This is a set of bid documents for the Alabama National Cemetery Gravesite Expansion Phase 3 project located in Montevallo, Alabama, prepared by the U.S. Department of Veterans Affairs, Office of Design and Construction Service. The project number is 927CM3003, issued October 25, 2024, with the Architect/Engineer of Record being Integrity Federal Services–The LA Group Joint Venture, LLC. The documents include irrigation system details, structural foundation plans, columbarium details, and electrical/technology infrastructure specifications. Key design consultants include Modjeski and Masters (structural), Aqua Engineering (irrigation), and Above Group (technology).
The bid documents specify detailed design and construction requirements across multiple disciplines. For irrigation, the contract requires installation of isolation gate valves, air vacuum relief valve assemblies, quick coupling valves, pop-up and rotor sprinkler assemblies, and PVC-to-HDPE transition couplings using Victaulic Aquamine Series 2971 transition couplings with calibrated torque wrench installation. Structural work includes columbarium foundation systems with concrete wall footings (6'-6" x 1'-6" with #6 reinforcement at 12" O.C.), double-sided columbarium units with limestone caps, precast niche units, and concrete piers with stainless steel stone anchors. Electrical/technology scope encompasses telecommunications infrastructure upgrades in the Administration and Maintenance Buildings, including wall-mounted 48"H x 24"W x 30"D cabinets (Chatsworth Cube-It basis of design), fiber optic patch panels, network switches, UPS systems, and structured cabling (CAT6A copper with 800-foot allowance per building). Additional requirements include panelboard modifications, circuit breaker installations, grounding systems per TIA-607B standards, and GNSS base station placement with radio survey coordination.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : O
:\IF
S\
AL
AB
AM
A-
PH
3\P
-A
LA
BA
MA
3.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
JDL 163CCT
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
BID DOCUMENTS
Ce rt i f ie d Irr igat ion Designer
46102
JO
HN D. LEONARD
I RR
I G A T I O N A S SOC I AT I O
N
2024-10-23
1 ISOLATION GATE VALVE
ASSEMBLY N.T.S. 2 AIR VACUUM RELIEF VALVE
ASSEMBLY N.T.S. 3 QUICK COUPLING VALVE
ASSEMBLY N.T.S.
4 JOINT RESTRAINT
ASSEMBLY N.T.S. 5 ROTOR SPRINKLER
ASSEMBLY N.T.S. 6 ROTOR SPRINKLER IN IRRIGATION AISLE
ASSEMBLY N.T.S.
A
B
C
D
E
F
G H
I
J
A. JUMBO VALVE BOX WITH EXTENSION AND
COVER (HEIGHT AS REQUIRED)
B. FINISH GRADE/TOP OF MULCH
C. AIR VACUUM RELIEF VALVE
D. PVC SCH 80 NIPPLE (LENGTH AS REQUIRED)
E. PVC SCH 40 BALL VALVE (SIZE 2")
F. PVC SCH 80 NIPPLE (LENGTH AS REQUIRED)
G. 3" MINIMUM DEPTH OF 3/4" WASHED GRAVEL
H. BRICK (1 OF 4)
I. PVC MAINLINE PIPE
J. TEE OR EL: SEE SPECIFICATIONS FOR
MATERIALS
K. TRACING WIRE
NOTES:
1. OPEN BALL VALVE IN ASSEMBLY 1/4 TURN UNTIL IRRIGATION SYSTEM IS FULLY CHARGED WITH WATER.
2. CLOSE VALVE DURING WINTERIZATION AND OPEN 1/2 TURN AFTER WINTERIZATION OF SYSTEM TO
PROTECT VALVE DURING FREEZING WEATHER.
3. REPLACE PVC BALL VALVE WITH BRASS BALL VALVE IN THE EVENT AN AIR VACUUM RELIEF VALVE WITH
MALE INLET IS USED.
K
IRRIGATION DETAILS 1
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : O
:\IF
S\
AL
AB
AM
A-
PH
3\P
-A
LA
BA
MA
3.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
JDL 163CCT
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
BID DOCUMENTS
Ce rt i f ie d Irr igat ion Designer
46102
JO
HN D. LEONARD
I RR
I G A T I O N A S SOC I AT I O
N
2024-10-23
2 POP-UP SPRAY SWING JOINT
ASSEMBLY N.T.S.
3 REMOTE CONTROL VALVE MANIFOLD
DETAIL N.T.S.
IRRIGATION DETAILS 2
1 PVC TO HDPE TRANSITION
DETAIL N.T.S.
HDPE PIPEPVC PIPE
VICTAULIC AQUAMINE SEREIS 2971
TRANSITION COUPLING. INSTALL
PER MANUFACTURERS
RECOMMENDATIONS, CONTRACTOR
MUST USE CALIBRATED TORQUE
WRENCH.
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : O
:\IF
S\
AL
AB
AM
A-
PH
3\P
-A
LA
BA
MA
3.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
JDL 163CCT
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
BID DOCUMENTS
Ce rt i f ie d Irr igat ion Designer
46102
JO
HN D. LEONARD
I RR
I G A T I O N A S SOC I AT I O
N
2024-10-23
1 IRRIGATION CONTROLLER
DETAIL N.T.S.
IRRIGATION DETAILS 3
3 SPRINKLER PLACEMENT
ASSEMBLY N.T.S.
52" MIN.
IRRIGATION
AISLE BOUNDARY
8"
4'
2 IRRIGATION CONTROLLER GROUNDING
DETAIL N.T.S.
AB ANCHOR BOLT
ABV ABOVE
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT, ADJUSTMENT
A/E ARCHITECT/ENGINEER
AESS ARCHITECTURALLY EXPOSED STRUCTURAL STEEL
AFF ABOVE FINISHED FLOOR
AGG AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALT ALTERNATE
ANCH ANCHOR
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APA ENGINEERED WOOD ASSOCIATION
APRX APPROXIMATE
AR ANCHOR ROD
ARCH ARCHITECT(URAL)
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASD ALLOWABLE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWC AMERICAN WOOD COUNCIL
AWPA AMERICAN WOOD PROTECTION AGENCY
AWS AMERICAN WELDING SOCIETY
AVG AVERAGE
B BOTTOM
B/ BOTTOM OF
B-B BACK-TO-BACK
BAL BALANCE
BEL BELOW
BF BRACED FRAME
BLDG BUILDING
BLK(G) BLOCK(ING)
BM BEAM
BOT BOTTOM
BP BASE PLATE, BEARING PLATE
BR BRACE(ING)
BRDG BRIDGING
BRG BEARING
BRK BRICK
BRKT BRACKET
BS BOTH SIDES
BSMT BASEMENT
BT BENT
BTWN BETWEEN
BYD BEYOND
C STEEL CHANNEL
CAIS CAISSON
CALC CALCULATION
CANT CANTILEVER
CAP CAPACITY
C-C CENTER-TO-CENTER
CE CONCRETE ENCASED
CFM COLD FORMED METAL
CHAM CHAMFER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL/CONTRACTION JOINT
CL CENTERLINE, COLUMN LINE
CLG CEILING
CLR CLEAR
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMB COMBINED
COMP COMPOSITE
CONC CONCRETE
COND CONDITION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
COV COVER
CP CAP PLATE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CSK COUNTERSUNK
CTR CENTER(ED)
CY CUBIC YARD
CYL CYLINDER
d PENNY (AS IN NAIL, Id)
DBL DOUBLE
DD DESIGN DEVELOPMENT
DEF DEFLECTION
DEG DEGREE
DEMO DEMOLITION/DEMOLISH
DEPR DEPRESS(ED)/DEPRESSION
DET(S) DETAIL(S)
DEV DEVELOP/DEVELOPMENT
DIA DIAMETER
DIAG DIAGONAL
DIM(S) DIMENSION(S)
DIR DIRECTION
DK DECK
DL DEAD LOAD
DN DOWN
do DITTO
DP DEEP
DWG(S) DRAWING(S)
DWL DOWEL
(E) EXISTING
E EAST
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMBED EMBEDMENT/EMBEDDED
ENGR ENGINEER
EO EDGE OF
EOD EDGE OF DECK
EOM EDGE OF MASONRY
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
STRUCTURAL ABBREVIATIONS
ES EACH SIDE
EXCAV EXCAVATE/EXCAVATION
EXP EXPANSION
EXT EXTERIOR
EXIST EXISTING
EW EACH WAY
F/ FACE OF
FAB FABRICATE
FB FLAT BAR
FBO FURNISHED BY OTHERS
FDN FOUNDATION
FFE FINISHED FLOOR ELEVATION
FIN FINISH(ED)
FL(R) FLOOR
FLG FLANGE
FND FOUNDATION
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIREPROOFING
FRMG FRAMING
FRP FIBER-REINFORCED POLYMER
FRT FIRE RETARDANT TREATED
FS FAR SIDE
FT FEET
FTG FOOTING
FUT FUTURE
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZE(D)
GB GRADE BEAM
GC GENERAL CONTRACTOR
GLB GLUE LAMINATED BEAM
GR GRADE
GYP GYPSUM
HD HEAVY DUTY
HDR HEADER
HEF HORIZONTAL EACH FACE
HGR HANGER
HI HIGH
HIF HORIZONTAL INSIDE FACE
HK HOOK(ED)
HOF HORIZONTAL OUTSIDE FACE
HORIZ HORIZONTAL
HP HIGH POINT
HS HIGH STRENGTH
HT HEIGHT
H&V HORIZONTAL & VERTICAL
HVAC HEATING, VENTILATING & AIR CONDITIONING
IBC INTERNATIONAL BUILDING COUNCIL
ICC INTERNATIONAL CODE COUNCIL
ID INSIDE DIAMETER
IF INSIDE FACE
IFC ISSUE FOR CONSTRUCTION
IN INCH
INCL INCLUDE(D)(ING)
INFO INFORMATION
INSTL INSTALL/INSTALLATION
INSUL INSULATION
INT INTERIOR
INV INVERT(ED)
JST(S) JOIST(S)
JT JOINT
k KIP (THOUSAND POUNDS)
KB KNEE BRACE
KSI KIPS PER SQUARE INCH
LB, # POUND
LDGR LEDGER (BOARD)
LEN LENGTH
LG LONG
LL LIVE LOAD
LLBB LONG LEGS BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOCN LOCATION
LONGIT LONGITUDINAL
LP LOW POINT
LRFD LOAD AND RESISTANCE FACTOR DESIGN
LSL LONG SLOTTED HOLE,
LAMINATED STRAND LUMBER
LVL LAMINATED VENEER LUMBER
LW LONG WAY
LWC LIGHT WEIGHT CONCRETE
M MOMENT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL & PLUMBING
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MONO MONOLITHIC
MPH MILES PER HOUR
MTL METAL
NA NOT APPLICABLE
NDS NATIONAL DESIGN SPECIFICATION FOR WOOD
CONSTRUCTION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
O-O OUT-TO-OUT
OPG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
OSL OUTSTANDING LEG,
ORIENTED STRAND LUMBER
OVS OVERSIZED HOLE
PAF POWDER ACTUATED FASTENER
PC PRECAST CONCRETE, PIECE
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERP PERPENDICULAR
PREFAB PREFABRICATE(D)
PL PLATE
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PMF PREMOLDED FILLER
PROJ PROJECT(ION)
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT PRESERVATIVE-TREATED,
POST-TENSIONED
PVC POLYVINYL CHLORIDE
QTY QUANTITY
R RADIUS
RCMU REINFORCED CONCRETE MASONRY UNIT
RCSC RESEARCH COUNCIL ON STRUCTURAL
CONNECTIONS
RD ROOF DRAIN
RDK ROOF DECK
REF REFERENCE
REINF REINFORCE(D)/REINFORCEMENT
REQ(D) REQUIRE(D)
RET RETAINING
REV REVISE(D)/REVISION
RO ROUGH OPENING
RQMT(S) REQUIREMENT(S)
RTU ROOFTOP UNIT
RXN REACTION
SAN SANITARY
SC SLIP-CRITICAL (CONNECTION)
SCHED SCHEDULE
SECT SECTION
SD STORM DRAIN
SDI STEEL DECK INSTITUTE
SF SQUARE FOOT
SHRG SHORING
SHTHG SHEATHING
SIM SIMILAR
SL SLOPE(D)
SLBB SHORT LEGS BACK TO BACK
SLV SLEEVE
SOD SLAB ON DECK
SOG SLAB ON GRADE
SPA SPACE(S)/SPACING
SPEC(S) SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
SSL SHORT SLOTTED HOLE
STD STANDARD
STIFF STIFFENER
STIR STIRRUP
STL STEEL
STRUC STRUCTURAL
SUPT SUPPORT
SW SHORT WAY, SHEAR WALL
SYM SYMMETRICAL
T TOP
T/ TOP OF
T&B TOP AND BOTTOM
TB TRUSS BEARING
TC TERRA COTTA
TEMP TEMPORARY,TEMPERATURE
T&G TONGUE AND GROOVE
THD THREAD(ED)
THK THICK(NESS)
TMS THE MASONRY SOCIETY
TOS TOP OF SLAB
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
U-P UNDERPINNING
V SHEAR
VAR VARIES
VB VAPOR BARRIER
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERTICAL INSIDE FACE,
VERIFY IN FIELD
VOF VERTICAL OUTSIDE FACE
VR VAPOR RETARDER
W/ WITH
W/O WITHOUT
WD WOOD
WI WROUGHT IRON
WP WORK POINT, WATERPROOFING
WT WEIGHT
WWF WELDED WIRE FABRIC
XS EXTRA STRONG
XXS DOUBLE EXTRA STRONG
∅ DIAMETER
± PLUS OR MINUS
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
FOUNDATIONS:
1. FOUNDATIONS ARE DESIGNED FOR A BEARING PRESSURE OF 1500
PSF TO BE FOUNDED ON NATURAL SOIL OR STRUCTURAL
COMPACTED FILL BASED ON A SUBSURFACE EXPLORATION
PROGRAM CONDUCTED BY ECS SOUTHEAST, LLC JOB NUMBER
30:2402-A IN REPORT DATED APRIL 30, 2024.
2. CONTRACTOR SHALL NOTIFY THE GEOTECHNICAL ENGINEER FOR
INSPECTION BEFORE PLACING ANY FOOTINGS. GEOTECHNICAL
ENGINEER SHALL INSPECT AND REPORT ON ADEQUACY OF BEARING
MATERIAL.
3. FOOTINGS SHOULD BE CAST ON THE SAME DAY IN WHICH
EXCAVATION FOR THEM IS COMPLETED. IF PLACING OF CONCRETE IS
DELAYED, FOOTING BOTTOM SHALL BE TRIMMED TO FIRM MATERIAL
IMMEDIATELY BEFORE CASTING.
4. PLACE CONCRETE IN DRY EXCAVATIONS ONLY. NOTE SOIL AND
WATER CONDITIONS AS SHOWN BY BORINGS AND DEPTHS OF
FOOTINGS AS SHOWN ON FOUNDATION PLANS. PENDING APPROVAL
BY THE COR, CONTRACTOR MAY ELECT TO CONDUCT FURTHER
SUBSURFACE INVESTIGATIONS AT THEIR OWN EXPENSE.
