S02. 541-23-208_PPG Entrance_BID submittal_Drawings.pdf
PDF 20 MB Posted
- Solicitation number
- 36C25025B0024_1
About this file
These construction documents detail a renovation project for the Louis Stokes Cleveland VA Medical Center's patient parking garage entrance. The project involves improving approximately 2,100 square feet of space on the second floor, specifically the patient parking garage and elevator lobby areas. The renovation will include architectural, structural, mechanical, electrical, and technology system upgrades, with work focused on improving the entrance and modernizing the space.
The project is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB), with an estimated project magnitude between $500,000 and $1,000,000. The contract (Solicitation Number 36C25025B0024_1) requires bidders to be verified in VetCert and registered in SAM. Key dates include a Request for Information (RFI) cut-off of 06-16-2025 at 2:00 PM EST, and bidders must submit completed documentation at the time of bid opening. The project will be evaluated primarily on price, with work to be performed at 10701 East Boulevard, Cleveland, Ohio.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXTERIOR ELEVATION
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
WINDOW OPENING
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
XX
10'-8"
X
X
XX.X-X
XX
X
1/A101
X
A101
XX
TOILET ACCESSORY TAGXX SIGNAGE TAG
A101
SIM
X
N
PROJECT LOCATION -
2ND LEVEL
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OH 45409
937.224.0861 P
937.224.5777 F
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JOHN POE ARCHITECTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
THP
STRUCTURAL
100 E. EIGHTH STREET, STE. 300
CINCINNATI, OH 45202
513.241.3222 P
/1
/2
:1
:1
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
COVER SHEET
G001
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
IMPROVE ENTRANCE FROM PATIENT
PARKING GARAGE
10701 EAST BLVD. CLEVELAND, OHIO 44106 PROJECT #: 541-23-208
FINAL CONSTRUCTION
DOCUMENTS
22026.00
S101 FIRST FLOOR SHORING PLAN
G001 COVER SHEET
G100 CODE DATA
G200 PHASING PLAN
AD102 DEMOLITION PLAN - SECOND FLOOR
A101 OVERALL PLAN - SECOND FLOOR
A102 ENLARGED PLAN - SECOND FLOOR
A103 OVERALL PLAN - THIRD FLOOR
A121 REFLECTED CEILING PLAN
A201 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A311 WALL SECTIONS
A401 INTERIOR ELEVATIONS
A601 DOOR SCHEDULE & DETAILS
AF101-F INTERIOR FINISHES PLAN
S001 GENERAL NOTES
S102 SECOND FLOOR FRAMING & SLAB PLAN
S301 DETAILS
SR001 EXISTING SECOND FLOOR STRUCTURAL PLAN
SR002 EXISTING PT SLAB AND BEAM CONSTRUCTION
FX102 SECOND FLOOR PLAN - FIRE SUPPRESSION
M100 LEGEND AND INDEX OF DRAWINGS
MD102 HVAC FLOOR PLAN - DEMOLITION
M102 HVAC FLOOR PLAN - NEW WORK
M103 3RD/4TH/ROOF PLANS - NEW WORK
M501 DETAILS
M601 SCHEDULES
M901 CONTROLS
E100 LEGEND AND INDEX OF DRAWINGS
ED102 SECOND FLOOR PLAN - ELECTRICAL DEMOLITION
E101 SECOND FLOOR PLAN - LIGHTING NEW WORK
E201 SECOND FLOOR PLAN - POWER NEW WORK
E202 THIRD FLOOR PLAN - POWER NEW WORK
E301 SECOND FLOOR PLAN - FIRE ALARM NEW WORK
E501 LIGHT FIXTURE DETAIL
E601 ELECTRICAL SCHEDULES & DETAILS
T100 LEGEND AND INDEX OF DRAWINGS
TD101 SECOND FLOOR PARKING GARAGE DEMO
T101 SECOND FLOOR PLAN - TECHNOLOGY
T601 TECHNOLOGY SCHEDULES & DETAILS
DRAWING INDEXVICINITY MAP
GRAPHIC SYMBOLS
GENERAL CONSTRUCTION NOTES
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. iF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
13. THE GENERAL CONTRACTOR SHALL OBTAIN A SIGNED HOT WORKS PERMIT
EACH WORKING DAY BEFORE USING OPEN FLAMES, WELDING RODS, AND
TORCHES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS
AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER
PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING
BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT
WORK.
14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE
STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AT ALL
TIMES.
15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED
BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE
PROPERTY OF THE CONTRACTOR AND IT SHALL BE PROPERLY DISPOSED OF.
NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION
ROUTES BEYOND THE AREAS OF WORK.
16. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT
DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS
PROVIDED IN THE FINAL CONSTRUCTION.
17. NEW PENETRATIONS IN EXISTING FLOOR, ROOF, AND WALL STRUCTURES
FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO
THAT CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.
Revisions Date
S101 FIRST FLOOR SHORING PLAN
G001 COVER SHEET
G100 CODE DATA
G200 PHASING PLAN
AD102 DEMOLITION PLAN - SECOND FLOOR
A101 OVERALL PLAN - SECOND FLOOR
A102 ENLARGED PLAN - SECOND FLOOR
A103 OVERALL PLAN - THIRD FLOOR
A121 REFLECTED CEILING PLAN
A201 EXTERIOR ELEVATIONS
A301 BUILDING SECTIONS
A311 WALL SECTIONS
A401 INTERIOR ELEVATIONS
A601 DOOR SCHEDULE & DETAILS
AF101-F INTERIOR FINISHES PLAN
DN
0-HR Smoke Partition - NFPA 101-8.4
1-HR Smoke Barrier - NFPA 101-8.5
1-HR Fire Barrier - NFPA 101-8.3
2-HR Fire Barrier - NFPA 101-8.3
Means of Egress
Exit Sign
Fire Extinguisher Location
CODE LEGEND
F.E.
Travel Distance to Exit:
Max. Allowable = 400' Actual = 303'
Note: Existing 2 hr. fire separation of occupancies (Storage from
Ambulatory Heath Care) occurs at double egress pair of doors on opposite side of pedestrian bridge.
F.E.
F.E.
BUILDING CODE SUMMARY
Project Name: Improve Entrance From Patient Parking Garage
Project Number: VA# 541-23-208 / RDCJAP# 22026.00
Project Address: Department of Veterans Affairs Medical Center, 10701 East Blvd., Cleveland, Ohio 44106
Project Description: Project scope includes construction of a new 1,100 s.f. entrance to the second floor elevator lobby of the Patient Parking Garage. Existing Elevator Lobby, 430 s.f., to receive new finishes only. Existing elevators to remain in service.
Applicable Codes:
• VA Directives, Design Manuals, Master Specifications, VA National CAD Standard
Application Guide, and other Guidance on the Technical Information Library (TIL) (HYPERLINK "http://www.cfm.va.gov/til/"www.cfm.va.gov/til/)
• 2021 NFPA 101, Life Safety Code (LSC) Chapter 18, et al
• NFPA National Fire Codes, with the exception of NFPA 5000 and NFPA 900
• 2021 International Building Code (IBC), only when specifically referenced in VA Design
Documents
• Occupational, Safety and Health Administration (OSHA) Standards.
• VA Seismic Design Requirements, H-18-8
• Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier
Free Design Guide (PG-18-13), rev. 11/01/2022
Classification of Building Occupancy:
Storage
Table 7.3.1.2, Occupant Load Factor:
Assembly Use (Fixed Seating): 11 persons
Table A.7.6, Common Path, Dead End, and Travel Distance Limits:
• Storage
• Common path: 50 feet
• Dead end: 50 feet
• Travel distance: 400 feet
Construction Type and Construction Type Limitations:
• Type I (332) construction
• More than 4 stories allowed
Table A.8.2.1.2, Fire Resistance Ratings for Type II Construction:
• Exterior bearing walls, supporting more than one floor, columns or other bearing walls: 3 hour
• Supporting one floor only: 3 hour
• Supporting Roof only: 3 hour
• Interior bearing walls, supporting more than one floor, columns or other bearing walls: 3 hour
• Supporting one floor only: 3 hour
• Supporting Roof only: 2 hour
• Columns, supporting more than one floor, columns or other bearing walls: 3 hour
• Supporting one floor only: 2 hour
• Supporting Roof only: 2 hour
• Beams, Girders, Trusses, and Arches, supporting more than one floor, columns or other bearing walls: 3 hour
• Supporting one floor only: 2 hour
• Supporting Roof only: 2 hour
• Floor/Ceiling assemblies: 2 hour
• Roof Ceiling assemblies: 1.5 hour
• Interior nonbearing walls: 0 hour
• Exterior nonbearing walls: 0 hour
Table A.10.2.2, Interior Finish Classification Limitations:
• Storage
• Exits: Class A or B, I or II
• Exit access corridors: Class A, B or C
• Other spaces: Class A, B or C
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:2
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
CODE DATA
G100
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
N Scale: 1/16" = 1'-0"
CODE PLAN - SECOND FLOOR
Revisions Date
14 15 16 17 18 19 20 23
J
PHASE 2A & 2B
PHASE 3
PHASE 4
LOCATION OF TEMPORARY
CONSTRUCTION BARRIER
MAINTAIN ACCESS TO ELEVATOR
LOBBY DURING PHASE 1
CONTRACTOR STAGING /
LAYDOWN AREA FOR
PHASE 1 & 2
8'-0" CONSTRUCTION
FENCE
TEMPORARY ACCESSIBLE
RAMP UP TO CONCRETE SLAB
• PHASE 1
• RESTRIPE ALL PARKING SPOTS
• PHASE 2A
• CONCRETE TOPPING SLAB
• PHASE 2B
• BUILDING NORTH
• PHASE 3
• BUILDING SOUTH
• PHASE 4
• EXISTING ELEVATOR LOBBY &
STRIPING AT DROP-OFF AREA
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:3
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
PHASING PLAN
G200
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
N Scale: 1/8" = 1'-0"
PHASING PLAN - SECOND FLOOR
A. Maintain as many existing parking spaces as possible during construction. Perform restriping during weekends and non-peak operating hours.
B. Work in existing elevator lobby to be completed during non-peak operating hours and weekends. Access to skyway bridge from stairs and elevators must be maintained during normal business hours of Monday-Friday 8:00am-6:00pm.
C. Material to be brought to construction site through the parking garage. No space available for lift from ground.
D. All material and waste to be stored in laydown area or offsite. No other sites are available on campus.
PHASING NOTES
Phasing Descriptions
1 23 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2223
A
B C
D E
F G
H
J n9 nA nB nC nD
W
Bid Item 02
76' - 0"
2.53
2.51
2.54
2.66
DEMOLITION LEGEND
Elements to be Demolished
Existing Elements to Remain
20 23
J
W
2.53 2.53
2.57
2.57
2.56
2.55
2.55
2.02
2.02
2.54 2.54 2.54
2.59
2.60
2.61
Bid Item 02
2.04
2.56
2.62
/8
10' - 6" 14' - 6"
8' - 3 1/2"
2.63
2.64
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:0
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
DEMOLITION PLAN - SECOND
FLOOR
AD102
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
A. Remove all existing items shown with dashed line. Repair to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Remove all existing borrowed lights, doors and hollow metal frames where indicated with dashed line. Unused hardware shall be turned over to Owner. Box hardware before giving to Owner.
C. Remove existing corner guards in areas to be remodeled.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Prepare walls and floor slabs as required to receive new fininsh materials where existing finish is indicated to be removed.
G. Temporarily remove and store all loose furnishings in the construction area, including but not limited to benches, trash cans, signage, et al.
H. Repair all damage to concrete in work area.
2.02 Existing structure to remain.
2.04 Existing piping to remain. Protect in place during construction.
Coordinate new construction with existing Unistrut supports.
2.51 Remove existing painted parking striping.
2.52 Remove existing painted handicap access symbol.
2.53 Remove existing painted "Reserved for SCI" parking symbol.
2.54 Remove existing concrete bollard.
2.55 Remove existing concrete ramp and topping slab down to
parking deck below. Clean and prep slab for new topping slab structure.
2.56 Remove existing metal handrail.
2.57 Remove existing metal guardrail and concrete sleeve. Repair concrete at all sleeve locations. Cut steel tubes and temporarily support until new post is installed.
2.59 Remove existing suspended grid ceiling structure.
2.60 Remove and reinstall existing wall-mounted fixtures, devices, and signage. Existing wall to be furred out with new metal studs and gypsum board.
2.61 Remove existing carpet. Prep floor slab to receive new floor finish.
2.62 Remove existing steel bollard.
2.63 Remove existing expansion joint.
2.64 Remove existing sleeve at corner of wall. Repair damaged concrete to match existing conditions.
2.66 Remove existing downspout.
PLAN NOTES
GENERAL DEMOLITION NOTES
N Scale: 1/16" = 1'-0"
DEMOLITION PLAN - SECOND FLOOR
N Scale: 1/8" = 1'-0"1
DEMOLITION PLAN - SECOND FLOOR
1 23 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2223
A
B C
D E
F G
H
J n9 nA nB nC nD
676'-3"
676'-0"
9/16" / 12"
676'-6"
32.01
Bid Item 02
/1
32.01
32.0332.03
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:0
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
OVERALL PLAN - SECOND FLOOR
A101
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. Coordinate location of all new core drilling with existing post tension reinforcing using ground penetrating radar prior to setting location of walls . Notify VA and architect of any discrepancies caused by existing conditions.
32.01 Energy absorbing traffic bollard.
32.03 New painted parking striping.
PLAN NOTES
GENERAL NOTES
N Scale: 1/16" = 1'-0"
SECOND FLOOR PLAN
18 19 20 23
J
Elevator Equipment
Stair 'D'
B
A301
A301
A301
S3.0
S3.0
S1.0
S2.0
S1.0
S4.0
S4.0
S4.0
Vestibule
Wheelchairs
Storage
Storage
2' - 7 1/2"
2.02
2.02
2.02
S5.0
S1.0
A
14' - 9 1/2" 6' - 2 1/2" 7' - 8 3/4" 22' - 6 1/4"
2"
78.2°
101.8°
' - 0 3/4"
7/8"
' - 6"
7/8"
208A
A
3/ A
2/A201
1/A
4/A201
Lobby
E1.0
E1.0
E1.1
E1.1
E1.0
E1.1
/4
/4
676'-0"
676'-3"
676'-6"
9/16" / 12" 5 /1
11' - 2"
24' - 3 1/2"
7' - 0"
14' - 6 1/4"
6'-0"
14'-6"
6'-0"
101.8°
Bid Item 02
5' - 0" 6' - 8"
45.0°
10.40
'-0
E1.0
2.04
32.01
11.31
32.01
5.22
5.22
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
' - 0"
S3.0S3.0
S3.0
S3.0
7.88
S3.0
S3.0
S3.0
S2.0
A102
A102
S3.0
A102
Sim
11' - 9 3/8" 9' - 2 5/8"
A401
A
A
A L
IG
N
56' - 11 3/4"
6' - 0 5/8"
8' - 11"
/8
/8
/2
7.8613
A401
A
A
A401
A401
A401
A401
A401
AF101-F
Elevator Lobby
A103
3.11
3.11
3.11
7.25
5.22
5.21
10.41
2.06
"ALIGN S1.0
E1.0
S2.0
S2.0
S4.1
S4.0
S4.1
S4.1
31' - 6 3/4" 20' - 10"
/8
/4
/4
5/A201
Corridor
204A
S2.0
' - 0"
E1.0
7.14
9.21
5.06
7.16
7.17
7.41
6.19
EXTERIOR
NON-RATED
FREE-STANDING
STRUCTURE ABOVE
FIN. CEILING
FLOOR SLAB
S1.0
INTERIOR
NON-RATED
FREE-STANDING
4 7/8"
9.219.21
9.02
7.13
7.82
9.04
S2.0
9.21
9.02
7.13
7.82
7.16
4 1/4"
9.04
INTERIOR
NON-RATED
FREE-STANDING
S4.0
9.21
7.12
7.16
2 5/8"
9.15
9.07
INTERIOR
NON-RATED
FURRING
S3.0
1 1/2"
9.05
9.21
INTERIOR
NON-RATED
FURRING
2.06
7.19
7.43
7.86
E1.0 2"
2.06
S2.0
S1.0
7.19
8.23
7.86
S4.1
9.21
8.23
2 5/8"
9.15
INTERIOR
NON-RATED
FURRING
S4.0 Below
S5.0
4 7/8"
9.219.21
9.02
7.82
A .F
.F
9.42
6.03
INTERIOR
NON-RATED
FREE-STANDING
E1.1
7.14
5.06
7.16
7.17
7.41
6.19
EXTERIOR
NON-RATED
FREE-STANDING
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:0
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
ENLARGED PLAN - SECOND FLOOR
A102
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. Coordinate location of all new core drilling with existing post tension reinforcing using ground penetrating radar prior to setting location of walls . Notify VA and architect of any discrepancies caused by existing conditions.
2.02 Existing structure to remain.
2.04 Existing piping to remain. Protect in place during construction.
Coordinate new construction with existing Unistrut supports.
2.06 Existing storefront system to remain. Clean oxidation from storefront.
3.11 Broom finish and sealant. Basis of Design: H&C Clarishield Natural Look Sealer.
5.06 3-5/8" cold formed metal framing @ 16" O.C. See Structural Drawings.
5.21 1-1/2" ID stainless steel handrail.
5.22 1-1/2" ID painted steel handrail. Dark grey color to match existing railings.
6.03 2x wood blocking.
6.19 5/8" exterior glass mat gypsum board sheathing. Seal all joints.
7.12 Rigid thermal wall insulation, R-12 min.
7.13 Batt thermal wall insulation. R-11 min.
7.14 Batt thermal wall insulation. R-19 min.
7.16 Vapor barrier. Seal all joints and penetratons.
7.17 Air and moisture barrier. Lap air and moisture barrier over thru-wall flashing.
7.19 2" multi-faced, silicone-coated, precompressed expansion joint.
7.25 Replace downspout with PVC pipe and route to new secondary roof drain wall outlet.
7.41 2" thick, horizontal, insulated, flat, non-embossed, metal wall panel. Basis of Design: Kingspan Optimo. Color: Light Grey.
7.43 Metal panel closure trim by panel manufacturer. Color to match panel color.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
7.86 Fire rated expansion joint cover assembly.
7.88 2" insulated building expansion joint
8.23 Cover this row of glazing with opaque film. Color: Black.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.04 Slip type deflection track. Install per manufacturer's
recommendations.
9.05 7/8" Z furring channel @ 16" o.c.
9.07 Align with top of existing concrete half wall.
9.15 2" metal 'Z' girt running horizontally @ 24" o.c.
9.21 5/8" Type X gypsum board.
9.42 Provide solid surface cap for half height wall.
10.40 Surface-mounted fire extinguisher cabinet.
10.41 Semi-recessed fire extinguisher cabinet.
11.31 Owner provided and installed bench.
32.01 Energy absorbing traffic bollard.
PLAN NOTES
GENERAL NOTES
N Scale: 1/4" = 1'-0"
ENLARGED SECOND FLOOR PLAN
Room Schedule RM # Name Area
202 Elevator Lobby 424 SF
204 Lobby 618 SF
204A Corridor 45 SF
205 Storage 48 SF
206 Storage 58 SF
207 Wheelchairs 72 SF
208 Vestibule 164 SF
Grand total 1,429 SF
Scale: 1" = 1'-0"
Wall Types
Scale: 1 1/2" = 1'-0"2
PLAN DETAIL
Scale: 1 1/2" = 1'-0"1
PLAN DETAIL
14 15 16 17 18 19 20 2223
B C
D E
F G
J
7.24
1.03
66' - 0"
K
L
M
N
2.657.21
2.09
2.10
2.10
7.22
PPG-2A-Entrance 676'-3"
PPG-2-Second Floor 676'-0"
5.22
3.01
2.02
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:1
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
OVERALL PLAN - THIRD FLOOR
A103
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
N Scale: 1/16" = 1'-0"
THIRD FLOOR PLAN
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. Edge of all door jambs at hinge side not otherwise indicated are to be 6" from the face of intersecting walls. Edge of all door jambs at strike side not otherwise located are to be 18" minimum from the face of intersecting walls.
C. All wood blocking to be fire retardent treated.
D. All partitions shall be type 'S1.0' unless noted otherwise.
E. Coordinate location of all new core drilling with existing post tension reinforcing using ground penetrating radar prior to setting location of walls . Notify VA and architect of any discrepancies caused by existing conditions.
1.03 Outline of construction on floor below.
2.02 Existing structure to remain.
2.09 Existing roof drain to remain. Protect in place during
construction.
2.10 Existing mechanical equipment to remain. Protect in place during construction.
2.65 Remove existing roofing membrane and tapered roof insulation to deck below as required to install new equipment support curbs. See Mechanical Drawings.
3.01 3" bonded concrete slab. See Structural Drawings.
5.22 1-1/2" ID painted steel handrail. Dark grey color to match existing railings.
7.21 Install and repair existing roof membrane and tapered
insulation around new equipment curbs. Flash and repair around equipment curbs per Manufacturer's recommendations.
7.22 Flash and repair around new pipe penetrations per
Manufacturer's recommendations.
7.24 Install concrete waterproofing system on existing parking deck per manufacturer's recommendations.
PLAN NOTES
GENERAL NOTES
N Scale: 1/8" = 1'-0"
ROOF PLAN
Scale: 1 1/2" = 1'-0"3
HANDRAIL DETAIL
REFLECTED CEILING PLAN LEGEND
Recessed downlight fixture
2' x 2' Supply Air Diffuser
2' x 1' Return Air Grille
2' x 2' light fixture
2' x 2' acoustical tile ceiling
Gypsum board / soffit -painted P-3
Chain-hung light fixture
Recessed linear light fixture
Linear Supply Air Diffuser
2' x 2' Return Air Grille
Recessed Air Curtain Radiant Ceiling Panel
2' x 1' Exhaust Grille
8'-0"
8'-0"
8'-0"
1.02
ACT-1
9'-6"
Bid Item 02
ACT-1
9.33
5' - 0"
5' - 0"
9.809.80
9.809.80
A121
2.11
' - 0"
1' - 0"
' - 0" 1' - 0"
9.399.39
9.399.39
9.40
9.40
9.40
9.40
.0
ACT-1
7'-10"
8.16
9' - 3"
1.02
1' - 0" 9.41
9.39 9.029.02
9.21
2.02
9.21
9.40
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:1
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
REFLECTED CEILING PLAN
A121
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
A. All wood blocking shall be fire retardant.
B. Light fixtures, sprinkler heads, speakers, and HVAC devices shall be located as close as possible to the center of acoustical ceiling panels. Confirm any deviation from this with the Project Engineer.
C. See P, M, E and FP drawings for additional information regarding final information and quantites of fixtures/devices to be installed in ceiling.
D. See Electrical Drawings for lighting specifications.
E. All gypsum board ceilings to be painted P-4 unless noted otherwise.
F. Ceiling height to be 8'-0" AFF, unless noted otherwise.
1.02 No ceiling work this area.
2.02 Existing structure to remain.
2.11 Existing junction box to remain.
8.16 2'-6" x 2'-6" access panel. Paint to match adjacent ceiling.
Verify exact size and location of existing junction box prior to installation.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.21 5/8" Type X gypsum board.
9.33 Paint the face and underside of the existing gyp. soffit (P-4).
9.39 6" extruded aluminum perimeter trim, finish to match acoustical ceiling grid, color white. Basis of design: Armstrong Axiom Classic Trim.
9.40 Paint all exposed above ceiling areas (P-5).
9.41 Suspended acoustic ceiling tile/grid. See Room Finish
Schedule.
9.80 Paint hatched area of concrete (P-4).
PLAN NOTES
GENERAL NOTES
N Scale: 1/4" = 1'-0"
Reflected Ceiling Plan - Second Floor
Scale: 1 1/2" = 1'-0"2 Ceiling Detail
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
B
PPG-2B-Elevator Lobby 676'-6"
2.02
2.02
7.41
7.40 7.402.022.02
7.42
7.42
8.26 7.40
8.36
2.02
2.02
5.22
AREA OF WORK
AREA OF WORK
7.48
7.48 7.48
11.31 11.31
7.40
7.41
7.43
7.43 7.43
5.22 5.13
5.14
A301
Sim
FIELD VERIFY
8' - 0"
FIELD VERIFY
8' - 0"
A301
Sim
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
A301
PPG-2B-Elevator Lobby 676'-6"
8.61
7.40 7.427.42
2.02
2.02
AREA OF WORK
5.01
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
A301
A301
PPG-2B-Elevator Lobby 676'-6"
7.402.02
2.022.02
7.19
7.19
2.02
2.02
7.427.42
7.427.42
AREA OF WORK
AREA OF WORK
8.61
5.015.02
7.49 2.04
2.052.05
7.40
7.40
7.25
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
A
PPG-2B-Elevator Lobby 676'-6"
2.05
2.04
2.022.02
2.02
7.41
8.26
2.08
7.48
7.49
7.40
7.42
7.43
AREA OF WORK
32.01
5.22
A301
Sim
PPG-2A-Entrance 676'-3"
PPG-2-Second Floor 676'-0"
5.22
FIELD VERIFY
7' - 0"
FIELD VERIFY
14' - 6"
FIELD VERIFY
7' - 0"
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:2
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
EXTERIOR ELEVATIONS
A201
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
Scale: 1/4" = 1'-0"2 North Elevation
Scale: 1/4" = 1'-0"3 East Elevation
Scale: 1/4" = 1'-0"4 South Elevation
Scale: 1/4" = 1'-0"1 West Elevation
KEYNOTES
2.02 Existing structure to remain.
2.04 Existing piping to remain. Protect in place during construction.
Coordinate new construction with existing Unistrut supports.
2.05 Remove and reinstall existing perforated metal screen and frame as required to install new construction. Contractor to store and protect screen during construction activities.
2.08 Existing guardrail to remain.
5.01 New 2" x 2" steel post, welded to existing steel tubes. Post to be supported on 2" x 6" steel plate anchored to concrete deck.
Paint to match existing.
5.02 Existing decorative metal grille to be cut and re-attached to new steel post. Close all open ends of railing.
5.13 30" metal lettering set on standoffs.
5.14 10" metal letters set on standoffs.
5.22 1-1/2" ID painted steel handrail. Dark grey color to match existing railings.
7.19 2" multi-faced, silicone-coated, precompressed expansion joint.
7.25 Replace downspout with PVC pipe and route to new secondary roof drain wall outlet.
7.40 2" thick, horizontal, insulated, flat, non-embossed, metal wall panel. Basis of Design: Kingspan Optimo. Color: Dark Grey
7.41 2" thick, horizontal, insulated, flat, non-embossed, metal wall panel. Basis of Design: Kingspan Optimo. Color: Light Grey.
7.42 Metal panel reveal.
7.43 Metal panel closure trim by panel manufacturer. Color to match panel color.
7.48 Two piece flashing around existing concrete beam. Finish to match metal panel.
7.49 Cut and fit metal panels around existing piping per
Manufacturer's recommendations.
8.26 4-1/2" Aluminum storefront window system. Basis of design:
YKK YES600.
8.36 Automatic sliding entrance door. Basis of design: Assa Abloy SL500 4.5" overhead concealed full breakout narrow stile bi-part sliding door system.
8.61 Prefinished aluminum louver. Color to match metal panel. See Mechanical Drawings.
11.31 Owner provided and installed bench.
32.01 Energy absorbing traffic bollard.
Revisions Date
Scale: 1/4" = 1'-0"5 Handrail Elevation
PPG-1-First Floor 663'-0"
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-4-Fourth Floor 702'-4"
PPG-2-Second Floor 676'-0"
Lobby
PPG-2B-Elevator Lobby 676'-6"
A311
PPG-Penthouse 715'-6"
AREA OF WORK
AREA OF WORK
Elevator Lobby
PPG-1-First Floor 663'-0"
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-4-Fourth Floor 702'-4"
PPG-2-Second Floor 676'-0"
A311
Vestibule
Lobby
PPG-2B-Elevator Lobby 676'-6"
AREA OF WORK
AREA OF WORK
PPG-1-First Floor 663'-0"
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-4-Fourth Floor 702'-4"
PPG-2-Second Floor 676'-0"
A311
A311
Vestibule
Wheelchairs
PPG-2B-Elevator Lobby 676'-6"
AREA OF WORK
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:3
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
BUILDING SECTIONS
A301
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
Scale: 1/4" = 1'-0"2
BUILDING SECTION
Scale: 1/4" = 1'-0"3
BUILDING SECTION
Scale: 1/4" = 1'-0"1
BUILDING SECTION
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
S4.0
S4.1
PPG-2B-Elevator Lobby 676'-6"
E1.1
A311
1B
A311
1A
2.02
2.02
3.03
/4
/2
/4
9.02
9.21
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
PPG-2B-Elevator Lobby 676'-6"
E1.0
A311
2A
2.05
2.042.04
9.41
2.03
2.02
2.02
3.03
A311
1B Sim
/2
/4
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
PPG-2B-Elevator Lobby 676'-6"
3.01
2.02
/2
/2
/4
E1.0
A311
3A
A311
3B
2.02
9.39
1' - 0"
9.41
PPG-2A-Entrance 676'-3"
PPG-2-Second Floor 676'-0"
E1.0
2.03
7.65
7.43
7.17
/8
6.06
2.02
7.43
7.81
S4.1 E1.1
9.04
7.46
S4.1 E1.1
2.02 S4.0
7.43
7.62
7.17
PPG-2A-Entrance 676'-3"
PPG-3-Third Floor 689'-0"
PPG-2-Second Floor 676'-0"
PPG-2B-Elevator Lobby 676'-6"5/16" / 12"
9.28
9.41
3.04
2.022.02
2.02
2.06
2"
7.86
8.23
9.66
9.65
PPG-2A-Entrance 676'-3"
PPG-2-Second Floor 676'-0"
E1.0
2.02
3.01
7.43
7.17
7.62
E1.0
2.02
9.04
7.46 7.43
7.81
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:3
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
WALL SECTIONS
A311
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
2.02 Existing structure to remain.
2.03 Existing wall to remain.
2.04 Existing piping to remain. Protect in place during construction.
Coordinate new construction with existing Unistrut supports.
2.05 Remove and reinstall existing perforated metal screen and frame as required to install new construction. Contractor to store and protect screen during construction activities.
2.06 Existing storefront system to remain. Clean oxidation from storefront.
3.01 3" bonded concrete slab. See Structural Drawings.
3.03 Taper concrete slab at garage perimeter.
3.04 Concrete ramp. See plan for slopes.
6.06 2x preservative-treated wood blocking.
7.17 Air and moisture barrier. Lap air and moisture barrier over thru-wall flashing.
7.43 Metal panel closure trim by panel manufacturer. Color to match panel color.
7.46 Allow for deflection at metal panel closure channel. Install per Manufacturer's recommendations.
7.62 Metal flashing.
7.65 Metal flashing to match existing cap flashing. Tie new flashing into existing flashing to remain per SMACNA recommended details.
7.81 Continuous sealant over backer rod.
7.86 Fire rated expansion joint cover assembly.
8.23 Cover this row of glazing with opaque film. Color: Black.
9.02 3 5/8" non-structural metal framing @ 16" o.c.
9.04 Slip type deflection track. Install per manufacturer's
recommendations.
9.21 5/8" Type X gypsum board.
9.28 Gypsum board ceiling. See Room Finish Schedule for finish.
9.39 6" extruded aluminum perimeter trim, finish to match acoustical ceiling grid, color white. Basis of design: Armstrong Axiom Classic Trim.
9.41 Suspended acoustic ceiling tile/grid. See Room Finish
Schedule.
9.65 Gypsum board 'F' reveal. Finish to match existing storefront.
Hold reveal tight to face of vertical storefront members.
9.66 Expansion material to fill gap between storefront glazing and metal stud framing. Hold material back from exposed edge of ceiling.
SECTION NOTES
Scale: 1" = 1'-0"1
WALL SECTION
Scale: 1" = 1'-0"2
WALL SECTION
Scale: 1" = 1'-0"3
WALL SECTION
Scale: 1 1/2" = 1'-0"2A
DETAIL
Scale: 1 1/2" = 1'-0"1B
DETAIL
Scale: 1 1/2" = 1'-0"1A
DETAIL
Scale: 1" = 1'-0"4
WALL SECTION
Scale: 1 1/2" = 1'-0"3A
DETAIL
Scale: 1 1/2" = 1'-0"3B
DETAIL
XX
XX
X
Toilet Accessory
Equipment
Signage
Keynote
Material Finish
SYMBOL LEGEND
8"
1' - 0"
3' - 0"
Note: Flush valve located on accessible side
6"
1' - 6"
B
A
M
IN
D
C
MIN.
7"
H
T o D is p e n s e r
O p e n in g
A D c c e s s ib le
T o
O p e ra b le
M e c h a n is m
" 4
G
K
J
M
Finish Floor
WP-1
P-4/WP-3 CR-1RB-1 10.01 CG-1
P-1
BUTT JOINT
CG-1
CG-1
1' - 2" 3' - 8" 1' - 2"
11.36
P-4
EQ. 4' - 0" 4' - 0" EQ.
BUTT JOINT
10.41
CR-1
8.17
WP-2 RB-1
4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 2' - 1 3/8"
P-1
WP-1
RB-1
EG-1
OPEN
P-1
WP-1
RB-1
CG-1
5.21
8.17
WP-1
RB-1
CR-1
P-1
P-1
WP-1
CR-1
RB-1
EG-1
OPEN
P-1
WP-1
RB-1
CR-1
OPEN
OPEN
5' - 4 3/4" + -
SS-1
WP-1
RB-1 CR-1
CG-1
P-1
WP-1RB-1
P-1
CG-1
WP-1
RB-14
OPEN
OPEN SS-1
WP-1
CR-1
RB-1 4
CG-1
P-1
CG-1
WP-1
RB-1
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:4
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
INTERIOR ELEVATIONS
A401
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
TOILET ACCESSORIES SCHEDULE
MARK DESCRIPTION MODEL #
PROVIDED
BY
INSTALLED
BY
O W
N E
R
C O
N T
R A
C T
O R
O W
N E
R
C O
N T
R A
C T
O R
A Grab Bar - 18" Length B-6806 X 18 X X
B Grab Bar - 42" Length B-6806 X 42 X X
C Grab Bar - 36" Length B-6806 X 36 X X
D Toilet Tissue Dispenser -- X X
G Paper Towel Dispenser -- X X
H Mirror - 24" x 36" B-290 2436 X X
J Soap Dispenser -- X X
K SAINTARY WASTE DISPENSOR B-5270
Scale: 1/4" = 1'-0"
Typical Mounting Heights - Toilet Accessories
1011 9
13 12141517
5.21 1-1/2" ID stainless steel handrail.
8.17 Push button door actuator.
10.01 1/8" thick acrylic lettering, contractor provided/installed.
10.41 Semi-recessed fire extinguisher cabinet.
11.36 Owner provided and installed equipment. See Electrical and Plumbing Drawings.
KEYNOTES
SEE PLAN
1/2" 1/2"
H1
J1
8.02
9.21
9.82
8.02
9.09
9.21
9.82
9.08
7.82
7.82 1/2" 1/2"
2"
SEE
SCHED. 2"
S E
E S
C H
E D
U L E
1 3/4" SEE SCHEDULE 1 3/4"
S E
E S
C H
E D
U L E
SEE SCHED.
S E
E S
C H
E D
U L E
FFG
8.51
SEE SCHEDULE
S E
E S
C H
E D
U L
E
TYP.
PPG-2A-Entrance 676'-3"
PPG-2-Second Floor 676'-0"
EQ EQ EQ
A
IG-1
IG-1 IG-1
IG-1
J11
A601
S10
A601
H10
A601
IG-1
IG-1
8' - 11 1/8"
J10
A601
PPG-2A-Entrance 676'-3"
PPG-2-Second Floor 676'-0"
24'-3 31/64"
EQEQEQEQEQEQ
B
IG-1
IG-1 IG-1
IG-1 IG-1
IG-1 IG-1
IG-1
J13
A601
S10
A601
H10
A601
IG-1
IG-1
IG-1
IG-1
J12
A601
E1.0
9.04
2.02
9.08
7.82
6.03
7.81
7.43
7.81
7.43
7.62
7.17
8.26 1" 4 1/2"
7.46
4 1/2"
7.81
8.26
7.82
3.01
2.02
8.36
8.26
8.27
/2
S2.0
E1.0
/2
8.26
7.82
7.81
7.43
9.09
S5.0
E1.0
8.26
7.81
7.43
7.82
9.09
PPG-2A-Entrance 676'-3"
F .V
1' - 2" 8.61
J16
A601
H12
A601
/2
E1.0
7.82
8.26
7.81
7.43
9.09
9.21
E1.1
SIM.
8.61
7.81
7.43
9.09 S4.1
7.81
E1.1SIM.
8.61
7.81
7.43
7.62
S4.1
7.81
6.06
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:5
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
DOOR SCHEDULE & DETAILS
A601
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
DOOR SCHEDULE
DOOR #
BETWEEN DOOR DESCRIPTION FRAME DESCRIPTION
FIRE
RATING
HDWE
SET REMARKSRM RM TYPE MAT'L
SIZE
TYPE MAT'L HEAD JAMB# W H T
205 204A 205 F WD 1 3'-6" 7'-0" 1 3/4" 1 HM H1 J1 -- 2.0
206 206 204A F WD 1 3'-6" 7'-0" 1 3/4" 1 HM H1 J1 -- 1.0
208A 208 PG FG ALUM 1 14'-0" 6'-10" 2 ALUM H10, SIM J11, J12 -- 3.0 Basis of Design: Assa Abloy SL500
2.02 Existing structure to remain.
3.01 3" bonded concrete slab. See Structural Drawings.
6.03 2x wood blocking.
6.06 2x preservative-treated wood blocking.
7.17 Air and moisture barrier. Lap air and moisture barrier over thru-wall flashing.
7.43 Metal panel closure trim by panel manufacturer. Color to match panel color.
7.46 Allow for deflection at metal panel closure channel. Install per Manufacturer's recommendations.
7.62 Metal flashing.
7.81 Continuous sealant over backer rod.
7.82 Continuous acoustic sealant @ non-rated walls / fire-rated sealant @ rated walls each side.
8.02 Hollow metal frame.
8.26 4-1/2" Aluminum storefront window system. Basis of design: YKK
YES600.
8.27 Aluminum storefront corner mullion.
8.36 Automatic sliding entrance door. Basis of design: Assa Abloy SL500 4.5" overhead concealed full breakout narrow stile bi-part sliding door system.
8.51 1/4" clear tempered glass.
8.61 Prefinished aluminum louver. Color to match metal panel. See Mechanical Drawings.
9.04 Slip type deflection track. Install per manufacturer's
recommendations.
9.08 Metal framing box header.
9.09 Double metal framing at jambs, typ.
9.21 5/8" Type X gypsum board.
9.82 Acoustic insulation.
Scale: 1 1/2" = 1'-0"
H.M. Frame Details
Scale: 1/4" = 1'-0"
H.M. Frame Types Scale: 1/4" = 1'-0"
Door Types
DETAIL NOTES
Scale: 1/4" = 1'-0"
Storefront Elevations
H10
S10
J11J13
Glazing Schedule
Type Mark Description
IG-1 1" Insulated Clear Glazing Unit - Fully Tempered
J10
Scale: 1/4" = 1'-0"
Louver Elevation
J12J16
H12
Scale: 1 1/2" = 1'-0"
Storefront Details
Elevator Equipment
Stair 'D'
CPT-1
Vestibule
Storage
Storage
CG-1
CG-1
CG-1
CPT-2
Wheelchairs
RB-1
Bid Item 02
CPT-1
SC-1
RB-1RB-1
9/16" / 12"
/1
9.44
CG-1 CG-1
CG-1
CG-1
CPT-1
CPT-1
HR-1
CR-1
CR-1
WP-3
9.32
WP-2
Elevator Lobby
6.26
9.60
9.60
10.07
CR-1
WP-1
WP-1
Lobby
CR-1
EG-1
CR-1
CG-1
CR-1
CG-1
CG-1
P-4
10.07
10.07
10.07
AF101-F
Sim
3.11
9.44
SC-1
INTERIOR FINISHES LEGEND
ACOUSTICAL CEILING TILE
TAG: ACT-1
MFG: ARMSTRONG
SERIES: 1935 ULTIMA HEALTHZONE
GRID: 15/16 SQUARE LAY-IN
SIZE: 24" X 24" X 3/4"
COLOR: WHITE
GRID COLOR: WHITE
MODULAR CARPETING
TAG: CPT-1
MFG: MILLIKEN CONTRACT
COLLECTION: OBEX TILE CUT
PATTERN: CUT/FIZZ
COLOR: BLUE
INSTALL: ASHLAR
TAG: CPT-2
MFG: MILLIKEN CONTRACT
COLLECTION: OBEX - CUTX - 11MM
CLOSED SYSTEM
COLOR: BLUE
SEALED CONCRETE
TAG: SC-1
MFG: SHERWIN WILLIAMS
TYPE: ARMORSEAL K1
FINISH: CLEAR
RESILIENT ACCESSORIES
TAG: RB-1
TYPE: RUBBER WALL BASE
MFG: TARKETT-JOHNSONITE
SERIES: MILLWORKS
PROFILE: MANDALAY
COLOR: BLACK
HEIGHT: 6"H
PORCELAIN TILE
TAG: PT-1
MFG: DALTILE
SERIES: WANDERWISE
COLOR: DRIFT
SIZE: 12" X 24"
FINISH: MATTE
GROUT COLOR: SELECTED FROM
MANUFACTURERS FULL RANGE OF
STANDARD COLORS
INSTALL: 30% OFFSET
INTERIOR PAINTS
TAG: P-1 (FIELD WALL PAINT)
MFG: SHERWIN WILLIAMS
COLOR: SW7631 CITY LOFT
TAG: P-2 (HOLLOW METAL DOOR
FRAMES)
MFG: SHERWIN WILLIAMS
COLOR: SW 7030 ANEW GRAY
TAG: P-3 (GYP. CEILING/SOFFIT)
MFG: SHERWIN WILLIAMS
COLOR: SW70007 CEILING BRIGHT
WHITE
TAG: P-4 (ACCENT PAINT)
MFG: SHERWIN WILLIAMS
COLOR: 7604 SMOKEY BLUE
TAG: P-5 (EXPOSED CEILING)
MFG: SHERWIN WILLIAMS
COLOR: SW6258 TRICORN BLACK
WALL PROTECTION
TAG: HR-1
TYPE: ROUND HANDRAIL - STAINLESS STEEL
MFG: INPRO
SERIES: 900SSR
TAG: CG-1
TYPE: CORNER GUARD - STAINLESS STEEL
MFG: INPRO
HEIGHT: FULL HEIGHT X 3" WING
TAG: EG-1
TYPE: CORNER GUARD - STAINLESS STEEL
MFG: INPRO
HEIGHT: FULL HEIGHT X 2" WING
TAG: CR-1
TYPE: CRASHRAIL - STAINLESS STEEL
MFG: INPRO
SERIES: 51SS
HEIGHT: 4"H PROFILE
TAG: WP-1
TYPE: RIGID SHEET VINYL WALL PROTECTION
MFG: INPRO
COLOR: DRIFTWOOD
SIZE: 4' X 8'
TAG: WP-2
MFG: MDC INTERIOR SOLUTIONS
TYPE: FIBERGLASS REINFORCED PLASTIC
SHEET WALL PROTECTION
PATTERN: CUSTOM DIGITAL GRAHPIC
PROVIDED BY MANUFACTURER
SIZE: 4'X8'
TAG: WP-3
MFG: MDC INTERIOR SOLUTIONS
TYPE: FIBERGLASS REINFORCED PLASTIC
SHEET WALL PROTECTION
COLOR: CLEAR
SIZE: 4'X8'
SIMULATED STONE
TAG: SS-1 (WALL CAP)
TYPE: SOLID SURFACE
MFG: CORIAN
COLOR: NUETRAL CONCRETE
Bid Item 03
WALL TILE TO WALL
PROTECTION
9.27
WALL TILE TO FLOOR
TILE
9.34
9.35
9.34
9.34
9.35
WALL TILE TO HOLLOW METAL
DOOR FRAME
9.34
9.35
8.01
AF101-F
AF101-F
AF101-F
Sim
9.21
5.06
9.21
9.21
10.03
9.45
5.065.06
5.06
5.06
5.065.06
9.41
9.219.21
10.03
AF101-F
4"
4"
10.03
10.03
10.02
10.02
10.03
10.03
9.219.21
9.219.21
9.219.21
10.05
5.06
10.05
10.07
10.07
11.36
10.05
9.219.21
10.03
9.21
10.03
10.06
9.41
9.45
10.07
9.21
10.06
BID ITEM DESCRIPTIONS
BID ITEM 2:
1. All work included in BID ITEM 1, BASE BID, except: Delete alteration work in Existing Elevator Lobby 202. Lobby to remain in current state at time of bidding.
BID ITEM 3:
1. All work included in BID ITEM 2, except: Delete all wall protection (WP), crash rail (CR-1), and corner guards (CG-1).
Replace with paint P-1.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:1
:1
A
M
IMPROVE ENTRANCE FROM
PATIENT PARKING GARAGE
02/14/2025
INTERIOR FINISHES PLAN
AF101-F
NSJR
541-23-208
Cleveland, Ohio VAMC
PPG
FINAL CONSTRUCTION
DOCUMENTS
22026.00
N Scale: 1/4" = 1'-0"
FINISHES PLAN - SECOND FLOOR
A. Provide resilient or metal transition strip at all flooring material junctures. Material transitions, where applicable, occur at center of door panel Refer to details for typical floor material transitions.
Color selected by architect from manufacturers full range of colors.
B. All gypsum ceilings as well as underside of bulkheads, and soffits to be painted (P-3)..
C. All hollow metal doors and hollow metal frames to be painted both side (P-2).
D. All exposed mechanical grilles, diffusers, metal panels, and trim devices shall be painted to match adjacent wall finish.
E. Where new finishes would match existing finishes, or new finishes are not required, maintain existing finishes where possible during demolition and construction phase for reuse. Patch and match existing finishes where disturbed by construction.
F. All walls to be painted (P-1); unless noted otherwise. Confirm accent paint color and location with architect in field before proceeding with finish work.
G. Fire extinguisher cabinets shall be painted to match adjacent wall surface color.
H. Walls with porcelain tile shall receive metal trim on all outside & inside corners.
J. All interior paint shall be epoxy finish.
K. Finish tag under room name denotes all finishes in room receive said material. Accent surface to be noted otherwise.
L. All porcelain tile shall receive epoxy grout.
M. Center of handrails to be installed 34" A.F.F.
N. Center of crashrails to be installed 16" A.F.F. Coordinate all wall-mounted boxes with crash rail height.
P. All new gyp. interior walls shall receive wall protection (WP-1) 48" A.F.F; unless noted otherwise. Provide 5/8" top cap. Gypsum board above wall protection shall be painted (P-1).
Q. Coordinate heights of wall-mounted boxes and equipment with crash rail and wall protection heights.
GENERAL FINISH PLAN NOTES
3.11 Broom finish and sealant. Basis of Design: H&C Clarishield Natural Look Sealer.
5.06 3-5/8" cold formed metal framing @ 16" O.C. See Structural Drawings.
6.26 Solid surface wall cap (SS-1). Refer to wall type S5.0/A102 for further details.
8.01 Hollow metal door.
9.21 5/8" Type X gypsum board.
9.27 Gypsum board.
9.32 Paint existing gyp. wall (P-1).
9.34 Porcelain tile.
9.35 Metal [stainless steel] edge trim.
9.41 Suspended acoustic ceiling tile/grid. See Room Finish
Schedule.
9.44 Provide stainless steel metal edging around existing door frame where new wall abuts door frame.
9.45 Reslient rubbe wall base (RB-1).
9.60 Provide rubber wall base (RB-1) on all sides of wrapped
column.
10.02 Stainless steel corner guard (CG-1).
10.03 FRP panel (WP-3).
10.05 90 degree mitred outside stainless steel trim piece, 3/4" wing.
Basis of design: Inpro - Palladium - Stainless Steel trim piece.
10.06 5/8" Stainless steel transition trim piece; Basis of design:
Inpro - Palladium - stainless steel trim piece.
10.07 Provide wall protection (WP-1,WP-3) on all gyp. walls at 48"H A.F.F; unless noted otherwise. Provide 5/8" stainless steel top cap. Basis of design to be Inpro - Palladium.
11.36 Owner provided and installed equipment. See Electrical and Plumbing Drawings.
PLAN NOTES
Scale: 12" = 1'-0"2
TILE METAL TRANSITIONS
Scale: 1 1/2" = 1'-0"3 Section Detail
Scale: 1 1/2" = 1'-0"4 Plan Detail
Scale: 6" = 1'-0"5
WALL PROTECTION
(WP-3)…
This is the start of the file's text. The full file is on GovTribe.