Divisional cost break down template.docx

DOCX document 16 KB Posted

Attached to
Y1DA--528A8-16-807 REPAIR PARKING LOTS
Solicitation number
36C24222R0102
Issued by

About this file

This document contains a divisional cost break down template for use in preparing pricing proposals for construction projects. The template outlines 14 divisions of construction work and provides columns for itemizing the labor cost, material cost, and total cost for each division. It also includes lines for overhead, profit, bond, and a total base offer cost.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs to repair parking lots at a Veterans Health Administration facility. It is identified as solicitation number 36C24222R0102 for work under the title "Y1DA--528A8-16-807 REPAIR PARKING LOTS." The description notes it is an amendment providing the final drawing set.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price /Price Breakdown

Pricing shall be formatted in a section that can be easily removed from the rest of the Offeror’s Proposal so it can be independently evaluated. Pricing shall be broken down by trade, profit, overhead, and contain a total cost for the entire project.

Item Description

Labor Cost

Material Cost

Total Cost

Division 1 - General Requirements

Division 2 - Existing Conditions

Division 3 – Concrete

Division 4 – Masonry

Division 5 - Metals

Division 6 - Wood and Plastic

Division 7 - Thermal and Moisture Protection

Division 8 - Doors and Windows

Division 9 - Finishes

Division 10 – Specialties

Division 11 – Equipment

Division 12 – Furnishings

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression

Division 22 – Plumbing

Division 26 – Electrical

Division 27 – Communications

Division 28 - Electronic Safety and Security

Division 31 – Earthwork

Division 32 - Exterior Improvements

Division 33 – Utilities

Division 34 – Transportation

Subtotal

Overhead (xx %)

Profit (xx %)

Bond (xx %)

Total Base Offer Cost

File details come from the government source that posted it. Updated .