S02. Bid Item.pdf
PDF 143 KB Posted
- Attached to
- Add AHU Metering Federal contract opportunity
- Solicitation number
- 36C25021R0066_1
About this file
This document contains a solicitation for a federal construction contract opportunity along with bid item details. The solicitation is to add AHU metering to individual air handling units at the Louis Stokes Cleveland VA Medical Center in Cleveland, Ohio in order to implement energy conservation measures. The project magnitude is between $500,000 and $1,000,000. Bidders are to provide pricing for three bid items, with the base bid including all work and the alternates deducting specified items. The NAICS code is 236220 for the project, which has a 100% set aside for verified Service Disabled Veteran Owned Small Businesses. The cutoff date for requests for information is May 10, 2021 and bids are to be submitted based on price. The period of performance is 425 calendar days from notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02. VAMC Health Requirements.pdf | ||
| S02. Specifications 09 29 20.pdf | ||
| S02. Wage Determination.pdf | ||
| S02. Drawings 09 29 20.pdf | ||
| S02. Calculation of Self-Performed and Sub-Contracted Work.docx | DOCX document | |
| S02. Safety.docx | DOCX document | |
| S02. Solicitation 36C25021R0066.pdf | ||
| S02. Site Visit Information.pdf | ||
| S02. RFI Form.docx | DOCX document | |
| S02. Bid Opening Instructions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
**NOTE: A SINGLE AWARD MAY BE MADE ON BID ITEM 1 (BASE BID), BUT IN THE EVENT THE
OFFER EXCEEDS THE FUNDS AVAILABLE, A SINGLE AWARD MAY BE MADE ON BID ITEM 2, BID
ITEM 3, IN THAT ORDER, BASED ON AVAILABLE FUNDING. OFFERORS SHOULD QUOTE A PRICE
ON EACH ITEM LISTED AND WILL NEED TO SUBMIT A TOTAL COST FOR EACH BID ITEM. THE
PRICE FOR EACH BID ITEM SHOULD NOT REQUIRE ANY MATHEMATICAL CALCULATIONS TO BE
PERFORMED BY THE VA TO DETERMINE THE BIDDER’S PRICE.
BID ITEM 1 (BASE BID): Work includes all labor material, equipment and supervision to perform the required general trades, construction work on this project. Project will add metering to individual AHU units to implement energy conservation measures All work shall be completed within 425 calendar days after receipt of Notice to Proceed.
BID ITEM 2 (Alternate NO. 1): All Work in BID ITEM 1 (BASE BID) except: Remove all work as indicated by “DEDUCT ALTERNATE #1” and with AC-28, AC-63, AC-64, RTU-65, RTU-66, RTU-67, RTU-68, RTU-69 and including sensors, controls, programming and electrical connections. All work shall be completed within 425 days after receipt of Notice to Proceed.
BID ITEM 3 (Alternate NO. 2): All work in BID ITEM 1 (BASE BID), except: Remove all work specified in BID ITEM 2 (Alternate NO. 1). In addition: Remove all work as indicated by “DEDUCT ALTERNATE #2” and with AC-14, AC-35, AHU-S-2-3, AHU-S-2-4, AHU-S-2-5 and including sensors, controls, programming and electrical connections. All work shall be completed within 425 days of the Notice to Proceed.