S02_Construction Drawings bk 8.pdf
PDF 10 MB Posted
- Solicitation number
- 36C78626R0008
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X X X
X X
X
XXX
X X
X X
W
W
E
450445440
21+00 451 20+00
430B-05
B-06
B-08
B-07
B-03
B-04
B-02
B-01
A-02 A-01
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
B
RI
DG
E
PL
AN
E
LE
VA
TI
ON
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
PLAN
(FOR ADDITIONAL DETAILING AND
NOTATION, SEE ROADWAY PLANS)
PLAN
NORTH
TYPICAL SECTION
(AT ℄OF BRIDGE)
(LOOKING AHEAD STATION)
ELEVATION
(LOOKING NORTH)
FL
OW
81'-0" PRECAST ARCH SPAN
ROADWAY GRADE
EL. VARIES
M.S.E. SPANDREL ENDWALL (TYP.)
CAST IN PLACE CONCRETE BARRIER
WITH MOMENT SLAB (TYP.)
1'-2 12" BARRIER (TYP.)
'-8
C
LE
AR
R
IS
E
STREAM BED
EL. = 428.0±
END ARCH
STA. 20+77.60
EL. 451.00
BEGIN ARCH
STA. 19+96.60
EL. 452.00
℄ PROPOSED ROAD AND
CONSTRUCTION STA. AHEAD
81'-0" CLEAR SPAN
PRECAST CONCRETE ARCH
2'-4 12" SHOULDER (TYP.) 12'-0"
LANE
2.00% 2.00%4.00% 4.00%
BOTTOM OF FOOTING
EL. = 421.95
LEGEND:
BARRIER
12'-0"
LANE
℄ PROPOSED ROADWAY AND
CONSTRUCTION
EXISTING CONTOUR
PROPOSED CONTOUR
DIRECTION OF TRAFFIC
BORING LOCATION
IRRIGATION PIPE
ELECTRIC LINE
WINGWALL D
WINGWALL B
WINGWALL A
WINGWALL C
AESTHETIC SURFACE
TREATMENT (TYP.)
END ARCH
STA. 20+77.60
EL. 451.00
BEGIN ARCH
STA. 19+96.60
EL. 452.00
90°
WATER PUMP
12'-0"
LANE
SH
OA
L C
RE
EK
PAVING SECTION AND
SUBGRADE (ROADWAY ITEM)
FLOODWAY
PROPOSED ROADWAY
SHOULDER
(TYP.)
40'-0"±
STREAM WIDTH
'-9
5 8"
PR
EC
AS
T
AR
CH
R
IS
E
BEDROCK
12'-0"
LANE
BARRIER
(TYP.)
INDEX OF DRAWINGS
DRAWING
NO. DESCRIPTION
BD100 BRIDGE PLAN & ELEVATION
BD101 GENERAL NOTES
BD102 STAKE-OUT PLAN
BD103 FOUNDATION PLAN
BD104 BRIDGE PLAN
BD105 BRIDGE ELEVATIONS
BD106 FOUNDATION DETAILS
BD107 MISCELLANEOUS DETAILS - 1
BD108 MISCELLANEOUS DETAILS - 2
BD109 MISCELLANEOUS DETAILS - 3
-1.20% 7.46%
-1.20%
-9.02%
VERTICAL PROFILE
NOT TO SCALE
HORIZONTAL GEOMETRY
PVI STA. = 18+98.05
PVI ELEV. = 453.17'
K = 23.01
VC = 180.00'
PVI STA. = 21+50
PVI ELEV. = 450.14'
K = 16.16
VC = 140.00'
TANGENT DIRECTION = S 74° 03' 41.90" W
TANGENT LENGTH = 276.79'
PT = 18+89.60
PC = 21+66.39
TOP OF FOOTING
EL. = 426.62
CAST IN PLACE FOOTING
ROCK LINING (TYP.)
BOTTOM OF FOOTING
EL. = 421.95
TOP OF FOOTING
EL. = 426.62
TOP OF ROCK
(VARIES)
NOTES:
1. THE TOPOGRAPHIC CONTOUR INTERVAL IS BOTH ONE FOOT AND FIVE
FOOT AND OBTAINED FROM THE TOPOGRAPHIC SURVEY PERFORMED BY
ENGINEERING DESIGN GROUP, LLC. THE HORIZONTAL DATUM IS BASED ON
STATE PLANE GRID ALABAMA WEST (NAD83) AND THE VERTICAL IS BASED
ON NADV88. THE SURVEY WAS PERFORMED BY BOTH LIDAR, GPS, AND
FIELD SURVEY DATED MAY 2024. THERE ARE AREAS OUTSIDE OF THE
CONSTRUCTION LIMITS THAT ARE TEN FOOT CONTOURS AND THESE ARE
BASED ON USGS WEBSITE TO SHOW DRAINAGE PATTERNS AND ESTABLISH
DRAINAGE DIVIDES DATED FEBRUARY 2024.
2. 100 YEAR FLOOD ELEVATION IS 438.2.
GUARDRAIL (ROADWAY ITEM)
TOP OF ROCK
(VARIES)
IRRIGATION PIPE
AS-DRILLED BORING LOCATIONS
BORING
NO. STATION (FT.) OFFSET (FT.)
B-01 19+60.23 38.45 RT
B-02 19+84.42 32.73 RT
B-03 19+78.65 1.52 LT
B-04 19+55.48 15.24 LT
B-05 20+68.62 6.39 RT
B-06 20+57.56 11.77 RT
B-07 20+55.33 12.53 LT
B-08 20+61.39 18.66 LT
A-01 19+35.36 4.94 RT
A-02 21+11.47 2.61 RT
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
B
RI
DG
E
PL
AN
E
LE
VA
TI
ON
.D W
G
BRIDGE PLAN & ELEVATION ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD100
16373OCTOBER 25, 2024 MP ALS
31'-2"
GUARDRAIL (TYP.)
(ROADWAY ITEM)
ELECTRIC LINE
AutoCAD SHX Text 0'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 0'
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 0'
AutoCAD SHX Text 3/16"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 12'
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
G
EN
ER
AL
N
OT
ES
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
G
EN
ER
AL
N
OT
ES
.D
W G
GENERAL NOTES ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD101
16374OCTOBER 25, 2024 MP ALS
GENERAL NOTES
DESIGN SPECIFICATIONS:
1. AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 9th EDITION, (2020), AND AS SUPPLEMENTED BY ALDOT STRUCTURAL DESIGN MANUAL, JANUARY 2023 EDITION.
2. LIVE LOAD DISTRIBUTION IS BASED UPON AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 9th EDITION, (2020).
3. DESIGN IS IN ACCORDANCE WITH THE LRFD METHOD.
4. PRECAST ARCH DESIGN METHODOLOGY IS PER AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS 9th EDITION, (2020).
DESIGN LIVE LOADS:
1. BRIDGE UNITS: HL-93
2. HEADWALLS: EARTH PRESSURE + LIVE LOAD SURCHARGE
3. WINGWALLS: EARTH PRESSURE + LIVE LOAD SURCHARGE
DEAD LOADS:
1. DESIGN FILL HEIGHT: 2'-0 MIN. TO 5'-0” MAX. FROM TOP OF CROWN TO TOP OF PAVEMENT.
PRECAST ARCH STRUCTURE:
1. PRIOR TO CONSTRUCTION, CONTRACTOR MUST VERIFY ALL ELEVATIONS SHOWN THROUGH THE COR.
2. ONLY CONTECH ENGINEERED SOLUTIONS LLC, THE CON/SPAN® APPROVED PRECASTER IN ALABAMA MAY PROVIDE THE STRUCTURE
DESIGNED IN ACCORDANCE WITH THESE PLANS.
3. THE USE OF ANOTHER PRECAST STRUCTURE WITH THE DESIGN ASSUMPTIONS USED FOR THE CON/SPAN® STRUCTURE MAY LEAD TO SERIOUS DESIGN ERRORS. USE OF ANY OTHER PRECAST STRUCTURE WITH THIS DESIGN AND DRAWINGS VOIDS ANY CERTIFICATION OF THIS DESIGN AND WARRANTY. CONTECH ENGINEERED SOLUTIONS LLC ASSUMES NO LIABILITY FOR DESIGN OF ANY ALTERNATE OR SIMILAR
TYPE STRUCTURES.
4. ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT DRAWINGS AND CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER, REGISTERED IN THE STATE OF ALABAMA, EMPLOYED BY THE PRECAST CONCRETE BRIDGE SUPPLIER, ARE SUBMITTED TO THE
ENGINEER 2 WEEKS PRIOR TO THE BID DATE FOR REVIEW AND APPROVAL.
5. ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT THE ALTERNATE DESIGN DOES NOT REDUCE THE HYDRAULIC OPENING OF THE STRUCTURE AS SHOWN ON THE DRAWINGS. AT A MINIMUM THE ALTERNATE STRUCTURE MUST PROVIDE THE SAME OR LARGER SPAN
AND RISE AS THE STRUCTURE SHOWN ON THE DRAWINGS.
6. THE PRECAST ARCH SUPPLIER MUST ATTEND THE PRE-BID MEETING, IF ONE IS HELD.
7. SUPPLIER OF PROPOSED ALTERNATES TO A CON/SPAN® BRIDGE SYSTEM MUST SUBMIT AT LEAST TWO (2) INDEPENDENTLY VERIFIED FULL SCALE LOAD TESTS THAT CONFIRM THE PROPOSED DESIGN METHODOLOGY OF THE THREE SIDED/ARCH STRUCTURE(S). THE PROPOSED ALTERNATE, UPON SATISFACTORY CONFIRMATION OF DESIGN METHODOLOGY, MAY BE CONSIDERED AN ACCEPTABLE ALTERNATE.
8. PROPOSED ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT THE PRECAST CONCRETE BRIDGE STRUCTURES ARE PROVIDED BY A SUPPLIER THAT HAS A MINIMUM OF TWO (2) REGISTERED PROFESSIONAL ENGINEERS ON STAFF THAT ARE DEDICATED TO THE DESIGN OF THESE TYPES OF STRUCTURES. SUPPLIER MUST PROVIDE THESE NAMES, P.E. LICENSE NUMBERS AND DATES OF HIRE AT
TIME OF ALTERNATE SUBMITTAL.
GENERAL:
1. PROVIDE MATERIALS AND PERFORM WORK IN ACCORDANCE WITH ALABAMA STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION
2022 AND THE CONTRACT SPECIAL PROVISIONS.
2. PRECAST UNITS SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH CON/SPAN® SPECIFICATIONS.
3. PROVIDE 2 IN. CONCRETE COVER ON REINFORCEMENT BARS, EXCEPT AS NOTED.
4. PROVIDE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 3500 PSI FOR CONCRETE IN BARRIERS, MOMENT SLAB AND FOOTING.
5. A HIGHER CLASS CONCRETE MAY BE SUBSTITUTED FOR A LOWER CLASS CONCRETE AT NO ADDITIONAL COST IF APPROVED.
6. USE EPOXY COATED REINFORCEMENT FOR PRECAST SECTIONS AND ALL CAST IN PLACE CONCRETE.
7. PROVIDE GRADE 60 REINFORCING STEEL BARS THAT MEET THE REQUIREMENTS OF ASTM A 615/A 615M, A 996/A 996M, OR A 706/A 706M. DO NOT WELD GRADE 60 REINFORCING STEEL BARS UNLESS SPECIFIED. DO NOT USE RAIL STEEL A 996/A 996/M REINFORCEMENT BARS WHERE
BENDING OR WELDING OF THE REINFORCEMENT BARS IS INDICATED.
8. RAKE-FINISH ALL HORIZONTAL CONSTRUCTION JOINTS, EXCEPT AS INDICATED.
9. CHAMFER EXPOSED CONCRETE EDGES 1 IN. BY 1 IN., EXCEPT AS NOTED.
10. ALL DIMENSIONS SHOWN ARE HORIZONTAL, EXCEPT AS NOTED.
11. THE MAXIMUM DIFFERENCE IN THE SURFACE LEVELS OF THE FILL ON OPPOSITE SIDES OF THE BRIDGE MUST NOT EXCEED 2'-0". DO NOT ALLOW THE WHEELS OF ROLLERS TO COME CLOSER THAN 1 FT. TO THE FACE OF THE STRUCTURE DURING COMPACTION OF THE BACKFILL.
12. PROVIDE MINIMUM LAP AND EMBEDMENT LENGTH OF 30 DIAMETERS OR IN ACCORDANCE WITH AASHTO AS MODIFIED BY ALDOT
STRUCTURAL DESIGN MANUAL, WHICHEVER IS GREATER.
13. NO BLASTING ALLOWED FOR STRUCTURE EXCAVATIONS. ROCK EXCAVATION MUST BE ACCOMPLISHED BY MECHANICAL MEANS ONLY.
14. NO BACKFILL SHALL BE PLACED AGAINST ANY STRUCTURE ELEMENT UNTIL THE MATERIAL HAS BEEN APPROVED BY THE COR.
15. WHEN PLACING BACKFILL AGAINST A WATERPROOFED SURFACE, USE SUFFICIENT CARE TO AVOID DAMAGE TO THE WATERPROOFING
MATERIAL.
16. MECHANICAL TAMPERS OR APPROVED COMPACTING EQUIPMENT SHALL BE USED TO COMPACT ALL BACKFILL AND EMBANKMENT IMMEDIATELY ADJACENT TO EACH SIDE OF THE ARCH AND OVER THE TOP OF THE ARCH UNTIL IT IS COVERED TO A MINIMUM DEPTH OF 6”.
THE BACKFILL WITHIN FOUR FEET OF EACH SIDE OF THE ARCH SHALL BE PLACED IN LIFTS OF EIGHT INCHES OR LESS (LOOSE DEPTH).
17. PROVIDE WATERPROOFING MEMBRANE AS PER SPECIAL PROVISIONS.
18. PRECAST ARCH SUPPLIER ASSUMES FULL RESPONSIBILITY FOR ACQUIRING A HAULING PERMIT FOR THE PRECAST COMPONENTS.
19. WINGWALLS TO BE DESIGNED BY THE SUPPLIER. SUBMIT DESIGN CALCULATIONS AND SHOP DRAWINGS, SIGNED AND SEALED BY AN ENGINEER REGISTERED IN ALABAMA TO THE COR FOR APPROVAL BEFORE BEGINNING FABRICATION.
20. PROVIDE 3 INCH ROUND WEEP HOLES SPACED NOT OVER TEN FEET ON CENTERS IN THE M.S.E. PANEL WINGWALLS WITH BACKFILL AS PER
ALABAMA STANDARD SPECIFICATIONS SUBARTICLE 214.02.
21. DESIGNER OF PRECAST ARCH TO NEED NOT PROVIDE LRFD LOAD RATINGS.
22. BRIDGE BARRIER SHALL CONFORM TO STANDARD BRIDGE BARRIER RAIL (36" SINGLE SLOPE) PER ALDOT STANDARDS.
FOUNDATION NOTES:
1. IF BEDROCK IS ENCOUNTERED ABOVE THE BOTTOM OF FOOTING, EXCAVATE ROCK UP TO THE PROPOSED BOTTOM OF FOOTING. IF BEDROCK
IS NOT ENCOUNTERED AT THE BOTTOM OF FOOTING,OVEREXCAVATE ALL SOILS UP TO SOUND BEDROCK AND BACKFILL WITH CLASS C
CONCRETE UP TO THE BOTTOM OF FOOTING.
2. PROVIDE DEWATERING TO MAINTAIN GROUNDWATER AT LEAST 1 FOOT BELOW THE EXCAVATION SUBGRADE. THE CONTRACTOR IS
RESPONSIBLE FOR IMPLEMENTATION OF ADEQUATE DEWATERING MEASURES.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND INSTALLATION OF ALL TEMPORARY EXCAVATION SUPPORT AND PROTECTION (TESP) SYSTEMS. EFFECT OF SURCHARGE AND RETAINED SLOPING EARTH CONDITION MUST BE CONSIDERED IN TESP DESIGN. THE FOLLOWING GEOTECHNICAL PARAMETERS MAY BE USED FOR THE DESIGN OF TESP, BUT THE CONTRACTOR MUST VERIFY THAT THEY ARE APPROPRIATE
FOR THE SPECIFIC SUPPORT SYSTEM TO BE USED:
COHESION, C = 0 PSF
INTERNAL FRICTION ANGLE, f= 31° MOIST UNIT WEIGHT, g = 115 PCF SATURATED UNIT WEIGHT, g = 120 PCF
GROUND WATER ELEVATION = 428.0
SHEAR STRENGTH OF ROCK MASS = 27 KSF
4. CONSTRUCT ALL TEMPORARY SLOPES NO STEEPER THAN 1.5H:1V. THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE SLOPES.
5. BLASTING IS NOT PERMITTED FOR FOUNDATION EXCAVATION.
LIST OF ABBREVIATIONS
- BASELINE
BOT. - BOTTOM
℄ - CENTERLINE
C.I.P. - CAST-IN-PLACE
CLR. - CLEAR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
DIA. - DIAMETER
EL. - ELEVATION
F.F. - FRONT FACE
FT. - FEET
MAX. - MAXIMUM
MIN. - MINIMUM
M.S.E. - MECHANICALLY STABILIZED EARTH
NO. - NUMBER
PCP - PREFORMED CELLULAR POLYSTYRENE
⅊ - PLATE
SPA. - SPACING
STA. - STATION
TYP. - TYPICAL
W.P. - WORK POINT6. ALL EXCAVATION MUST CONFORM TO CURRENT OSHA AND OTHER APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO ENSURE THE STABILITY OF THE EXCAVATIONS.
7. PER AASHTO TABLE 4.7.4.3.1-1, SEISMIC ANALYSIS IS NOT REQUIRED FOR SINGLE SPAN BRIDGES.
8. CORE BORING SAMPLES ARE AVAILABLE FOR THIS PROJECT AND WILL BE DISPLAYED UPON REQUEST.
CONCRETE PROTECTIVE COATINGS:
1. APPLY A 3 4” MAX RELIEF FORMLINER TO THE FACE OF ENDWALLS, BRIDGE RAIL AND WINGWALLS IN ACCORDANCE WITH SPECIAL PROVISIONS.
ms
53 4" 53 4"
53 4"
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
S
TA
KE
-O
UT
P
LA
N.
DW
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
STAKE-OUT PLAN
21+00 20+00
35'-0"
40' -0"
40'-0"
60'-0"
COORDINATE TABLE
CENTERLINE PROPOSED ROADWAY & CONSTRUCTION BASELINE
WORK POINT STATION OFFSET (FT) NORTHING EASTING DESCRIPTION
1 21+05.6868 40.2049 RT 1139975.7670 2169310.4452 END OF WINGWALL A AT F.F.
2 20+80.9381 15.4562 RT 1139958.7657 2169341.0386 END OF WINGWALL A AT F.F.
3 20+80.9381 14.9729 RT 1139958.3011 2169341.1713 F.F. OF NORTH SPANDREL WALL AT F.F. OF WEST ARCH 4 20+77.6047 14.9729 RT 1139959.2164 2169344.3765 F.F. OF NORTH SPANDREL WALL AT F.F. OF WEST ARCH 5 20+77.6047 0 1139944.8191 2169348.4881 ℄ PROPOSED ROAD AND CONSTRUCTION AT F.F. OF WEST ARCH 6 20+77.6047 14.9781 LT 1139930.4118 2169352.6026 F.F. OF SOUTH SPANDREL WALL AT F.F. OF WEST ARCH 7 20+80.9381 14.9833 LT 1139929.4964 2169349.3974 F.F. OF SOUTH SPANDREL WALL AT F.F. OF WEST ARCH
8 20+80.9381 15.4666 LT 1139929.0317 2169349.5301 END OF WINGWALL B AT F.F.
9 21+09.2223 43.7509 LT 1139894.0678 2169330.1001 END OF WINGWALL B AT F.F.
10 19+32.1047 14.9729 RT 1139999.1712 2169484.2831 END OF WINGWALL C AT F.F.
11 19+96.6047 14.9781 RT 1139981.4593 2169422.2627 END OF WINGWALL C AT F.F./F.F. OF NORTH SPANDREL WALL AT F.F.
OF EAST ARCH
12 19+96.6047 0 1139967.0620 2169426.3743 ℄ PROPOSED ROAD AND CONSTRUCTION AT F.F. OF EAST ARCH 13 19+96.6047 14.9833 LT 1139952.6546 2169430.4888 F.F. OF SOUTH SPANDREL WALL AT F.F. OF EAST ARCH 14 19+93.2714 14.9833 LT 1139953.5700 2169433.6940 F.F. OF SOUTH SPANDREL WALL AT F.F. OF EAST ARCH
15 19+93.2714 15.4666 LT 1139953.1053 2169433.8267 END OF WINGWALL D AT F.F.
16 19+64.9871 43.7508 LT 1139933.6753 2169468.7906 END OF WINGWALL D AT F.F.
F.F. WINGWALL A
F.F. WINGWALL B
F.F. WINGWALL C
F.F. WINGWALL D
90° 0'0
(TYP.)
℄ PROPOSED ROAD AND
CONSTRUCTION
PLAN
NORTH
40'-6" 40'-6"
℄ PRECAST ARCH BRIDGE
F.F. WEST ARCH (AT BASE)
STA. 20+77.60
F.F. EAST ARCH (AT BASE)
STA. 19+96.60
F.F. HEADWALL
F.F. HEADWALL
FOUR PLACE COORDINATES ARE FOR COMPUTATIONAL PURPOSES ONLY
AND DO NOT IMPLY A PRECISION BEYOND TWO DECIMAL POINTS.
THE HORIZONTAL DATUM IS BASED ON STATE PLANE GRID ALABAMA WEST
(NAD83) AND THE VERTICAL DATUM IS BASED ON NADV88.
W.P. 1
W.P. 2
W.P. 3
W.P. 4
W.P. 5
W.P. 6
W.P. 7
W.P. 8
W.P. 9
W.P. 10W.P. 11
W.P. 12
W.P. 16
W.P. 15
W.P. 14
W.P. 13
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
S
TA
KE
-O
UT
P
LA
N.
DW
G
STAKE-OUT PLAN ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD102
16375OCTOBER 25, 2024 MP ALS
'-1
13 4"
'-1 13 4"
45°0'0"
45°0'0"
45°0'0"
STA. AHEAD
90°0'0"
AutoCAD SHX Text 0'
AutoCAD SHX Text 3/16"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
F
OU
ND
AT
IO
N
PL
AN
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
FOUNDATION PLAN
21+00 20+00
PLAN
NORTH
21+00 20+00
F.F. WINGWALL A
F.F. WINGWALL B
F.F. WINGWALL C
F.F. WINGWALL D
℄ PROPOSED ROAD AND
CONSTRUCTION
℄ PRECAST ARCH BRIDGE
W.P. 1
W.P. 2
W.P. 3
W.P. 4
W.P. 5
W.P. 6
W.P. 7
W.P. 8
W.P. 9
W.P. 10 W.P. 11
W.P. 12
W.P. 16
W.P. 15
W.P. 14
W.P. 13
PRECAST ARCH
STRUCTURE LIMITS
PRECAST ARCH
STRUCTURE LIMITS
12'-0" FOOTING
(TYP.)
55'-6"
LEVELING PAD
LEVELING PAD
LEVELING PAD
LEVELING PAD
39' -8
1 4 " 39'-8 1
4 "
32'-8 1
4 "
'-0
'-0
'-0
'-0
PRECAST ARCH
STRUCTURE LIMITS
45°0'0"
45°0'0"
45°0'0"
STA. AHEAD
90°0'0"
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
F
OU
ND
AT
IO
N
PL
AN
.D W
G
FOUNDATION PLAN ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD103
16376OCTOBER 25, 2024 MP ALS
AutoCAD SHX Text 0'
AutoCAD SHX Text 3/16"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
B
RI
DG
E
PL
AN
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
BRIDGE PLAN
21+00 20+00
PLAN
NORTH
21+00 20+00
℄ PROPOSED ROAD AND
CONSTRUCTION
℄ PRECAST ARCH BRIDGE
M.S.E. HEADWALL (TYP.)
FL
OW
10'-0"
(TYP.)
10'-0"
(TYP.)
10'-0"
(TYP.)
40'-6" 40'-6"
M.S.E. WINGWALL (TYP.)
60'-0" M.S.E. PANEL
WINGWALL C
35'-0" M.S.E. PANEL
WINGWALL A
45°0'0.0"
45°0'0" 45°0'0"
40' -0"
M.S.E. P
ANEL
WINGWALL
B
40'-0" M.S.E. PANEL
WINGWALL D
A
BD107
BD107
'-1
11 2" 6 -
(O
) 8
1'- 0"
S
PA
N x 1
8'- 95 8"
RI
SE
x 4'-
1 2"
LO
NG
PR
EC
AS
T
CO
NC
RE
TE
B
RI
DG
E
UN
IT
S
PL
US
JO
IN
TS
AT
1 2"
PE
R
JO
IN
T
2'-0
" LE
VELIN
G PAD
(TYP.)
SLOPE
F.F. WEST ARCH (AT BASE)
STA. 20+77.60
F.F. EAST ARCH (AT BASE)
STA. 19+96.60
PRECAST ARCH STRUCTURE LIMITS
℄ JOINT (TYP.)
℄ JOINT (TYP.)
℄ JOINT (TYP.)
℄ JOINT (TYP.)
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
B
RI
DG
E
PL
AN
.D W
G
BRIDGE PLAN ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD104
16377OCTOBER 25, 2024 MP ALS
AutoCAD SHX Text 0'
AutoCAD SHX Text 3/16"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
ROADWAY GRADE
GUTTER LINE
CAST IN PLACE CONCRETE
BARRIER & MOMENT SLAB
(O1381) 81'-0" SPAN
8"±
THRU BOLT
REMOVABLE EXPANSION
ANCHOR (FIELD DRILL)
STEEL ANGLE
PRECAST
ARCH UNIT
PRECAST M.S.E.
HEADWALL
TIMBER POST OR TIMBER BLOCKING
CUT TO BEAR, W/STEEL POST SHORE
PRECAST ARCH UNIT
STEEL ANGLE
THRU BOLT (TYP.) TIMBER POST OR TIMBER BLOCKING
CUT TO BEAR, W/STEEL POST SHORE
REMOVABLE EXPANSION
ANCHOR (FIELD DRILL) (TYP.)
FORMLINER
( 3 4" MAX. RELIEF)
(TYP.)
FORMLINER
(3 4" MAX. RELIEF)
(TYP.)
FORMLINER ASHLAR
TYPE (TYP.)
4'- 8"
STREAM BED
EL. = 428.0 ±
STREAM BED
EL. = 428.0 ±
'-9
5 8"
RI
SE
'-9
5 8"
RI
SE
M.S.E. WINGWALL
(TYP.)
M.S.E. WINGWALL
(TYP.)
15'-6"
℄TIMBER POST OR
STEEL SHORE (TYP.)
GRILLAGE BY OTHERS
TEMPORARY SHORING
BY OTHERS (TYP.)
SEE POST
CONNECTION
DETAIL ON THIS
SHEET
15'-6"
15'-6"
℄TIMBER POST OR
STEEL SHORE (TYP.)
GRILLAGE BY OTHERS
TEMPORARY SHORING
BY OTHERS (TYP.)
15'-6"
TOP OF FOOTING
EL. 426.62
TOP OF M.S.E. WALL
EL. 451.51
TOP OF M.S.E. WALL
EL. 450.74
TOP OF M.S.E. WALL
EL. 450.17 TOP OF M.S.E. WALL
EL. 449.59
TOP OF M.S.E. WALL
EL. 450.63
TOP OF M.S.E. WALL
EL. 445.00
3'- 41 2"
9'- 93 4"
9'- 81 4"
'-8
1 4"
'-6
5 8"
'-6
5 8"
'-5
1 8"
'-5
1 8"
'-3
5 8"
'-3
5 8"
'-2
'-2
'-0
1 2"
'-6
1 4" 7'- 73 8"
5'- 01 4"
3'- 75 8"
3'- 61 8"
4'- 75 8"
6'-
5 8"
'-7
3 8"
'-1
05 8"
'-1
11 8"
'-8
7 8" 19 '-8
7 8"
'-1
15 8"
'-1
15 8"
'-3
5 8"
TOP OF M.S.E. WALL
EL. 443.50
TOP OF M.S.E. WALL
EL. 450.63
TOP OF M.S.E. WALL
EL. 449.59 3'-
41 2"
TOP OF M.S.E. WALL
EL. 450.17
TOP OF M.S.E. WALL
EL. 450.74
TOP OF M.S.E. WALL
EL. 451.79
TOP OF M.S.E. WALL
EL. 444.50
7'- 95 8"
9'- 71 2"
'-7
1 2" 14 '-5
1 2"
'-5
1 2" 19 '-3
3 8"
'-3
3 8"
'-1
11 8"
'-1
07 8"
'-7
3 8" 6'-
5 8" 4'- 75 8"
3'- 61 8"
3'- 75 8"
5'- 01 4"
7'- 73 8"
'-6
1 4"
'-0
3 8"
'-1
'-9
" 20 '-9
'-9
1 4"
'-9
1 4"
'-9
3 8"
'-9
3 8"
8'- 95 8"
TOP OF LEVELING PAD
EL. 429.62
TOP OF LEVELING PAD
EL. 432.62
TOP OF LEVELING PAD
EL. 435.62
TOP OF LEVELING PAD
EL. 438.62
TOP OF LEVELING PAD
EL. 441.62
TOP OF FOOTING
EL. 426.62
TOP OF LEVELING PAD
EL. 429.62
TOP OF LEVELING PAD
EL. 432.62
TOP OF FOOTING
EL. 426.62
TOP OF LEVELING PAD
EL. 429.62
TOP OF LEVELING PAD
EL. 432.62
TOP OF LEVELING PAD
EL. 435.62
TOP OF FOOTING
EL. 426.62
TOP OF LEVELING PAD
EL. 429.62
TOP OF LEVELING PAD
EL. 432.62
TOP OF LEVELING PAD
EL. 435.62
90'-0" M.S.E. PANEL
SPANDREL ENDWALL
90'-0" M.S.E. PANEL
SPANDREL ENDWALL
2'- 11 2"
(O1381) 81'-0" SPAN
4 " BARRIER JOINT (REFER TO
ALDOT STANDARD DRAWING
BBR-2 FOR JOINT DETAILS) (TYP.)
30'-0" 30'-0" 30'-0"
ROADWAY GRADE
GUTTER LINE
CAST IN PLACE CONCRETE
BARRIER & MOMENT SLAB
30'-0"30'-0"
10'-0"
2'-6"
(TYP.)
SEE DETAIL "CONNECTION TO BRIDGE
RAIL" ON DRAWING BD108 (TYP.)
BARRIER RAIL TRANSITION (TYP., SEE
ALDOT SPECIAL BRIDGE PROJECT
DRAWING BBR-2)
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
B
RI
DG
E
EL
EV
AT
IO
NS
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
B
RI
DG
E
EL
EV
AT
IO
NS
.D
W G
BRIDGE ELEVATIONS ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD105
16378OCTOBER 25, 2024 MP ALS
NORTH END ELEVATION
(LOOKING SOUTH)
SOUTH END ELEVATION
(LOOKING NORTH)
NOTES:
1. INSTALL TIMBER OR STEEL POSTS TIGHT AGAINST UNDERSIDE OF PRECAST
ARCH UNIT PRIOR TO SETTING PRECAST HEADWALL UNITS.
2. POSTS SHALL REMAIN IN PLACE UNTIL BACKFILL IS AT LEAST 1'-0" FROM
TOP OF STRUCTURE.
POST CONNECTION DETAIL
NOT TO SCALE
HEADWALL SECTION
TEMPORARY SHORING DETAIL & SECTION
NOT TO SCALE
AutoCAD SHX Text 0'
AutoCAD SHX Text 3/16"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 12'
AutoCAD SHX Text 0'
AutoCAD SHX Text 3/16"=1'-0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
GROUT TO TOP
OF KEYWAY
F.F. PRECAST BRIDGE UNIT
3"
KE
YW
AY
KE
YW
AY1"
GR
OU
T
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
F
OU
ND
AT
IO
N
DE
TA
ILS
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
FOUNDATION REINFORCEMENT
PLAN
NORTH
PRECAST ARCH
STRUCTURE LIMITS
PRECAST ARCH
STRUCTURE LIMITS
4'- 8"
12'-0"
3" CL
R.
4" CL
R. 3" CLR.
(TYP.)17 - #5 (TOP AND BOT.)
#6 AT 6" MAX
#8 AT 6" MAX
SECTION
(WEST ARCH FOOTING SHOWN, EAST ARCH FOOTING OPPOSITE HAND)
A
BD106
PRECAST ARCH
3'-0"
#4 AT 12" (TYP.)
GROUT TO TOP OF KEYWAY
KE
YW
AY
1"
GR
OU
T
3"
KE
YW
AY
PRECAST ARCH
STRUCTURE LIMITS
PRECAST ARCH
STRUCTURE LIMITS
17 - #5 (TOP AND BOTTOM)
#6 A
T 6 M
AX
TO
P)
#8 A
T 6"
M
AX
BO
TT
OM
17 - #5 (TOP AND BOTTOM)
#6 A
T 6"
M
AX
TO
P) #8
A T
6" M
AX
BO
TT
OM
5" 7"
10"7"
BOTTOM OF FOOTING
421.95
ROCK PARAMETERS
ALLOWABLE BEARING
RESISTANCE 14.4 KSF
GROSS NOMINAL BEARING
RESISTANCE 36.1 KSF
PHI FACTORS FOR
STRENGTH 0.45
PHI FACTORS FOR
EXTREME 1
ALLOWABLE SETTLEMENT 0.5 INCH
ROCK QUALITY 83%
POISSON'S RATIO 0.15
ELASTIC MODULUS 1775 KSI
FOOTING BEARING PRESSURE
LIMIT
STATE
MAXIMUM
BEARING
PRESSURE
(KSF)
BEARING
RESISTANCE
(KSF)
PERFORMANCE
RATIO
STR-1 13.84 16.24 1.17
2'-9"
1'-7"
3"
#4 AT 12" (TOP)
#4 A
T
" M
AX
TO
P)
#4 AT 12" (TOP)
#4 A
T
" M
AX
TO
P)
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
F
OU
ND
AT
IO
N
DE
TA
ILS
.D
W G
FOUNDATION DETAILS ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD106
16379OCTOBER 25, 2024 MP ALS
TYPICAL BRIDGE UNIT GROUT DETAIL
NOT TO SCALE
NOTE: 1. FILL ENTIRE KEYWAY INCLUDING NOMINAL 1" VOID BETWEEN BOTTOM OF
KEYWAY AND BOTTOM OF PRECAST BRIDGE UNIT LEG WITH GROUT.
A
BD106
STA. AHEAD
20+00
℄ PROPOSED ROAD AND
CONSTRUCTION
3" CLR.
(TYP.)
3" C
LR
(T
YP
1'- 01 4"
(T
YP
'-0
'-0
W.P. 5 W.P. 12
BAR SHAPE
BAR SHAPE
AutoCAD SHX Text 0'
AutoCAD SHX Text 3/8"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 6'
AutoCAD SHX Text 0'
AutoCAD SHX Text 1/2"=1'-0"
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
4'
31'-2"
STREAM BED
EL. 428.00±
JOINT SEAL
BETWEEN END
UNIT AND
HEADWALL (TYP.)
8" x 13
8" BUTYL ROPE
9" WIDE JOINT WRAP
PRIMER COMPATIBLE
WITH JOINT WRAP
TOP OF PRECAST
BRIDGE UNIT
PRECAST BRIDGE UNIT
SEE TYPICAL
JOINT SEAL
DETAIL ON THIS
SHEET (TYP.
BETWEEN UNITS)
BUTYL ROPE, PRIMER & JOINT WRAP
INSTALLED UNDER TIE PLATE 11"
BRIDGE INTERIOR UNITBRIDGE END UNIT
℄1"Ø x 9" LONG HILTI KWIK BOLT 3 EXPANSION ANCHOR
OR APPROVED EQUAL. INSTALL IN FIELD DRILLED HOLES
W/ MINIMUM 6" EMBEDMENT, AS PER MANUFACTURER'S
INSTALLATION INSTRUCTIONS (TYP.)
4" 2"
2"
2'-8"
2" 6"
1'-4" 6"
2"
8" x 4" x 2'-8"
GALVANIZED ⅊(P-1)
3 - 11
8"Ø HOLES
BUTYL ROPE
JOINT WRAP & PRIMER
INSTALLED UNDER TIE PLATEPLATE WASHER
℄J O
IN
T
℄8" TWO BOLT PRESET
ANCHOR FOR 1"Ø x 23
4" BOLTS,
(6" PITCH)
W/ ROUND WASHERS
2" x 11 8"Ø
SLOTTED HOLE
M.S.E. HEADWALL
(TYP.)
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
1.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
1.D W
G
MISCELLANEOUS DETAILS - 1 ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD107
16380OCTOBER 25, 2024 MP ALS
SECTIONA
BD104
TYPICAL JOINT SEAL DETAIL
NOT TO SCALESECTION
NOT TO SCALE
B
BD107DETAIL
NOT TO SCALE
BD104
B
BD107
AutoCAD SHX Text 0'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
8'
3'-0" MIN.
(TYP.) A C.I.P. CROWN JOINT
O-SERIES PRECAST
ARCH LEAF (TYP.)
C SPANL
CROWN JOINT
WATERPROOFING
MEMBRANE
ARCH JOINT
WRAP (TYP.)
C SPANL
3'-0" MIN.
(TYP.)
A
CROWN JOINT
WATERPROOFING MEMBRANE
AND PRIMER (TYP.)
2" MINIMUM LAP PER MANUFACTURER'S
RECOMMENDATION (TYP.)
ARCH JOINT
WRAP (TYP.)
C.I.P. CROWN
JOINT (TYP.)
PRECAST ARCH UNIT
LAY LENGTH (TYP.)
LIQUID MEMBRANE TERMINATION
SHALL BE APPLIED TO THE
PERIMETER OF THE MEMBRANE
*NOT REQUIRED IF FULL STRUCTURE
WATERPROOFING MEMBRANE IS REQUIRED
IN-SITU
SOIL
5'- 0"
M
AX
FI
LL
H
EI
GH
T
FINISHED
GRADE
A
LIMITS OF CRITICAL
BACKFILL ZONE B
CC
TO ROADWAY
BASE/ FINISH
GRADE OR
2'-0" MIN.
ARCH UNIT
FOUNDATION
(TYP.)
4'-0"
MIN
B
IN-SITU
SOIL
B
A
GW, GP, SP
GM, SW, SP,
SM
TYPICAL
USCS
MATERIALS
AASHTO
GROUP
AASHTO
SUBGROUP
PERCENT PASSING
US SIEVE NO.
#40#10 #200
30 MAX50 MAX 15 MAX
50 MAX 25 MAX
SP, SM, SW
A1
A3
A-1A
A-1B
CHARACTER OF FRACTION
PASSING NO. 40 SIEVE
LIQUID
LIMIT
PLASTICITY
INDEX
6 MAX
6 MAX
51 MIN 10 MAX NON-
PLASTIC
SOIL DESRIPTION
LARGELY GRAVEL BUT CAN
INCLUDE SAND AND FINES
GRAVELLY SAND OR GRADED
SAND, MAY INCLUDE FINES
FINE SANDS
C.
I.P
. C
LO
SU
RE
(T
YP
3'-
0" M
IN
(T
YP
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
-2
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
-2
.D W
G
MISCELLANEOUS DETAILS - 2 ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD108
16381OCTOBER 25, 2024 MP ALS
BARRIER AND MOMENT SLAB
BARRIER MOMENT SLAB WIDTH
6'-0" MIN.
2"
3'- 0"
5'- 11 2"
1'- 11 2"
BE
LO
W G
UT
TE
R
LIN
E 1'-
0"
1'-21 2"
7"
1'- 0"
2'- 0"
90°
4'- 4"
1'-03 4"
PRECAST WALL
2"
(TYP.)
1"
2"
CL
R.
3" CL
R. #5 AT 6"
#4 AT 12" MAX.
(TOP AND BOT.)
#6 AT 6"
2"
CLR.
TOP OF PAVEMENT
SEE NOTE 3
CONSTRUCTION
JOINT
PR
EC
AS
T
W
AL
L
1'-43 4"
2"
PCP (REMOVE AFTER CIP CONCRETE IS
CURED). GLUE TO PANEL AS REQUIRED
TO KEEP PCP IN PLACE DURING
PLACEMENT OF CIP CONCRETE (TYP.)
#4 E
QU
AL
S
PA
#4 AT 6" MAX.
#4 AT 6" MAX
#4 E
QU
AL
S
PA
23 4"
1" CLOSED CELL NEOPRENE
SPONGE (CONTINUOUS)
41 4"
4"
2" CLR.
(TYP.)
PCP (TO REMAIN IN PLACE)
GLUE TO PANEL WITH
WATERPROOF ADHESIVE
#4
8"
6"
4"
3'- 4"
2'-6 12 "
2'-6"
BACKFILL REQUIREMENTS
PLAN
CROWN JOINT SEALING DETAILS*
ELEVATION
ACCEPTABLE SOILS FOR USE IN ZONE B BACKFILL
101°90°
10"
2'-
1 2"
2 12 " DIA BENDING PIN
CONNECTION TO BRIDGE RAIL
(12) GALVANIZED RECTANGULAR WASHERS (FWR03) ARE REQUIRED
UNDER THE BOLT HEAD AT THE TERMINAL CONNECTOR SPLICE TO
NESTED THRIE BEAM. (SEE NOTES 1 & 2).
2"
±2" 2'-6"
(TERMINAL CONNECTOR)
2'-0"
TAPER
4"
1'- 9"
INSTALL WITH BOLT
HEADS ON TRAFFIC SIDE
±3 3 8"
2'-6"
±3"
TERMINAL CONNECTOR
10 GAUGE
NOTES:
1. GALVANIZED WASHERS USED WITH THE 5 8" DIA. POST BOLTS SHALL BE TYPE A 1 3 4" O.D.
WASHERS. THE (12) PLATE WASHERS (FWR03) REQUIRED AT THE TERMINAL CONNECTOR
SPLICE.
2. BUTTON HEAD "POST" BOLTS (ASTM A307) SHALL BE OF SUFFICIENT LENGTH TO EXTEND
THROUGH THE FULL THICKNESS OF THE NUT (ASTM A563) AND WASHER AND NOT MORE
THAN 1" BEYOND IT. BUTTON HEAD "SPLICE" BOLTS (ASTM A307) 5 8" DIA. x 2" (AT TRIPLE
RAIL SPLICES) WITH 5 8" DOUBLE RECESSED NUTS.
3. ASPHALT AND RUBBER SEALING COMPOUND (ASTM D5078).
A
BD108
GUARDRAIL
BRIDGE BARRIER RAIL
SECTIONA
BD108
CROWN JOINT
WATERPROOFING
MEMBRANE CHART
FORM/SPAN A*
1381T 14'-6"
NOTE: LENGTHS ARE ALONG THE ARCH SURFACE
BACKFILL ZONES
ZONE TYPE
A CONSTRUCTED EMBANKMENT OR OVERFILL
B FILL THAT IS DIRECTLY ASSOCIATED WITH PRECAST
CONCRETE BRIDGE INSTALLATION
C ROAD STRUCTURE
VIEW BB
BD108
B
BD108
1'- 9"
1'- 8"
(T
YP
.)313
(T
YP
1'-21 2"
2"
2" 8"
4" 41 4"
4 "
GUTTER LINE
BAR SHAPE
BAR SHAPE
BAR SHAPE
AutoCAD SHX Text 1-1/2"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 1'
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text 0'
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text 1/2'
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 0'
AutoCAD SHX Text 1"=1'-0"
AutoCAD SHX Text 1/2'
AutoCAD SHX Text 1'
2'
C.I.P. CROWN JOINT
REINFORCING BAR LIST - 1380T
SPACED @ 33
4"± O.C.
SPACED @ 33
4"± O.C.
NOTE:
· SELECT APPROPRIATE SPACERS (NOT INDICATED ON DRAWING).
· CROWN JOINT TO BE CAST-IN-PLACE 6000 PSI CONCRETE. INTERIOR CROWN JOINT 1.9 CY, EXTERIOR CROWN
JOINT 0.8CY. ESTIMATE VOLUMES ARE PER JOINT
· CONCRETE AND REINFORCEMENT SUPPLIED BY CONTRACTOR EXCEPT WHERE NOTED.
· REINFORCING SIZE AND QUANTITY ARE PRELIMINARY, PENDING FINAL DESIGN
SPACED @ 4"± O.C.
7'-8"
7'-8"
R3 #4
R2 #5
R1 #7
LENGTHNO.MARK SIZE fy = 60 ksi
3'-4"
SPACED @ 4"± O.C.9'-2"120R4 #4
PRECAST END
ARCH UNIT
12 - R1 12 - R2
5 - R1 5 - R2
12 - R1 12 - R2
24 - R4
TYPE
STR
STR
BENT
BENT
R3 OR R4 SEAL THIS JOINT
BEFORE POURING
BARS PROTRUDING
FROM ARCH UNIT
R1
R2
3'-6"
12"
R4
6"
1'-3"
R3
12"
STANDARD CROWN
JOINT (TYP.)
24 - R4
24 - R3
PRECAST INTERIOR
ARCH UNIT
PRECAST END ARCH
UNIT CROWN JOINT
24 - R4
12 - R1 12 - R2
1'-63 4"
60°0'0"
R1 '-6
6" 6"
1"Ø A307 TEMPORARY
CONNECTING BOLT
#5 D101A DOWEL BAR WITH #5
D101 DOWEL-IN (8 PER LEAF)
(TYP.)
5°
0'0
#7 D101A DOWEL BAR WITH #7
D101 DOWEL-IN (8 PER LEAF)
(TYP.)
2"Ø F44 THIN
SLAB INSERT
PRECAST INTERIOR
ARCH UNIT
#5 (TOP) & #7 (BOTTOM) D101 DOWEL-INS
PROTRUDING FROM ARCH UNIT AND LAPPED
WITH R2 (TOP) AND R1 (BOTTOM) BARS.
12 - R1 12 - R1
12 - R224 - R3
12 - R2 24 - R4
PRECAST INTERIOR
ARCH UNIT
12 - R1
12 - R2
24 - R4
5 - R1
24 - R4 5 - R2
PRECAST END
ARCH UNIT
2"Ø F44 THIN
SLAB INSERT
STRAIGHT DOWEL-IN SPLICER, FIELD
INSTALLED, SUPPLIED BY PRECASTER
SIZE AND SPACING TO BE DETERMINED AT
SHOP DRAWING STAGE
5"
8'-0"
3'-
1'-
53 4" 3'-
3'-
# Description MM/DD/YY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
3.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
A L A B A M A L I C E N S E D
E NG I N E E R
M I C H E L L E P R I C E
No. PE53955
PROFESSIONAL
Fil e P ath : Q
:\4
8-
AL
AB
AM
A
NA
TI
ON
AL
C
EM
ET
ER
Y\
CA
DD
\S
TR
UC
TU
RA
L\B
D1
M
IS
CE
LL
AN
EO
US
D
ET
AI
LS
3.D W
G
MISCELLANEOUS DETAILS - 3 ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3BID DOCUMENTS
MONTEVALLO, ALABAMA
927CM3003
BD109
16382OCTOBER 25, 2024 MP ALS
CROWN JOINT REINFORCING DETAIL
NOT TO SCALE
SECTION
NOT TO SCALE
A
BD109
SECTION
NOT TO SCALE
B
BD109
TEMPORARY CONNECTING BOLT DETAIL
NOT TO SCALE
B
BD109
A
BD109
CULVERT 1-2 PROFILE
85.00' - 54" CMP
@ 0.50%
COMPACTED STRUCTURAL
PER GEOTECH REPORT
+8
5=
HE
AD
WA
LL
IN
V.
OU
T=
4.3 2 (
C1 -54
+0
0=
HE
AD
WA
LL
IN
V.
IN
=4
.90 (C
2-5 4")
22' RIP-RAP
+5
7=
" S
TO
RM
SE
WE
R
X-
IN
G
IN
V.=
9.2
PR. GRADE
EX. GRADE
STREAM 2
C2C1
TW ELEV=
457.50
HW ELEV=
459.65STREAM 2
0.3'
CLEAR
STORM 1-18 PROFILE
43.97' - 15" RCP CL III
@ 2.30%
124.23' - 15" RCP CL III
@ 2.00%
123.80' - 18" RCP CL III
@ 1.74%
102.02' - 24" RCP CL III
@ 0.50%165.78' - 24" RCP CL III
@ 0.50%59.29' - 24" RCP CL III
@ 0.50%93.66' - 24" RCP CL III
@ 0.50%86.11' - 24" RCP CL III
@ 0.50%86.02' - 24" RCP CL III
@ 0.50%149.04' - 30" RCP CL III
@ 0.52%
TO
P=
6.5
TO
P=
6.4
TO
P=
4.9
TO
P=
3.6
TO
P=
2.9
TO
P=
3.1
TO
P=
1.3
TO
P=
9.5
TO
P=
7.2
TO
P=
6.9
TO
P=
4.7
+0
0=
EN
D
SE
CT
IO
N
IN
V.
IN
=4
.10 (2
-30
+3
4=
" S
TO
RM
SE
WE
R
X-
IN
G
IN
V.=
4.1
+0
1=
MA
NH
OL
E (
IN
LE
T G
RA
DE
TO
BE
PL
AC
ED
WI
TH
BI
D
OP
TIO
N
3)
IN
V.
OU
T=
0.2 7 (
-15
+5
7.0 3=
MA
NH
OL
E
IN
V.
OU
T=
9.1
6 (
-15
IN
V.
IN
=4
.26
(1 2-1
5")
+8
9.9 4=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.2
8 ( 9-1
5")
IN
V.
IN
=4
.38 (1
1-1 5")
IN
V.
IN
=4
.38
(1 0A
-15
+6
5.7 1=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
2.5
0 ( 8-1
8")
IN
V.
IN
=4
.80 (1
0-1 5")
+4
1.9 1=
2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
9.8
5 ( 7-2
4")
IN
V.
IN
=4
.35 (9
-18
IN
V.
IN
=4
.60
(8 A-
+3
9.8 9=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
9.2
4 ( 6-2
4")
IN
V.
IN
=4
.34 (8
-24
IN
V.
IN
=4
.08
(7 A-
+7
4.1 1=
MA
NH
OL
E
IN
V.
OU
T=
8.3
1 ( 5-2
4")
IN
V.
IN
=4
.41 (7
-24
+1
4.8 2=
MA
NH
OL
E
IN
V.
OU
T=
7.9
1 ( 4-2
4")
IN
V.
IN
=4
.01 (6
-24
+2
1.1 6=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
7.3
4 ( 3-2
4")
IN
V.
IN
=4
.44 (5
-24
IN
V.
IN
=4
.75
(4 A-
+3
5.0 5=
MA
NH
OL
E
IN
V.
OU
T=
6.8
1 ( 2-2
4")
IN
V.
IN
=4
.91 (4
-24
IN
V.
IN
=4
.04
(3 A-
+4
9.0 4=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.8
8 ( 1-3
0")
IN
V.
IN
=4
.38 (3
-24
IN
V.
IN
=4
.40
(1 9-2
4")
COMPACTED STRUCTURAL
PER GEOTECH REPORT
PR. GRADE
EX. GRADE
PR. GRADE
EX. GRADE
167.09' - 15" RCP CL III
@ 2.26%2.7'
COVER
0.3'
CLEAR
13' RIP-RAP
COMPACTED STRUCTURAL
PER GEOTECH REPORT
PROFILE TO BE
CONTINUED IN
BID OPTION 3
TO
P=
9.5
TO
P=
6.9
TW ELEV=
457.10
10 YR. HGL
10 YR. HGL
BIORETENTION
#1 PONDING
ELEV.=455.00
STORM 3-24 PROFILE
28.51' - 24" RCP CL III
@ 0.50%
28.50' - 15" RCP CL III
@ 0.50%
21.56' - 15" RCP CL III
@ 0.50%137.36' - 24" RCP CL III
@ 0.57%
28.51' - 24" RCP CL III
@ 0.50%
68.49' - 24" RCP CL III
@ 0.50%
TO
P=
9.5
TO
P=
1.3
TO
P=
9.5
TO
P=
0.1
TO
P=
2.8
TO
P=
2.8
TO
P=
1.3
+1
2.9 2=
DR
OP
IN
LE
T (
TY
PE
P1
IN
V.
OU
T=
6.6 9 (
-15
+9
1.3 6=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
6.4
8 (
-15
IN
V.
IN
=4
.58
(2 4-1
5")
+6
2.8 6=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.5
9 (
-24
IN
V.
IN
=4
.34
(2 3-1
5")
+2
5.5 0=
2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
4.7
1 (
-24
IN
V.
IN
=4
.81
(2 2-2
4")
+9
7= 2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
4.4 7 (
-24
IN
V.
IN
=4
.57 (2
1-2 4")
+0
0= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.8 8 (
1-3 0")
IN
V.
IN
=4
.38
(3 -24
IN
V.
IN
=4
.40 (1
9-2 4")
PR. GRADE
EX. GRADE
2.2'
COVER
+2
8.5 1=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
9.5
5 ( 2-2
4")
IN
V.
IN
=4
.13 (2
0-2 4")
IN
V.
IN
=4
.88
(U D1
-12
TO
P=
2.8
+6
2.8 6=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.5
9 (
-24
IN
V.
IN
=4
.34
(2 3-1
5")
TO
P=
1.3
10 YR. HGL
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
CU201
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
A
LA
BA
MA
\E
NG
IN
\P
LA
NS
\C U2
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
CDW 163RJP
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
STORM SEWER PROFILES-BASE BID
STORM 3 TO 3A PROFILE
TO
P=
5.7
3A
TO
P=
3.1
32.19' - 15" RCP CL III
@ 0.50%
+3
2.1 9=
DR
OP
IN
LE
T (
TY
PE
P1
IN
V.
OU
T=
2.2 1 (
3-1 5")
+0
0=
MA
NH
OL
E
IN
V.
OU
T=
6.8 1 (
2-2 4")
IN
V.
IN
=4
.91
(4 -24
IN
V.
IN
=4
.04 (3
A-
PR. GRADE
EX. GRADE
10 YR. HGL
STORM 4 TO 4A PROFILE
TO
P=
4.9
28.72' - 15" RCP CL III
@ 0.50%
TO
P=
5.0
4A
+2
8.7 2=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
0.9
0 ( 4-1
5")
+0
0= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
7.3 4 (
3-2 4")
IN
V.
IN
=4
.44
(5 -24
IN
V.
IN
=4
.75 (4
A-
PR. GRADE
EX. GRADE
COMPACTED STRUCTURAL
PER GEOTECH REPORT
10 YR. HGL
STORM 7 TO 7A PROFILE
28.57' - 15" RCP CL III
@ 0.50%
TO
P=
7.1
7A
TO
P=
7.2
+2
8.5 7=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
3.2
2 ( 7-1
5")
+0
0= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
9.2 4 (
6-2 4")
IN
V.
IN
=4
.34
(8 -24
IN
V.
IN
=4
.08 (7
A-
PR. GRADE
EX. GRADE
COMPACTED STRUCTURAL
PER GEOTECH REPORT
10 YR. HGL
STORM 8 TO 8A PROFILE
28.52' - 15" RCP CL III
@ 0.53%
TO
P=
4.7
8A
TO
P=
4.7
+2
8.5 2=
2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
0.7
5 ( 8-1
5")
+0
0= 2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
9.8 5 (
7-2 4")
IN
V.
IN
=4
.35
(9 -18
IN
V.
IN
=4
.60 (8
A-
PR. GRADE
EX. GRADE
COMPACTED STRUCTURAL
PER GEOTECH REPORT
10 YR. HGL
STORM 10 TO 10A PROFILE
28.50' - 15" RCP CL III
@ 0.50%
TO
P=
9.5
10A
TO
P=
9.5
+2
8.5 0=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.5
3 (
-15
+0
0= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.2 8 (
9-1 5")
IN
V.
IN
=4
.38
(1 1-1
5")
IN
V.
IN
=4
.38 (1
0A -15
PR. GRADE
EX. GRADE
COMPACTED STRUCTURAL
PER GEOTECH REPORT
10 YR. HGL
STORM 30 TO 33 PROFILE
85.49' - 15" RCP CL III
@ 1.79%
28.50' - 15" RCP CL III
@ 0.77%
53.94' - 15" RCP CL III
@ 2.38%
TO
P=
2.9
+0
0=
EN
D
SE
CT
IO
N
IN
V.
IN
=4
.10 (3
1-1 5")
+8
5.4 9=
2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
6.6
3 (
-15
IN
V.
IN
=4
.95
(3 2-1
5")
IN
V.
IN
=4
.73 (3
1A -15
+6
7.9 4=
DR
OP
IN
LE
T (
TY
PE
P1
IN
V.
OU
T=
0.5 4 (
-15
TO
P=
3.4
TO
P=
3.4
+1
3.9 9=
2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
9.1
6 (
-15
IN
V.
IN
=4
.26
(3 3-1
5")
IN
V.
IN
=4
.41 (U
D2 -12
PR. GRADE
EX. GRADE
BIORETENTION
15' RIP-RAP
TW ELEV=
456.10
10 YR. HGL
BIORETENTION #1 PONDING
ELEV.=455.00
STORM 41 TO 43 PROFILE
29.72' - 15"
RCP CL III
@ 2.52%
TO
P=
1.1
TO
P=
1.1
28.50' - 15" RCP CL III
@ 1.00%
+6
2.3 9=
2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1 ) W
/FI
LT
ER
A
IN
V.
OU
T=
6.1
4 (
-15
IN
V.
IN
=4
.00
(F
ILT
ER
RA
-43 -6"
+3
3.8 9=
2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1 ) W
/FI
LT
ER
A
IN
V.
OU
T=
5.7
5 (
-15
IN
V.
IN
=4
.85
(4 3-1
5")
IN
V.
IN
=4
.00 (F
ILT
ER
RA
-42
-6"
+0
4.1 7=
EN
D
SE
CT
IO
N
IN
V.
IN
=4
.00
(4 2-1
5")
PR. GRADE
EX. GRADE
COMPACTED STRUCTURAL
PER GEOTECH REPORT58' RIP-RAP
10 YR. HGL
TW ELEV=
446.00'
STORM 51 TO 53 PROFILE
18.00' - 15"
RCP CL III
@ 6.38%
28.50' - 15"
RCP CL III
@ 1.00%
TO
P=
6.4
TO
P=
6.4
+1
7.7 3=
EN
D
SE
CT
IO
N
IN
V.
IN
=4
.68
(5 2-1
5")
+3 5.7
3= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
) W
/FI
LT
ER
A
IN
V.
OU
T=
1.8 3 (
-15
IN
V.
IN
=4
.93 (5
3-1 5")
IN
V.
IN
=4
.38
(F
ILT
ER
RA
-52 -6"
+6 4.2
3= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
) W
/FI
LT
ER
A
IN
V.
OU
T=
2.2 2 (
-15
IN
V.
IN
=4
.38 (F
ILT
ER
RA
-53
-6"
PR. GRADE
EX. GRADE
104'
RIP-RAP
TW ELEV=
451.68 10 YR. HGL
STORM 61 TO 63 PROFILE
TO
P=
7.2
EX.
20.47' - 15"
RCP CL III
@ 0.50%
TO
P=
8.5
28.50' - 15" RCP CL III
@ 3.95%
TO
P=
8.5
+0
0=
EX
. E X.
GR
AT
E I
NL
ET
IN
V.
OU
T=
2.9 9 (
IN
V.
IN
=4
.09
(6 2-1
5")
IN
V.
IN
=4
.89 (-1
8")
+2 0.4
7= 2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
) W
/FI
LT
ER
A
IN
V.
OU
T=
3.1 9 (
-15
IN
V.
IN
=4
.29 (6
3-1 5")
IN
V.
IN
=4
.72
(F
ILT
ER
RA
-62 -6"
+4 8.9
7= 2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
) W
/FI
LT
ER
A
IN
V.
OU
T=
4.4 2 (
-15
IN
V.
IN
=4
.42 (F
ILT
ER
RA
-63
-6"
PR. GRADE
EX. GRADE
10 YR. HGL
TO
P=
8.1
RAISE EX.
STRUCTURE TOP
STORM 27 TO 29 PROFILE
TO
P=
7.2
TO
P=
7.2
+0
0=
EN
D
SE
CT
IO
N
IN
V.
IN
=4
.10 (2
8-1 5")
+5
5.1 1=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
7.8
7 (
-15
IN
V.
IN
=4
.61
(2 9-1
5")
+8 3.6
1= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
2.9 0 (
-15
IN
V.
IN
=4
.00 (2
9A -15
28.50' - 15"
RCP CL III
@ 1.02%
55.10' - 15" RCP CL III
@ 5.03%
PR. GRADE
EX. GRADE
8' RIP-RAP
TO
P=
2.3
29A
+0
9.6 2=
DR
OP
IN
LE
T (
TY
PE
P1
IN
V.
OU
T=
3.3 3 (
-15
26.01' - 15"
RCP CL III
@ 1.27%
TW ELEV=
456.10
10 YR. HGL
BIORETENTION #1 PONDING
ELEV.=455.00
ADD 6" OF PR. GRADE
TO BEHIND THE
GRATE TO HELP
PREVENT BYPASS
STORM 31 TO 31A PROFILE
TO
P=
3.4
+0
0= 2 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
6.6 3 (
-15
IN
V.
IN
=4
.95 (3
2-1 5")
IN
V.
IN
=4
.73
(3 1A
-15
+0
3.1 7=
DR
OP
IN
LE
T (
TY
PE
P1
IN
V.
OU
T=
7.7 5 (
-15
203.17' - 15" RCP CL III
@ 0.50%
PR. GRADE
EX. GRADE
TO
P=
1.1
31A
0.85' CONCRETE RISER
(TO BE REMOVED
DURING BID OPTION 1
CONSTRUCTION)
10 YR. HGL
C7-C8 PROFILE
C8
+4
9.8 1=
EN
D
SE
CT
IO
N
(18 ''-D
R3
IN
V.
OU
T=
9.9
3 ( C7
-18
39.81' - 18"
RCP CL III
@ 0.50%
PR. GRADE
EX. GRADE
+1
0=
EN
D
SE
CT
IO
N (18
''-D R3
IN
V.
IN
=4
.73 (C
8-1 8")
C7
9' RIP-RAP
HW ELEV=
451.71TW ELEV=
450.93
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
CU202
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
A
LA
BA
MA
\E
NG
IN
\P
LA
NS
\C U2
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
CDW 163RJP
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
STORM SEWER PROFILES-BASE BID
STORM 31 TO 31A PROFILE
+0
3.1 7=
DR
OP
IN
LE
T (
TY
PE
P1
)-A
DJ
US
T I
NL
ET
TO
N
EW
G
RA
DE
IN
V.
OU
T=
7.7
5 ( -15
203.17' - 15" RCP CL III
@ 0.50%
PR. GRADE
EX. GRADE
TO
P=
0.2
31A
TO BE CONSTRUCTED IN BASE BID
SEE CU202
0.85' CONCRETE RISER
TO BE REMOVED AND
INLET TO BE SET TO
NEW GRADE
COLUMBARIUM
GRADING
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
CU203
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
A
LA
BA
MA
\E
NG
IN
\P
LA
NS
\C U2
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
CDW 163RJP
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
STORM SEWER PROFILES-BID
OPTION 1
CULVERT 3-4 PROFILE
14' RIP-RAP
112.00' - 42" RCP CL III
@ 1.90%
C3
+0
0=
HE
AD
WA
LL
IN
V.
IN
=4
.69 (C
4-4 2")
+1
2=
HE
AD
WA
LL
IN
V.
OU
T=
2.8 2 (
C3 -42
+7
9=
" S
TO
RM
SE
WE
R
X-
IN
G
IN
V.=
2.4
PR. GRADE
EX. GRADE
STREAM 1
C4
HW ELEV=
467.34
TW ELEV=
463.49
CULVERT 5-6 PROFILE
8' RIP-RAP
127.00' - 15"
RCP CL III
@ 3.00%
C6C5
+0
0=
EN
D
SE
CT
IO
N
IN
V.
IN
=4
.35 (C
6-1 5")
+2
7=
EN
D
SE
CT
IO
N
IN
V.
OU
T=
4.1 6 (
C5 -15
COMPACTED STRUCTURAL
FILL PER GEOTECH REPORT
+8
5=
" S
TO
RM
SE
WE
R
X-
IN
G
IN
V.=
1.5
PR. GRADE
EX. GRADE
STREAM 2
STREAM 2 TW ELEV=
461.35
HW ELEV=
465.95
STORM 12-18 PROFILE
65.92' - 15" RCP CL III
@ 0.89%
91.77' - 15" RCP CL III
@ 1.66%
28.50' - 15" RCP CL III
@ 0.50%185.12' - 15" RCP CL III
@ 2.28%
183.44' - 15" RCP CL III
@ 0.57%
28.50' - 15" RCP CL III
@ 0.50%
TO
P=
2.4
TO
P=
1.6
TO
P=
0.1
TO
P=
0.1
TO
P=
7.2
TO
P=
4.4
TO
P=
4.4
+9
7=
" S
TO
RM
SE
WE
R
X-
IN
G
IN
V.=
2.8
+4
4=
" S
TO
RM
SE
WE
R
X-
IN
G
IN
V.=
2.1
+8
4.2 6=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
8.5
1 (
-15
+1
8.3 4=
MA
NH
OL
E
IN
V.
OU
T=
7.8
2 (
-15
IN
V.
IN
=4
.92
(1 8-1
5")
+2
6.5 7=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
6.2
0 (
-15
IN
V.
IN
=4
.30
(1 7-1
5")
+9
8.0 7=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
5.9
6 (
-15
IN
V.
IN
=4
.06
(1 6-1
5")
+1
2.9 4=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
1.6
5 (
-15
IN
V.
IN
=4
.75
(1 5-1
5")
+2
9.5 0=
1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
OU
T=
0.5
1 (
-15
IN
V.
IN
=4
.61
(1 4-1
5")
+0
1= 1 W
IN
G
CU
RB
IN
LE
T (
TY
PE
S1
IN
V.
IN
=4
.37 (1
3-1 5")
PR. GRADE
EX. GRADE
2'
COVER
1.9'
COVER
COMPACTED STRUCTURAL
PER GEOTECH REPORT
COMPACTED STRUCTURAL
PER GEOTECH REPORT
GRAPHICAL SCALE: 1"=50'
50 25 0 50 100 150
VERTICAL SCALE: 1"=5'
0 2.5 5 10 15
CU204
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
A
LA
BA
MA
\E
NG
IN
\P
LA
NS
\C U2
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
CDW 163RJP
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
STORM SEWER PROFILES-BID
OPTION 3
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
A
LA
BA
MA
\E
NG
IN
\P
LA
NS
\C U2
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
CDW 163RJP
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456 NOT FOR
CONSTRUCTION
STORM SEWER
COMPUTATIONS-BASE BID
NOTES:
1. STONE QUALITY FOR RIP-RAP SHALL CONSIST OF FIELDSTONE OR ROUGH UNHEWN QUARRY STONE. THE STONE SHALL BE HARD, OF AN ANGULAR END AND OF
A QUALITY THAT WILL NOT DISINTEGRATE ON EXPOSURE TO WATER OR WEATHERING. RECYCLED CONCRETE MAY BE USED PROVIDED IT HAS A DENSITY OF AT LEAST 150 POUNDS PER CUBIC FOOT AND DOES NOT HAVE ANY EXPOSED STEEL OR REINFORCING BARS.
2. IN ALL CASES, FILTER FABRIC SHALL BE PLACED BETWEEN THE RIP-RAP AND THE UNDERLYING SOIL TO PROTECT SOIL MOVEMENT INTO, THROUGH, AND UNDERNEATH THE RIP-RAP.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .