S02. Drawings 09 29 20.pdf

PDF 7 MB Posted

Attached to
Add AHU Metering Federal contract opportunity
Solicitation number
36C25021R0066_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This solicitation is for an add AHU metering project at the Louis Stokes Cleveland VA Medical Center. The project scope involves adding metering to individual air handling units to implement energy conservation measures. The contractor must provide all labor, equipment, supplies, and supervision necessary for the project. The project magnitude is between $500,000 to $1 million. The NAICS code is 236220 with a business size standard of $39.5 million. The solicitation is a 100% set aside for service-disabled veteran-owned small businesses. Bids are due by May 10, 2021 at 3:30 PM EST and must be submitted electronically. Site visits will be conducted following social distancing guidelines. Requests for information must be submitted by the stated cutoff date and time.

View the file

Other files for this federal contract opportunity

Other files attached to Add AHU Metering, newest first.
File Type Posted
S02. Site Visit Information.pdf PDF
S02. RFI Form.docx DOCX document
S02. Bid Opening Instructions.pdf PDF
S02. Safety.docx DOCX document
S02. Solicitation 36C25021R0066.pdf PDF
S02. VAMC Health Requirements.pdf PDF
S02. Specifications 09 29 20.pdf PDF
S02. Wage Determination.pdf PDF
S02. Bid Item.pdf PDF
S02. Calculation of Self-Performed and Sub-Contracted Work.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE SHEET & DRAWING

INDEX

SITE KEY PLAN

NTS

10701 EAST BLVD. CLEVELAND, OH. 44106

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

Cleveland Veterans Affairs

Medical Center

ADD AHU METERING

DRAWING INDEX

PROJECT NO. 541-21-205

GI-1 TITLE SHEET & DRAWING INDEX

MECHANICAL/HVAC

M-001 LEGEND AND ABBREVIATIONS

M-002 OVERALL AHU SUMMARY MATRIX

M-100 LEVEL A - OVERALL AHU PLAN

M-101 BASEMENT - OVERALL AHU PLAN

M-102 FIRST FLOOR - OVERALL AHU PLAN

M-103 SECOND FLOOR - OVERALL AHU PLAN

M-104 THIRD FLOOR - OVERALL AHU PLAN

M-105 FOURTH FLOOR - OVERALL AHU PLAN

M-106 FIFTH FLOOR - OVERALL AHU PLAN

M-107 SIXTH FLOOR - OVERALL AHU PLAN

M-108 SEVENTH FLOOR - OVERALL AHU PLAN

BID ISSUE SUBMISSION

9.29.20

CLEVELAND VAMC

NORTH

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BLDG

A. NATURE OF PROJECT: ASSESSMENT/ADDITION OF METERING TO EXISTING AIR

HANDLERS AT THE MAIN MEDICAL CAMPUS

B. DESIGN CODES: 2018 NFPA LIFE SAFETY CODE 101, IBC 2018

C. USE GROUP: MIXED USE GROUPS IN HOSPITAL (I-2/S/B) - NO CHANGE

PROPOSED

D. CONSTRUCTION TYPE: TYPE I -332, IB - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.2)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING

WALLS

2 HRS (ALL OTHERS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1

HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS

CODE INFORMATION

35% SCHEM. DESIGN SUBMISSION 6.4.20

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

F i l e

P a t h

P

M

FULLY SPRINKLERED

Louis Stokes Cleveland

VA Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

Project Director

CJK DAKRevisions: Date:

1468 WEST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

E T

G

DE

I

RET

S

HCRA

I

KACZMAR

STANLEY

NO. 4988

T

E R

S

ATE

I

T C

J.

O

O

FO

H

GI-1

BID ISSUE SUBMISSION

9.29.20

65% DESIGN DEVELOPMENT SUBMISSION 7.7.20

M-601 AHU SCHEMATICS (CONFIG. A & B)

M-602 AHU SCHEMATICS (CONFIG. C & D)

M-603 AHU SCHEMATICS (CONFIG. E. & F)

M-604 AHU SCHEMATICS (CONFIG. G & H)

M-605 AHU SCHEMATICS (CONFIG. I & J)

M-606 AHU SCHEMATICS (CONFIG. K & L)

M-607 AHU SCHEMATICS (CONFIG. M & N)

M-608 AHU SCHEMATICS (CONFIG. O & P)

M-609 AHU SCHEMATICS (CONFIG. Q & R)

M-610 AHU SCHEMATICS (CONFIG. S & T)

M-611 AHU SCHEMATICS (CONFIG. U & V)

M-701 AHU ENLARGED PLANS - BASEMENT

M-702 AHU ENLARGED PLANS - FIRST FLOOR

M-703 AHU ENLARGED PLANS - SECOND FLOOR

M-704 AHU ENLARGED PLANS - THIRD FLOOR

M-705 AHU ENLARGED PLANS - FIFTH & SEVENTH

FLOOR

HEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

90% CDs SUBMISSION 7.31.20

E. PROJECT AREA: ALL AIR HANDLERS IN ENTIRE HOSPITAL

F. PROJECT AREA OCCUPANT LOAD: NOT APPLICABLE

G. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED AND

WILL REMAIN AS A PART OF THIS PROJECT.

FIRE PROTECTION SYSTEM DESIGN NOT IN

SCOPE OF WORK

100% CDs SUBMISSION 8.20.20

BID ISSUE SUBMISSION 9.29.20

AutoCAD SHX Text

EAST BLVD.

AutoCAD SHX Text

E. 105 ST.

AutoCAD SHX Text

EAST BLVD.

AutoCAD SHX Text

MAGNOLIA DR.

AutoCAD SHX Text

HAZEL DR.

AutoCAD SHX Text

E. 108 ST.

AutoCAD SHX Text

MT. SINAI DR.

AutoCAD SHX Text

MARTIN LUTHER KING DR.

NOTE: ALL SYMBOLS AND ABBREVIATIONS

ARE SUBJECT TO MODIFICATIONS

ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS

MIGHT NOT NECESSARILY BE USED ON

THIS PROJECT.

ABBREVIATIONS

AC - AIR COMPRESSOR OR AIR CONDITIONER

ACCU - AIR COOLED CONDENSING UNIT

AD - ACCESS DOOR OR AREA DRAIN

ADJ - ADJUSTABLE

AFF - ABOVE FINISHED FLOOR

AFG - ABOVE FINISHED GRADE

AFMS - AIR FLOW MEASURING STATION

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATC - AUTOMATIC TEMPERATURE CONTROL

(SYNONYMOUS W ITH BAS)

BAS - BUILD ING AUTOMATION SYSTEM

BDD - BACK DRAFT DAMPER

BFP - BACKFLOW PREVENTER

BLDG - BUILD ING

BOB - BOTTOM OF BEAM

BOD - BOTTOM OF DUCT

BOE - BOTTOM OF EQUIPMENT

BOF - BOTTOM OF FOOTING

BOG - BOTTOM OF GRILLE

BOP - BOTTOM OF PIPE

BOT - BOTTOM

BTU - BRITISH THERMAL UNIT

BTUH - BRITISH THERMAL UNIT PER HOUR

CBD - COUNTER BALANCED BACKDRAFT DAMPER

CC - COOLING COIL

C.C.L.A.T. - COILING COIL LEAVING AIR TEMPERATURE

CFCI - CONTRACTOR FURNISHED CONTRACTOR

INSTALLED

CFM - CUBIC FEET PER MINUTE

CHGR - CHILLED W ATER GLYCOL SOLUTION RETURN

CHGS - CHILLED W ATER GLYCOL SOLUTION SUPPLY

CHW - CHILLED W ATER

CHW S - CHILLED W ATER SUPPLY

CHW R - CHILLED W ATER RETURN

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CO - CLEAN OUT

CO2 - CARBON DIOXIDE

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CT - CURRENT TRANSDUCER

CTR - CENTER

CU - COPPER

CW - COLD W ATER

CW R - CONDENSER W ATER RETURN

CW S - CONDENSER W ATER SUPPLY

D - DRAIN LINE

DB - DRY BULB

DDC - D IRECT D IGITAL CONTROLS

DI - DEIONIZED W ATER

DIA - D IAMETER

DIM - D IMENSION

DN - DOW N

DW G - DRAW ING

EA - EACH OR EXHAUST AIR

EAT - ENTERING AIR TEMPERATURE

EC - ELECTRICAL (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATOR

EQUIP - EQUIPMENT

ET - EXPANSION TANK

ETR - EXISTING TO REMAIN

EQS - EQUIPMENT SUPPLIER

EW T - ENTERING W ATER TEMPERATURE

EXH - EXHAUST

EXP - EXPANSION

EXT - EXTERIOR

EX - EXISTING

FD - FLOOR DRAIN

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FOB - FLAT ON BOTTOM

FOF - FUEL OIL FLOW

FOG - FUEL OIL GAUGE

FOR - FUEL OIL RETURN

FOS - FUEL OIL SUPPLY

FOT - FLAT ON TOP

FPM - FEET PER MINUTE

FSC - FIRE SUPPRESSION (DIVISION 21)

FT - FEET

FTG - FOOTING

G - GAS OR NATURAL GAS

GA - GAUGE

GAL - GALLON

GALV - GALVANIZED

GC - GENERAL TRADES

GPM - GALLONS PER MINUTE

HB - HOSE BIBB

HC - HVAC (DIVISION 23)

H.C.L.A.T. - HEATING COIL LEAVING AIR TEMPERATURE

HD - HUB DRAIN

HG - REFRIGERANT HOT GAS

HP - HORSEPOW ER

HPC - H IGH PRESSURE CONDENSATE RETURN

HPS - H IGH PRESSURE STEAM SUPPLY

HR - HOUR

HT - HEAT TRACE

HTR - HEATER

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

HHW - HEATING HOT W ATER

HHW R - HEATING HOT W ATER RETURN

HHW S - HEATING HOT W ATER SUPPLY

ID - INSIDE DIAMETER

INV - INVERT ELEVATION

IN - INCHES

KEC - KITCHEN EQUIPMENT

L - LENGTH

LAT - LEAVING AIR TEMPERATURE

LAV - LAVATORY

LBS - POUNDS

LPC - LOW PRESSURE CONDENSATE RETURN

LPS - LOW PRESSURE STEAM SUPPLY

LW T - LEAVING W ATER TEMPERATURE

MAX - MAXIMUM

MDD - MOTORIZED DAMPER

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE

MIN - MIN IMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

MPC - MEDIUM PRESSURE CONDENSATE

RETURN

MPS - MEDIUM PRESSURE STEAM SUPPLY

MU - W ATER MAKE-UP

N/C - NORMALLY CLOSED

NIC - NOT IN CONTRACT

N/O - NORMALLY OPEN

NOM - NOMINAL

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

OA - OUTDOOR AIR

OBD - OPPOSED BLADE DAMPER

OD - OUTSIDE DIAMETER

OFCI - OW NER FURNISHED CONTRACTOR

INSTALLED

OFOI - OW NER FURNISHED O W NER INSTALLED

P - PROPANE GAS

PC - PLUMBING (DIVISION 22)

OR PUMPED CONDENSATE RETURN

PHC - PREHEAT COIL

PLBG - PLUMBING

PRESS - PRESSURE

PRV - PRESSURE REGULATING VALVE

PSF - POUNDS PER SQUARE FOOT

PSI - POUNDS PER SQUARE INCH

PSIG - POUNDS PER SQUARE INCH GAUGE

RA - RETURN AIR

RAD - RADIUS

RCP - REFLECTED CEILING PLAN

RD - ROOF DRAIN

REC - RECESSED

REQD - REQUIRED

RI - ROUGH IN

RL - REFRIGERANT LIQUID

ROS - REVERSE OSMOSIS W ATER SUPPLY

ROR - REVERSE OSMOSIS W ATER RETURN

RPM - REVOLUTIONS PER MINUTE

RS - REFRIGERANT SUCTIO N

S - SPRINKLER (W ET)

SA - SUPPLY AIR

SAN - SANITARY OR SANITARY DRAIN

SCH - SCHEDULE

SCW - SOFT COLD W ATER

SHT - SHEET

SPEC - SPECIFICATIONS

SQ - SQUARE

SR - SUPPLY RISER

SRV - SAFETY RELIEF VALVE

SS - STAINLESS STEEL

STD - STANDARD

STM - STORM OR STORM DRAINAGE

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TEMP - TEMPERATURE

TOB - TOP OF BEAM

TOD - TOP OF DUCT

TOE - TOP OF EQUIPMENT

TOF - TOP OF FOOTING

TOJ - TOP OF JOIST

TOP - TOP OF PIPE

TOS - TOP OF SLAB OR TOP OF STEEL

TYP - TYPICAL

UNO - UNLESS NOTED OTHERW ISE

V - VENT

VAC - VACUUM

VEL - VELO CITY

VIB - VALVE IN BOX

VOL - VOLUME

VTR - VENT THROUGH ROOF

VR - VENT RISER

W / - W ITH

W /O - W ITHOUT

W B - W ET BULB

W CO - W ALL CLEANOUT

GENERAL FLOOR PLAN NOTES

PLAN NOTE. APPLIES ONLY TO THE SHEET W HICH IT IS SHOW N UNLESS

NOTED OTHERW ISE.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

A1

EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER DESIGNATIONS

REFER TO SCHEDULES.

H1 H1OR

EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO

SCHEDULES.

H2

B

H2

RISER OR STACK NUMBER

DETAIL: B = DETAIL DESIGNATION

H2 = SHEET W HERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

H2 = SHEET W HERE DETAIL IS LOCATED

A1 "UP TO" SYMBOL (ITEM ON FLOOR ABOVE)

APPROXIMATE DIMENSION ABOVE FIN ISHED FLOOR TO TOP OR BOTTOM OF

EQUIPMENT, UNLESS NOTED OTHERW ISE

10"

ELEV: 8' - 0"ELEV: 8' - 0"

TOD: 8' - 10"

BOD: 7' - 2"

20x20

20x20

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR BOTTOM OF

DUCTW ORK, UNLESS NOTED OTHERW ISE

APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE OF PIPE,

UNLESS NOTED OTHERW ISE

DL-1

UC-X DOOR UNDERCUT. X = HEIGHT OF UNDERCUT IN INCHES; 0.75 INCH

UNDERCUT IF NO HEIGHT IS NOTED. COORDINATE W ITH GC.

DOOR LOUVER. 1 = SQUARE FEET OF LOUVER.

CONNECT TO EXISTING

HVAC PIPING DESIGNATIONS

CHILLED W ATER SUPPLY PIPECHS

CONDENSER W ATER SUPPLY PIPECW S

CONDENSER W ATER RETURN PIPECW R

DRAIN LINE. PITCH IN DIRECTION INDICATEDD

HEATING HOT W ATER SUPPLY PIPEHW S

HEATING HOT W ATER RETURN PIPEHW R

W ATER MAKE-UP PIPEMU

VENT PIPEV

REFRIGERANT LIQUID LINERL

REFRIGERANT SUCTION LINERS

EXPANSION TANK PIPEET

REFRIGERANT HOT GAS LINEHG

LOW PRESSURE CONDENSATE RETURN PIPELPC

LOW PRESSURE STEAM SUPPLY PIPELPS

MEDIUM PRESSURE CONDENSATE RETURN PIPEMPC

MEDIUM PRESSURE STEAM SUPPLY PIPEMPS

PUMPED CONDENSATE RETURN PIPEPC

HIGH PRESSURE CONDENSATE RETURN PIPEHPC

HIGH PRESSURE STEAM SUPPLY PIPEHPS

STEAM SUPPLY PIPE - NUMBER IND ICATES P.S.I.G.10

MISC SYMBOLS

DUCTWORK SYMBOLS

ROUND BRANCH DUCTW ORKCONICAL

FITTING

ACOUSTIC

FITTING

ACOUSTIC

FITTING

ADAD

D

R R

D

REC TANGULAR BR ANCH DUCTW ORK

SQUARE TEE W ITH TURNING VANES

NOTE: ALL SQUARE ELBOW S IN

RECTANGULAR AND ROUND / OVAL

DUCTW ORK SHALL BE PROVIDED W ITH

TURNING VANES. REFER TO

SPECIFICATIONS FOR ADDITIONAL DETAILS.

EXISTING DUCTW ORK TO REMOVED

RETURN AIR , RELIEF AIR, OR TRANSFER AIR

DUCTW ORK. (UP AND DOW N) RADIUSED

OR SQUARE W ITH TURNING VANES.

SUPPLY AIR OR OUTDOOR AIR DUCTW ORK.

(UP AND DOW N) RADIUSED OR SQUARE

W ITH TURNING VANES.

EXHAUST AIR DUCTW ORK. (UP AND DOW N)

RADIUSED OR SQUARE W ITH TURNING

VANES.

RECTANGULAR AND ROUND / OVAL

DUCTW ORK RISE / DROP W ITH 90° RADIUSED

OR SQUARE ELBOW S AND TURNING VANES.

RADIUS ELBOW

90° SQUARE ELBOW (W ITH TURNING VANES)

NOTE: ALL SQUARE ELBOW S IN

RECTANGULAR AND ROUND DUCTW ORK

SHALL BE PROVIDED W ITH TURNING VANES.

ACCESS DOOR OR PANEL

DUCTW ORK RISE IN DIRECTION OF AIR

FLOW

DUCTW ORK DROP IN DIRECTION OF AIR

FLOW

DUCTW ORK W ITH ACOUSTICAL LINER.

LISTED DUCT SIZES ARE INSIDE CLEAR

DIMENSIONS.

RECTANGULAR ROUND / OVAL

FLEXIBLE DUCTW ORK

FLEXIBLE CONNECTION

DUCTW ORK CONSTRUCTED OF SPECIAL

MATERIAL AS NOTED

DIRECTION OF PITCH

RECTANGULAR DUCTW ORK DIMENSIONS

(W x H)26x20

ROUND DUCTW ORK DIMENSIONS (DIA)26ø

OVAL DUCTW ORK DIMENSIONS (W x H)26x20 OV

DUCTWORK DEVICE SYMBOLS

W ALL OR DUCTW ORK MOUNTED AIR DEVICE. SG1 = DESIGNATION (REFER

TO AIR DEVICE SCHEDULE). 20x12 = DUCT CONNECTION SIZE (IN INCHES).

300 = REQUIRED CFM. 9'-0" = MOUNTING HEIGHT FROM FLOOR TO BOTTOM

OF GRILLE.

A3 10ø

MANUAL BALANCING DAMPER W ITH LOCKING DEVICE

BDD = BACK DRAFT DAMPER

CBD = COUNTER-BALANCED BACK DRAFT DAMPER

SD = SMOKE DAMPER

FS = COMBINATION FIRE - SMOKE DAMPER

MDD = MOTORIZED DAMPER

AFMS = AIR FLOW MEASURING STATION

DUCT MOUNTED SMOKE DETECTOR. COORDINATE LOCATION.

HUMIDITY SENSOR - DUCT MOUNTED

SG1

20x12

BOG : 9'-0"

XXX

A-D

XX

H

SD

SP

AIR DEVICE. A3 = DESIGNATION (REFER TO FLOOR PLANS AND AIR DEVICE

SCHEDULE FOR VARIOUS DESIGNATIONS).

10ø = NECK SIZE (IN INCHES). 300 = REQUIRED CFM. ALL AIR DEVICE

DISCHARGE 4-W AY UNLESS NOTED W ITH FLOW ARROW S. AIR DEVICE

SHOW N IS 2-W AY SIDE THROW . METHOD OF IDENTIFICATION ALSO APPLIES

TO OTHER CEILING MOUNTED AIR DEVICES.

FIRE DAMPER

A = TYPE (REFER TO FLOOR PLANS FOR VARIOUS TYPES)

D OR S = DYNAMIC OR STATIC

STATIC PRESSURE SENSOR - DUCT MOUNTED

C

CARBON DIOXIDE SENSOR - DUCT MOUNTED

S

TEMPERATURE SENSOR - DUCT MOUNTED

CHECK VALVE

T

P

FOB

FOT

SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR

REQUIRED TYPE BASED ON APPLICATIONS)

CONCENTRIC PIPE REDUCER

ECCENTRIC PIPE REDUCER

PRESSURE GAUGE

TEMPERATURE GAUGE OR THERMOMETER

COMBINATION SHUTOFF AND BALANCING VALVE

(REFER TO SPECIFICATIONS FOR REQUIRED

TYPE BASED ON APPLICATIONS)

BALL VALVE

BUTTERFLY VALVE

GATE VALVE

VALVES AND FITTINGS

DOUBLE LINE SINGLE LINE

10"

TOE: 3' - 0"

BOE: 0' - 6"

GLYCOL W ATER SOLUTION RETURN PIPEGW R

GLYCOL W ATER SOLUTION SUPPLY PIPEGW S

CHILLED W ATER RETURN PIPECHR

SQUARE THROAT / RADIUS HEEL

FITTINGS NOT ACCEPTABLE

PIPING SYMBOLS

DOUBLE LINE SINGLE LINE

BOTTOM CONNECTION (45°)

BRANCH TEE CONNECTION (NOTE:

BULLHEAD TEE'S ARE NOT PERMITTED)

DIRECTION OF PITCH

DROP

ELBOW DOW N

ELBOW UP

EXISTING PIPE TO BE REMOVED

EXISTING PIPE TO REMAIN

FLOW DIRECTION DESIGNATION

PUMP

RISE

TOP CONNECTION (45°)

TOP CONNECTION (90°)

BOTTOM CONNECTION (90°)

DD

RR

PIPE RISER

RADIUS'D BRANCH

RADIUS'D TEE

EXISTING DUCTW ORK TO REMAIN

UNLESS NOTED OTHERW ISE ON DRAW INGS,

15° MAX FOR DIVERGING, 30° MAX FOR

CONVERGING TRANSITION

EMERGENCY SHUTOFF STATION. 46" MOUNTING HEIGHT UNLESS NOTED OTHERW ISE.

SPACE TEMPERATURE SENSOR / THERMOSTAT. W HEN W ALL MOUNTED, MOUNTING

HEIGHT 46" TO MEET ADA REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH

COORDINATE W ITH ARCHITECT.

T

DP

DIFFERENTIAL PRESSURE SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO

MEET ADA REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH

ARCHITECT.

H

HUMIDITY SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH ARCHITECT.

CARBON DIOXIDE SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH ARCHITECT.

C

CO

CARBON MONOXIDE SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET

ADA REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH

ARCHITECT.

TEMPERATURE SENSOR. W HEN W ALL MOUNTED, MOUNTING HEIGHT 46" TO MEET ADA

REQUIREMENTS. W HEN MOUNTED NEXT TO W ALL SW ITCH COORDINATE W ITH

ARCHITECT.

S

S TEMPERATURE SENSOR MOUNTED IN CEILING PLENUM.

STATIC PRESSURE SENSOR.SP

STRAINER W ITH A BLOW DOW N VALVE AND HOSE

CONNECTION

DRAIN VALVE W ITH HOSE END CONNECTION

AUTOMATIC FLOW CONTROLLER W ITH P/T PLUG IN

AND OUT

EXPANSION JOINT

MANUAL AIR VENT

AUTOMATIC AIR VENT

PRESSURE REDUCING VALVE

2 PORT AUTOMATIC CONTROL VALVE

3 PORT AUTOMATIC CONTROL VALVE

QUICK OPENING MANUAL VALVE

VACUUM BREAKER

NEEDLE VALVE

PRESSURE AND TEMPERATURE TEST PLUG

VACUUM GAUGE W ITH STOP

END CAP

GLOBE VALVE

SHUTOFF VALVE AND BOX

SHUTOFF VALVE ON RISER

A

M

M

N

V

VB

SOLENOID VALVE

S

SAFETY RELIEF VALVE. FOR HYDRONIC SYSTEMS

PIPE DISCHARGE AIR GAPPED TO FLOOR DRAIN

UNLESS NOTED OTHERW ISE. FOR STEAM

SYSTEMS PIPE D ISCHARGE TO OUTDOORS.

W ATER METERM

PRESSURE G AUGE W ITH COCK AND SIPHON LOOP

BI-M ETALIC STEAM TRAP AND DRIP ASSEM BLY

THERMODYNAMIC STEAM TRAP AND DRIP

ASSEMBLY

INVERTED BUCKET STEAM TRAP AND DRIP

ASSEMBLY

FLOAT AND THERMOSTATIC STEAM TRAP AND

DRIP ASSEMBLY

TH ERM OSTATIC STEAM TRAP AND DRIP ASSEM BLY

BM

TD

IB

FT

TS

FLOW METER

F

UNION

CLEANOUT

STRAINER

AUTOMATIC PRESSURE INDEPENDENT CONTROL

VALVE

M

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:0

A

M

M-001

LEGEND & ABBREVIATIONS

HEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

HVAC SHEET LIST

SHEET NUMBER SHEET NAME

M-001 LEGEND & ABBREVIATIONS

M-002 OVERALL AHU SUMMARY MATRIX

M-100 LEVEL A - OVERALL AHU PLAN

M-101 BASEMENT - OVERALL AHU PLAN

M-102 FIRST FLOOR - OVERALL AHU PLAN

M-103 SECOND FLOOR - OVERALL AHU PLAN

M-104 THIRD FLOOR - OVERALL AHU PLAN

M-105 FOURTH FLOOR - OVERALL AHU PLAN

M-106 FIFTH FLOOR - OVERALL AHU PLAN

M-107 SIXTH FLOOR - OVERALL AHU PLAN

M-108 SEVENTH FLOOR - OVERALL AHU PLAN

M-601 AHU SCHEMATICS (CONFIG. A & B)

M-602 AHU SCHEMATICS (CONFIG. C & D)

M-603 AHU SCHEMATICS (CONFIG E & F)

M-604 AHU SCHEMATICS (CONFIG. G & H)

M-605 AHU SCHEMATICS (CONFIG. I & J)

M-606 AHU SCHEMATICS (CONFIG. K & L)

M-607 AHU SCHEMATICS (CONFIG. M & N)

M-608 AHU SCHEMATICS (CONFIG. O & P)

M-609 AHU SCHEMATICS (CONFIG. Q & R)

M-610 AHU SCHEMATICS (CONFIG. S & T)

M-611 AHU SCHEMATICS (CONFIG. U & V)

M-701 AHU ENLARGED PLANS - BASEMENT

M-702 AHU ENLARGED PLANS - FIRST FLOOR

M-703 AHU ENLARGED PLANS - SECOND FLOOR

M-704 AHU ENLARGED PLANS - THIRD FLOOR

M-705 AHU ENLARGED PLANS - FIFTH AND SEVENTH FLOOR

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

100% CDS SUBMISSION 08/20/20

BID ISSUE SUBMISSION 09/29/20

AHU SUMMARY

NOTES: BID ITEMS:

AHU TAG LOCATION SERVES LEVELS SERVED

AREA

SERVED (SF)

CONFIGURATION CONFIG SHEET

ENLARGED

PLAN SHEET

BID ITEM # NOTES

AC-6 PENTHOUSE 2-B-501 MRI, RADIOLOGY 1 6,710 A M-601 M-703 1

AC-14 2C129 LOBBY B, 1 9,300 R M-609 M-703 BID ITEM #3 1

AC-20 3RD FLOOR ROOF HEMO/ONCOLOGY 2 6,800 A M-601 M-704 1

AC-22 3RD FLOOR PENTHOUSE RADIATION THERAPY B 7,600 A M-601 M-704 1

AC-26 BF467 RESEARCH, ENVIRONMENTAL MANAGEMENT B, 1 22,500 C M-602 M-701 1

AC-28 BE260 RESEARCH (ANIMAL OR) B 1,060 B M-601 M-701 BID ITEM #2 1

AC-29 7TH FLOOR ROOFTOP BEDS SCI 6 21,800 Q M-609 M-705 1

AC-31 BE260 MICU 2 8,325 E M-603 M-701 1

AC-32 BE260 DIRECTOR'S SUITE, QUALITY MGMT., EDUCATION, SURGICAL, GERIATRICS 1 12,000 F M-603 M-701 1

AC-34 3RD FLOOR ROOF

RADIATION THERAPY, BEHAVIORAL HEALTH, PSYCHOSOCIAL REHAB AND

RECOVERY CENTER

B, 1, 2 17,960 A M-601 M-704 1

AC-35 BE260 RESEARCH FES, APT B 9,800 S M-610 M-701 BID ITEM #3 1

AC-51 BA109 AMBULATORY CARE SOUTH 1, 2 26,700 F M-603 M-701 1

AC-52 BA109 AMBULATORY CARE NORTH B, 1, 2 34,450 F M-603 M-701 1

AC-53 BA109 ATRIUM, CORRIDORS 1, 2 20,420 G M-604 M-701 1

AC-54 5TH FLOOR PAC200 EYE CLINIC, BEHAVIORAL HEALTH, AUDIOLOGY 3, 4 28,000 H M-604 M-705 1

AC-55 5TH FLOOR PAC302 BEHAVIORAL HEALTH, DENTAL, COMMON SPACE 3, 4, 5 21,275 H M-604 M-705 1

AC-56 PENTHOUSE 2F501B LOGISTICS, WAREHOUSE B, 1 26,940 J M-605 M-703 1

AC-57 PENTHOUSE 2F501C PATHOLOGY LABORATORIES 1 16,000 M M-607 M-703 1

AC-61 7TH FLOOR W PENTHOUSE PF104

CARES TOWER: PATIENT BEDS CLC, BLINDS REHAB, BEDS PSY RES

REHAB, REHAB MEDICINE, NUTRITION, CHAPEL, EDU., ENV. MGMT.,

INPATIENT PSYCHIATRY, SUBSTANCE ABUSE

A, B, 1, 2, 3, 4, 5, 6 105,800 K M-606 M-705 1

AC-62 7TH FLOOR W PENTHOUSE PF104

CARES TOWER: PATIENT BEDS CLC, PSY RES REHAB, REHAB MEDICINE,

INPATIENT PSYCHIATRY, SUBSTANCE ABUSE

A, B, 1, 2, 3, 4, 5, 6 108,720 K M-606 M-705 1

AC-63 1F191 COMMON SPACE B, 1 3,450 J M-605 M-702 BID ITEM #2 1

AC-64 7TH FLOOR W PENTHOUSE PF104 PENTHOUSE ELECTRICAL, ELEVATOR 7 2,600 T M-610 M-705 BID ITEM #2 1

AHU-E-0-1 2ND FLOOR PENTHOUSE 2B480A

CARDIOLOGY/NUCMED, ENGINEERING, ENG BIO-MED, MEDICAL SERVICE

ADMIN, ENV MANAGEMENT, CENTRALIZED STAFF FACILITIES, DIAGNOSTIC

IMG.,

B 49,500 H M-604 M-703 1

AHU-E-0-2 2ND FLOOR PENTHOUSE 2B480A NUTRITION, FOOD, ENG., PROSTHETICS, RESEARCH, ENV. MGMT. B 22,000 H M-604 M-703 1

AHU-E-0-3 2ND FLOOR PENTHOUSE 2B480A PHARMACY B 9,100 H M-604 M-703 1

AHU-E-1-1 2ND FLOOR PENTHOUSE 2B480A

SPEC. CARE, SURGICAL, RESEARCH, BEHAV. HEALTH, PRI. CARE, W.

HEALTH, SEC., ENG., H.C. ADMIN, HOME-BASED HEALTH, VSO VET ASSIST.

UNION, PATHOLOGY, VOL. SVC., ENV. MGMT., CANTEEN SVC.

1 57,700 H M-604 M-703 1

AHU-E-1-2 2ND FLOOR PENTHOUSE 2B480A CANTEEN SVC., NUTRITION, FOOD 1 22,175 H M-604 M-703 1

AHU-S-2-1 3RD FLOOR PENTHOUSE 3B162D SICU, DIGESTIVE ENDOSCOPY 2 19,000 H M-604 M-704 1

AHU-S-2-2 3RD FLOOR PENTHOUSE 3B162D SURGICAL 2 19,600 L M-606 M-704 1, 2

AHU-S-2-3 3RD FLOOR PENTHOUSE 3B162D SURGICAL 2 1,850 H M-604 M-704 BID ITEM #3 1

AHU-S-2-4 1C164 SURGICAL, STORAGE, OFFICE 2 3,850 U M-611 M-702 BID ITEM #3 1

AHU-S-2-5 3RD FLOOR S ROOFTOP SURGICAL, HYBRID ORS 2 3,775 V M-611 M-704 BID ITEM #3 1

AHU-W-0-1 2ND FLOOR PENTHOUSE 2E480A MORGUE, PATHOLOGY, ENG. SHOPS B 11,500 I M-605 M-703 1

AHU-W-0-2 2ND FLOOR PENTHOUSE 2E480A RESEARCH, COMMON, ENV. MGMT. B 14,050 I M-605 M-703 1

AHU-W-0-3 BD490 ENGINEERING SHOPS, COMMON SPACE B 17,750 N M-607 M-701 1

AHU-W-1-1 2ND FLOOR PENTHOUSE 2E480A

RETAIL, LIBRARY, NUTRITIONAL, FOOD, DIRECTOR'S SUITE, QUALITY

MGMT., PATHOLOGY, CANTEEN SVC., ENV. MGMT, MEDICAL SVC. ADMIN,

SPEC. CARE, INFECTIOUS DISEASE, VOL. SVC.

1 45,500 H M-604 M-703 1

AHU-W-1-2 2ND FLOOR PENTHOUSE 2E480A REC. HALL, ENV. MGMT., VOL. SVC., EDUCATION 1 5,000 D M-602 M-703 1

AHU-W-1-3 2ND FLOOR PENTHOUSE 2E480A CHAPEL 1 2,700 D M-602 M-703 1

RTU-65 2ND FLOOR W ROOFTOP PALMS CONNECTING CORRIDOR 1 2,600 P M-608 M-703 BID ITEM #2 1

RTU-66 2ND FLOOR W ROOFTOP CONNECTING CORRIDOR B 1,600 O M-608 M-703 BID ITEM #2 1

RTU-67 2ND FLOOR W ROOFTOP CONNECTING CORRIDOR 1 533 O M-608 M-703 BID ITEM #2 1

RTU-68 2ND FLOOR W ROOFTOP CONNECTING CORRIDOR 1 533 O M-608 M-703 BID ITEM #2 1

RTU-69 2ND FLOOR W ROOFTOP CONNECTING CORRIDOR 1 533 O M-608 M-703 BID ITEM #2 1

AI

AO

BI

BO

PI

OAT

MAT

RAT

SAT

CCAT

HCAT

OAHY

RAH

SAH

NC

NO

L

H

C

XX-01

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

CONTROL POINT - SEE POINTS SCHEDULE

ANALOG INPUT

ANALOG OUTPUT

BINARY INPUT

BINARY OUTPUT

PULSED INPUT

OUTSIDE AIR TEMPERATURE

MIXED AIR TEMPERATURE

RETURN AIR TEMPERATURE

SUPPLY AIR TEMPERATURE

COOLING COIL LEAVING AIR TEMPERATURE

HEATING COIL LEAVING AIR TEMPERATURE

OUTSIDE AIR HUMID ITY

RETURN AIR HUMIDITY

SUPPLY AIR HUMIDITY

NORMALLY CLOSED (CLOSES ON LOSS OF POW ER)

NORMALLY OPEN (OPENS ON LOSS OF POW ER)

LOW

HIGH

COMMON

2-W AY AUTOMATIC 2-POSITION CONTROL VALVE

3-W AY AUTOMATIC 2-POSITION CONTROL VALVE

2-W AY AUTOMATIC MODULATING CONTROL VALVE

3-W AY AUTOMATIC MODULATING CONTROL VALVE

DIFFERENTIAL PRESSURE SENSOR

DIFFERENTIAL PRESSURE SW ITCH

CARBON DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CURRENT SENSOR TRANSMITTER

ELECTRONIC TO PNEUMATIC TRANSDUCER

FLOW METER TRANSMITTER

HUMIDITY SENSOR

LEVEL CONTROLLER

LEVEL TRANSMITTER

PRESSURE SENSOR

STATIC PRESSURE SENSOR

TEMPERATURE SENSOR

W ATER FLOW SENSOR

W ATER LEVEL SENSOR

CURRENT SW ITCH

END SW ITCH

FLOW SW ITCH

HUMIDISTAT

OCCUPANCY SENSOR

PRESSURE SW ITCH, HIGH LIMIT

PRESSURE SW ITCH, LOW LIMIT

TEMPERATURE LOW LIMIT (FREEZE STAT)

ROOM THERMOSTAT

W ATER LEVEL SW ITCH

EMERGENCY SHUT-OFF STATION

AIR FLOW MEASURING STATION

VARIABLE FREQUENCY DRIVE (ADJUSTABLE FREQUENCY MOTOR CNRL)

MOTOR STARTER

CONTACTOR

LOCAL TEMPERATURE CONTROL PANEL

PRESSURE SAFETY - HIGH

PRESSURE SAFETY - LOW

SMOKE DETECTOR

DAMPER OR VALVE ACTUATOR - MODULATING

DAMPER OR VALVE ACTUATOR - 2-POSITION

RELAY

UVGI LIGHT

PUMP

FAN

COOLING COIL

HEATING COIL

HUMIDIFIER

FILTER

ENERGY RECOVERY W HEEL

OPPOSED BLADE CONTROL DAMPER

PARALLEL BLADE CONTROL DAMPER

SMOKE DAMPER

MIN OA / ECON DAMPER

DX COIL

W ALL MOUNTED DEVICE

DUCT INSERTION DEVICE

PIPE INSERTION OR IMMERSION DEVICE W ITH W ELL

AVERAGING SENSOR OR DEVICE

OUTDOOR SENSOR OR DEVICE, SHIELDED

FAN ARRAY, "X" FANS VERTICAL x "Y" FANS HORIZONTAL

M

M

M

M

DPH

L

DP

H

L

C

CO

CS

EPT

FM

H

LC

LT

P

SP

T

W F

W L

CS

ES

FS

H

OS

HL

P

LL

P

T

LL

T

W L

LEGEND-

AUTOMATIC TEMPERATURE CONTROLS

AFMS

VFD

MS

CON

TCP

SD

M

M

SD

X

X

X

X

X

X

X

X

X

X

R

M M

MINECON

R

UV

3 x 1X x Y

PSH

PSL

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:0

A

M

M-002

OVERALL AHU SUMMARY MATRIX

HEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

AIR HANDLING UNIT ENERGY USE INDEX (EUI) CALCULATIONS

A. CALCULATE AN EUI FOR EACH AIR HANDLING UNIT (AHU) SYSTEM AND THE AREA IT SERVES. THE AHU EUI W ILL ONLY CONSIDER THE MECHANICAL AND ELECTRICAL ENERGY CONSUMED BY THE CENTRAL AIR HANDLING UNITS. EUI IS EXPRESSED AS ENERGY PER SQUARE FOOT PER YEAR. IT’S CALCULATED BY DIVIDING THE TOTAL ENERGY CONSUMED IN ONE YEAR (MEASURED IN KBTU) BY THE TOTAL GROSS FLOOR AREA.

FIELD CONTROLLER SEQUENCES OF OPERATION: ALL FIELD CONTROLLER SCOPE IS TO BE PROVIDED BY THE CONTRACTOR.

REFER TO SPEC SECTION 23 09 23 PARAGRAPH 1.1.G FOR COORDINATION OF W ORK BETW EEN CONTRACTOR AND VA RETAINED, THIRD-PARTY MASTER

SYSTEM INTEGRATOR UNDER SEPARATE CONTRACT.

A. GENERAL SCOPE: MODIFY AND EXTEND THE EXISTING FIELD CONTROLLERS AS SHOW N IN THE CONTRACT DOCUMENTS. THE FIELD CONTROLLERS ARE TO

BE USED TO MONITOR REAL TIME ENERGY USAGE AND PROVIDE TIME-AVERAGED DATA FOR USE BY THE SUPERVISOR. THE TIME-AVERAGE FUNCTION IS TO ENSURE ACCURACY OF ENERGY CALCULATIONS W HILE REDUCING THE POLL FREQUENCY AND NETW ORK TRAFFIC TO A REASONABLE AMOUNT.

B. ELECTRICAL USAGE: FOR EACH ITEM BELOW , SCALE AND CALCULATE THE ANALOG INPUT AS REQUIRED TO THE UNITS OF KW . TIME AVERAGE THIS VALUE

OVER A 15-MINUTE PERIOD AND PROVIDE FOR USE BY THE SUPERVISOR.

1. FIXED SPEED MOTORS: MEASURE ELECTRICAL CURRENT VIA AN ANALOG CURRENT TRANSDUCER FOR FIXED SPEED MOTORS. CALCULATE THIS

CURRENT TO POW ER (KW ) USING THE MEASURED CURRENT AND NAMEPLATE LINE-TO-LINE VOLTAGE AND POW ER FACTOR AS FOLLOW S:

A. 3-PHASE MOTOR KW = 1.73 * VOLTS * AMPS * POW ER FACTOR / 1000

B. 1-PHASE MOTOR KW = VOLTS * AMPS * POW ER FACTOR / 1000

2. VARIABLE SPEED MOTORS: FOR MOTORS DRIVEN BY VARIABLE FREQUENCY DRIVES, RECONFIGURE THE EXISTING DRIVE TO OUTPUT POW ER USAGE

VIA AN ANALOG OUTPUT AND MONITOR AND AVERAGE BY THE DDC CONTROLLER.

C. W ATER SIDE UTILITY USAGE: FOR EACH ITEM BELOW , DIRECTLY CALCULATE THE UTILITY USAGE VIA A W ATER SIDE BTU METER AND INTEG RATE DIRECTLY

INTO THE TRIDIUM SYSTEM.

1. CHILLED W ATER USAGE (EXCEPT AC-20 AND AC-34): DIRECTLY CALCULATE ALL AHU CHILLED W ATER USAGE VIA W ATER SIDE BTU METERS AND

INTEGRATE DIRECTLY INTO THE TRIDIUM SYSTEM.

2. CHILLED W ATER USAGE (AC-20 AND AC-34): TIME-AVERAGE ALL CHILLED W ATER SENSORS AS SHOW N IN EACH CONFIGURATION MATRIX OVER A 15-

MINUTE PERIOD AND MAKE AVAILABLE FOR USE BY THE SUPERVISOR. THESE DATA INCLUDE SUPPLY AND RETURN W ATER TEMPERATURE AND FLOW .

3. HOT W ATER USAGE: DIRECTLY CALCULATE SELECT AHU’S HOT W ATER USAGE VIA W ATER SIDE BTU METERS AND INTEGRATE DIRECTLY INTO THE

TRIDIUM SYSTEM. SEE AHU CONFIGURATIONS TO IDENTIFY W HICH AHUS UTILIZE W ATER SIDE APPROACH FOR HOT W ATER METERING.

D. AIR SIDE STEAM AND HOT W ATER USAGE: FOR ALL AHU’S STEAM USAGE AND SELECT AHU’S HOT W ATER USAGE RATES, CALCULATE AT THE TRIDIUM

SUPERVISOR UTILIZING TIME-AVERAGED DATA FROM THE DDC CONTROLLERS. SEE AHU CONFIGURATIONS TO IDENTIFY W HICH AHUS UTILIZE AIR SIDE

APPROACH FOR HOT W ATER METERING.

1. TIME-AVERAGE ALL SENSORS AS SHOW N IN EACH CONFIGURATION MATRIX OVER A 15-MINUTE PERIOD AND MAKE AVAILABLE FOR USE BY THE

SUPERVISOR. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO, TEMPERATURE, HUMIDITY, AND AIRFLOW .

SUPERVISOR SEQUENCE OF OPERATION: ALL SUPERVISOR SCOPE IS TO BE PROVIDED BY THE OWNER VIA A SEPARATE CONTRACT.

A. ANALYTICS FEATURE: FACILITATE ANALYTICAL FEATURES THRO UGH THE SUPERVISOR TO COMPARE UTILITY USAGE AGAINST A DEFINABLE BENCHMARK

PERIOD. VIA THE DASHBOARD, FACILITATE THIS ANALYTICAL FEATURE BY:

1. HAVING A USER DEFINED PERIOD (PER AHU SYSTEM) TO BENCHMARK PERFORMANCE (1-YEARS LENGTH)

2. TRACKING CUMULATIVE UTILITY USAGE FOR THE LAST CALENDAR YEAR

3. TRACKING CUMULATIVE USAGE ON A ROLLING 12-MONTH BASIS

4. MAINTAINING A TREND LOG OF EACH UTILITY-RATE SO THAT ANY PERIOD’S CUMULATIVE USAGE MAY BE CALCULATED EXTERNALLY

B. SUPERVISOR INTEGRATION: USE THE EXISTING N IAGARA SUPERVISOR FOR THE ENERGY DASHBOARD AND ANALYTICS. THE CALCULATION OF EACH UTILITY’S USAGE RATE W ILL BE COMPLETED AT THE AHU DDC CONTRO LLER OR BTU METER LEVEL AS SPECIFIED ABOVE. DETERMINE THE CUMULATIVE

USAGE FOR EACH ANALYTICAL PERIOD AT THE SUPERVISOR.

1. STOP CALCULATIONS AND GENERATE AND ALARM UPON A LOSS OF COMMUNICATION LONGER THAN 15 MINUTES. ADDITIONALLY, CUMULATE THE

TOTAL TIME DURATION OF VALID DATA SO THAT EACH ANALYTICAL PERIOD CAN BE NORMALIZED TO A YEAR’S LENGTH REGARDLESS OF DATA

COMMUNICATION FAILURES.

C. SUPERVISOR SEQUENCES OF OPERATION:

1. GENERAL SCOPE: FOR EACH AHU INTEGRATE ALL NEW DATA POINTS FOR ALL UTILITIES TO THE SUPERVISOR. UTILIZE THESE POINTS FOR

CALCULATIONS, MONITORING AND TRENDING PURPOSES. UTILIZE THE SUPERVISOR TO CALCULATE ENERGY USAGE AND TIME DURATION ACROSS THE VARIOUS ANALYTICAL TIME-PERIODS AS DESCRIBED IN THE ANALYTICS FEATURES SECTION. MAKE THESE CALCULATIONS FOR EACH INDIVIDUAL UTILITY AND PROVIDE A GRAND TOTAL. CALCULATE INDIVIDUAL UTILITIES IN THEIR MEASURED UNITS. USE THE TRADITIONAL UNIT OF KBTU/FT2 FOR

GRAND TOTALS. THE FOLLOW ING CONVERSIONS APPLY.

• MBTU X 1

• BTU X 0.001

• KW H X 3.14

2. ELECTRICAL USAGE: CALCULATE THE ELECTRICAL POW ER IN KW FOR EACH MOTOR AT THE AHU DDC CONTROLLER AND AVERAGE OVER A 15 MINUTE PERIOD. AT THE SUPERVISOR, CUMULATE THIS ELECTRICAL USAGE AS REQUIRED BY THE GENERAL SCOPE.

3. W ATER SIDE UTILITY USAGE

A. CHILLED W ATER USAGE (EXCEPT AC-20 AND AC-34): THE CHILLED W ATER UTILITY RATE IS CALCULATED BY EACH W ATER SIDE BTU METER. AT THE

SUPERVISOR, CUMULATE THIS CHILLED W ATER USAGE AS REQUIRED BY THE GENERAL SCOPE.

B. CHILLED W ATER USAGE (AC-20 AND AC-34): CALCULATE THE CHILLED W ATER ENERGY USAGE IN THE FOLLOW ING MANNER

a. AT THE DDC FIELD CONTROLLER, CALCULATE A ROLLING 15-MINUTE AVERAGE OF TEMPERATURE AND W ATER FLOW DATA. INTEGRATE INTO

TRIDIUM SYSTEM.

b. CALCULATE CHILLED W ATER ENERGY RATE (MBTU/HR) = 500 * GPM * (TOUT - TIN) / 1000

c. CUMULATE THIS USAGE AS REQUIRED BY THE GENERAL SCOPE.

C. HOT W ATER USAGE: THE HOT W ATER UTILITY RATE IS CALCULATED BY EACH W ATER SIDE BTU METER. AT THE SUPERVISOR, CUMULATE THIS HOT W ATER USAGE AS REQUIRED BY THE GENERAL SCOPE. SEE AHU CONFIGURATIONS TO IDENTIFY W HICH AHUS UTILIZE W ATER SIDE APPROACH

FOR HOT W ATER METERING.

4. AIR SIDE STEAM AND HOT W ATER USAGE: FOR ALL AHU’S STEAM USAGE AND SELECT AHU’S HOT W ATER USAGE, CALCULATE RATES AT THE TRIDIUM

SUPERVISOR UTILIZING TIME-AVERAGED DATA FROM THE DDC CONTROLLERS. SEE AHU CONFIGURATIONS TO IDENTIFY W HICH AHUS UTILIZE AIR SIDE

APPROACH FOR HOT W ATER METERING.

A. HEATING COIL: CALCULATE STEAM OR HOT W ATER HEATING COIL USAGE IN THE FOLLOW ING MANNER

a. AT THE DDC FIELD CONTROLLER, CALCULATE A ROLLING 15 MINUTE AVERAGE OF TEMPERATURE AND AIRFLOW DATA. INTEGRATE INTO THE

TRIDIUM SYSTEM.

b. CALCULATE THE STEAM ENERGY RATE (MBTU/HR) = 1.08 * CFM * (TOUT – TIN) / 1000

c. CUMULATE THIS USAGE AS REQUIRED BY THE GENERAL SCOPE.

B. HUMIDIFIER: CALCULATE STEAM HUMIDIFIER USAGE IN THE FOLLOW ING MANNER:

a. AT THE DDC FIELD CONTROLLER, CALCULATE A ROLLING 15 MINUTE AVERAGE OF TEMPERATURE, HUMIDITY, AND AIRFLOW DATA. INTEGRATE

INTO THE TRIDIUM SYSTEM.

b. CALCULATE W IN, THE INLET HUMIDITY RATIO, AND W OUT, THE OUTLET HUMIDITY RATIO. TO CALCULATE W :

• CALCULATE THE VAPOR PRESSURE USING THE DDC TEMPERATURE AND RELATIVE HUMIDITY DATA AND THE BUILT-IN PSYCHROMETRIC

FUNCTION BLOCK.

• THE HUMIDITY RATIO IS THEN CALCULATED AS W = 0.621945 * VAPOR PRESSURE / (14.35 – VAPOR PRESSURE)

c. CALCULATE THE STEAM ENERGY RATE (MBTU/HR) = 4760 * CFM * (W OUT – W IN) / 1000

d. LIM IT TO MINIMUM OF 0 BTU/HR

e. CUMULATE THIS USAGE AS REQUIRED BY THE GENERAL SCOPE.

UTILITY SERVICE INTERRUPTION REQUIREMENTS

A. NO UTILITY SERVICE SUCH AS W ATER, GAS, STEAM, ELECTRICITY, FIRE PROTECTION SYSTEMS AND COMMUNICATIONS SYSTEMS MAY BE INTERRUPTED W ITHOUT PRIOR APPROVAL OF COR. ELECTRICAL W ORK SHALL BE ACCOMPLISHED W ITH ALL AFFECTED CIRCUITS OR EQUIPMENT DE-ENERGIZED.

B. CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COR, IN W RITING, 7 DAYS IN ADVANCE OF PROPOSED INTERRUPTION.

REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION.

C. CONTRACTOR W ILL BE ADVISED (IN W RITING) OF APPROVAL OF REQUEST, OR OF W HICH OTHER DATE AND/OR TIME SUCH INTERRUPTION W ILL CAUSE LEAST INCONVENIENCE TO OPERATIONS OF MEDICAL CENTER. INTERRUPTION TIME APPROVED BY MEDICAL CENTER MAY OCCUR AT OTHER THAN

CONTRACTOR'S NORMAL W ORKING HOURS.

D. MAJOR INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN W RITING, AT LEAST 15 CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE

PERFORMED AS D IRECTED BY THE COR .

E. IN CASE OF A CONTRACT CONSTRUCTION EMERGENCY, SERVICE W ILL BE INTERRUPTED ON APPROVAL OF COR. SUCH APPROVAL W ILL BE CONFIRMED IN

W RITING AS SOON AS PRACTICAL.

PROJECT SEQUENCING

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING A SEQUENCING PLAN FOR THE ORDER IN W HICH THE AIR HANDLERS IN THE PROJECT ARE ADDRESSED, AND SHALL SUBMIT SAME TO THE VA COR FOR REVIEW AND APPROVAL DURING THE PRE-CONSTRUCTION PHASE. IT IS NOT NECESSARILY A REQUIREMENT THAT THE AIR HANDLERS BE W ORKED ON ONE-BY-ONE IF THE CONTRACTOR OBTAINS APPROVAL FROM THE VA COR TO W ORK ON MULTIPLE AIR HANDLERS AT ONCE. REGARDLESS OF THE APPROACH TAKEN, TOTAL CONSTRUCTION TIMELINE SHALL NOT EXCEED THE DURATION

OUTLINED BELOW .

B. PROJECT SCHEDULE SHALL INDICATE THE STARTING DATE AND DURATION OF W ORK FOR EACH AIR HANDLING UNIT SYSTEM.

C. REFER TO 23 09 23 PARAGRAPH 1.1.G FOR COORDINATION OF W ORK BETW EEN CONTRACTOR AND VA RETAINED, THIRD-PARTY MASTER SYSTEM

INTEGRATOR UNDER SEPARATE CONTRACT.

CONSTRUCTION PHASING

FOR EACH UNIT, THE GENERAL PHASING OF W ORK SHALL BE:

A. DETERMINE EXACT UPGRADES THAT ARE TO BE PERFORMED ON AIR HANDLING UNIT AND ASSOCIATED CONTROLLER AS SPECIFIED IN UNIT'S SENSOR

CONFIGURATION MATRIX.

B. SCHEDULE SHUTDOW N OF UNIT.

C. PERFORM W ORK NOT REQUIRING UNIT SHUTDOW N, SUCH AS: AHU CONTROLLER UPGRADES, NEW CONDUIT AND W IRING BETW EEN CONTROLLER PANELS

AND SENSOR OR METER LOCATIONS. INSTALL ANY CHILLED W ATER METERING SENSORS AND METERS.

D. SHUTDOW N AIR HANDLING UNIT. EACH AHU SHALL BE OUT OF SERVICE NO LONGER THAN 4 HOURS.

E. PERFORM REMAIN ING SENSOR INSTALLATION.

F. PERFORM SENSOR TESTING AND CALIBRATION OF EXISTING AND NEW SENSORS AS DESCRIBED IN AIR HANDLING UNIT SENSOR CONFIGURATION MATRIX.

G. COMPLETE FIELD CONTROLLER AND PROGRAMMING W ORK.

H. RESTART UNIT.

I. COORDINATE W ITH THIRD-PARTY MASTER SYSTEM INTEGRATOR (PROVIDED UNDER SEPARATE CONTRACT) TO COMPLETE SUPERVISOR AND EUI

INTEGRATION W ORK.

CONSTRUCTION TIMELINE

THE SCOPE OF W ORK DESCRIBED IN THIS DRAW ING PACKAGE REPRESENTS A PROJECT THAT MUST BE UNDERTAKEN DURING FULL OCCUPANCY AND FUNCTIONALITY OF THE EXISTING HOSPITAL. THE PROPOSED DURATION PLAN IS AS FOLLOW S:

PRE-CONSTRUCTION: 60 DAYS

CONSTRUCTION: 365 DAYS* (NOTE: CONTRACTOR SHALL ALLOW 7 DAYS PER AIR HANDLER

FOR VA'S MASTER SYSTEM INTEGRATOR W ORK)

TOTAL TIMEFRAME: 425 DAYS

THE FOLLOW ING CONSTRUCTION SCHEDULE TIMEFRAMES SHALL APPLY TO THIS PROJECT:

CONSTRUCTION ACTIVITIES ARE PERMITTED TO OCCUR DURING REGULAR SHIFT HOURS, W HEN NO INTERRUPTION TO OPERATION RESULTS. CONTRACTORS, HOW EVER, SHALL NOT BE PERMITTED TO HAVE MATERIALS AND DELIVERIES DELIVERED OR TAKEN AW AY DURING REGULAR SHIFT HOURS, AND MUST

COORDINATE SUCH ACTIVITIES W ITH STAFF AND VA COR.

THE TIMEFRAMES IDENTIFIED ABOVE ARE IN REFERENCE TO NORMAL CONSTRUCTION ACTIVITIES AND, UNLESS APPROVED BY VA COR, SHALL NOT APPLY TO

W ORK SUCH AS:

• UTILITY SHUTDOW NS

• EXISTING MEP SYSTEM SHUTDOW NS

• W ORK IN PUBLIC CORRIDORS

• CUTTING OF FLOOR OPENINGS IN THE EXISTING BUILDING

• W ORK OUTSIDE OF TEMPORARY CONSTRUCTION PARTITIONED AREAS, INCLUDING ACCESS OF CEILING PLENUM SPACES IN FLOORS ABOVE OR BELOW

CONSTRUCTION AREAS, AND REPLACEMENT OF EXISTING FINISHES.

• CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS.

W ORK IDENTIFIED ABOVE SHALL OCCUR EITHER IN THE EVENING SHIFT OR ON W EEKENDS. ALL CONSTRUCTION ACTIVITIES AND SCHEDULES MUST BE REVIEW ED AND APPROVED BY VA COR. REFER TO SPEC DIVISION 01 FOR GENERAL PROJECT REQUIREMENTS.

1) PROVIDE ALL CLEANING, CALIBRATION, SENSORS, CONDUIT, W IRING, NEW CONTROL POINTS, AND PROGRAMMING AS REQUIRED FOR W ORK INDICATED ON AHU CONFIGURATION MATRICES, AND ENLARGED AHU PLANS. ALL NEW

CONTROL POINTS SHALL BE DISCOVERABLE BY THE TRIDIUM SYSTEM.

2) AS OF DESIGN, UNIT IS NOT YET IN SERVICE.

BID ITEM 1 (BASE BID): ALL W ORK INCLUDED W ITHIN CONSTRUCTION DOCUMENTS AND ASSOCIATED SPECIFICATIONS.

BID ITEM 2 (DEDUCT ALTERNATE 1): W ORK INCLUDES BID ITEM 1 (BASE BID), EXCEPT DELETE ALL W ORK ASSOCIATED W ITH AC-28, AC-63, AC-64, RTU-65, RTU-66, RTU-67, RTU-68, AND RTU-69 INCLUDING SENSORS, CONTROLS, PROGRAMMING, AND ELECTRICAL CONNECTIONS.

BID ITEM 3 (DEDUCT ALTERNATE 2): W ORK INCLUDES BID ITEM 2, EXCEPT ADDITIONALLY DELETE ALL W ORK ASSOCIATED W ITH AC-14, AC-35, AHU-S-2-3, AHU-S-2-4, AHU-S-2-5, INCLUDING SENSORS, CONTROLS, PROGRAMMING, AND ELECTRICAL CONNECTIONS.

GENERAL NOTES:

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

XX

X

X X

X

X

X

X

X

X XXX

X X X X X X X X X X X

X

X

X

XX

X

X

X

X X

FEC

FEC

FEC

FEC

UP

UP

UP

X

AC-61

AC-62

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:1

A

M

M-100

LEVEL A - OVERALL AHU PLAN

HEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

GENERAL NOTES

A. AIR HANDLER SHAPE, SIZE, AND LOCATION IS APPROXIMATE AND

FOR REFERENCE ONLY.

B. SHOW N AHU SERVICE AREA IS APPROXIMATE AND FOR REFERENCE

ONLY.

C. ALL EXISTING AIR HANDLER MECHANICAL ROOMS ARE ENCLOSED IN

1 HR RATED FIRE BARRIERS. CONTRACTOR SHALL FIRESTOP ALL

NEW THRU-W ALL PENETRATIONS.

SCALE: 1/32" = 1'-0"

LEVEL A FLOOR PLAN

1N

DASHED BOUNDARY INDICATES APPROXIMATE

AREA SERVED BY TAGGED AIR HANDLERAHU TAG

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

Existing panel Existing panel Existing panel Existing panelExisting panel

UP

DN

DN

UP

UP

DN

B F C

B F C

16001600

B

B

B

A

AC-22

AC-26

AC-26

AC-28

AC-34

AC-52

AC-53

AC-52

AC-51

AC-31

AC-32

AC-56

AHU-E-0-1

AHU-E-0-2

AHU-E-0-3

AHU-W-0-1

AHU-W-0-2

AHU-W-0-3

AHU-W-0-3

AC-61

AC-62

M -701

AC-28

M -701

M -701

M -701

AC-63

AC-35

A C

-1

AC-35

RTU-66

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:1

A

M

M-101

BASEMENT - OVERALL AHU PLAN

HEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

SCALE: 1/32" = 1'-0"

BASEMENT FLOOR PLAN

GENERAL NOTES

N

DASHED BOUNDARY INDICATES APPROXIMATE

AREA SERVED BY TAGGED AIR HANDLER

A. AIR HANDLER SHAPE, SIZE, AND LOCATION IS APPROXIMATE AND

FOR REFERENCE ONLY.

B. SHOW N AHU SERVICE AREA IS APPROXIMATE AND FOR REFERENCE

ONLY.

C. ALL EXISTING AIR HANDLER MECHANICAL ROOMS ARE ENCLOSED IN

1 HR RATED FIRE BARRIERS. CONTRACTOR SHALL FIRESTOP ALL

NEW THRU-W ALL PENETRATIONS.

AHU TAG

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

C

B

A

G

FED

C

B A

FEC

U P

R

D O W N

R

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

STAIR D

PE1

STAIR B

STAIR A

STAIR 2

STAIR 3

STAIR 1

STAIR 2

STAIR 6

STAIR 5

STAIR 4

STAIR 13 STAIR 2

STAIR 9

STAIR 2

STAIR C

STAIR B

STAIR A

STAIR 11

STAIR A

STAIR 8

STAIR S3

STAIR S2

P3P2P1

STAIR S1

S3

S2

S1

PE8PE7

PE6PE5PE4PE3

SE2SE1

16001600

B

A B

B

B

C

AC-26

AC-34

AC-51

AC-52

AC-6

AC-32

AC-53

A C

-5

AC-57

AHU-E-1-1

AHU-E-1-2

AHU-W-1-1

A H

U -W

-1 -3

AHU-W-1-2

AC-61

AC-62

RTU-65

AHU-S-2-4

AC-63

AHU-63

M -702

M -702

AC-14

AHU-E-1-1

AHU-S-2-4

RTU-67-69

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:2

A

M

M-102

FIRST FLOOR - OVERALL AHU PLAN

HEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

SCALE: 1/32" = 1'-0"

FIRST FLOOR PLAN

GENERAL NOTES

N

A. AIR HANDLER SHAPE, SIZE, AND LOCATION IS APPROXIMATE AND

FOR REFERENCE ONLY.

B. SHOW N AHU SERVICE AREA IS APPROXIMATE AND FOR REFERENCE

ONLY.

C. ALL EXISTING AIR HANDLER MECHANICAL ROOMS ARE ENCLOSED IN

1 HR RATED FIRE BARRIERS. CONTRACTOR SHALL FIRESTOP ALL

NEW THRU-W ALL PENETRATIONS.

DASHED BOUNDARY INDICATES APPROXIMATE

AREA SERVED BY TAGGED AIR HANDLERAHU TAG

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

CRASH CRASH

NIC NIC

AE113AW

B

HM

I M

SC

10.000000EC

AE113AW

B

HM

I

M

SC

10.000000EC

AE113AW

B

HM

I

M

SC

10.000000ECAE113AW

B

HM

I

M

SC

10.000000EC AE113AW

B

HM

I

M

SC

10.000000EC AE113AW

B

HM

I

M

SC

10.000000EC

AE113AW

B

HM

I

M

SC

10.000000ECAE113AW

B

HM

I

M

SC

10.000000EC

AE113AW

B

HM

I

M

SC

10.000000EC

AE113AW

B

HM

I

M

SC

10.000000EC AE113AW

B

HM

I

M

SC

10.000000EC

AE113AW

B

HM

I

M

SC

10.000000EC

46-3618-38HM IM FS10.000000

3 6/18 M S

46-3618-38HMI MFS 10.000000

36/18

MS

46-3618-38HM IM FS10.000000

3 6/18 M S

46-3618-38HMI MFS 10.000000

36/18

MS

SA300ANMAUS10.000000

SA300ANMAUS10.000000

SA300ANMAUS10.000000SA300ANMAUS10.000000 SA300ANMAUS10.000000 SA300ANMAUS10.000000

SA300ANMAUS10.000000SA300ANMAUS10.000000

SA300ANMAUS10.000000

SA300ANMAUS10.000000 SA300ANMAUS10.000000

SA300ANMAUS10.000000

E3231.42HM

I

HEI170.000000U

E3231.42HM

I

HEI170.000000U

E3210.42WHM

I

HEI170.000000U

E3210.42WHM

I

HEI170.000000U

E6010. HMI HEI 162.000000U

E6010. HMI HEI 162.000000U

E6010. HMI HEI 162.000000U

E6010. HMI HEI 162.000000U

M 16-1522-FFHM IM ER10.000000M P

M 16-1522-FFHM IM ER10.000000M P

M 16-1528-BFHM IM ER10.000000M P M 16-1528-BFHM IM ER10.000000M P

M 16-1528-BFHM IM ER10.000000M P

M 16-1522-FFHM IM ER10.000000M P

M 16-1528-BFHM IM ER10.000000M P

M 16-1522-FFHM IM ER10.000000M P

26-4220-3NHM

I

M

ER

10.000000M F

26-4220-3NHM

I

M

ER

10.000000M F

2 1

..1.

H S

L-

H A

P

..1.

H S

L-

H A

P

H S L- 0 02 4

H A P

- J LE

..1.

H F

P-

H A

P

H S L- 0 04 2

H A P

. . 1 .

H S

R-

H A

P

. . 1 .

H S

R-

H A

P

HSL-0048

HAP HAP

HSL-0054

HSL-0030

HAP

H S R- 0 03 0

H A P

H S R- 0 03 0

H A P

H S L- 0 04 8

H A PH A P

H S L- 0 05 4

H S L- 0 03 0

H A P

HSL-0024

HAP

..1.

H S

L-

H A

P

..1.

H S

L-

H A

P

..1

J

LE

P D

M

H A

P

..1

J

LE

P D

M

H A

P

HSL-0042

HAP

HTTC-30

HAP

H S L- 0 02 4

H A P

- J LE

. . 1 .

H F

P-

H A

P

HSL-0048

HAP HAP

HSL-0054

HSL-0030

HAP

H S L- 0 04 8

H A PH A P

H S L- 0 05 4

H S L- 0 03 0

H A P

H S L- 0 04 2

H A P

ELEVATOR

D O W N

R

FEC

W

V

U

T

S

UP

DN

DN

UP

UP

DN

B F C

AC-34

AC-51

AC-52

AC-20

AC-6

AC-31

AC-53

AC-56

AC-57

AHU-E-0-3 AHU-E-0-2

AHU-E-1-1

AHU-E-0-1AHU-E-1-2

AHU-S-2-1

AHU-S-2-2

AHU-W-0-2 (LOWER)

AHU-W-0-1 (UPPER)

AHU-W-1-2 (LOWER)

AHU-W-1-3 (UPPER)

AHU-W-1-1

AC-61

AC-62

M -703

M -703

A H

U -S

-2 -3

RTU-68

RTU-66

RTU-69

M -703

RTU-67

AC-14

AHU-S-2-5

RTU-65

M -703

M -703

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:3

A

M

M-103

SECOND FLOOR - OVERALL AHU

PLANHEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

SCALE: 1/32" = 1'-0"

SECOND FLOOR PLAN

GENERAL NOTES

N

A. AIR HANDLER SHAPE, SIZE, AND LOCATION IS APPROXIMATE AND

FOR REFERENCE ONLY.

B. SHOW N AHU SERVICE AREA IS APPROXIMATE AND FOR REFERENCE

ONLY.

C. ALL EXISTING AIR HANDLER MECHANICAL ROOMS ARE ENCLOSED IN

1 HR RATED FIRE BARRIERS. CONTRACTOR SHALL FIRESTOP ALL

NEW THRU-W ALL PENETRATIONS.

DASHED BOUNDARY INDICATES APPROXIMATE

AREA SERVED BY TAGGED AIR HANDLERAHU TAG

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

UPDN

UP DN

DN

UP

B F C

16001600

B

C

B

B

B

A

AC-34

AC-22

AC-20

AC-54

AC-55

AHU-S-2-1

AC-61

AC-62

AHU-S-2-2

M -704

M -704

M -704

AHU-S-2-5

AHU-S-2-3

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:3

A

M

M-104

THIRD FLOOR - OVERALL AHU

PLANHEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

SCALE: 1/32" = 1'-0"

THIRD FLOOR PLAN

GENERAL NOTES

N

A. AIR HANDLER SHAPE, SIZE, AND LOCATION IS APPROXIMATE AND

FOR REFERENCE ONLY.

B. SHOW N AHU SERVICE AREA IS APPROXIMATE AND FOR REFERENCE

ONLY.

C. ALL EXISTING AIR HANDLER MECHANICAL ROOMS ARE ENCLOSED IN

1 HR RATED FIRE BARRIERS. CONTRACTOR SHALL FIRESTOP ALL

NEW THRU-W ALL PENETRATIONS.

DASHED BOUNDARY INDICATES APPROXIMATE

AREA SERVED BY TAGGED AIR HANDLERAHU TAG

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

FEC

B F C

16001600

B

C

B

B

B

A

AC-54

AC-55

AC-61

AC-62

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:4

A

M

M-105

FOURTH FLOOR - OVERALL AHU

PLANHEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

SCALE: 1/32" = 1'-0"

FOURTH FLOOR PLAN

GENERAL NOTES

N

A. AIR HANDLER SHAPE, SIZE, AND LOCATION IS APPROXIMATE AND

FOR REFERENCE ONLY.

B. SHOW N AHU SERVICE AREA IS APPROXIMATE AND FOR REFERENCE

ONLY.

C. ALL EXISTING AIR HANDLER MECHANICAL ROOMS ARE ENCLOSED IN

1 HR RATED FIRE BARRIERS. CONTRACTOR SHALL FIRESTOP ALL

NEW THRU-W ALL PENETRATIONS.

DASHED BOUNDARY INDICATES APPROXIMATE

AREA SERVED BY TAGGED AIR HANDLERAHU TAG

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

16001600

B

A B

B

B

C AC-54

AC-55

AC-55

AC-61

AC-62

M -705

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a l_ jd z e ig le r.

rv t

/3

/2

:5

:4

A

M

M-106

FIFTH FLOOR - OVERALL AHU PLAN

HEAPY ENGINEERING

1422 EUCLID AVE STE 1162

CLEVELAND, OH 44115

216-862-5846

ADD AHU METERING

10701 EAST BLVD. CLEVELAND, OHIO

541-21-205

CAMPUS

09/29/2020 MGW JDZ

BID ISSUE SUBMISSION

FULLY SPRINKLERED

2020-05088

01528

SCALE: 1/32" = 1'-0"

FIFTH FLOOR PLAN

GENERAL NOTES

N

A. AIR HANDLER SHAPE, SIZE, AND LOCATION IS APPROXIMATE AND

FOR REFERENCE ONLY.

B. SHOW N AHU SERVICE AREA IS APPROXIMATE AND FOR REFERENCE

ONLY.

C. ALL EXISTING AIR HANDLER MECHANICAL ROOMS ARE ENCLOSED IN

1 HR RATED FIRE BARRIERS. CONTRACTOR SHALL FIRESTOP ALL

NEW THRU-W ALL PENETRATIONS.

DASHED BOUNDARY INDICATES APPROXIMATE

AREA SERVED BY TAGGED AIR HANDLERAHU TAG

Revisions: Date:

35% SCHEM. DESIGN SUBMISSION 06/04/20

65% DESIGN DEVELOPMENT 07/07/20

90% CDS SUBMISSION 07/31/20

X

6A107C

STAIR 4

STAIR 3

STAIR 5

STAIR 8

STAIR 9

SE1 SE2

PE3 PE4 PE5 PE6

PE7 PE8

STAIR S1

S1

S2

S3

STAIR S2

STAIR S3

P1 P2 P3

16001600

B

A B

B

B

C

AC-61

AC-62

AC-29

P: 937-224-0861 www.heapy.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Departm ent of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD STAMPARCHITECT

321 4 5 6 7 8 9 10

1468 W EST 9TH STREET #400

CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

PROJECT NO.

STATE COA FIRM NO.

D a y d a ta

\H e a p y D o c u m e n ts \j d z e ig le r\ M y D o c u m e n ts

\2

-0

-M E

-C e n tr a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .