This document contains a past performance relevancy questionnaire template for a federal contract opportunity to repair parking lots. The template requests information on up to three of the offeror's most relevant prior contracts, including a description of the work performed, completion dates, contract values, any modifications, subcontractors used, and a point of contact. Relevant work experience must have occurred within the last three years. Additional questions seek the names of any subcontractors or teaming partners proposed for the parking lot repair work, limiting the response to three subcontractors per discipline. The related federal opportunity is solicitation number 36C24222R0102 from the Department of Veterans Affairs for repair of parking lots at a Veterans Health Administration facility. An amendment provided final drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02-FINAL DRAWINGS 2 OF 2.pdf | ||
| 36C24222R0102 0002.docx | DOCX document | |
| 36C24222R0102 0001.docx | DOCX document | |
| S02-FINAL DRAWINGS 1 of 2.pdf | ||
| FAR 52.225-2 Buy American Certification.docx | DOCX document | |
| EXHIBIT C - Past Performance Questionnaire.docx | DOCX document | |
| Divisional cost break down template.docx | DOCX document | |
| 36C24222R0102_1.docx | DOCX document | |
| Q and A.docx | DOCX document | |
| VAAR 819 219 77 VA Notice of Limitation on subcontracting.docx | DOCX document | |
| VS11-Boring Report-VA.pdf | ||
| EXHIBIT B - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx | DOCX document | |
| Wage Determinations 8.5.2022.pdf | ||
| 528A8-16-807_Specifications.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART 1: Prepare no more than three (3) Part 1 forms:
Provide the following information requested in this format for each of the projects/contracts being described. Projects may be ongoing and cannot have been completed any later than 3 years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use additional space as required.
A. Offeror (Your) Name (Company/Division):
B. Project/Contract Title:
C. Contract Specifics:
1. Description of Effort as Prime or _Subcontractor
2. Contract Number
3. Original Contract $ Value Current/Final Contract $ Value
4. If amounts in 3 above are different, provide a brief description of the reason:
5. Completion Date:
1. Original Date:
2. Current Schedule: _____________________
3. Estimate/Final Completion Date:
4. Primary cause for Contract Modifications
D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)
In addition, address the following
1. Describe the specific elements of the work performed by your firm.
2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on projects awarded under this solicitation. Should you intend to use these same subcontractors, please list their company names and described their principal areas of work that they will perform.
3. Address any technical areas about this project you consider uniquely relevant to this solicitation.
E. Point of Contact for Owner/Government agency Contracting Officer and or inspector (COR / COTR); include a current phone number and email address for each.
Part 2, Additional offeror information required.
A. Name subcontractors and/or Teaming Partners to be utilized on this contract. Multiple subcontractors may be named for the same discipline but are limited to a maximum of three (3) subcontractors per discipline. As a minimum, provide the name(s) of subcontractors to be utilized in the following areas:
(Specialty Trades will address their specific trade for any major subcontractor or Teaming partner)
Page 1 of Page 1 of