5. LABELS:
A. ELEVATION OF TOP OF FOOTING UNLESS NOTED OTHERWISE
SHALL BE -3'-6" BELOW GRADE.
B. MARK OF FOOTINGS GIVEN ON PLANS, REFER TO SCHEDULE FOR
SIZE AND REINFORCEMENT.
6. FOOTINGS SHALL BE FORMED UNLESS OTHERWISE PERMITTED BY
THE ENGINEER.
7. PROVIDE CONTINUOUS KEYWAY AND DOWELS IN TOP OF WALL
FOOTING SUPPORTING CONCRETE WALLS.
8. REFER TO SPECIFICATIONS AND ARCHITECTURAL DRAWINGS FOR
WATERPROOFING DETAILS AND PROCEDURES. PROVIDE WATER
STOP AT ALL JOINTS BELOW GRADE.
9. BACKFILLING:
A. BEFORE BACKFILLING WALLS, GROUT AND/OR CONCRETE SHALL
HAVE ATTAINED DESIGN STRENGTH, AND ALL SLABS AND BEAMS
THAT ARE NECESSARY FOR THE STABILITY OF THE WALLS SHALL
BE IN PLACE.
B. BACKFILL SHALL BE CARRIED UP EVENLY ON BOTH SIDES OF
WALL TO LOWER GRADE.
C. BACKFILL SHALL BE PLACED IN MAXIMUM OF 8" LOOSE LIFT
THICKNESS AND COMPACTED TO INFILL 98% OF STANDARD
PROCTOR.
D. TESTS SHALL BE PERFORMED FOR EACH LIFT AT A RATE OF TWO
TESTS PER LIFT MINIMUM AND NOT LESS THAN ONE TEST PER 100'
OF WALL LENGTH.
10. STRUCTURAL FILL INCLUDING UNDER FOOTINGS:
A. SHALL BE PLACED IN MAXIMUM OF 8" LOOSE LIFT THICKNESS AND
COMPACTED TO 98% OF STANDARD PROCTOR.
B. ON-SITE OR IMPORTED GRANULAR FILLS INCLUDING GW, GP, GM,
SW, SP, ND, SM CLASSIFIED IN ACCORDANCE WITH THE UNIFIED
SOIL CLASSIFICATION SYSTEM (USCS) AND WITHIN 2% OF
OPTIMUM MOISTURE. FURTHERMORE, THE MATERIAL TO BE
UTILIZED AS STRUCTURAL FILL SHOULD HAVE A PLASTICITY INDEX
(PI) LESS THAN 2, SUBJECT TO FINAL APPROVAL BY THE
GEOTECHNICAL ENGINEER.
11. FILL UNDER SLABS ON GRADE SHALL BE COMPACTED TO 98% OF
STANDARD PROCTOR DENSITY. TESTS SHALL BE PERFORMED FOR
EACH LIFT.
GENERAL:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR MEANS AND METHODS
DURING THE COURSE OF THE WORK. DO NOT DAMAGE OR
ENDANGER THE STRUCTURAL INTEGRITY OF THE WORK.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER AND SAFE
DESIGN OF SHORING SYSTEMS FOR TRENCHES AND EXCAVATIONS.
3. NOTIFY COR IN CASE OF DISCREPANCIES BETWEEN DRAWINGS,
THESE NOTES, AND PROJECT MANUAL BEFORE PROCEEDING WITH
THE WORK.
4. USE ARCHITECTURAL DRAWINGS AND DRAWINGS OF OTHER TRADES
IN CONJUNCTION WITH THE STRUCTURAL DRAWINGS TO PROPERLY
PERFORM THE WORK.
5. IF CONDITIONS DISCLOSED DURING EXCAVATION REVEAL
UNFORESEEN CONDITIONS, PROMPTLY REQUEST DIRECTION FROM
COR BEFORE PROCEEDING.
6. CONTRACTOR IS RESPONSIBLE FOR COORDINATING BETWEEN
TRADES.
7. DO NOT SCALE DRAWINGS.
8. SECTIONS AND DETAILS SHOWN, WHILE DRAWN FOR SPECIFIC
LOCATIONS, ARE INTENDED TO ESTABLISH THE GENERAL TYPES OF
DETAILS WILL APPLY TO OTHER LOCATIONS.
9. THE ENGINEER'S REVIEW OF A SUBMITTAL SHALL NOT RELIEVE THE
CONTRACTOR OF THEIR RESPONSIBILITY TO FOLLOW THE INTENT OF
THE CONTRACT DRAWINGS.
10. REPRODUCTION OF CONTRACT DOCUMENTS WILL NOT BE ACCEPTED
AS SHOP DRAWINGS.
GENERAL NOTES
DELEGATED DESIGN ITEMS:
1. EMPLOY OR RETAIN A LICENSED PROFESSIONAL ENGINEER IN THE
PROJECT JURISDICTION TO DESIGN AND DETAIL THE FOLLOWING
PERFORMANCE SPECIFIED STRUCTURAL COMPONENTS:
A. PRECAST COLUMBARIUM UNITS
2. SEE INDIVIDUAL MATERIAL SECTIONS FOR ADDITIONAL
REQUIREMENTS.
3. SHOP DRAWINGS AND CALCULATIONS SHALL BE SIGNED AND SEALED
BY A PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL
JURISDICTION AND SUBMITTED FOR REVIEW.
CONCRETE:
1. CONCRETE NOT OTHERWISE SPECIFIED SHALL BE f'c=3000 PSI
NORMAL WEIGHT CONCRETE. ALL CONCRETE EXPOSED TO THE
WEATHER SHALL BE f'c=5000 PSI MINIMUM AND SHALL BE AIR
ENTRAINED FOR EXPOSURE CLASS F2 PER ACI 318 "BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE".
2. ALL REINFORCING STEEL SHALL BE CONFORMING TO ASTM
DESIGNATION A615, GRADE 60. ALL REINFORCING STEEL SHALL BE
DETAILED, FABRICATED AND PLACED IN ACCORDANCE WITH ACI
SP-66, "ACI DETAILING MANUAL".
3. ALL SPLICES IN REINFORCING SHALL BE CLASS "B" SPLICES IN
ACCORDANCE WITH ACI 318, "BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE" EXCEPT AS OTHERWISE NOTED.
4. UNLESS OTHERWISE NOTED ON STRUCTURAL DRAWINGS, PROVIDE
CONCRETE PROTECTION FOR REINFORCING AS FOLLOWS:
A. CAST AGAINST EARTH = 3"
B. EXPOSED TO EARTH OR WEATHER:
1. NO. 6 AND LARGER BARS = 2"
2. NO. 5 AND SMALLER BARS = 1 1/2"
C. NOT EXPOSED TO EARTH OR WEATHER:
1. SLABS AND WALLS = 3/4"
2. BEAMS AND COLUMNS = 1 1/2" TO TIES, STIRRUPS OR SPIRALS
5. CONSTRUCTION JOINTS SHALL HAVE THE SURFACE OF THE FIRST
POUR ROUGHENED TO 1/4" AMPLITUDE, UNLESS OTHERWISE NOTED.
6. THE CONTRACTOR MUST SUBMIT A CONCRETE DESIGN MIX IN
ACCORDANCE WITH ACI 318. SUCH DESIGN MIX SHALL BE
ACCOMPANIED BY THE APPROPRIATE GRAPHS AND BACKGROUND
DATA. CONCRETE DESIGN MIX SHALL INDICATE 7 AND 28 DAY
STRENGTHS, CEMENT CONTENT, WATER-CEMENT RATIO, FINE AND
COARSE AGGREGATES AND ADMIXTURES FOR EACH DESIGN
STRENGTH. THE ADDITION OF WATER AT THE PLANT OR IN THE FIELD
GREATER THAN THE SPECIFIED WATER CONTENT IS STRICTLY
PROHIBITED.
7. ALL CONCRETE WORK SHALL CONFORM TO THE LATEST LOCAL
APPROVED EDITIONS OF THE FOLLOWING ACI AND ASTM
DOCUMENTS:
A. ACI-301 SPECIFICATIONS FOR STRUCTURAL CONCRETE
B. ACI-318 CODE
C. ACI-214 COMPRESSIVE TEST
D. ACI-306 COLD WEATHER
E. ACI SP-66 DETAILING
F. ACI-347 FORMWORK
G. ACI-305 HOT WEATHER
H. ACI-211 PROPORTIONS OF CONCRETE
I. ACI-304 PLACING CONCRETE
J. ASTM C-94 READY-MIX CONCRETE
8. ALL FIELD AND LAB TESTING OF CONCRETE SHALL CONFORM TO THE
LATEST LOCAL APPROVED EDITIONS OF ASTM:
A. ASTM C-31 FIELD CYLINDER SPECIMENS
B. ASTM C-143 SLUMP TEST
C. ASTM C-231 AIR CONTENT (WHEN REQUIRED)
D. ASTM C-39 LAB TESTING CYLINDERS
E. ASTM C-172 SAMPLING FRESH CONCRETE
F. ASTM C-42 HARDENED CORES (WHEN REQUIRED)
TEST RESULTS SHALL BE SIGNED AND SEALED BY A
PROFESSIONAL ENGINEER REGISTERED IN THE LOCAL
JURISDICTION.
9. ALL FORMWORK SHALL BE IN ACCORDANCE WITH ACI 347, "GUIDE TO
FORMWORK FOR CONCRETE".
DESIGN CODES:
NATIONAL CEMETERY ADMINISTRATION DESIGN GUIDE:
FEB 1, 2024
VA DESIGN MANUAL STRUCTURAL:
PG-18-10 (OCTOBER 1, 2022 REV JULY 1, 2023)
VA SEISMIC DESIGN REQUIREMENTS:
H18-8 (JULY 1, 2023)
INTERNATIONAL BUILDING CODE:
IBC 2021
MINIMUM BUILDING DESIGN LOADS AND ASSOCIATED CRITERIA FOR
BUILDINGS AND OTHER STRUCTURES:
ASCE 7-22
BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE:
ACI 318-19
BUILDING CODE AND SPECIFICATION FOR MASONRY STRUCTURES:
TMS 402/602-16
DESIGN LOADS:
RISK CATEGORY II
ROOF LOADS:
GROUND SNOW LOAD, pg = 17 PSF (12 PSF ASD) FLAT ROOF SNOW LOAD, pf = 15 PSF (10 PSF ASD) MINIMUM ROOF SNOW LOAD pm= 17 PSF (12 PSF ASD) SNOW EXPOSURE FACTOR, Ce = 1.0 THERMAL FACTOR, Ct = 1.2
RAIN INTENSITY, 3.51 IN/HR
LATERAL FORCE-RESISTING SYSTEMS:
GROUND SUPPORTED CANTILEVERED CONCRETE WALLS, R=1.25
SEISMIC DESIGN DATA:
EQUIVALENT LATERAL FORCE PROCEDURE
SOIL SITE CLASS D
SEISMIC DESIGN CATEGORY B
SEISMIC IMPORTANCE FACTOR, Ie = 1.0
MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS:
Ss = 0.31g S1 = 0.11g
DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS:
Sds = 0.24g Sd1 = 0.15g
WIND LOADS:
DESIGN WIND SPEED:
Vult = 107 MPH (3 SECOND GUST)
WIND EXPOSURE B
INTERNAL PRESSURE COEFFICIENT, GCpi = +/-0.18
CONCRETE REBAR MINIMUM SPLICE
LENGTH TABLE (CLASS B)
BAR SIZE
#4 28" 22"
TOP (INCHES) OTHER (INCHES)
#5 41" 32"
#6 56" 43"
#7 90" 69"
#8 112" 86"
#9 134" 103"
NOTE:
1. BASED ON 3,000 PSI NW CONCRETE AND #5 OR SMALLER
GRADE 60 UNCOATED OR GALVANIZED REINFORCING BAR
WITH 3/4" MINIMUM COVER
2. "TOP" ARE HORIZONTAL BARS LOCATED WHERE MORE THAN
12" OF FRESH CONCRETE IS CAST IN MEMBER BELOW THE
BARS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Integrity Federal Services
(304) 725-8456
Integrity Federal Services - The LA Group Joint Venture, LLC
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
Modjeski and Masters
(717) 790-9565
The LA Group
(518) 587-8100
Above Group
(321) 345-9026
Aqua Engineering
(970) 372-6104
A u to d e s k D o c s /0
A la b a m a N a ti o n a l C e m e te ry /0
A la b a m a N a ti o n a l C e m e te ry R
S .r v t
/2 /2
:0
:2
A M
S-001
STRUCTURAL GENERAL NOTES
AND ABBREVIATIONS
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 RAS SLS
BID DOCUMENTS
SHEET LIST
Sheet Number Sheet Name
S-001 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS
SS101 COLUMBARIUM FOUNDATION PLAN
SS102 COLUMBARIUM FOUNDATION PLAN - BID OPTION
S-301 COLUMBARIUM DETAILS AND SECTIONS
Revisions Date Dwg. 155 of 163
2 2
W F
W F
W F
W F
W F
S-301
S-301
TYP.
TYP.
6' - 6"
S-301
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Integrity Federal Services
(304) 725-8456
Integrity Federal Services - The LA Group Joint Venture, LLC
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
Modjeski and Masters
(717) 790-9565
The LA Group
(518) 587-8100
Above Group
(321) 345-9026
Aqua Engineering
(970) 372-6104
A u to d e s k D o c s /0
A la b a m a N a ti o n a l C e m e te ry /0
A la b a m a N a ti o n a l C e m e te ry R
S .r v t
/2 /2
:0
:2
A M
SS101
COLUMBARIUM FOUNDATION
PLAN
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 RAS SLS
BID DOCUMENTS
CODED NOTES:
DOUBLE SIDED COLUMBARIUM UNITS, REFER TO SECTIONS CUT ON PLAN.
METAL BENCH, REFER TO CIVIL DRAWINGS.
DRAWING NOTES:
1. REFER TO CIVIL DRAWINGS FOR DIMENSIONS AND FURTHER DETAILS.
N 0 4' 8' 16' 24'
1/8" = 1'-0"
CONCRETE WALL FOOTING SCHEDULE
Mark Size Reinforcement
WF1 6'-6" x 1'-6" 6 #6 TOP & BOTTOM LONGITUDINAL, #6 AT
12" O.C. TOP & BOTTOM TRANSVERSE
1/8" = 1'-0"1
COLUMBARIUM B FOUNDATION PLAN
Dwg. 156 of 163
W F
W F
1W F
W F
S-301
S-301
TYP.
TYP.
6' - 6"
BID OPTION
S-301
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Integrity Federal Services
(304) 725-8456
Integrity Federal Services - The LA Group Joint Venture, LLC
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
Modjeski and Masters
(717) 790-9565
The LA Group
(518) 587-8100
Above Group
(321) 345-9026
Aqua Engineering
(970) 372-6104
A u to d e s k D o c s /0
A la b a m a N a ti o n a l C e m e te ry /0
A la b a m a N a ti o n a l C e m e te ry R
S .r v t
/2 /2
:0
:2
A M
SS102
COLUMBARIUM FOUNDATION
PLAN - BID OPTION
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 RAS SLS
BID DOCUMENTS
CODED NOTES:
DOUBLE SIDED COLUMBARIUM UNITS, REFER TO SECTIONS CUT ON PLAN.
METAL BENCH, REFER TO CIVIL DRAWINGS.
DRAWING NOTES:
1. REFER TO CIVIL DRAWINGS FOR DIMENSIONS AND FURTHER DETAILS.
N 0 4' 8' 16' 24'
1/8" = 1'-0"
CONCRETE WALL FOOTING SCHEDULE
Mark Size Reinforcement
WF1 6'-6" x 1'-6" 6 #6 TOP & BOTTOM LONGITUDINAL, #6 AT
12" O.C. TOP & BOTTOM TRANSVERSE
1/8" = 1'-0"
COLUMBARIUM B FOUNDATION PLAN - BID OPTION
Dwg. 157 of 163
3" C
LE
A
R
3" CLEAR
1' - 7" MIN. 3' - 4" 1' - 7" MIN.
6' - 6"
7'
/8
3'
M
IN
#6 AT 8" O.C.
#6 AT 8" O.C., LAP WITH PIER
HORIZONTAL BARS
LIMESTONE CAP
PRECAST COLUMBARIUM UNIT
CONCRETE WALL FOOTING,
REFER TO PLAN AND/OR
SCHEDULE
CONCRETE WALL
EXTERIOR SIDEWALK,
REFER TO CIVIL DRAWINGS
4" M
IN
, 8
M
A X
V A
R
IE
S , R
E F
E R
T O
C
IV
IL
D
R A
W
IN
G S
1'
4"
2" CLEAR
NOTE: REFER TO CI DRAWINGS FOR FURTHER DIMENSIONS AND DETAILS.
3" C
LE
A
R
3" CLEAR
1' - 0" MIN. 4' - 6" 1' - 0" MIN.
6' - 6"
3'
M
IN
#6 AT 8" O.C.
#6 AT 8" O.C.
LIMESTONE CAP
CONCRETE WALL FOOTING,
REFER TO PLAN AND/OR
SCHEDULE
CONCRETE WALL
EXTERIOR SIDEWALK,
REFER TO CIVIL DRAWINGS
#5 AT 8" O.C.
#5 AT 8" O.C.
LIMESTONE VENEER
10" 2' - 10" 10"
TOP OF PIER
VARIES, MATCH TOP OF ADJACENT PRECAST NICHE UNITS
TOP OF FOUNDATION
VARIES, REFER TO CIVIL DRAWINGS
CONCRETE PIER
3" CLEAR
NOTES:
REFER TO CI DRAWINGS FOR FURTHER DIMENSIONS AND DETAILS.
ALL STEEL TO BE STAINLESS 316.
2" 3"
4"
1"
STONE ANCHORS, HB-433 BASIS OF DESIGN, 1/4" THICK AND 3"
LONG SPACED AT 16" O.C. MAX HORIZ & VERT, ATTACH TO
CONCRETE WITH 1/4" DIA. x 3" LONG SIMPSON TITEN HD
SCREWS WITH COUNTERSUNK HEAD AND TO STONE WITH 3/8"
DIA. x 1" LONG PIN, REFER TO CI DRAWINGS FOR LOCATIONS
1" 4" 1"
6"
1/4" THICK AND 6" LONG RECESSED PLATE, ATTACH TO CONCRETE
WITH (2) 1/2" DIA. x 4" LONG HEADED STUDS, LOCATED 4" MIN. FROM
EDGE OF CONCRETE
1/4" THICK AND CONTINUOUS RECESSED PLATE, ATTACH TO
CONCRETE WITH (3) 1/2" DIA. x 4" LONG HEADED STUDS, SPACED
4" O.C. MIN. AND LOCATED 4" MIN. FROM EDGE OF CONCRETE
6" STONE ANCHORS, HB-452 BASIS OF DESIGN (NO ADDITIONAL
HOLE), 1/4" THICK AND 2" WIDE, ATTACH TO STONE WITH 3/8"
DIA. x 1" LONG PIN, REFER TO CI DRAWINGS FOR LOCATIONS
1"
6"1"
3/16"
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Integrity Federal Services
(304) 725-8456
Integrity Federal Services - The LA Group Joint Venture, LLC
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
Modjeski and Masters
(717) 790-9565
The LA Group
(518) 587-8100
Above Group
(321) 345-9026
Aqua Engineering
(970) 372-6104
A u to d e s k D o c s /0
A la b a m a N a ti o n a l C e m e te ry /0
A la b a m a N a ti o n a l C e m e te ry R
S .r v t
/2 /2
:0
:2
A M
S-301
COLUMBARIUM DETAILS AND
SECTIONS
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 RAS SLS
BID DOCUMENTS
N.T.S.
DOUBLE SIDED COLUMBARIUM WALL DETAIL
2 N.T.S.
DOUBLE SIDED COLUMBARIUM WALL PIER DETAIL
Dwg. 158 of 163
NEW (HEAVY, SOLID LINE)
EXISTING TO REMAIN (LIGHT, SOLID LINE)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
RECEPTACLE, DUPLEX
RECEPTACLE, DOUBLE DUPLEX (QUADRAPLEX)
RECEPTACLE, SPECIAL PURPOSE, SEE CODED NOTES ON FLOOR PLANS FOR
NEMA CONFIGURATION AND WIRING REQUIREMENTS
ELECTRICAL SYMBOLS - POWER/LIGHTING PLANS
SYMBOL DESCRIPTION
BRANCH CIRCUIT PANELBOARD, OVER 250 VOLTS, SURFACE MOUNTED
BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, SURFACE MOUNTED
SPD SURGE PROTECTIVE DEVICE
ABC
PANELBOARD MAIN CIRCUIT BREAKER TYPE, ONE-LINE
### - INDICATES BREAKER RATING
ABC - INDICATES PANEL DESIGNATION
ABC
PANELBOARD MAIN LUG TYPE, ONE-LINE
### - INDICATES BUS RATING
ABC - INDICATES PANEL DESIGNATION
ELECTRICAL ONE-LINE
TELEPHONE BACKBOARD (WALL MOUNTED)
OUTLET DATA ONLY - (1) CAT6A CABLE PER PORT.
# = NUMBER OF PORTS, CH = COUNTER HEIGHT
COMMUNICATION SYMBOLS
SYMBOL DESCRIPTION
TECHNOLOGY GENERAL NOTES
1. PRODUCTS SHALL BE OF MATERIALS THAT ARE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE TO BE INSTALLED.
2. WORKING CLEARANCES AROUND ELECTRICAL EQUIPMENT SHALL BE MAINTAINED IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE
ARTICLE 110, COORDINATE EQUIPMENT INSTALLATION TO MAINTAIN REQUIRED CLEARANCES.
3. IF AN OUTLET BOX IS REQUIRED TO BE LOCATED IN AN ASSEMBLY OR PARTITION RATED AS "FIRE/SMOKE" OR "SMOKE" OR IDENTIFIED AS EITHER "FIRE/SMOKE" OR "SMOKE", THEN ALL OF THE FOLLOWING CONDITIONS SHALL BE MET:
A. THE OUTLET BOX SHALL BE METALLIC.
B. THE OUTLET BOX OPENINGS SHALL OCCUR ONLY ON ONE SIDE OF THE FRAMING SPACE.
C. THE OUTLET BOX OPENINGS SHALL NOT EXCEED 16 SQUARE INCHES.
D. ALL CLEARANCES BETWEEN THE OUTLET BOX AND THE WALL BOARD MATERIAL SHALL BE COMPLETELY SEALED WITH APPROVED
MATERIALS IN ACCORDANCE WITH THE APPLICABLE CODES AND STANDARDS FOR THE PROJECT.
E. PROVIDE A SUPPLEMENTAL BARRIER AROUND OUTLETS LARGER THAN 16 INCHES SO THAT THE ORIGINAL RATING OF THE PENETRATION IS
MAINTAINED.
F. THE TOTAL AGGREGATE SURFACE AREA OF THE OUTLET BOX SHALL NOT EXCEED 100 SQUARE INCHES PER 100 SQUARE FEET.
G. THE OUTLET BOX SHALL BE SEPARATED FROM OPENINGS ON THE OPPOSITE SIDE OF THE RATED PARTITION BY A MINIMUM HORIZONTAL
DISTANCE OF 24 INCHES.
H. THE OUTLET BOX SHALL BE SECURELY FASTENED TO A PARTITION FRAMING MEMBER BY MEANS OF AN APPROVED ATTACHMENT METHOD.
I. OPENINGS CUT INTO THE WALL BOARD MATERIAL SHALL NOT EXCEED 1/8 INCH BETWEEN THE EDGES OF THE OUTLET BOX AND THE EDGES
OF THE OPENING.
4. LOCATIONS OF EQUIPMENT SHOWN ON THE DRAWINGS ARE APPROXIMATE, COORDINATE EXACT EQUIPMENT LOCATION AND CONNECTION
REQUIREMENTS WITH THE APPROPRIATE TRADE PRIOR TO INSTALLATION.
5. PROVIDE FINAL CONNECTIONS TO OWNER PROVIDED EQUIPMENT WHERE INDICATED ON THE PLAN DRAWINGS.
6. ALL RACEWAY SYSTEMS SHOWN TO SUPPORT THE INSTALLATION OF THE DIVISION 27 EQUIPMENT SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR. PROVIDE COORDINATION FOR THE INSTALLATION OF THIS RACEWAY SYSTEM WITH THE ELECTRICAL CONTRACTOR.
7. ALL BONDING AND GROUNDING ELEMENTS UTILIZED FOR STRUCTURED CABLING SYSTEM SHALL BE IN COMPLIANCE WITH SPECIFICATION
SECTION 260526.
8. TELECOMMUNICATIONS ROOM SHALL BE BONDED AND GROUNDED IN ACCORDANCE WITH TIA-607B.
PULL SCHEDULE REQUIREMENTS
CONTRACTOR SHALL PROVIDE PULL SCHEDULE WITH TELECOM SHOP DRAWINGS. TELECOM SHOP DRAWINGS WILL NOT BE REVIEWED
UNLESS THEY INCLUDE PULL SCHEDULES.
CAT6A COPPER CABLE COLOR CODING
WHITE
YELLOW/GREEN/GREY
ORANGE
- VOICE
- DATA
- WIRELESS
STRUCTURED CABLING SYSTEM (SCS):
THE SCS CONTRACTOR (SCSC) SHALL PROVIDE ALL BACKBONE AND HORIZONTAL CABLING,
COMPONENTS AND TERMINATIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL CABLING
SYSTEM PER INDUSTRY BEST PRACTICES AS PRESCRIBED BY BICSI AND NEC.
THE SCSC SHALL BE RESPONSIBLE FOR COORDINATION WITH THE ELECTRICAL CONTRACTOR (EC) FOR SPECIFIC LOCATIONS OF ALL TELECOMMUNICATIONS SYSTEM DEVICES, INCLUDING ANCILLARY
SYSTEM COMPONENTS AND ASSOCIATED CONDUITS PROVIDED BY THE EC.
THE ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL
ROUGH-IN COMPONENTS ASSOCIATED WITH THE TELECOMMUNICATIONS SYSTEM COMPONENTS
AS NOTED ON THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, CONDUIT AND BACK-BOXES. THE EC SHALL COORDINATE ALL REQUIREMENTS WITH THE SCS CONTRACTOR.
TELECOM ROOM (TR) EQUIPMENT RACKS/CABINTS:
THE SCS CONTRACTOR (SCS) SHALL FURNISH AND INSTALL ALL EQUIPMENT RACKS. THE SCS
CONTRACTOR SHALL FURNISH AND INSTALL ALL CABLING PATCH PANELS (COPPER AND FIBER)
WITH RACK, AND SHALL BE RESPONSIBLE FOR ALL CABLE TERMINATIONS AT THE PATCH PANELS.
THE NCA SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING ALL ACTIVE EQUIPMENT,
CONTROLLERS, SWITCHES, ETC. THAT RESIDE WITHIN THESE RACKS.
GROUNDING AND BONDING:
THE EC SHALL BE RESPONSIBLE FOR INSTALLING THE GROUNDING BUSBAR(S) AS ILLUSTRATED ON THE DRAWINGS AND SPECIFICATIONS, AND CONNECTING IT TO THE BUILDING MAIN ELECTRICAL
SERVICE GROUND. THE EC SHALL BE RESPONSIBLE FOR GROUNDING ALL BACKBONE CONDUIT
AND CABLE TRAY.
THE SCSC SHALL BE RESPONSIBLE FOR GROUNDING ALL RACKS, CABINETS, ENCLOSURES,
PROTECTOR BLOCKS AND CABLE LADDER-RACK INSIDE TELECOMMUNICATIONS ROOMS.
FIRESTOPPING:
THE EC SHALL BE RESPONSIBLE FOR FIRE-STOPPING SLEEVE ASSEMBLIES TO OBTAIN A UL RATING.
THE SCSC SHALL BE RESPONSIBLE FOR FIRE-STOPPING INSIDE THE SLEEVES AFTER CABLE
INSTALLATION IS COMPLETE.
CONDUIT:
THE EC SHALL BE RESPONSIBLE TO PROVIDE AND INSTALL ALL BACKBONE AND HORIZONTAL CABLING
PATHWAYS. THIS SHALL INCLUDE ALL INTERIOR CONDUITS, PATHWAY COMPONENTS SUCH AS
JUNCTION BOXES, PULL BOXES, WALL/CEILING PENETRATIONS AND CONDUIT SLEEVES, WHETHER SHOWN ON THE DRAWINGS OR AS REQUIRED TO PENETRATE FULL-HEIGHT PARTITIONS AS SHOWN ON THE DRAWINGS. THE EC SHALL PROVIDE AND INSTALL ALL BUSHINGS ON TELECOMMUNICATIONS
CONDUITS PRIOR TO INSTALLATION OF CABLING.
THE SCSC SHALL BE RESPONSIBLE FOR ALL WIRE RACEWAYS, CABLE RUNWAY (LADDER RACK) AND
OTHER REQUIREMENTS FOR ROUTING AND SECURING CABLE INSIDE THE MAIN
TELECOMMUNICATIONS ROOM (MTR) AND ALL TR'S.
TELECOMMUNICATIONS COMMUNICATIONS OUTLETS (C.O.'S) AND DEVICES:
THE EC SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL CONDUIT AND BACK-BOXES
ASSOCIATED WITH THE TELECOMMUNICATIONS C.O.'S AND DEVICES.
THE SCSC SHALL BE RESPONSIBLE FOR INSTALLATION OF ALL STRUCTURED CABLING, JACKS,
FACEPLATES AND JUMPER/PATCH CORDS.
BACKBOARDS:
THE EC SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL BACKBOARDS AS ILLUSTRATED
ON THE DRAWINGS AND AS REQUIRED FOR A COMPLETE SYSTEM AS ILLUSTRATED IN THE
SPECIFICATIONS. THE EC SHALL BE RESPONSIBLE FOR ROUGH-IN OF ALL CONDUIT AND BACK-BOXES.
POWER CONDUITS SHALL BE CONCEALED BEHIND ALL BACKBOARDS. BACKBONE CONDUIT SHALL BE
EXPOSED AS ILLUSTRATED ON THE DRAWINGS (TR WALL ELEVATIONS).
COORDINATION NOTES
FLOOR RECEPTACLE - (1) CAT6A CABLE PER PORT.
# = NUMBER OF PORTS, CH = COUNTER HEIGHT
TELECOMM GROUND BUS BAR, COPPER
TELECOMMUNICATIONS ABBREVIATIONS
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
ADO AUTOMATIC DOOR OPENER
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
AMB OR A AMBIENT
ARCH ARCHITECT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISTR DISTRIBUTION
DN DOWN
DRSW DOOR SWITCH
DWG DRAWING
EC EMPTY CONDUIT
EG EQUIPMENT GROUND
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EXIST EXISTING
FLEX FLEXIBLE METALLIC CONDUIT
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
G OR GND GROUND OR GENERATOR
GEN GENERATOR
GTB GROUND TERMINAL BOX
HT HEIGHT
HZ HERTZ
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
J-BOX JUNCTION BOX
LF LINEAR FEET (FOOT)
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MT MOUNT
MTD MOUNTED
MTG MOUNTING
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEUT OR N NEUTRAL
NIC NOT IN CONTRACT
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
P POLE
PA PUBLIC ADDRESS
PB PANELBOARD, PULL BOX, OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
POTS PLAIN OLD TELEPHONE SYSTEM
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL
RM ROOM
REQD REQUIRED
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SURF SURFACE
SW SWITCH
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
TMGB TELECOMMUNICATIONS MAIN GROUND BUSBAR
TGB TELECOMMUNICATIONS GROUND BUSBAR
MSB MAIN SWITCH BOARD
TBB TELECOMMUNICATIONS BONDING BACKBONE
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
WP WEATHERPROOF
ELECTRICAL GENERAL NOTES
WHERE THERE IS A DISCREPANCY BETWEEN ABOVE GENERAL NOTES AND SPECIFICATIONS,
WHERE APPLICABLE, SPECIFICATIONS SHALL BE FOLLOWED
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2023
b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2022
c. LIFE SAFETY CODE, NFPA 101 – 2021
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2
3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
4. FEDERAL COMMUNICATION COMMISSION (FCC)
5. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
6. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
7. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
8. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
9. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
10. ILLUMINATION ENGINEERING SOCIETY (IES)
11. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)
12. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)
13. INTERNATIONAL CODE COUNCIL (ICC):
a. INTERNATIONAL BUILDING CODE (IBC)
14. UNIFORM BUILDING CODE (UBC)
15. COMBINED ANSI/ASHRAE/IES STANDARD 90.1 – “ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL
BUILDINGS”
16. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)
17. AMERICANS WITH DISABILITIES ACT (ADA)
18. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.
19. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE
a. AUTHORITIES HAVING JURISDICTION (AHJs).
20. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE OWNER.
1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT
ENCOMPASSES THE DRAWINGS AND SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.
2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND
ADDRESS OF AT LEAST ONE QUALIFIED SERVICE AGENCY.
3. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH LOCAL STATUTES REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE TIME OF DISPOSAL. PROVIDE OWNER WITH WRITTEN CERTIFICATION
OF ACCEPTED DISPOSAL.
4. ALL BRANCH CIRCUITS SHALL BE FURNISHED WITH A DEDICATED NEUTRAL. SHARED NEUTRALS ARE NOT ALLOWED
UNLESS SPECIFICALLY NOTED ON THE DRAWINGS.
5. ALL WORK ON THE ELECTRICAL SYSTEM REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE COORDINATED WITH THE WORK OF ALL OTHER DIVISIONS/TRADES PRIOR TO COMMENCEMENT OF WORK. AVOID INTERFERENCES WITH
THE PROGRESS OF OTHER DIVISIONS/TRADES.
6. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS AND DETAILS.
COORDINATE EXACT ROUTING WITH FIELD CONDITIONS AND OTHER TRADES.
7. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
8. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR
PHASING.
9. ANY TEMPORARY INTERRUPTION ON POWER REQUIRED FOR THE SYSTEM TIE-IN OR SWITCHOVER FOR ANY PORTION OF THE ELECTRICAL SYSTEM SHALL BE PRE-APPROVED IN WRITING BY THE OWNER AND SCHEDULED IN
ADVANCE.
10. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT.
CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT. RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO
PROCEEDING WITH REPAIRS.
11. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO 6' ABOVE EQUIPMENT OR STRUCTURAL CEILING, WHICHEVER DISTANCE IS LOWER, WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL
APPURTENANCES IN ACCORDANCE WITH NEC.
12. THE INFRASTRUCTURE FOR THE VOICE/DATA TELECOMMUNICATIONS SYSTEM (CONDUITS, ELECTRICAL BOXES) SHALL BE INSTALLED BY DIVISION 26. THE TELECOMMUNICATIONS CONTRACTOR SHALL PROVIDE AND INSTALL THE WIRE AND CABLE FOR THE SYSTEM AND ALL REQUIRED EQUIPMENT AND COMPONENTS. INSTALLATION OF THE CONDUITS AND ELECTRICAL BOXES SHALL BE UNDER THE DIRECT SUPERVISION OF THE TELECOMMUNICATIONS CONTRACTOR. COORDINATE EXACT LOCATIONS OF DEVICES, RACEWAY LOCATIONS, SIZES AND QUANTITY, CONDUIT
STUB-UPS PRIOR TO ROUGH IN.
13. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L. LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY.
14. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER, TO THE
SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.
15. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS. WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO REQUEST COMPENSATION FROM THE CONTRACTOR FOR
SAID SERVICES.
16. MAINTAIN A CURRENT AND ACCURATE SET OF PROJECT RECORD DOCUMENTS (AS-BUILTS) AT THE SITE THROUGHOUT THE DURATION OF THE PROJECT. RECORD DRAWINGS SHALL BE UPDATED EACH DAY TO REFLECT THE ACTUAL LOCATIONS, SIZES, ROUTING, ETC. OF EACH PORTION OF THE ELECTRICAL SYSTEM AFFECTED BY THIS WORK. A FINAL SET OF RECORD DOCUMENTS SHALL BE ISSUED TO THE A/E FOR REVIEW AND THEN SUBMITTED TO THE OWNER WITHIN 30 DAYS AFTER THE DATE OF FINAL ACCEPTANCE. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION INCLUDING SINGLE LINE DIAGRAM, POWER RISER DIAGRAM OF THE BUILDING ELECTRICAL DISTRIBUTION SYSTEM, SITE PLANS AND ALL ELECTRICAL FLOOR PLANS, DETAILS, PANEL SCHEDULES, ETC.
17. OWNER FURNISHED EQUIPMENT: VERIFY AND COORDINATE ELECTRICAL ROUGH IN REQUIREMENTS FOR OWNER
FURNISHED EQUIPMENT PRIOR TO ROUGH IN.
18. WHERE SUBMITTED EQUIPMENT REQUIRES REVISION TO OVERCURRENT PROTECTION, CONDUIT OR WIRING, MAKE
CHANGES IN ACCORDANCE WITH APPLICABLE CODES.
ELECTRICAL DEMOLITION NOTES
1. THE FACILITY WILL REMAIN OCCUPIED DURING RENOVATIONS.
2. DEVICES, LIGHT FIXTURES AND EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE DEMOLISHED; DEVICES, LIGHT
FIXTURES AND EQUIPMENT SHOWN IN LIGHT SOLID LINE TYPE ARE EXISTING TO REMAIN, UNLESS OTHERWISE NOTED.
3. EXISTING EQUIPMENT, LIGHT FIXTURES, DEVICES SHOWN ARE BASED ON FIELD SURVEYS AND RECORD DRAWINGS PROVIDED
BY THE OWNER, AND IS NOT NECESSARILY ALL INCLUSIVE IN EVERY AREA AS FAR AS EXISTING ELECTRICAL EQUIPMENT, LIGHT FIXTURES AND DEVICES. EXISTING CIRCUITING SHOWN IS BASED ON RECORD DRAWINGS AND THE SURVEYED PANEL DIRECTORIES, WHERE THEY WERE AVAILABLE. THE ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE CONDITIONS SHOWN ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT, WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK. FIELD CONDITIONS SHALL GOVERN.
4. WHERE EXISTING DEVICES ARE INDICATED TO REMAIN OR RELOCATED, LOCATED WITHIN THE SCOPE OF THIS PROJECT AND EXISTING CIRCUITING INFORMATION IS UNAVAILABLE, CONTRACTOR IS TO PROVIDE CIRCUIT TRACING TO IDENTIFY PANEL AND CIRCUIT DEVICES ARE CONNECTED TO AND PROVIDE THAT INFORMATION TO A/E PRIOR TO ROUTING CONDUITS AND WIRING
FOR NEW DEVICES AND EQUIPMENT WITHIN THE SCOPE OF THIS PROJECT.
5. PRIOR TO DEMOLITION, FIELD VERIFY CONDUIT AND WIRING WHICH SERVES AREAS OUTSIDE THE SCOPE OF WORK AND
PASSES THROUGH THE AREA OF WORK. MAINTAIN CONTINUITY OF SYSTEMS.
6. WHERE EXISTING DEVICES ARE TO REMAIN, CONTRACTOR MUST EXTEND EXISTING CIRCUITING WHERE NECESSARY TO
MAINTAIN CONTINUITY OF CIRCUIT.
7. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED. OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE ITEMS SUCH AS COVERPLATES, RECEPTACLES, LIGHT FIXTURES, PANELBOARDS, TRANSFORMERS, ETC. NOT BEING USED IN THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION. PROPERLY AND LEGALLY DISPOSE OF ALL EQUIPMENT AND MATERIALS BEING REMOVED.
8. COORDINATE EXACT AREAS, WALLS, CEILINGS, ETC. TO BE DEMOLISHED WITH ARCHITECTURAL, STRUCTURAL, PLUMBING AND
MECHANICAL DEMOLITION PLANS.
9. WHERE EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT ARE INDICATED TO BE DEMOLISHED, REMOVE ASSOCIATED CONDUIT AND WIRING BACK TO SOURCE PANEL OR TO NEAREST JUNCTION BOX TO MAINTAIN CIRCUIT CONTINUITY OF DEVICES TO REMAIN AND EQUIPMENT TO REMAIN. WHERE PANELS ARE TO BE REMAIN, TURN BREAKER TO "OFF" POSITION
AND LABEL THE CIRCUIT AS "SPARE" ON THE PANEL DIRECTORY.
10. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE PHASING WITH CONSTRUCTION MANAGER AND OWNER PRIOR TO DEMOLITION WHICH MAY RESULT IN INTERRUPTION OF POWER.
11. REMOVE ALL CONDUIT LEFT EXPOSED BY REMOVAL OF WALLS AND CEILINGS IN REMODELED OR RENOVATED AREA. CAP BOTH ENDS OF REMAINING CONDUIT IN WALL OR FLOOR WHERE CUT. REMOVE ALL ASSOCIATED SUPPORTS. REMOVE WIRING
BACK TO SOURCE OF VOLTAGE.
12. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR.
13. PROVIDE BLANK COVERPLATES WHERE DEVICES ARE BEING REMOVED FROM EXISTING WALLS TO REMAIN. MATCH COLOR OF
NEW ADJACENT DEVICE COVERPLATES.
14. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND OBTAIN
CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.
15. COORDINATE SERVICE INTERRUPTION WITH CONSTRUCTION MANAGER, OWNER, LANDLORD, AND UTILITY COMPANY, WHERE APPLICABLE, AND DO NOT INTERRUPT POWER WITHOUT WRITTEN PERMISSION. PROVIDE A MINIMUM OF ONE WEEK'S
WRITTEN NOTIFICATION WHEN POWER IS DESIRED TO BE INTERRUPTED.
16. EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND EQUIPMENT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER WIRING DEVICES, EQUIPMENT AND LIGHT FIXTURES THAT MAY BE CONNECTED TO
THE SAME CIRCUIT REMAIN OPERATIONAL AND ACTIVE.
17. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS DIAGRAMMATIC IN NATURE. FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL ITEMS SCHEDULED TO BE DEMOLISHED AND PERFORM THE
WORK AS INTENDED AND DEPICTED ON THE DRAWINGS.
18. UPDATE ALL EXISTING ELECTRICAL EQUIPMENT NAMEPLATES AND DIRECTORIES AS NECESSARY TO REFLECT FINAL AS-BUILT
CONDITIONS AT THE END OF CONSTRUCTION.
19. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED AREA. NOTIFY OWNER WHEN
ITEMS ARE READY TO BE REMOVED.
20. SCHEDULE ALL POWER INTERRUPTION WITH OWNER FOR EXACT DATE, TIME AND DURATION. PROVIDE A MINIMUM OF 72 HOURS NOTICE PRIOR TO DISCONNECTING ANY POWER TO ANY PORTION OF THE BUILDING, AND MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO COMMENCEMENT OF
WORK.
21. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT AREA. IT IS INTENDED TO PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE A/E. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED ELECTRICAL DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT.
22. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC. ANY EXISTING CONDUIT IS INSTALLED BELOW THE HEIGHT OF THE NEW CEILING SHALL BE RELOCATED TO ABOVE THE NEW CEILING HEIGHT.
23. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO THE END OF CONSTRUCTION.
24. UPDATE PANELBOARD DIRECTORIES WHICH ARE MODIFIED BY THIS PROJECT.
25. REPAIR DISTURBED AREAS TO MATCH EXISTING CONDITIONS.
ABC
100 A
AUTOMATIC TRANSFER SWITCH
ABC - INDICATES ATS DESIGNATION
100A - INDICATES ATS RATING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Design and Construction
Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Integrity Federal Services
(304) 725-8456
Integrity Federal Services - The LA Group Joint Venture, LLC
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201
Martinsburg, WV 25401
(304) 725-8456
The LA Group
40 Long Alley
Saratoga Springs, NY 12866
(518) 587-8100
Modjeski and Masters
(717) 790-9565
The LA Group
(518) 587-8100
Above Group
(321) 345-9026
Aqua Engineering
(970) 372-6104
A u to d e s k D o c s /0
A la b a m a N a ti o n a l C e m e te ry /0
A la b a m a N a ti o n a l C e m e te ry R
T .r v t
/2 /2
:3
:3
A M
ET001
ELEC/TECH LEGEND, ABBREV, &
GENERAL NOTES
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 BMS CVM
BID DOCUMENTS
SHEET LIST
SHEET NUMBER SHEET NAME
ET001 ELEC/TECH LEGEND, ABBREV, & GENERAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .