLING CABLE IN CONDUIT INSTALL A PULL CORD WITH
THE CABLE SO ADDITIONAL CABLE CAN BE INSTALLED LATER IF NEEDED.
TRAFFIC MANAGEMENT NOTES
1. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG
ROADWAYS AT ALL TIMES, EXCEPT WHERE STATED ON THE PHASING PLAN, OR IF
GIVEN PERMISSION BY THE VAMC AND CONTRACTING OFFICERS REPRESENTATIVE.
2. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE,
CONES AND BARRELS REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK
CLOSURE.
3. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND
CROSSWALK CLOSURES.
4. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE
MAINTAINED DAILY AFTER CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
5. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, PARKING LOT, DRIVEWAY
AND/OR SIDEWALK CLOSURES WITH THE VAMC PRIOR TO PERFORMING WORK.
LAYOUT AND MATERIALS NOTES
1. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY EXISTING
PAVEMENT, WALKWAY AND BUILDING ELEVATIONS AT INTERFACE WITH PROPOSED
PAVEMENTS AND WALKWAYS, AS WELL AS EXISTING GROUND ELEVATIONS
ADJACENT TO MANHOLES AND DRAINAGE STRUCTURES TO ASSURE PROPER
TRANSITIONS BETWEEN EXISTING AND PROPOSED FACILITIES.
2. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS
AND ARE NOT NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS
ON THE DRAWINGS. THE CONTRACTOR SHALL REFER TO THE DETAIL SHEET
DIMENSIONS, MANUFACTURER'S LITERATURE, SHOP DRAWINGS AND FIELD
MEASUREMENTS OF SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES.
3. THE CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS,
SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT
SHALL FIELD VERIFY LOCATION OF PROJECT FEATURES.
4. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
- ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY
PRODUCT OR ASSEMBLY. WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY
ILLUSTRATED BY THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR
ASSEMBLY.
- THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS
REQUIREMENTS OF SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE
"BASIS OF DESIGN" MAY VARY FROM THAT SHOWN BY THE DRAWINGS.
- THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR
ASSEMBLY IN LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS
APPROVED BY THE COR. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO
ADDITIONAL EXPENSE TO THE OWNER) FOR ALL COORDINATION AND REVISIONS
TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME
FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS
OF DESIGN" SHOWN BY THE CONTRACT DOCUMENTS.
- THE STORMWATER CONTROL ASSEMBLY EQUIPMENT AND PROGRAMMING
NOTED AS BEING PROCURED BY OPTI ARE NOT SUBJECT TO ALTERNATIVES OR
EQUIVALENCY. THE OPTI SYSTEM SHOWN IS PROPRIETARY AND MUST BE USED
ON THIS PROJECT.
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL BE AWARE THAT THE CAMPUS IS A FUNCTIONING
HOSPITAL AND SHALL WORK WITH THE VA AND COR THROUGHOUT CONSTRUCTION
TO ENSURE THAT THE CAMPUS IS ABLE TO FUNCTION AS INTENDED. THE
CONTRACTOR MUST NOTIFY THE COR BEFORE CLOSURE OF ANY PARKING LOTS,
ROADS, DRIVEWAYS AND SIDEWALKS. FULL CLOSURES OF ROADWAYS AND PARKING
LOTS WILL NOT BE PERMITTED, UNLESS OTHERWISE APPROVED BY THE COR.
2. CONTRACTOR STAGING FOR ALL PHASES SHALL BE LOCATED WITHIN EACH PHASE,
ALONG THE GRASS AREA BETWEEN THE EMPLOYEE PARKING LOT AND HOLLAND
AVENUE, OR AS DIRECTED BY THE COR. THE LOCATION IS SHOWN ON EROSION AND
SEDIMENTATION CONTROL PLANS, HOWEVER THE EXACT LOCATION AND EXTENT
SHALL BE COORDINATED WITH THE COR PRIOR TO CONSTRUCTION.
3. DAILY ACCESS TO THE EMPLOYEE PARKING AREA, NOT WITHIN THE CURRENT PHASE,
IS REQUIRED.
4. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TRAFFIC CONTROL
STRUCTURES AND PERSONNEL REQUIRED FOR LANE OR SIDEWALK CLOSURES.
LOCATION OF SUCH TRAFFIC CONTROL DEVICES SHALL BE COORDINATED WITH THE
COR BEFORE CLOSURE. OVERNIGHT CLOSURES REQUIRE SIGNS WITH FLASHING
LIGHTS.
5. SUB PHASES WITHIN EACH PHASE SHALL BE APPROVED BY THE COR PRIOR TO
CONSTRUCTION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TYING THE ENDS OF EACH PHASE
BACK TO EXISTING CONDITIONS TO ENSURE A SAFE TRANSITION BETWEEN PHASES.
BEFORE COMPLETION OF EACH PHASE THE CONTRACTOR SHALL OBTAIN APPROVAL
FROM THE COR AND COMPLETE ANY REQUIRED TRANSITION WORK.
7. THE CONTRACTOR SHALL PROVIDE THE COR WITH A SITE SAFETY PLAN PRIOR TO
CONSTRUCTION.
8. CONSTRUCTION FENCING SHALL BE INSTALLED BEFORE THE START OF EACH PHASE.
9. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING ALL WORK IN EACH PHASE IN
A MANNER TO ALLOW FOR THE FULL FUNCTIONALITY OF THE REMAINING PARKING
AREAS. ALL WORK SHALL BE PERFORMED IN A SAFE MANNER AND PROVIDE SAFE
TIE-INS TO EXISTING FEATURES.
10. THE COR RESERVES THE RIGHT TO MODIFY PHASE BOUNDARIES AS NECESSARY.
11. IF THE PROJECT IS NOT COMPLETE PRIOR TO WINTER SHUT DOWN, THE
CONTRACTOR MUST LEAVE THE LOT IN A CONDITION WHICH ALLOWS FOR SNOW
REMOVAL. ADDITIONALLY, THE CONTRACTOR SHALL MAKE PARKING AVAILABLE FOR
ALL UNDISTURBED PHASES AND TO THE GREATEST EXTENT POSSIBLE WITHIN THE
ACTIVE PHASE AREA. TEMPORARY STRIPING MAY BE REQUIRED. CONSTRUCTION
FENCING IN AREAS REQUIRING SNOW PLOWING WILL NOT BE ALLOWED, HOWEVER
THE CONTRACTOR SHALL PROVIDE SAFETY BARRIERS ALONG ANY TEMPORARY
GRADING.
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text Design - Repair Parking Lot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GI002
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text General Notes Sheet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
528A8-16-807
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date: 1/19/2021 Witczak Geary
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Dwg. of
Drawing Title
Approved:
Phase
Project Director
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text Design - Repair Parking Lot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GI003
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Summary Of Quantities
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
S
EX. MH 3
TG:192.37
INV. IN:164.9(NW - 30")
INV. IN:165.1(NE - 8")
INV. IN:185.6(S - 12")
INV. IN:185.6(S - 30")
INV. OUT:164.8
EX. CB 1A
TG:191.57
INV. IN:187.9(SE- 6")
INV. OUT:184.8
EX. CB 1B
TG:191.18
INV. OUT:188.1
EX. CB 10
TG:190.88
INV. OUT:186.6
STS
STS
STS
STS
STS
STS
E X.
6' of
" V
CP
S =0
.01
EX
. 4
0' of
" V
CP
S=
0.0
ST
S
E X.
' o f 3 0"
R
CP
S =0
.02
STS
E X.
' o f 3 0"
R
CP
S =0
.03
EX. 9' of 6" HDPE S=0.020**ASSUMED**
ST
S
ST
S
E X.
8' of
" C
MP
S =0
.00 0*
*A
SS
UM
ED
S
EX. MH 9
TG:197.75
INV. IN:187.7(SE - 12")
INV. IN:189.4(SW - 12")
INV. IN:189.8(SW - 12")
INV. OUT:187.4
ST
S
ST
S
ST
S
ST
S
EX
. 2 ' o f 1 5"
RC
P S
=0 .01
ST
S
EX
. 1
2" R
CP
EX. 12" RCP
EX. CB 15
TG:196.35
INV. IN:194.4(NW - 8")
INV. IN:194.4(SE - 8")
INV. OUT:194.2
EX
. 8
" H
DP
E
EX. 45'
of 12" PVC
S=0.098
EX
. 8
" H
DP
E
STS
STS
STS
STS
STS
STS
STS
STS
E X.
4' of
" V
CP
S =0
.00
ELKS MEMORIAL DRIVE
HO
LL
AN
D
AV
EN
UE
VE
TE
RA
NS
W
AY
EX. BUS
SHELTER
EX
. G
RA
NI
TE
C
UR
B
EX
. C
ON
CR
ET
E
CU
RB
X X
X X
X X
X X
X X
X X
X
X X X X X
EX
. C
ON
CR
ET
E
SI
DE
W
AL
K
T
EX. PARKING
METER
EX. 18"
DECD.
EX. 24"
DECD. EX. 12"
DECD.
EX. 18"
DECD.
EX. LP
#14
EX. NO
STOPPING
ANYTIME SIGN
EX. 18"
DECD.
EX. BUS
STOP
EX. 18"
DECD.
EX. 24"
DECD.
EX. TRAFFIC
JUNCTION BOX
E EX. LP #32 EX. LP #31 EX. LP #30 EX. LP #29
EX. LP #28
EX. LOOP
DETECTORS
EX. PLCC CURBEX. GRANITE
CURB
EX. 18"
DECD.
EX. 18"
DECD.EX. 15"
DECD. EX. 15"
DECD.
EX. 3"
DECD.
EX. 3"
DECD.
EX. LP #33
EX. PLCC CURB
T
EX. TRAFFIC
JUNCTION BOX
EX. TRAFFIC SIGNAL
EX. LP #13
EX. TWS
EX. TWS
EX. PLCC CURB
EX. EHH EX. LP #34
EX. WOODEN
SPLIT RAIL
FENCE
EX. RETAINING
WALL
EX. PLCC CURB
EX.
FH
EX.
WV
EX. BOLLARD(2)
EX. CONC. PAD
W/ BENCH (TYP.)EX. CONC. PAD
W/ BENCH (TYP.)
EX. 4"
DECD.
EX. 4"
DECD.
EX. LP #27
EX. LP #35
EX.PLCC
CURB
[8m ]13
[4m
EX. VA
DIRECTIONAL SIGN
EX. LP #36
EX. LP #37
EX.STOP
SIGN
EX.
STOP
SIGN
EX. SPEED
LIMIT SIGN (5
MPH)
EX. LP
#70
EX
. G
RA
NI
TE
CU
RB EX. LP
#71
EX. PEDESTRIAN
CROSSING SIGN
EX. PEDESTRIAN
CROSSING SIGN
E
EX. LP
#72
EX. 15"
DECD. EX. 15"
DECD.
EX. 15"
DECD.
EX. 15"
DECD.
EX. 12"
DECD.
EX. CONC. PAD
W/ TRASH CAN
EX. LP
#26
EX. LP
#25
EX
. P
OS
SI
BL
E
UN
DE
RG
RO
UN
D
EL
EC
TR
IC
EX. LP #20
W/ EMERG.
BOX
EX. CATCH BASIN AS
PER RECORD PLAN
(NOT FIELD VERIFIED)
EX. LP #21
EX. CONCRETE RETAINING
WALL & SIGNAGE
EX. CONCRETE
RETAINING WALL
EX. RESERVED PARKING
SPACES & SIGNAGE
EX. EHH
EX.
LP #9
[5.
5m
[8.
7m
[5.
6m
[5.
4m
9' [2.6m]
[7.
4m
EX. LP #15
EX.
TWS
5 19
7 19
3 19
5 195
2 19219
3 193 19419
198199
5 19319
419619
4 19
EX. LP
#73
EX. 2"
DECD.
EX. 2"
DECD.
EX. LP
#19
EX. PEDESTRIAN
CROSSING SIGN
DR
V.
'A
DRV. 'B'
EX. EHH
EX. EHH
(T.B.R.)
EX. EMH
EX.
THH
EX.
THH
EX. EHH
EX. EHH
EX.
EMH
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)(T.B.R.)
(T .B
.R
(T.B.R.) (T.B.R.)
SWCT
SW
CT
SW
CT
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T .B
.R
EX. LP
#23
EMPLOYEE PARKING LOT
(T.B.R.)
(T .B
.R
EX. TWS
EX.
TWS
EX.
TWS
EX.
TWS
(T.B.R.)
EX.
BOLLARD (3)
(T.B.R.)
(T.B.R.)
EX. TWS
(T.B.R.)
(T.B.R.)
BM3
BM1
EX. CB 11
TG:191.00
INV. OUT:187.0
ELEC. LINE
(T.B.R.)
PARKING SPACES = 787 (ADA SPACES = 38)
BM4
EX. RESERVED PARKING/
CARPOOL ONLY BY
PERMIT SIGNAGE
EX. NO PARKING
ANYTIME SIGN
AA
B
C CD D D D D D
D
D D
D
EX. MOTORCYCLE
PARKING ONLY
ENFORCED AT ALL
TIMES 24/7 SIGNAGE
EEEEE E
F FFF G
EX. LP #22
H
A A
(T.B.R.)
EX. TWS
(T.B.R.)
(T.B.R.)
(T.B.R.)
EX.
TWS
(T.B.R.) EX. TWS
(T.B.R.)
E F I
J J
J
JD
G
H
J
EX. LP#24
EX. EHH
(T.B.R.)
(T.B.R.)
(T.B.R.)
EX. CONCRETE SIDEWALKEX. CONCRETE WALK
EX
. C
ON
CR
ET
E
SI
DE
W
AL
K
EX
. C
ON
CR
ET
E
SI
DE
W
AL
K
EX
. C
ON
CR
ET
E
W
AL
K
EX
. C
ON
CR
ET
E
W
AL
K
LOST SIGNAL, THE CONTRACTOR
SHALL FIELD VERIFY THE TERMINAL
AND DEMO THE EX. UNDERGROUND
ELEC. LINE RUNNING UNDER PVMT.
LOST SIGNAL, THE CONTRACTOR
SHALL FIELD VERIFY THE TERMINAL
AND DEMO THE EX. UNDERGROUND
ELEC. LINE RUNNING UNDER PVMT
IF NO LONGER IN USE.
EX. TWS
EX. TWS
CS117
EXISTING CURBING TO BE REMOVED
THE CONTRACTOR SHALL CAREFULLY REMOVE
THE STONE CURBING AND TURN OVER TO THE
COR. BROKEN UNITS SHOULD BE DISPOSED OF
OFFSITE AT THE CONTRACTOR'S EXPENSE.
SITE SYMBOL - DEMOLITION
TO BE REMOVED(T.B.R.)
EXISTING STORM STRUCTURE TO BE REMOVED
EXISTING FULL DEPTH PAVEMENT
TO BE REMOVED
PAVEMENT SAWCUT
EXISTING CONCRETE TO BE REMOVED
VALVES, MANHOLE LIDS, INLET TOPS AND
METAL LIDS TO BE ADJUSTED TO GRADE
AS REQUIRED.
EXISTING LAWN AREA TO BE REMOVED
AND RESTORED
LIGHT POLE TO BE REMOVED
DECIDUOUS TO BE REMOVED
STORM/SAN SEWER LINE TO BE REMOVED
STORM/SAN PIPES TO BE FIELD VERIFIED AND
CONNECTED TO PROPOSED STORM/SAN LINE2
S
WATER LINE TO BE REMOVED
ELECTRIC LINE, UNDERGROUND TO BE REMOVED
STS
EXISTING MULCH AREA TO BE REMOVED
EU
W
SWCT
EXISTING ACCESS CONTROL SYSTEM TO BE
REMOVED (EX. LOOP DETECTORS, CARD
READERS, GATE AND ARM)
A EXISTING PARKING LOT STEEL POLE W/MISSING
SIGNAGE
B EXISTING COMMUTE W/ ENTERPRISE SIGN
C EXISTING ADA PARKING/ VAN ACCESSIBLE SIGN
D EXISTING ADA PARKING SIGN
E EXISTING RESERVED PARKING/CARPOOL ONLY
BY PERMIT SIGN
F EXISTING ENFORCED AT ALL TIMES SIGN
G EXISTING "→" SIGN
H EXISTING "←" SIGN
I EXISTING "↔" SIGN
J EXISTING RESERVED FOR PERSON WITH
HANDICAPPED ASSISTED DEVICES SIGN
4 EXISTING SIGNS TO BE CAREFULLY REMOVED,
PROTECTED, AND SAVED FOR REUSE.
REMOVE WIRE, ABANDON CONDUIT IN PLACE,
CAP ANY WIRE REMAINING. REMOVE/REPLACE
DAMAGED SIDEWALK/ PAVEMENT
6 REMOVE/REPLACE DAMAGED SIDEWALK
DURING EARTHWORK ACTIVITIES
CUT AND CAP WATER LINE OUTSIDE OF VAULT.
ASSUMED TO BE 12" DIP. CONTRACTOR TO
FIELD VERIFY.
EX. CB 7
TG:195.40
INV. OUT:190.7
EX. CB 6
TG:194.54
INV. OUT:189.9
EX. CB 8
TG:193.97
INV. OUT:189.3
S
EX. MH 1
TG:193.63
INV. IN:189.2(NE- 8")
INV. IN:189.2(E- 8")
INV. OUT:189.1
S
EX. CB 9
TG:191.88
INV. IN:186.9(NE- 12")
INV. OUT:186.8
EX. CB 4
TG:189.09
INV. IN:183.5(SE- 12")
INV. IN:183.4(N- 12")
INV. OUT:183.2
EX. CB 2
TG:188.07
INV. IN:184.8(SE- 12")
INV. OUT:184.7
STS
STS
STS
STS
STS
STS
E X.
6' of
" V
CP
S =0
.01
EX. 30" VCP
(SILTED
CLOSED)
STS
STS
EX. 12" HDPE EX. 8" PVC
ST
S
EX. 77' of 18" CMP S=0.010
ST
S
E X.
8' of
" C
MP
S =0
.00 0*
*A
SS
UM
ED
ST
S E
X.
' o f 1
2" C
MP
S
=0 .01
STS
EX. 75' of 12" CMP S=0.032
STS
STS
EX. 96' of 12" CMP S=0.035
ST
S
E X.
' o f 1 2"
V
CP
S =0
.00
STS
STS EX. 105' of 12" VCP S=0.024
EX. 12" VCP
EX. 12" VCP
STS
STS
EX. 93' of 8" VCP S=0.016
ST
S
ST
S
EX. 97' of 8" VCP S=0.026
EX. 46' of 8" VCP S=0.015
BLIND CONNECTION AS
PER RECORD DRAWING
S
STS
S
EX. MH 5
TG:194.94
INV. IN:181.1(SW - 18")
INV. OUT:181.0
S
EX. MH 6
TG:194.65
INV. IN:182.6(S - 18")
INV. OUT:182.5
S
S
EX. MH 8
TG:198.83
INV. IN:183.5(S - 15")
INV. IN:183.5(E - 8")
INV. OUT:183.4
ST
S
ST
S
ST
S
ST
S
STS
EX. 8" PVC
EX. 6" PVC
EX. 6" VCP
EX. CB 14
TG:194.76
INV. OUT:190.5
EX. CB 13
TG:194.04
INV. IN:190.8(SW - 12")
INV. OUT:190.4
S
EX. MH 11
TG:204.38
INV. IN:195.5(NW - 12")
INV. OUT:195.4
EX
. 1
2" V
CP
STS
EX. PARKING GARAGE
EX
. G
RA
NI
TE
C
UR
B
EX
. G
RA
NI
TE
C
UR
B
X X
X X
X
PO
SS
IB
LE
U
ND
ER
GR
OU
ND
E
LE
CT
RI
C
EX. PLCC CURB
EX. PEDESTRIAN
PUSHBUTTON
PEDESTAL
EX. 12"
DECD.
EX. LP #16
EX. NO
STOPPING
ANYTIME SIGN
EX. BIKE LANE
SIGN
EX. 18"
DECD.
EX. 18"
DECD.
EX. 22"
DECD.
EX. 15"
DECD.
EX. 18"
DECD.
EX. EMH
E
EX. WATER
VAULT W/ METAL
COVER
EX. 4"
DECD.
EX. LP #17
EX. LP #15
EX. NO STOPPING
ANYTIME SIGN
EX. BIKE LANE
/SHARE THE
ROAD SIGN
EX. PARKING
EX. 22"
DECD.
EX. LP
#10
9' 24
[7.
4m
[5.
6m
[5.
2m
9' [2.6m]EX. LP #14
EX. LP #11
EX. EHH
LOST SIGNAL, THE CONTRACTOR
SHALL FIELD VERIFY THE TERMINAL
AND DEMO THE EX. UNDERGROUND
ELEC. LINE
T
EX. TRAFFIC
JUNCTION BOX
T
EX. TRAFFIC
JUNCTION BOX
EX. EHH
EEX.
EMH
EX. EHH
EX.
WV
EX.
WV
EX. FH
EX. BOLLARD(2)
EX.
WV
EX. WV
EX.
FH
EX. BOLLARD(2)
EX. WV
EX
. G
RA
NI
TE
CU
RB
T
EX. TRAFFIC
JUNCTION
BOX
EX.
EHH
EX. (4)GOV.
VECH SIGNS
EX. LP #5
EX. LP
#6
EX.STOP
SIGN
EX.GOV.
VECH.
SIGN
201202
0195 19
319419
7 19
4 20
4 19619
EX. LP
EX. PEDESTRIAN
CROSSING SIGN
EX. PEDESTRIAN
CROSSING SIGN
EX. 2"
EX. LP#74
EX. CEDARS
EX. LP #7
EX. SPEED
LIMIT SIGN (5
MPH)
EX. 2"
DECD.
EX. 3"
DECD.
EX. LP #16
W/ EMERG.
BOX
EX. LP #13
EX. ABANDONED
WATERLINE
EX. LP
#18
DRV. 'C'
DRV. 'D'
NOT FIELD
SURVEYED
EX. EHH
EX. EHH
EX.
EHH
EX.
EHH
EX.
EHH
EX. EHH
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T .B
.R
(T.B.R.)(T.B.R.)
(T.B.R.)
1 1
SWCT
SWCT
SW
CT
SW
CT
EX. 2"
DECD.
(T.B.R.)
(T .B
.R
(T.B.R.)
(T .B
.R
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
EMPLOYEE PARKING LOT
EMPLOYEE PARKING LOT
(T.B.R.)
(T.B.R.)
(T .B
.R
EX.
TWS
EX.
TWS
EX.
TWS
EX. BOLLARD(2)
EX.
BOLLARD(4)
(T.B.R.)
EX. RETAINING
WALL
EX. WOODEN
SPLIT RAIL
FENCE
(T.B.R.)
(T.B.R.)
BM2
PARKING SPACES = 787 (ADA SPACES = 38)
EX. CB 12
TG:194.04
EX. 169' of 18" PVC S=0.004
EX. MH 7
TG:194.96
INV. IN:182.8(SE - 18")
INV. OUT:182.7
EX.
LP #8
(T.B.R.)
(T.B.R.)
BM5
EX. MH 2
TG:192.02
INV. IN:186.7(NW- 12")
INV. IN:187.7(N- 12")
INV. IN:186.7(NE- 12")
INV. IN:186.6(E- 8")
INV. OUT:186.4
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
(T.B.R.)
CONTRACTOR SHALL PUT CAPS ON
EXISTING CONDUCTORS AND LEAVE IN
NEW HAND HOLE. REFER TO CS116
FOR NEW HAND HOLE LOCATION.
CONTRACTOR SHALL PUT CAPS ON
EXISTING CONDUCTORS AND LEAVE IN
NEAREST HAND HOLE.
CONTRACTOR SHALL
FIELD VERIFY AND
DEMO LINE
(T.B.R.)
(T.B.R.)
EX. CB 5
TG:190.82
INV. IN:180.8(NE- 12")
INV. IN:183.7(W- 8")
INV. IN:182.4(E- 18")
INV. IN:174.3(W- 30")
INV. OUT:174.3
STS
EX. 30" VCP
EX
. C
ON
CR
ET
E
WA
LK
EX. TWS
EX. TWS
EX. TWS
EX. TWS
CONTRACTOR SHALL VERIFY EXISTING PIPES
CONNECTING TO MH-2 ARE NO LONGER ACTIVE
PRIOR TO REMOVAL. IF A PIPE IS ACTIVE THE
CONTRACTOR SHALL COORDINATE WITH THE COR.
(T.B.R.)
(T.B.R.)
(T.B.R.)
EX. 12" VCP
ABANDON 30"
SILTED PIPE. SEAL
WITH BRICK AND
FLOWABLE FILL
~DURING CONSTRUCTION, CONTRACTOR SHALL
VERIFY IF CONNECTION IS ACTIVE OR
ABANDONED AND COORDINATE WITH COR. IF
THE BLIND CONNECTION IS ABANDONED, CUT
AND CAP WITH BRICK AND FLOWABLE FILL.
EX. CB 3
TG:188.83
INV. OUT:183.5
CAPPED 8" TO THE SOUTH
CS117
Christopher W. Geary PE# 099085
Albany Stratton VAMC Albany, NY 12208
528A8-16-807
CH
RI
ST
OPHER WILLIAM GEARY
099085
S
T A T E OF NEW Y O
RK
L IC
ENSED PROFESSIONAL ENGI
NE
ER
811 OR 1-800-962-7962
ARCHITECT/ENGINEER OF RECORDCONSULTANT
Revisions: Date: 1/19/2021 Witczak Geary
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Dwg. of
Drawing Title
Approved:
Phase
Project Director
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
SCALE: 1"=30'
60'30'0'
SITE SYMBOLS - GENERAL
BENCHMARK #1 (BM1):
MANHOLE #3 LOCATED NORTH SIDE OF
ELKS MEMORIAL DR. IN DRV. 'A' TRAVEL LANE
ELEV. 192.37
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
CONCRETE
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
HYDRANT, FIRE (FH)
WATER VALVE (WV)
STORM/SAN SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, STORM/SANITARY MANHOLES
UTILITY, ELECTRICAL MANHOLE (EMH)E
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
DECIDUOUS TREES (DECD.)
DRAINAGE CATCH BASIN (CB)
CS142
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
TACTILE WARNING SURFACE (TWS)
LIGHT POLE (LP)
ELECTRIC LINE, UNDERGROUND
UTILITY, TRAFFIC JUNCTION BOX
BENCHMARK #2 (BM2):
MANHOLE #7 LOCATED NORTH SIDE OF DRV. 'D' TRAVEL LANE
ELEV. 194.96
BENCHMARK #3 (BM3):
X-CUT SOUTH BONNET BOLT
ELEV. 199.22
APPROX APPROXIMATELY
BIT BITUMINOUS
CHH COMMUNICATION HANDHOLE
CONC CONCRETE
COMB COMBINATION
DRV DRIVEWAY
EB ELECTRIC BOX
EOP EDGE OF PAVEMENT
EHH ELECTRIC HANDHOLE
ELEC ELECTRIC
EMH ELECTRIC MANHOLE
HDPE HIGH-DENSITY POLYETHYLENE PIPE
HMA HOT MIX ASPHALT
HW HEADWALL
INV STORMWATER PIPE END
LF LINEAR FEET
LP LIGHT POLE, LAMP POST
MH MANHOLE
PC POINT OF CURVATURE
PCCMP POLYMER-COATED CORRUGATED METAL PIPE
PLCC PLAIN CEMENT CONCRETE
RCP REINFORCED-CONCRETE PIPE
SF SQUARE FEET
TG TOP OF GRATE
THH TELEPHONE HANDHOLE
TWS TACTILE WARNING SURFACE
VCP VITRIFIED CLAY PIPE
BENCHMARK #4 (BM4):
CP 2 MAG NAIL
ELEV. 195.58
BENCHMARK #5 (BM5):
CP 1 MAG NAIL
ELEV. 197.71
NOTES:
1. SURVEY CONTROL WAS ESTABLISHED BY STATIC OPUS SOLUTION.
2. HORIZONTAL: NEW YORK STATE PLANE EAST ZONE(NAD83)
3. VERTICAL: EXISTING BENCHMARK PROVIDED BY VA AS SHOWN
4. ALL CALL BOXES AND LIGHT POLES SHALL BE SAVED FOR REUSE.
5. THE POWER AND CONTROL CABLING FOR THE EX. GATES AT DRIVEWAYS A&D NEED TO
BE CAREFULLY REMOVED AND PROTECTED FOR REUSE. THE POWER AND CONTROL
CABLING FOR THE EXISTING GATES AT DRIVEWAY C SHALL BE REMOVED TO THE
ORIGINATING PANEL (BOTH POWER AND CONTROL) AND IS NOT DESIGNATED FOR
REUSE.
NOTES:
1. IT IS ASSUMED ONLY THOSE ITEMS VISIBLE ON THE GROUND
AT THE TIME OF SURVEY WERE LOCATED AND SHOWN ON
THIS PLAN. THE VA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .